6b - 695-20-105 Drawings 1-30.pdf
PDF 16 MB Posted
- Attached to
- Z2DA--695-20-105: Upgrade Electrical System Area 2 Federal contract opportunity
- Solicitation number
- 36C25222B0010
About this file
This document provides details on a federal contract opportunity for upgrading an electrical system. The solicitation number is 36C25222B0010 for the project named "Z2DA--695-20-105: Upgrade Electrical System Area 2" issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The opportunity type is a solicitation to upgrade the electrical system in Area 2. File 6b - 695-20-105 Drawings 1-30.pdf contains the project drawings, but its content was not listed. No response date, award date, or other contractual terms were provided.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
UPGRADE ELECTRICAL
SYSTEMS PHASE 2
695-20-105
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
20-115
100% CONSTRUCTION DOCUMENTS
JULY 16, 2021 WEMKK
o | f | w |
CAMPUS MAP
NTS
G-001
COVER SHEET
UPGRADE ELECTRICAL SYSTEMS
AREA 2
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI 53295
VA PROJECT #: 695-20-105
REFER TO ES101 FOR THE AFFECTED BUILDINGS ON THIS PROJECT
DocuSign Envelope ID: 771D0359-7D82-443E-A333-C04C1C2CE44C
7/14/2021
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX
OF PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
Class III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction
Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2
Medium Risk
- Therapy Areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
I
Patient Risk Group
TYPE
D
TYPE
C
TYPE
A
Group 4
Highest Risk
Group 3
High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs
- SPD
- AMCU
- Respiratory Isolation Rooms
III
TYPE DTYPE CTYPE B
o r control procedures are necessary.
C L A
S S
I V
C L A
S S
I I
During Construction Project
C L A
S S
I I I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area.
Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III.
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers.
Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace walk-off mats per manufacturer's recommendations. Do not remove work area barriers until completed project is inspected each by the Hospital Department Safety Officer, Facilities Management Maintenance and Engineering and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company. Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering.
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
Class IV
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control
Precautions depending upon the Area Class Designation
II
I
LOW Risk Group 1
HIGH Risk Group 3
HIGHEST Risk Group 4
MEDIUM Risk Group 2
IV
IV
IV
III/IV
III/IV
III/IV
III/IV
III
III
III
Group 1
Low Risk
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
TYPE
B
I
C L A
S S
I
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
UPGRADE ELECTRICAL SYSTEMS PHASE 2
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
PLEASE USE ALTERNATE EXITS AS MARKED
1'-5"
INFECTION CONTROL RISK
ASSESSMENT, INTERIM LIFE
SAFETY MEASURES, FIRE WATCH
AND MISCELLANEOUS FORMS
PAPER
CADDY
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
A
PLASTIC SHEET BARRIER
NON RATED
PLASTIC SHEET BARRIER
EXISTING WALL
ASSEMBLY
EXISTING CEILING
BOTTOM SEALING
RUNNER
TOP SEALING RUNNER
SUPPORT POLES, QUANTITY
PER MANUF.
RECOMMENDATIONS
AS
REQ.
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX
OF PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
Class III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction
Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2
Medium Risk
- Therapy Areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
I
Patient Risk Group
TYPE
D
TYPE
C
TYPE
A
Group 4
Highest Risk
Group 3
High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs
- SPD
- AMCU
- Respiratory Isolation Rooms
III
TYPE DTYPE CTYPE B
o r control procedures are necessary.
C L A
S S
I V
C L A
S S
I I
During Construction Project
C L A
S S
I I I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area.
Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III.
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers.
Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace walk-off mats per manufacturer's recommendations. Do not remove work area barriers until completed project is inspected each by the Hospital Department Safety Officer, Facilities Management Maintenance and Engineering and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company. Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering.
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
Class IV
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control
Precautions depending upon the Area Class Designation
II
I
LOW Risk Group 1
HIGH Risk Group 3
HIGHEST Risk Group 4
MEDIUM Risk Group 2
IV
IV
IV
III/IV
III/IV
III/IV
III/IV
III
III
III
Group 1
Low Risk
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
TYPE
B
I
C L A
S S
I
ICRA CLASSIFICATION LOCATION MATRIX
BUILDING IDENTIFICATION ICRA CLASSIFICATION FLOOR NOTES
BUILDING 5 CLASS I ALL FLOORS
BUILDING 6 CLASS I AND CLASS II BASEMENT SEE SHEET G-101 AND G-102
FOR CLASS II LOCATIONS
BUILDING 6 CLASS I AND CLASS II FIRST FLOOR SEE SHEET G-101 AND G-102
FOR CLASS II LOCATIONS
BUILDING 6 CLASS I AND CLASS II SECOND FLOOR SEE SHEET G-101 AND G-102
FOR CLASS II LOCATIONS
BUILDING 6 CLASS I THIRD FLOOR
BUILDING 7 CLASS I ALL FLOORS
BUILDING 20 CLASS I ALL FLOORS
BUILDING 43 CLASS I ALL FLOORS
BUILDING 70 CLASS I ALL FLOORS
BUILDING 102 CLASS I BASEMENT
BUILDING 107 CLASS I FIRST FLOOR
BUILDING 108 CLASS I ALL FLOORS
BUILDING T114 CLASS I FIRST FLOOR
BUILDING 144 CLASS I FIRST FLOOR
ICRA CLASSIFICATION LOCATION CHART NOTE:
USE CLASS II INFECTION CONTROL MEASURES AT AREAS SHOWN G-101 AND G-102 FOR BUILDING 6. ALL
OTHER AREAS AFFECTED BY WORK IN BUILDING 6 TO USE CLASS I INFECTION CONTROL MEASURES. SEE
MATRIX ABOVE.
