This document is a scope of work for the 2026 roadwork project issued by Earl Township in Berks County, Pennsylvania. The project encompasses the placement of asphalt leveling and wearing courses, base course installation, base repairs, and milling operations across seven roadway segments within the township. The primary work includes approximately 1,806 tons of 9.5mm leveling course, 3,609 tons of 9.5mm wearing course overlay, 734 square yards of 4" 25mm base course installation, approximately 388 square yards of base repair, and approximately 3,085 square yards of milling. Specific locations include Sunset Hill Road (2,910' x 25'), Terrace Road (2,916' x 23'), Hauseman Road (sections totaling 2,115'), Grims Mill Road (833' x 23'), Pond Road (2,261' x 22'), Kristine Avenue (1,464' x 25'), and Laura Court (726' x 25'). The project also involves removal of temporary paving and stone base along recent road widening and inlet boxes on Sunset Hill Road, as well as targeted milling along curblines on Kristine Avenue and Laura Court. Bid proposals are due by 2:00 p.m. on Thursday, April 16, 2026, via PennBID, with bids opening and results posted at approximately 3:00 p.m. the same day. Award or rejection will occur during the Earl Township Board of Supervisors meeting on Monday, April 20, 2026. All work must be completed by August 21, 2026. A pre-bid inspection is required, arranged by contacting the Earl Township Roadmaster at (610) 342-6590 between 7:00 a.m. and 3:00 p.m., Monday through Friday.
Bidders must submit a certified check or bid bond equal to ten percent of the bid amount. Required documentation includes proof of PennDOT prequalification, workman's compensation affidavit, insurance certificate, CDL compliance certificate, public works verification form, and anti-collusion affidavit. Successful bidders must provide a performance bond and payment bond for 100% of the contract price within 20 days of award. Pennsylvania Prevailing Wage Rates apply to the contract. Liquidated damages are assessed at $500 per calendar day for non-completion. An alternate bid option is offered for Laura Court, which includes the installation of 260 square yards of paving fabric (Petromat 4598 by Propex or approved equal). The document does not specify a total project budget, set-asides for disadvantaged enterprises, or incumbent vendors, and Earl Township reserves the right to reject any or all bids that may not serve the public's best interest.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earl Township 2026 Paving Locations
Base Bid
Leveling Course plus Wearing Course:
1. Sunset Hill Road – Approximately 2,910’ x 25’ (average) from Route 73 to Mountain Road; Road width varies from 22 to 27’.
2. Terrace Road –Approximately 2,916’ x 23’ (average) from Route 73 to Pond; Road width varies with portions at 21’ and others at 28’.
3. Hauseman Road
a. Approximately 1,467’ x 23’ - from Colebrookdale Twp Line to Pond Road
b. Approximately 648’ x 23’ from Colebrookdale Twp Line to Sawmill Road
4. Grims Mill Road – 833’ x 23’ from Pond Road to Colebrookdale Township Line
5. Pond Road – 2,261’ x 22’ (average) from Grims Mill Road to Route 73; Road width varies 20’ to
24’
6. Kristine Avenue – Approximately 1,464’ x 25’ (average) from Terrace Road to Cul-de-Sac (50’
Radius); Road width ranges from 24’ to 28’.
7. Laura Court – 726’ x 25’ (average) from Terrace Road to Cul-de-Sac (50’ Radius)
Base Repair:
1. Pond Road total 86 SY
- #1 – 4’ x 27’
- #2 - 10’ x 60’
2. Sunset Hill Road - total 93 SY
- #1 – 8’ x 84’
- #2 – 4’ x 22’
3. Laura Court – 209 SY
-#1 57’ x 30’ area to be investigated and base repair done in this area
Base Course Installation & Temporary Paving Removal
1. Sunset Hill Road
a. Remove 2” depth temporary paving and 2” stone base along recent 2’ road widening (534 SY)
b. Remove 2” depth temporary paving and 2” stone base along 7 new inlet boxes and over 7 culvert pipes (200 SY).
c. Install 4” compacted depth Superpave Base Course, 25mm in above removal areas
(734 SY)
Milling:
1. Kristine Ave – 7’ wide along curbline, both sides of road, tapered from 0” to 1-1/2” and around cul-de-sac bulb (rolled curb on this street) - 2616 SY
2. Laura Court – 7’ wide along curbline (233’ section) and around outer edge cul-de-sac bulb curb
(315’) (rolled curb on this street) – 469 SY
Alternate Bid 1
Laura Court, Install 260 SY Paving fabric - Petromat 4598 by Propex (1-800-621-1273) or approved equal.