This is an Amendment (A001) to a sealed bid solicitation for a roadway construction project issued by the Federal Highway Administration (FHWA), Central Federal Lands Highway Division. The amendment, effective May 20, 2026, modifies solicitation number 6982AF26B000003 for the NV FLAP NYE 10(1) project—Bob Ruud Memorial Highway and Bell Vista Avenue construction in Nevada. The amendment removes and replaces the IFB sheet (A-1), bid schedule sheets (A-6 through A-15), SCR sheet (E-38), and plans (B1 through B7). The bid submission deadline is June 10, 2026, at 2:00 p.m. local time, with sealed offers in original format required at the Federal Highway Administration office in Lakewood, Colorado. Performance bonds are required within 10 calendar days of award, and the contractor must begin work within 10 calendar days and complete it within a mandatory performance period (specific duration referenced on page A-3 of the solicitation).
The project involves comprehensive roadway construction including clearing and grubbing (approximately 46-63 acres depending on schedule), embankment construction (approximately 10,000-31,000 cubic yards), asphalt concrete pavement (approximately 72,000-87,000 tons), drainage infrastructure with multiple pipe culverts (ranging from 12-inch to 72-inch diameters with over 2,000 linear feet of pipe), riprap placement, aggregate base installation, pavement markings, temporary traffic control, tortoise barrier fencing (3,000-6,000 linear feet), and erosion/sediment control measures. Two schedule options (Schedule A and Schedule B) are provided with varying quantities and complexity. The bid includes both base construction items and an alternated item for contractor-furnished testing laboratory services versus government-furnished laboratory services. All work must comply with FAR regulations, Department of Transportation regulations, Department of Labor construction wage requirements, and standard specifications for federal highway projects (FP-14). Offers must be received prior to the deadline, with failure to acknowledge the amendment potentially resulting in bid rejection.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION:
9A. AMENDMENT OF SOLICITATION NUMBER
5. PROJECT NUMBER (If applicable)
9B. DATED (SEE ITEM 11)
0*
*See Item 14
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
6982AF26B000003
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
05/01/2026
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
HFLCEO260125PR
6. PROJECT NO.
NV FLAP NYE 10(1)
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
Denise Martinez, Contract Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. 48 CFR, CHAPTER 1, FEDERAL ACQUISTION REGULATION (FAR), REVOLUTIONARY FAR OVERHAUL (RFO)
AND THE DEPARTMENT OF TRANSPORATION REGULATION (TAR)
2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES.
3. SPECIAL CONTRACT REQUIREMENTS.
4. PLANS.
5. BID SCHEDULE.
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-14, U.S. CUSTOMARY UNITS.
7. SUBCONTRACTING PLAN. (IF APPLICABLE)
See Subsection 104.04 of the FP-14 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *See Page A-3
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m.