A
M
G-100
TYPICAL ICRA DETAILS
A.
B.
C.
D.
TAPE ALL SERVICES TO PROTECT AGAINST
CONTAMINATION.
THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR AND THE MEDICAL CENTER.
USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER
AND VACUUM CEILING TILE PRIOR TO REPLACEMENT.
ANY CEILING ACCESS PANELS OPENED FOR
INVESTIGATION BEYOND SEALED AREAS SHALL BE
SEALED IMMEDIATELY WHEN UNATTENDED.
AT COMPLETION, REMOVE CONSTRUCTION
BARRIERS AND CEILING PROTECTION CAREFULLY,
OUTSIDE OF NORMAL WORK HOURS. VACUUM AND
CLEAN ALL SURFACES FREE OF DUST AFTER THE
REMOVAL.
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
#6
UPGRADE ELECTRICAL
SYSTEMS PHASE 2
695-20-105
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
20-115
100% RESUBMISSION CONSTRUCTION DOCUMENTS
JULY16, 2021 RRTJS
o | f | w |
Scale: No Scale
ILSM SIGNAGE
Scale: No Scale
ILSM BARRIER TAG
NOTE:
TAG SHALL BE PLACED ON ALL ILSM
TEMPORARY BARRIERS. FINAL LOCATION BY G.C.
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPES
E. CONTRACTOR TO VERIFY AND COORDINATE FINAL
AND APPROVED ICRA MEASURES WITH THE
ZABLOCKI VA MEDICAL CENTER'S ICRA
PERSONNEL, PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION ACTIVITY.
F. SEE ICRA CLASSIFICATION MATRIX THIS SHEET FOR
ICRA CLASS REQUIREMENTS ON EACH BUILDING.
BUILDING 6 - 2ND FLOOR
G-102
G-102
G-102
BUILDING 6 - BASEMENT
G-102
G-102
G-102
G-102
G-102
G-102
G-102
AREA OF
WORK
KEY PLAN - BUILDING 6
N
G-101
A. REMOVE ALL TRASH DAILY FROM THE WORK AREA.
B. THESE DRAWINGS ARE BASED ON FIELD SURVEY
AND EXISTING PLANS. VERIFY ALL FIELD
CONDITIONS.
C. COORDINATE WITH VA COR FOR OFF-HOURS
SCHEDULE AND TEMPORARY REROUTING ACCESS
FOR HOSPITAL STAFF AND VISITORS, PRIOR TO
ERECTING TEMPORARY BARRIERS.
D. CONSULT WITH VA SAFETY DEPARTMENT TO
MAINTAIN MINIMUM CLEARANCE IN CORRIDORS AND
HALLWAYS.
E. CONTRACTOR TO VERIFY AND COORDINATE FINAL
AND APPROVED ICRA MEASURES WITH THE
ZABLOCKI VA MEDICAL CENTER'S ICRA PERSONNEL,
PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION ACTIVITY.
F. USE CLASS II INFECTION CONTROL MEASURES AT
AREAS SHOWN THIS SHEET. ALL OTHER AREAS
AFFECTED BY WORK THIS BUILDING TO USE CLASS I
INFECTION CONTROL MEASURES.
OVERALL ICRA FLOOR PLANS -
BUILDING 6
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
#6
UPGRADE ELECTRICAL
SYSTEMS PHASE 2
695-20-105
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
20-115
100% RESUBMISSION CONSTRUCTION DOCUMENTS
JULY16, 2021 RRTJS
o | f | w | 3
1 BUILDING 6 - BASEMENT
SCALE: 1/32" = 1'-0"
2 BUILDING 6 - FIRST FLOOR
SCALE: 1/32" = 1'-0"
3 BUILDING 6 - SECOND FLOOR
SCALE: 1/32" = 1'-0" NORTH
0 8 16 32
NORTH
0 8 16 32
NORTH
0 8 16 32
4'-0"
6'-0"
4'-2
3'-8"
4'-4"
4'-6"
4'-4"
4'-0"
AREA OF
WORK
KEY PLAN - BUILDING 6
N
G-102
1. PROVIDE TEMPORARY ICRA TYPE 'A' PLASTIC
SHEET BARRIER PARTITION TO THE UNDERSIDE
OF CEILING WITH ZIPPER ENTRY. PARTITION
SHALL BE INSPECTED BY VA ICRA STAFF PRIOR
TO START OF CONSTRUCTION IN SPACE.
MAINTAIN NEGATIVE PRESSURE VENTILATION IN
THE CONSTRUCTION SPACE.
2. PROVIDE TWO STICKY MATS AT EACH
CONSTRUCTION ACCESS POINT.
3. NEW FURRED OUT WALL TERMINATED 6" ABOVE
PANEL BOX WITH SLOPED TOP.
4. THIS SIDE OF DOOR TO BE SHUT FOR DURATION
OF WORK IN THIS AREA.
A. REMOVE ALL TRASH DAILY FROM THE WORK AREA.
B. THESE DRAWINGS ARE BASED ON FIELD SURVEY
AND EXISTING PLANS. GC VERIFY ALL FIELD
CONDITIONS.
