Amendment A002.pdf
PDF 1 MB Posted
- Solicitation number
- 6982AF26B000003
About this file
This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Federal Highway Administration, Central Federal Lands Highway Division on May 26, 2026.
The amendment (A002) modifies solicitation 6982AF26B0000003, dated May 1, 2026, for Project NV FLAP NYE 10(1) under requisition HFLCOE260125PR. The amendment removes and replaces specification sheets E-38 and E-45. Section E-38 addresses environmental controls, including grubbing and grading operations limitations (maximum 520 acres combined, 20 acres exposed soil at one time), stormwater pollution prevention plan (SWPPP) requirements following state or EPA templates, and erosion, sediment, and non-stormwater control measures. Section E-45 addresses aggregate gradation specifications for base and surface course materials, and full depth reclamation construction requirements including pulverizing, material processing, handling, storage, and placement procedures. The contractor must submit a pulverizing plan to the Contracting Officer for approval at least 14 days before operations commence, detailing processing methods, material removal and sequencing, storage details, anticipated quantities, and mixing locations. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or face rejection of their offer. The contractor is not required to sign and return this document.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION:
9A. AMENDMENT OF SOLICITATION NUMBER
5. PROJECT NUMBER (If applicable)
9B. DATED (SEE ITEM 11)
0*
*See Item 14
E-38
Do not exceed 520 acres if combined grubbing and grading operations at one time. Limit the combined grubbing and grading operations areas to 20 acres of exposed soil at one time.
157.07 Stormwater Pollution Prevention Plan. Prepare, submit, and implement a Construction SWPPP following the SWPPP template of the state in which the project is located.
Include the Federal Highway Administration as an operator on the project in charge of plans and specifications. If the state does not provide a template, follow the SWPPP template provided by the Environmental Protection Agency (EPA) (https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates#swppp).
Provide a SWPPP according to the Stormwater Construction General Permit (CGP).
Provisions in the SWPPP are incorporated by reference into the contract. Provide an electronic copy of the SWPPP.
Based on the approved SWPPP, provide the CO a list of the planned pollution prevention devices for each of the following: erosion controls, sediment controls, and non-stormwater controls.
Implement the SWPPP as required throughout the construction period. Modify the erosion, sediment, and non-stormwater pollution control details and SWPPP plans as necessary to accommodate project site conditions and proposed construction operations. Update the SWPPP when modifying erosion, sediment, and non-stormwater pollution controls. Provide a copy of the updated SWPPP monthly to the CO for review.
157.08 Soil Erosion Control. Apply erosion control measures to stabilize soils and to control temporary concentrated flows throughout the duration of the project. Construct and maintain measures according to manufacturer’s recommendations.
157.09 Sediment Control. Apply sediment control measures to intercept, slow, and detain the flow of stormwater throughout the duration of the project. Construct and maintain measures according to manufacturer’s recommendations.
157.10 Non-Stormwater Controls. Apply non-stormwater measures as needed and as required in the SWPPP to control non-stormwater discharges, and to prevent or limit potential pollutants at their source from contact with stormwater throughout the duration of the project. Construct and maintain measures according to manufacturer’s recommendations.
157.11 Acceptance. Material for erosion, sediment, and non-stormwater pollution control measures will be evaluated under Subsections 106.02 and 106.03.
Construction, maintenance, and removal of erosion control, sediment control, and non-stormwater controls will be evaluated under Subsections 106.02 and 106.04.
Measurement
AMENDMENT A002 05.26.2026
denise.martinez Cross-Out denise.martinez Cross-Out denise.martinez Cross-Out
E-45
For base course set target values within the gradation ranges shown in Table 703-2, grading C, D, or E.
For surface course aggregate set target values within the gradation range shown in Table 703-3.
Section 304. — FULL DEPTH RECLAMATION
Construction Requirements
304.03 General. Add the following:
Full depth reclamation includes pulverizing the existing surface, spreading and mixing to the width and depth shown on the typical sections, compacting, and finishing.
Asphalt concrete pavement mix design must be approved by the CO before pulverizing activities can begin.
Submit a plan to the CO for approval 14 days before pulverizing. Include in the plan details on the following for the pulverized material and new aggregate (if required):
(a) Processing. Describe procedures, methods, equipment, and extents of processing.
(b) Removal and Handling. Describe procedures, methods, sequencing, and equipment used for removing the pulverized material.
(c) Storage. If the pulverized material will be moved to a separate location and stored, provide relevant details for storing the material, such as duration and location of stockpiling the material. If applicable, stockpile material according to Subsections 314.04 and 314.05.
(d) Quantities. Show the anticipated quantities in cubic yards of pulverized material that will be processed, removed, stored (if applicable), and re-used.
(e) Sequencing. Describe the timing and order of operations to complete the work.
(f) Mixing and placement locations. Describe the locations where the pulverized material will be placed and mixed with new aggregate (if required).
304.05 Pulverizing. Add the following:
Remove the pulverized material for use as crushed aggregate at the locations shown on the Plans.
Add the following Subsection:
304.05A Preparing Surface. Prepare the surface on which the pulverized material is placed according to Section 204 or 303 as applicable.
AMENDMENT A002 05.26.2026
| 1 CONTRACT ID CODE: 1 |
| 2 AMENDMENTMODIFICATION NUMBER: A002 |
| 4 REQUISITIONPURCHASE REQUISITION NUMBER: HFLCEO260125PR |
| 3 EFFECTIVE DATE6 ISSUED BY CODE: |
| 5 PROJECT NUMBER If applicableRow1: |
| 9A AMENDMENT OF SOLICITATION NUMBER: 6982AF26B0000003 |
| undefined: |
| undefined_2: |
| 10A MODIFICATION OF CONTRACTORDER NUMBER: |
| CODE: |
| FACILITY CODE: |
| 10B DATED SEE ITEM 13: |
| The above numbered solicitation is amended as set forth in Item 14 The hour and date specified for receipt of Offers: Off |
| is extended: Off |
| is not extended: On |
| 13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSORDERS: |
| undefined_3: |
| A THIS CHANGE ORDER IS ISSUED PURSUANT TO Specify authority THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A: |
| undefined_4: |
| undefined_5: |
| C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: |
| undefined_6: |
| D OTHER Specify type of modification and authority: |
| is not: Off |
| is required to sign this document and return: Off |
| Date1_af_date: 5/1/26 |
| Date2_af_date: 5/26/26 |
| Text3: SCR's: Remove and replace sheet E-38 and E-45. |
| Text4: 3 |
| Contract Specialist: DENISE MARTINEZ |
| Project Number: NV FLAP NYE 10(1) |
File details come from the government source that posted it. Updated .