(hour) local time on 06/1002/2026 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA
FAR (48 CFR) 53.236-1(d)
X
X
X
X
X
A-1 A001 Amendment 05.20.2026 denise.martinez Cross-Out
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
BID SCHEDULE
Bid Schedule Project: NV FLAP NYE 10(1), BOB RUUD MEM HWY & BELL VISTA AVE
A-6
AMENDMENT A001 05.20.2026
BID SCHEDULE
Project No : NV FLAP NYE 10(1) Schedule : A
Project Name : BOB RUUD MEM HWY & BELL
VISTA AVE
Schedule Type : Base
Contract Quantity Pay Items
No Contract Quantity Pay Items
AMD# Line Item Number
Pay Item Number
Description Supplemental Description
Quantity Unit Unit Price Amount
A0010 15101-0000 MOBILIZATION ALL LPSM
A0020 15215-1000
SURVEY AND
STAKING, APPROACH
ROAD
32.000 EACH
A0030 15215-3000
SURVEY AND
STAKING, DRAINAGE
STRUCTURE
52.000 EACH
A0040 15225-0000
SLOPE, REFERENCE,
AND CLEARING AND
GRUBBING CONTROL
15.500 MILE
A0050 15236-2000 SURVEY CONTROL,
GRADE FINISHING 31.000 MILE
A0060 15301-0000 CONTRACTOR
QUALITY CONTROL ALL LPSM
A0070 15401-0000 CONTRACTOR
TESTING ALL LPSM
A0080 15501-0000 CONSTRUCTION
SCHEDULE ALL LPSM
A0090 15701-0000 SOIL EROSION
CONTROL ALL LPSM
A0100 15720-0000
STORM WATER
POLLUTION
PREVENTION PLAN
ALL LPSM
A0110 15802-0000 WATERING FOR DUST
CONTROL ALL LPSM
A0120 20101-0000 CLEARING AND
GRUBBING 46.000 ACRE
A0130 20301-0700 REMOVAL OF
DELINEATOR 146.000 EACH
A0140 20301-2400 REMOVAL OF SIGN 54.000 EACH
A0150 20301-2400 REMOVAL OF SIGN (POST ONLY) 44.000 EACH
A0160 20302-2100 REMOVAL OF PIPE
CULVERT 1,320.000 LNFT
A0170 20402-0000 SUBEXCAVATION 500.000 CUYD
A0180 20420-0000 EMBANKMENT
CONSTRUCTION 10,000.000 CUYD
A0190 21101-1000
ROADWAY
OBLITERATION,
METHOD 1
800.000 SQYD
A0200 25101-0200 PLACED RIPRAP,
METHOD A, CLASS 2
(FILLED AND
TOPPED) 350.000 CUYD
A0210 25101-0300 PLACED RIPRAP,
METHOD A, CLASS 3
(FILLED AND
TOPPED) 300.000 CUYD
A0220 30101-0000 AGGREGATE BASE 27,500.000 TON
A0240 30401-5200
FULL DEPTH
RECLAMATION,
METHOD 2, 4-INCH
DEPTH
11.000 MILE
A0250 30401-5500
FULL DEPTH
RECLAMATION,
METHOD 2, 8-INCH
DEPTH
5.000 MILE
Bid Schedule Project: NV FLAP NYE 10(1), BOB RUUD MEM HWY & BELL VISTA AVE
(CONTRACTOR
FURNISHED LAB)
A-7
A0260 40101-5600
ASPHALT CONCRETE
PAVEMENT,
GYRATORY MIX, 1/2-
INCH OR 3/4-INCH
NOMINAL MAXIMUM
SIZE AGGREGATE, 0.3
TO <3 MILLION ESAL
72,000.000 TON
A0280 40105-3000 ANTISTRIP ADDITIVE,
TYPE 3 720.000 TON
A0300 40601-0000 FOG SEAL 150.000 TON
A0310 41101-1000 PRIME COAT,
METHOD 1 500.000 TON
A0320 41105-0000 BLOTTER 510.000 TON
A0330 41201-0000 TACK COAT 150.000 TON
A0340 50101-0600
MINOR CONCRETE
PAVEMENT,
REINFORCED, 6-INCH