C. COORDINATE WITH VA COR FOR OFF-HOURS
SCHEDULE AND TEMPORARY REROUTING ACCESS
FOR HOSPITAL STAFF AND VISITORS, PRIOR TO
ERECTING TEMPORARY BARRIERS.
D. CONSULT WITH VA SAFETY DEPARTMENT TO
MAINTAIN MINIMUM CLEARANCE IN CORRIDORS AND
HALLWAYS.
E. CONTRACTOR TO VERIFY AND COORDINATE FINAL
AND APPROVED ICRA MEASURES WITH THE
ZABLOCKI VA MEDICAL CENTER'S ICRA PERSONNEL,
PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION ACTIVITY.
F. USE CLASS II INFECTION CONTROL MEASURES AT
AREAS SHOWN THIS SHEET. ALL OTHER AREAS
AFFECTED BY WORK THIS BUILDING TO USE CLASS I
INFECTION CONTROL MEASURES.
ENLARGED ICRA PLANS -
BUILDING 6
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
#6
UPGRADE ELECTRICAL
SYSTEMS PHASE 2
695-20-105
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
20-115
100% RESUBMISSION CONSTRUCTION DOCUMENTS
JULY16, 2021 RRTJS
o | f | w | 4
1 STAIR 6-B-C-ST-02
SCALE: 1/4" = 1' 0"
5 ELEVATOR 6-1-A-EL-01
SCALE: 1/4" = 1' 0" 2 VACANT 6-B-C-008
SCALE: 1/4" = 1' 0"
3 STAIR 6-B-B-ST-01
SCALE: 1/4" = 1' 0"
4 MECH ROOM 6-B-C-004
SCALE: 1/4" = 1' 0"10 CLIMET OFFICE C212
SCALE: 1/4" = 1' 0"
6 STAIR 6-1-B-ST-01
SCALE: 1/4" = 1' 0"
7 STAIR 6-1-C-ST-02
SCALE: 1/4" = 1' 0"
8 ELEVATOR 6-2-A-EL-01
SCALE: 1/4" = 1' 0"
9 STAIR 6-2-B-ST-01
SCALE: 1/4" = 1' 0" NORTH
0 8 16 32
NORTH
0 8 16 32
NORTH
0 8 16 32
NORTH
0 8 16 32
NORTH
0 8 16 32
NORTH
0 8 16 32
NORTH
0 8 16 32
NORTH
0 8 16 32
NORTH
0 8 16 32
NORTH
0 8 16 32
SECOND FLOOR @ FIRST FLOOR @
SECOND FLOOR @
SECOND FLOOR @
BASEMENT @
FIRST FLOOR @
FIRST FLOOR @
BASEMENT @
BASEMENT @
BASEMENT @
RAISED
PLANTER
CISTERN
SNOW
PILE
WOOD POST &
PLASTIC MESH
ENCLOSURE
GRAVEL
WOOD RAMP
GUARD RAILGUARD RAIL
CONC
WALL
CONC WALL
W/ GUARD RAIL
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONC
CONC
TRANSFORMER
M
AR
KE
D
W
AT
ER
L
IN
E
TIMBER
WALL
G R
AVEL
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
BUILDING 107
BUILDING 108
UG/E
UG/E
UG/T
UG/T
W
W
635634
637 638
644640 641 642 643
CONC
WALL
T114
T107
W O
R
KS
H O
P R
O
ADN
M
IT
CH
EL
L
BL
VD
CHRYSLER WOOD AVE
WOOD AVE
WOOD POST &
PLASTIC MESH
ENCLOSURE
ASPHALT
UG/E
UG/E
UG/E
UG/E
BUILDING T-114
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects JULY 16, 2021 ZLRFCM
UPGRADE ELECTRICAL
SYSTEMS PHASE 2
695-20-105
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
20-095
100% CONSTRUCTION DOCUMENTS
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
107, 108
LEGEND
EXISTING UNDERGROUND ELECTRIC LINE
EXISTING UNDERGROUND TELEPHONE LINE
LIMITS OF DISTURBANCE
TREE PROTECTION FENCING
EXISTING CONTOURS
EXISTING FENCING AND/OR PLANTER BED TO BE
REMOVED
EXISTING ASPHALT PAVING TO BE SAWCUT AND
REMOVED
XXXX
CIVIL DEMOLITION PLAN
CD101
1" = 10'
SCALE IN FEET
10 5 10 20
1) ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
INSTALLED PRIOR TO ANY WORK INCLUDING DEMOLITION.
2) ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY WITH
APPLICABLE STATE, FEDERAL, AND LOCAL BUILDING AND UTILITY
INSTALLATION CODES.
3) ALL MATERIALS AND CONSTRUCTION METHODS SHALL BE IN
ACCORDANCE WITH VA STANDARD SPECIFICATIONS.
4) THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON THESE
PLANS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
FIELD VERIFY THE LOCATIONS OF ALL UTILITIES WITHIN THE LIMITS
OF CONSTRUCTION AND TO NOTIFY THE ENGINEER AND COR IN CASE
OF DISCREPANCIES THAT AFFECT THE CONSTRUCTION PROJECT.
5) CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY
OCCUR TO ANY ADJACENT STRUCTURES OR PROPERTY, OR ANY
EXISTING STRUCTURES WITHIN LIMITS OF CONSTRUCTION THAT ARE
DESIGNATED ON THE PLANS TO REMAIN, AND SHALL REPAIR OR
REPLACE SUCH DAMAGED PROPERTY TO THE VA SATISFACTION AT
NO COST TO THE VA.
6) THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS AND
SPECIFICATIONS WITHOUT THE PRIOR WRITTEN CONSENT OF THE VA
COR.
7) THE CONTRACTOR SHALL SEQUENCE THE WORK AND PROVIDE
TEMPORARY MEASURES AS NECESSARY TO MAINTAIN ACCESS TO
THE SITE THROUGH ALL ENTRANCES AT ALL TIMES DURING
CONSTRUCTION. TEMPORARY PROVISIONS MAY INCLUDE, BUT ARE
NOT LIMITED TO: BARRICADES, FLASHING LIGHTS, FLAGMAN,
TEMPORARY PAVEMENT, AND DIRECTIONAL SIGNAGE AS NECESSARY
TO ACCOMPLISH THE WORK.
8) CONTRACTOR SHALL CONSIDER COORDINATION ASPECTS OF
CONSTRUCTION EQUIPMENT OPERATIONS DURING DEMOLITION
ACTIVITY.
9) THE CONTRACTOR SHALL DISPOSE OF ANY HAZARDOUS
MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL,
STATE, AND FEDERAL LAWS.
10) ALL ITEMS DESIGNATED FOR REMOVAL SHALL BE LEGALLY
DISPOSED OF, OFF SITE.
11) CONTRACTOR TO CONTACT UTILITIES PROTECTION CENTER
PRIOR TO ANY EXCAVATION.
12) CONTRACTOR IS RESPONSIBLE FOR CONTACTING VETERANS
AFFAIRS AND ALL EXISTING UTILITY PROVIDERS BEFORE REMOVING
ANY/ALL UTILITIES FROM THEIR EXISTING LOCATION ON THE SITE.
THE CONTRACTOR SHALL PERFORM ALL UTILITY DEMOLITION OR
RELOCATION ACTIVITIES IN ACCORDANCE WITH THE EXISTING
UTILITIES SPECIFICATIONS, MATERIALS, AND REQUIREMENTS.
13) EROSION CONTROL DEVICES ARE TO BE INSTALLED PRIOR TO
ANY CLEARING OR EARTHWORK OPERATIONS AND SHALL BE
MAINTAINED THROUGHOUT CONSTRUCTION AND UNTIL PERMANENT
GROUND COVER IS ESTABLISHED IN ALL DISTURBED AREAS.
14) THE CONTRACTOR SHALL PROVIDE DUST CONTROL AND SHALL
PROTECT ADJACENT PAVEMENTS FROM SOIL ACCUMULATION
DURING CONSTRUCTION.
15) ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED BY
THE VA COR AS DETERMINED BY FIELD CONDITIONS.
16) STORM DRAINAGE STRUCTURES AND CONDUITS SHALL BE
PROTECTED FROM SEDIMENTATION AS REQUIRED BY STATE OR
LOCAL CODES.
SHEET NOTES:
KEY NOTES:
KEY PLAN
1) NO SOIL SHALL BE DISTURBED UNDER CANOPY OF LARGE
HISTORIC OAK TREES WITHOUT WRITTEN APPROVAL OF COR.
2) EXISTING TRANSFORMER (TO REMAIN)
3) EXISTING FENCING TO BE REMOVED.
4) EXISTING RAISED PLANTER BED TO BE REMOVED.
5) EXISTING ASPHALT PAVING TO BE SAWCUT AND REMOVED AND
REPLACED FOR CONDUIT.
LOD LOD LOD
SITE
UG/T UG/T
UG/E UG/E
M
ATC
H
LIN
E
(SH
EET C
D 101)
M
ATC
H
LIN
E
(SH
EET C
D 101)
AutoCAD SHX Text
MISC. MH
AutoCAD SHX Text
SILL 644.50
AutoCAD SHX Text
SILL 642.43
AutoCAD SHX Text
DOWNSPOUT
AutoCAD SHX Text
DOWNSPOUT
AutoCAD SHX Text 30"
AutoCAD SHX Text 30"
AutoCAD SHX Text 14"
AutoCAD SHX Text
DOWNSPOUT
AutoCAD SHX Text 14"
AutoCAD SHX Text 14"
AutoCAD SHX Text
14" QUAD
AutoCAD SHX Text
SILL 633.49
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text X
T114
T107
W O
R
KS
H O
P R
O
AD
N M
IT
CH
EL
L
BL
VD
CHRYSLER WOOD AVE
WOOD AVE
CISTERN
SNOW
PILE
GRAVEL
WOOD RAMP
GUARD RAILGUARD RAIL
CONC
WALL
CONC WALL
W/ GUARD RAIL
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONC
CONC
TRANSFORMER
M
AR
KE
D
W
AT
ER
L
IN
E
TIMBER
WALL
G R
AVEL
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
BUILDING 107
BUILDING 108
UG/E
UG/E
UG/T
UG/T
W
W
635634
637 638
644640 641 642 643
CONC
WALL
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG/E
UG
/E
UG
/E
UG
/E
UG/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
15'
4'
10'
4'
1.92'
ASPHALT
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
BUILDING T-114
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects JULY 16, 2021 ZLRFCM
UPGRADE ELECTRICAL
SYSTEMS PHASE 2
695-20-105
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
20-095
100% CONSTRUCTION DOCUMENTS
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
107, 108
CIVIL SITE & UTILITY PLAN
CS101
1) CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES
BETWEEN THE EXISTING CONDITIONS IN THE FIELD AND THE SURVEY
SHOWN ON THE PLANS BEFORE PROCEEDING WITH ANY NEW
CONSTRUCTION.
