695-20-105 SOW R 3.25.2022.pdf

PDF 235 KB Posted

Attached to
Z2DA--695-20-105: Upgrade Electrical System Area 2 Federal contract opportunity
Solicitation number
36C25222B0010
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This statement of work and related federal contract opportunity provide details for the Upgrade Electrical Systems Area 2 project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The scope of work involves replacing existing power distribution switchboards and branch circuit panelboards with new equipment in buildings 5, 6, 7, 20, 43, 107, and 108. It also replaces one electrical panelboard each in buildings 102 and 144. For buildings 5, 6, 20, 43, 107, and 108 it replaces the electrical service entrance switchboard or power panel. For building 70 it replaces several electrical feeder conductors in existing conduit between electrical panelboards. A new generator will also be provided to feed buildings 107, 108, and T114. The work must be completed within 315 calendar days of the notice to proceed. The solicitation number for this opportunity is 36C25222B0010 and it is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--695-20-105: Upgrade Electrical System Area 2, newest first.
File Type Posted
S02 36C25222B0010 0004.pdf PDF
6-A2-5 (NEW).pdf PDF
Kohler Walk-in Enclosure_45-32658-60REOZK-390GAL-LVL2-ASSEMBLY.pdf PDF
S04 - Pre-Bid Sign-in Sheet.doc DOC document
102-EUL-Q-B3 (NEW).pdf PDF
43-MDP (NEW).pdf PDF
S02 36C25222B0010 0003.pdf PDF
20-MD-20 (NEW).pdf PDF
6-MAIN D BSMT (NEW).pdf PDF
36C25222B0010 0002.pdf PDF
36C25222B0010 0001.docx DOCX document
6b - 695-20-105 Drawings 1-30.pdf PDF
P01 6a - 695-20-105 Specifications.pdf PDF
P07 Wage Decision.pdf PDF
6b - 695-20-105 Drawings 61-65.pdf PDF
6b - 695-20-105 Drawings 46-50.pdf PDF
6b - 695-20-105 Drawings 71-75.pdf PDF
6b - 695-20-105 Drawings 66-70.pdf PDF
6b - 695-20-105 Drawings 76-79.pdf PDF
P03 SSJ 3c - 695-20-105 Firestop_SingleSourceJustification_MPT-SAT.docx DOCX document
P03 SSJ 3b - 695-20-105 Door Hardware_SingleSourceJustification_MPT-SAT.docx DOCX document
6b - 695-20-105 Drawings 31-45.pdf PDF
6b - 695-20-105 Drawings 56-60.pdf PDF
36C25222B0010.docx DOCX document
6b - 695-20-105 Drawings 51-55.pdf PDF
P03 SSJ 3a - 695-20-105 Building Automation HVAC Cntrls_SingleSourceJustification_MPT-SAT.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clement J. Zablocki VA Medical Center

Upgrade Electrical Systems Area 2

Project 695-20-105

Scope of Work

July 30, 2021

US Department of Veterans Affairs

Clement J. Zablocki VA Medical Center

5000 W. National Ave.

Milwaukee, WI 53295-0001

STATEMENT OF WORK

Prepared by:

Facility Management Division

PROJECT NO: 695-20-105

PROJECT NAME: Upgrade Electrical Systems Area 2

I. General Description:

Provide Construction Services for Project#: 695-20-105 Upgrade Electrical Systems Area 2

II Project Scope:

1. General Description:

1. General Description: Contractor shall provide for and furnish all labor, materials, equipment, qualified supervision, and other items designated in this contract in accordance with the specifications and drawings to complete Project # 695-20-105:

Upgrade Electrical Systems Area 2 at Clement J. Zablocki VA Medical Center, 5000 West National Avenue Milwaukee, WI.

a. This is mostly an electrical construction project of replacing existing power distribution switchboards and branch circuit panelboards with new equipment in the same location as existing equipment being replaced.

b. For buildings: 5, 6, 7, 20, 43, 107, and 108 replace most of the electrical branch circuit panelboards throughout building. Also replace one electrical panelboard in buildings 102 and 144.

c. For buildings: 5, 6, 20, 43, 107, and 108 replace electrical service entrance switchboard or power panel.

d. For buildings 70 replace several electrical feeder conductors in existing conduit between electrical panelboards.

e. Provide a single new generator to feed buildings 107, 108, and T114.

2. All work shall be completed within 315 calendar days after receiving Notice to Proceed.

This project shall be completed within Three Hundred sixty five (365) days once NTP is issued.

• Phase 1: Pre-construction (kick-off) Meeting is anticipated to be scheduled on the effective date identified in the Notice to Proceed (NTP).

• Phase 2: Pre-Construction Accident Prevention Plan and Construction Schedule, to be completed no later than NTP + 30 days. Within this period the contractor shall submit the Accident Prevention Plan, submit the Construction Schedule, and schedule a review meeting with the COR and VA Safety.

• Phase 3: Pre-Construction Period duration is NTP + 60 calendar days (not to exceed). Within this period the contractor shall submit the following (as applicable per the specification requirements):

1. Logistics Plan.

2. Construction Security Plan.

3. Construction Phasing Plan.

4. Submittal Registry.

5. Accident Prevention Plan.

6. Activity Hazard Analyses.

7. Construction Schedule.

8. Schedule of Values.

9. Existing Conditions Survey.

10. Infection Control Plan.

11. Quality Control Plan.

12. Environmental Protection Plan.

13. Document Submissions.

14. Demolition Debris Management Plan.

15. Certificates, Licenses, and Training Documents.

16. Obtain PIV badges.

• Phase 4: Pre-Construction VA Review Period. Phase 2 is anticipated to be 30 calendar days and shall be completed no later than NTP + 90 calendar days. Within this period the VA shall complete all review and approvals of contractor Pre- Construction submittals.

• Phase 5: Construction Period – Phase duration is anticipated to be 180 days; to be completed no later than NTP + 320. All applicable documentation listed in Phases 2 and 3 and any necessary submittals required to mobilize must be approved by the COR prior to commencing work. No demolition or construction shall be started without COR review and approval of those items listed in the Pre-Construction Period unless authorized in writing by the COR or the CO. Should naturally occurring weather delays occur, the contractor shall restart construction immediately once conditions permit.

• Phase 6: Post-Substantial Completion Period duration is NTP + 365 calendar days.

The contractor shall provide all required materials to include the following within 45 days of completion of Phase 5.

1. Inspection and Approval by the COR and/or the CO.

2. Final Approval and Beneficial Occupancy when applicable.

3. Warranties documents and O&M Manuals.

4. As-built drawings and record submittals.

5. Staff training when applicable.

6. Waste Reports.

7. Existing Conditions Re-survey.

8. Release of Claims.

-- End SOW --