DEPTH
1,620.000 SQYD
A0350 55401-1000 REINFORCING STEEL 3,500.000 LB
A0360 60101-0000 CONCRETE 45.000 CUYD
A0370 60103-0140
CONCRETE,
HEADWALL FOR 24-
INCH PIPE CULVERT
2.000 EACH
A0380 60103-0180
CONCRETE,
HEADWALL FOR 36-
INCH PIPE CULVERT
2.000 EACH
A0390 60103-0220
CONCRETE,
HEADWALL FOR 48-
INCH PIPE CULVERT
8.000 EACH
A0400 60103-0640
CONCRETE,
HEADWALL FOR
DOUBLE 30-INCH PIPE
CULVERT
2.000 EACH
A0410 60201-0400 12-INCH PIPE
CULVERT 185.000 LNFT
A0420 60201-0600 18-INCH PIPE
CULVERT 280.000 LNFT
A0430 60201-0800 24-INCH PIPE
CULVERT 1,210.000 LNFT
A0440 60201-0900 30-INCH PIPE
CULVERT 200.000 LNFT
A0450 60201-1000 36-INCH PIPE
CULVERT 385.000 LNFT
A0460 60201-1200 48-INCH PIPE
CULVERT 270.000 LNFT
A0470 60210-0400 END SECTION FOR 12-
INCH PIPE CULVERT 8.000 EACH
A0480 60210-0600 END SECTION FOR 18-
INCH PIPE CULVERT 12.000 EACH
A0490 60210-0800 END SECTION FOR 24-
INCH PIPE CULVERT 50.000 EACH
A0500 60210-0900 END SECTION FOR 30-
INCH PIPE CULVERT 4.000 EACH
A0510 60210-1000 END SECTION FOR 36-
INCH PIPE CULVERT 14.000 EACH
A0520 61901-3300 FENCE, TORTOISE
BARRIER 3,000.000 LNFT
A0530 62201-0200
DUMP TRUCK, 8
CUBIC YARD MINIMUM
CAPACITY
120.000 HOUR
A0540 62201-0550
BACKHOE LOADER, 6
CUBIC FOOT MINIMUM
RATED CAPACITY
BUCKET, 24-INCH
WIDTH
100.000 HOUR
Bid Schedule Project: NV FLAP NYE 10(1), BOB RUUD MEM HWY & BELL VISTA AVE
A-8
A0550 62201-0950
WHEEL LOADER, 3
CUBIC YARD MINIMUM
RATED CAPACITY
100.000 HOUR
A0560 62201-1450
BULLDOZER, 350HP
MINIMUM FLYWHEEL
POWER
100.000 HOUR
A0570 62201-2850
MOTOR GRADER, 12
FOOT MINIMUM
BLADE
100.000 HOUR
A0580 62201-3350
HYDRAULIC
EXCAVATOR, 1 CUBIC
YARD MINIMUM
CAPACITY
100.000 HOUR
A0590 62301-0000 GENERAL LABOR 60.000 HOUR
A0600 62302-1100
SPECIAL LABOR,
HIRED SURVEY
SERVICES
60.000 HOUR
A0610 62303-1000
SPECIAL LABOR,
HIRED TECHNICAL
SERVICES
(ADTB)
ALL LPSM
A0620 62406-0100
PLACING
CONSERVED
TOPSOIL, 2-INCH
DEPTH
40.000 ACRE
A0630 62510-2000 SEEDING, HYDRAULIC
METHOD 40.000 ACRE
A001 A0635 62515-2000 MULCHING,
HYDRAULIC METHOD 40.000 ACRE
A0640 63301-0000 SIGN SYSTEM 64.000 EACH
A0650 63301-0000 SIGN SYSTEM (WITH FLASHING
BEACON) 8.000 EACH
A0660 63306-0400 POST, STEEL, 2-INCH
X 2-INCH 44.000 EACH
A0670 63308-2000 OBJECT MARKER,
TYPE 2 48.000 EACH
A0680 63309-0200 DELINEATOR, TYPE 2 970.000 EACH
A0690 63314-0000 RUMBLE STRIP 1.700 MILE
A0700 63316-1000 REMOVE AND RESET
SIGN
(PANEL ONLY) 44.000 EACH
A0710 63401-0300
PAVEMENT
MARKINGS, TYPE B,
SOLID
2,250.000 LNFT
A0720 63402-0300
PAVEMENT
MARKINGS, TYPE B,
SOLID
47.000 MILE
A0730 63402-0400
PAVEMENT
MARKINGS, TYPE B,
BROKEN
22.000 MILE