2) CONTRACTOR IS RESPONSIBLE FOR CORRECT HORIZONTAL AND
VERTICAL ALIGNMENT OF ALL TIES BETWEEN PROPOSED AND
EXISTING PAVEMENTS, CURB AND GUTTER, SIDEWALKS, WALLS, AND
UTILITIES.
3) ALL BUFFERS, TREE SAVE AREAS, AND UNDISTURBED AREAS
SHALL BE CLEARLY IDENTIFIED BY FLAGGING AND/OR FENCING
PRIOR TO COMMENCEMENT OF ANY LAND DISTURBANCE.
4) NO OUTSIDE STORAGE IS PERMITTED. THIS INCLUDES SUPPLIES,
VEHICLE, EQUIPMENT, PRODUCTS, ETC.
5) ALL EROSION, SEDIMENT CONTROL AND TREE PROTECTION
MEASURES SHALL BE INSTALLED PRIOR TO ANY GRADING.
6) MAXIMUM CUT OR FILL SLOPE=3H:1V
7) 24 HOUR CONTACT: VA COR
8) IN ALL AREAS OF FILL OR OTHERWISE DISTURBANCE OF
EXISTING CONDITIONS, UNLESS OTHERWISE NOTED, THE
CONTRACTOR SHALL FULLY AND COMPLETELY REMOVE AND
LEGALLY DISPOSE OFF-SITE, ALL PLANT MATERIALS INCLUDING BUT
NOT LIMITED TO ROOT SYSTEMS, CONCRETE, REINFORCED
CONCRETE, ASPHALT DEBRIS, UNDERBRUSH, TOPSOIL, AND OTHER
DELETERIOUS MATERIAL. THE SUBGRADE TO REMAIN SHALL BE
COMPACTED TO 98% STANDARD PROCTOR MAXIMUM DRY DENSITY
FOLLOWING FULL REMOVAL OF THESE MATERIALS. REFER TO SPEC
31 20 00 FOR FURTHER DETAILS.
9) ALL SUBGRADE PREP AND AREAS OF THE SITE TO RECEIVE FILL
SHALL BE COMPLETED IN STRICT CONFORMANCE WITH THE
RECOMMENDATIONS IN THE GEOTECHNICAL REPORT, DATED
OCTOBER 13, 2020 BY TERRACON. THE CONTRACTOR SHALL HAVE
THIS REPORT ON THE JOB SITE FOR REFERENCE AT ALL TIMES. THE
CONTRACTOR SHALL PROVIDE EARTHWORK OPERATIONS AND
CONSTRUCTION PHASE MONITORING TO ENSURE THAT ALL
COMPACTION IS COMPLETED IN ACCORDANCE WITH THE
GEOTECHNICAL REPORT. THE CONTRACTOR SHALL PROVIDE
TESTING REPORTS TO THE OWNER REGARDING COMPACTION
TESTING PER THE TESTING PROTOCOL IN THE GEOTECHNICAL
REPORT.
10) CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION
AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROLS
DURING CONSTRUCTION FOR PROTECTION OF ADJACENT
ROADWAYS.
SHEET NOTES:
KEY NOTES:
KEY PLAN
1) PROVIDE LEVEL CONCRETE PAD FOR GENERATOR. TOP OF PAD
TO BE A MINIMUM 6" ABOVE EXISTING GRADE. SEE PAD DETAIL THIS
SHEET. SEE ELECTRICAL PLANS FOR GENERATOR DETAILS.
2) PROVIDE LEVEL CONCRETE PAD FOR AUTOMATIC TRANSFER
SWITCH (ATS). TOP OF PAD TO BE A MINIMUM 6" ABOVE EXISTING
GRADE. SEE PAD DETAIL SHEET CS501. SEE ELECTRICAL PLANS FOR
ATS DETAILS.
3) PROVIDE 4' X 4' CONCRETE LANDING PAD AT EXISTING GRADE
FOR STAIRS.
4) PROVIDE BOLLARD SEE DETAIL SHEET CS501.
5) PROVIDE UNDERGROUND POWER CONDUIT. SEE ELECTRICAL
PLANS FOR DETAILS, TYP.
6) ASPHALT PAVING PATCH FOR ELECTRICAL CONDUIT. SEE DETAIL
SHEET CS501.
LEGEND
PROPOSED CONCRETE PAD
PROPOSED ASPHALT PAVEMENT PATCH
PROPOSED UNDERGROUND POWER LINE
EXISTING UNDERGROUND POWER LINE
EXISTING CONTOUR LINE
PROPOSED BOLLARD
UG/E UG/E
SITE
XXXX
UG/E UG/E
M
ATC
H
LIN
E
(SH
EET C
S101)
M
ATC
H
LIN
E
(SH
EET C
S101)
1" = 10'
SCALE IN FEET
10 5 10 20
AutoCAD SHX Text
MISC. MH
AutoCAD SHX Text
SILL 644.50
AutoCAD SHX Text
SILL 642.43
AutoCAD SHX Text
DOWNSPOUT
AutoCAD SHX Text
DOWNSPOUT
AutoCAD SHX Text 30"
AutoCAD SHX Text 30"
AutoCAD SHX Text 14"
AutoCAD SHX Text
DOWNSPOUT
AutoCAD SHX Text 14"
AutoCAD SHX Text 14"
AutoCAD SHX Text
14" QUAD
AutoCAD SHX Text
SILL 633.49
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text 641.40
AutoCAD SHX Text 641.30
AutoCAD SHX Text 641.24
AutoCAD SHX Text 641.31
AutoCAD SHX Text 640.50
AutoCAD SHX Text 638.89
AutoCAD SHX Text 637.63
AutoCAD SHX Text 641.33
AutoCAD SHX Text 641.14
AutoCAD SHX Text 641.25
AutoCAD SHX Text 639.24
AutoCAD SHX Text 637.95
AutoCAD SHX Text 636.16
AutoCAD SHX Text 634.04
AutoCAD SHX Text 639.42
AutoCAD SHX Text 638.35
AutoCAD SHX Text 636.23
AutoCAD SHX Text 638.18
AutoCAD SHX Text 636.13
AutoCAD SHX Text 634.62
AutoCAD SHX Text 636.77
AutoCAD SHX Text 638.50
AutoCAD SHX Text 638.91
AutoCAD SHX Text 639.43
AutoCAD SHX Text 634.78
AutoCAD SHX Text 635.35
AutoCAD SHX Text 634.34
AutoCAD SHX Text 633.74
AutoCAD SHX Text 633.41
AutoCAD SHX Text 634.54
AutoCAD SHX Text 634.21
AutoCAD SHX Text 634.56
AutoCAD SHX Text 639.24
AutoCAD SHX Text 641.64
AutoCAD SHX Text 636.30
AutoCAD SHX Text 640.14
AutoCAD SHX Text 643.75
AutoCAD SHX Text 643.61
AutoCAD SHX Text 643.87
AutoCAD SHX Text 641.33
AutoCAD SHX Text 641.72
AutoCAD SHX Text 641.66
AutoCAD SHX Text 641.92
AutoCAD SHX Text 641.20
AutoCAD SHX Text 636.82
AutoCAD SHX Text 639.52
AutoCAD SHX Text 636.67
AutoCAD SHX Text 635.35
AutoCAD SHX Text 637.10
AutoCAD SHX Text 638.04
AutoCAD SHX Text 638.34
AutoCAD SHX Text 640.61
AutoCAD SHX Text 642.40
AutoCAD SHX Text 644.17
AutoCAD SHX Text 644.11
AutoCAD SHX Text 642.08
AutoCAD SHX Text 642.24
AutoCAD SHX Text 643.85
AutoCAD SHX Text 640.92
AutoCAD SHX Text 640.34
AutoCAD SHX Text 641.17
AutoCAD SHX Text 641.27
AutoCAD SHX Text 634.49
AutoCAD SHX Text 634.26
AutoCAD SHX Text 634.11
AutoCAD SHX Text 635.22
AutoCAD SHX Text 635.77
AutoCAD SHX Text 637.11
AutoCAD SHX Text 638.94
AutoCAD SHX Text 638.18
AutoCAD SHX Text 640.12
AutoCAD SHX Text 638.45
AutoCAD SHX Text 637.08
AutoCAD SHX Text 637.18
AutoCAD SHX Text 642.08
AutoCAD SHX Text 641.25
AutoCAD SHX Text 639.34
AutoCAD SHX Text 639.02
AutoCAD SHX Text 637.53
AutoCAD SHX Text 634.28
AutoCAD SHX Text 635.32
AutoCAD SHX Text 637.62
AutoCAD SHX Text 639.62
AutoCAD SHX Text 639.59
AutoCAD SHX Text 638.32
AutoCAD SHX Text 640.14
AutoCAD SHX Text 640.50
AutoCAD SHX Text 641.76
AutoCAD SHX Text 641.45
AutoCAD SHX Text 640.92
AutoCAD SHX Text 642.51
AutoCAD SHX Text 642.36
AutoCAD SHX Text 643.22
AutoCAD SHX Text 644.96
AutoCAD SHX Text 645.50
AutoCAD SHX Text 643.61
AutoCAD SHX Text 630.79
AutoCAD SHX Text 630.83
AutoCAD SHX Text 631.25
AutoCAD SHX Text 632.82
AutoCAD SHX Text 632.31
AutoCAD SHX Text 632.97
AutoCAD SHX Text 632.93
AutoCAD SHX Text 632.56
AutoCAD SHX Text 631.85
AutoCAD SHX Text 631.26
AutoCAD SHX Text 633.37
AutoCAD SHX Text 632.50
AutoCAD SHX Text 635.42
AutoCAD SHX Text 641.18
AutoCAD SHX Text 641.65
AutoCAD SHX Text 642.15
AutoCAD SHX Text 641.92
AutoCAD SHX Text 642.73
AutoCAD SHX Text 637.64
AutoCAD SHX Text 641.27
AutoCAD SHX Text 634.92
AutoCAD SHX Text 634.94
AutoCAD SHX Text 641.30
AutoCAD SHX Text 641.24
AutoCAD SHX Text 641.31
AutoCAD SHX Text 641.14
AutoCAD SHX Text 641.25
AutoCAD SHX Text 641.17
AutoCAD SHX Text 641.27
AutoCAD SHX Text 641.76
AutoCAD SHX Text 641.45
AutoCAD SHX Text 642.51
AutoCAD SHX Text 642.36
AutoCAD SHX Text 643.22
AutoCAD SHX Text 641.18
AutoCAD SHX Text 641.65
AutoCAD SHX Text 642.15
AutoCAD SHX Text 641.92
AutoCAD SHX Text 641.27
X
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project NumberCONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects JULY 16, 2021 ZLRFCM
UPGRADE ELECTRICAL
SYSTEMS PHASE 2
695-20-105
CLEMENT J. ZABLOCKI VAMC
5000 W NATIONAL AVE, MILWAUKEE, WI
53295
20-095
100% CONSTRUCTION DOCUMENTS
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
107, 108
CIVIL PAVING AND CONSTRUCTION DETAILS
CS501
CONCRETE GENERATOR PAD DETAIL
NOT TO SCALE
CS101
8"
5' M
IN
8"
1"
MIN.
#5 @ 12"o.c.
6" OF COMPACTED
FREE DRAINING
GRANULAR FILL
#4 AT 12"o.c.
EACH WAY AT
MID. DEPTH
#4 AT 12"o.c.
EACH WAY AT
MID. DEPTH
2'-0"
#5 @ 12"o.c.
#4 AT 12"o.c.
EACH WAY AT
MID. DEPTH
6" OF COMPACTED
FREE DRAINING
GRANULAR FILL
1' -6
8"
6"
1-#5 CONT.
TOP AND
BOT.
6"
CONCRETE SWITCH PAD DETAIL
NOT TO SCALE
CS101
PROVIDE 7"X60" HDPE BOLLARD SLEEVE.
3/16" THICK
6" SCH. 40 STEEL PIPE FILLED
W/ CONC.
REPLACE CONCRETE PAD TO MATCH
EXISTING SAWCUT CONC FOR
REPLACEMENT W/NEW CONC SLAB.
COORDINATE WITH
EQUIPMENT ANCHORAGE
AutoCAD SHX Text
CAD DETAIL NO.:
AutoCAD SHX Text
DATE ISSUED:
AutoCAD SHX Text %%uGENERAL NOTES
AutoCAD SHX Text
1. MATERIAL AND COMPACTION REQUIREMENTS FOR PIPE BEDDING/SHADING SHALL BE IN MATERIAL AND COMPACTION REQUIREMENTS FOR PIPE BEDDING/SHADING SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS FOR THE APPLICABLE UTILITY PIPE. 2. TRENCH BACKFILL SHALL COMMENCE 1 FOOT ABOVE THE TOP OF PIPE AND SHALL BE TRENCH BACKFILL SHALL COMMENCE 1 FOOT ABOVE THE TOP OF PIPE AND SHALL BE PER SECTION 31 20 00. 3. BACKFILL COMPACTION REQUIREMENTS SHALL BE PER SECTION 31 20 00. BACKFILL COMPACTION REQUIREMENTS SHALL BE PER SECTION 31 20 00. 4. THE 1 FOOT TRENCH "SHOULDER" AREAS SHALL BE DELETED FOR TYPE 2 TRENCHES. THE 1 FOOT TRENCH "SHOULDER" AREAS SHALL BE DELETED FOR TYPE 2 TRENCHES. 5. ABC SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 12 16. ABC SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 12 16. 6. PORTLAND CEMENT CONCRETE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF PORTLAND CEMENT CONCRETE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 05 23. 7. ASPHALTIC TACK MATERIAL SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF ASPHALTIC TACK MATERIAL SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 12 16. 8. ASPHALTIC CONCRETE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 ASPHALTIC CONCRETE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 12 16 FOR THE TYPE SPECIFIED. 9. LOAD TRANSFER DOWELS FOR JOINTS TRANSVERSE TO THE ROADWAY CENTERLINE SHALL LOAD TRANSFER DOWELS FOR JOINTS TRANSVERSE TO THE ROADWAY CENTERLINE SHALL BE SMOOTH STEEL DOWELS. DOWELS SHALL BE SIZED AND SPACED AS FOLLOWS: PCCP THICKNESS DOWEL SIZE DOWEL LENGTH DOWEL SPACING THICKNESS DOWEL SIZE DOWEL LENGTH DOWEL SPACING DOWEL SIZE DOWEL LENGTH DOWEL SPACING DOWEL LENGTH DOWEL SPACING DOWEL SPACING 6" #5 [No. 16] 12" 18" #5 [No. 16] 12" 18" 12" 18" 18" 7" #6 [No. 19] 15" 15" #6 [No. 19] 15" 15" #6 [No. 19] 15" 15" 15" 15" 15" 8" #8 [No. 19] 15" 12" #8 [No. 19] 15" 12" #8 [No. 19] 15" 12" 15" 12" 12" 10" #10 [No. 19] 15" 12" #10 [No. 19] 15" 12" 15" 12" 12" 10. DEFORMED TIE BARS SHALL BE USED IN TRENCH PATCHES LONGITUDINAL TO THE DEFORMED TIE BARS SHALL BE USED IN TRENCH PATCHES LONGITUDINAL TO THE ROADWAY CENTERLINE WHEN THE TRENCH LENGTH IS GREATER THAN 50 FEET. TIE BARS SHALL BE 24 INCHES LONG. DEFORMED #4 [No. 13] BARS FOR PCCP LESS THAN 8 INCHES THICK AND #5 [No. 16] BARS IF 8 INCHES THICK OR MORE. TIE BARS SHALL BE PLACED 30 INCHES CENTER-TO-CENTER. 11. HOLES SHALL BE DRILLED 1 FOOT INTO THE EXISTING SLAB FOR TIE BARS AND 7 INCHES HOLES SHALL BE DRILLED 1 FOOT INTO THE EXISTING SLAB FOR TIE BARS AND 7 INCHES FOR DOWELS. HOLES SHALL BE OF A DIAMETER SUFFICIENT TO ACCOMMODATE THE TIE BAR ANCHORAGE OR DOWEL CAP. TIE BARS SHALL BE ANCHORED WITH AN APPROVED HIGH VISCOSITY EPOXY. 12. IF THE CONCRETE SLAB REMAINING NEXT TO A LONGITUDINAL OR TRANSVERSE JOINT IS IF THE CONCRETE SLAB REMAINING NEXT TO A LONGITUDINAL OR TRANSVERSE JOINT IS LESS THAN 6 FEET AT ITS NARROWEST WIDTH, REMOVE AND REPLACE THE EXISTING CONCRETE TO THE JOINT.
AutoCAD SHX Text
UTILITY TRENCH PATCH NOTES
AutoCAD SHX Text
NONE
AutoCAD SHX Text
SCALE :
AutoCAD SHX Text
DETAIL TITLE /
AutoCAD SHX Text
SD321216-04.DWG
AutoCAD SHX Text
DECEMBER 2008
AutoCAD SHX Text
SCALE :
AutoCAD SHX Text
CAD DETAIL NO.:
AutoCAD SHX Text
DATE ISSUED:
AutoCAD SHX Text
DETAIL TITLE /
AutoCAD SHX Text
TYPE 1 UTILITY TRENCH PATCH
AutoCAD SHX Text
SD321216-01.DWG
AutoCAD SHX Text
DECEMBER 2008
AutoCAD SHX Text
NONE
AutoCAD SHX Text
UTILITY TRENCH PATCH NOTES
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text
CS501
AutoCAD SHX Text FOR TRENCH WIDTHS EXCEEDING 4' REFER TO VA STANDARD DETAIL 32 12 16-02 "TYPE 2 UTILITY TRENCH PATCH". FOR TRENCH WHERE PORTLAND CEMENT CONCRETE (PCC) PAVEMENT EXISTS, REFER TO 32 12 16-03 "TYPE 3 UTILITY TRENCH PATCH".
AutoCAD SHX Text
2" MINIMUM OR THICKNESS OF EXISTING PAVEMENT WHICHEVER IS GREATER.
AutoCAD SHX Text BITUMINOUS SURFACE TREATMENT (CHIPSEAL) REQUIRED ONLY FOR LONGITUDINAL TRENCHES WITH WIDTHS GREATER THAN 6'.
AutoCAD SHX Text 4" MINIMUM ABC OR THICKNESS OF EXISTING GRANULAR BASE COURSE MATERIALS (E.G. ABC & SELECT MATERIAL) WHICHEVER IS GREATER.
AutoCAD SHX Text REFER TO VA STANDARD DETAIL 32 12 16-04 "UTILITY TRENCH PAVEMENT PATCH NOTES" FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text
TYPE 1 UTILITY TRENCH PATCH
AutoCAD SHX Text
NTS
AutoCAD SHX Text
FLOWABLE FILL
AutoCAD SHX Text
ABC 100% MIN. COMPACTION
AutoCAD SHX Text
ASPHALTIC CONCRETE
AutoCAD SHX Text
SAW CUT EXISTING. ASPHALT FULL DEPTH BOTH SIDES
AutoCAD SHX Text
TACK COAT (TYP.)
AutoCAD SHX Text
EXISTING PAVEMENT
AutoCAD SHX Text
AutoCAD SHX Text
CS501
AutoCAD SHX Text
FY17 TJC & SAFETY CORRECTIONS AMENDMENT DETAIL
AutoCAD SHX Text
UNFINISHED FLOOR
SLAB
5/8" TYPE 'X' GYPSUM
WALLBOARD
3 5/8" METAL STUDS @
16" O.C. MAX.
NEW ELECTRICAL
PANEL BOX
V E
R I F
Y
I N
F
E
L D
EXISTING WALL
3 5/8" METAL STUDS @
16" O.C. MAX.
5/8" TYPE 'X' GYPSUM
WALLBOARD CAP
NEW WALL BASE TO
MATCH EXISTING
2 COATS PAINTED
FINISH ON NEW WALL
TO MATCH ADJACENT
WALL FINISH
USE PLASTIC CORNER
BEADS ALONG FULL
PERIMETER OF
OPENING FOR PANEL
6"
ALIGN TO PANEL
FACE
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
C
L
DEMOLITION KEYNOTE
WINDOW TYPE
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE
CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
GENERAL NOTES
INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION
AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN
OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS ARE PREPARED USING DIMENSIONS
AND PRODUCT AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE AND DETAILS FOR
SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND
PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION
DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION
REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR
RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING
CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE
SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY
DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS
AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS
THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING
DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE
CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN
INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE
CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE
INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT
CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING
WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF ANY
DISCREPANCY DISCOVERED.
THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE
TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD
CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT
INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR
DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR
SHALL FURNISH ALL NECESSARY LICENSES AND/OR PERMITS.
THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE
THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)
INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE
DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO
INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND
COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED
IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER
EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE
CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS
INDICATED IN THE SPECIFICATIONS.
CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY
REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
1.
2.
3.
4.
5.
6.
7.
8.
9.
DEMOLITION NOTES
KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL CENTER GROUNDS.
PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT CONSTRUCTION UNLESS INDICATED
OTHERWISE.
NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL
ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES
NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT
SCOPE WHETHER ABOVE, BELOW OR OUTSIDE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT
ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN
SERVICE. DISCOVERY…