A0740 63406-0100
RAISED PAVEMENT
MARKER, NON-
REFLECTIVE
320.000 EACH
A0750 63502-0600
TEMPORARY TRAFFIC
CONTROL,
BARRICADE TYPE 3
20.000 EACH
A0760 63502-1300 TEMPORARY TRAFFIC
CONTROL, DRUM 300.000 EACH
A0770 63502-3900
TEMPORARY TRAFFIC
CONTROL,
CONSTRUCTION SIGN
200.000 EACH
A0780 63503-0400
TEMPORARY TRAFFIC
CONTROL,
CONCRETE BARRIER
2,500.000 LNFT
A0790 63506-0500 TEMPORARY TRAFFIC
CONTROL, FLAGGER 8,000.000 HOUR
A0800 63506-0600 TEMPORARY TRAFFIC
CONTROL, PILOT CAR 1,120.000 HOUR
Bid Schedule Project: NV FLAP NYE 10(1), BOB RUUD MEM HWY & BELL VISTA AVE
A-9
A0810 63507-0800
TEMPORARY TRAFFIC
CONTROL, PORTABLE
CHANGEABLE
MESSAGE SIGN
165.000 DAY
A0820 63510-0100
TEMPORARY TRAFFIC
CONTROL, TRAFFIC
CONTROL
SUPERVISOR
33.000 WEEK
A0830 63701-0000 FIELD OFFICE 1.000 EACH
A0840 64620-0400 REMOVE AND RESET
MAILBOX 19.000 EACH
Submitted By: Schedule Total:
Bid Schedule Project: NV FLAP NYE 10(1), BOB RUUD MEM HWY & BELL VISTA AVE
A0070 15401-000 CONTRACTOR TESTING ALL LPSM $_________________
BID ALTERNATED ITEM (Government Furnished Lab) See page A-4
A-10
BID SCHEDULE
Project No : NV FLAP NYE 10(1) Schedule : B
Project Name : BOB RUUD MEM HWY & BELL
VISTA AVE
Schedule Type : Base
Contract Quantity Pay Items
No Contract Quantity Pay Items
AMD# Line Item Number
Pay Item Number
Description Supplemental Description
Quantity Unit Unit Price Amount
B0010 15101-0000 MOBILIZATION ALL LPSM
B0020 15215-1000
SURVEY AND
STAKING, APPROACH
ROAD
33.000 EACH
B0030 15215-3000
SURVEY AND
STAKING, DRAINAGE
STRUCTURE
80.000 EACH
B0040 15225-0000
SLOPE, REFERENCE,
AND CLEARING AND
GRUBBING CONTROL
20.500 MILE
B0050 15236-2000 SURVEY CONTROL,
GRADE FINISHING 41.000 MILE
B0060 15301-0000 CONTRACTOR
QUALITY CONTROL ALL LPSM
B0070 15401-0000 CONTRACTOR
TESTING ALL LPSM
B0080 15501-0000 CONSTRUCTION
SCHEDULE ALL LPSM
B0090 15701-0000 SOIL EROSION
CONTROL ALL LPSM
B0100 15720-0000
STORM WATER
POLLUTION
PREVENTION PLAN
ALL LPSM
B0110 15802-0000 WATERING FOR DUST
CONTROL ALL LPSM
B0120 20101-0000 CLEARING AND
GRUBBING 63.200 ACRE
B0130 20301-0700 REMOVAL OF
DELINEATOR 196.000 EACH
B0140 20301-2400 REMOVAL OF SIGN 70.000 EACH
B0150 20301-2400 REMOVAL OF SIGN (POST ONLY) 44.000 EACH
B0160 20302-2100 REMOVAL OF PIPE
CULVERT 2,200.000 LNFT
B0170 20303-1600 REMOVAL OF
PAVEMENT, ASPHALT 12,500.000 SQYD
B0180 20401-0000 ROADWAY
EXCAVATION 31,000.000 CUYD
B0190 20402-0000 SUBEXCAVATION 500.000 CUYD
B0200 21101-1000
ROADWAY
OBLITERATION,
METHOD 1
800.000 SQYD
B0210 25101-0200 PLACED RIPRAP,
METHOD A, CLASS 2
(FILLED AND
TOPPED) 630.000 CUYD
B0220 25101-0300 PLACED RIPRAP,
METHOD A, CLASS 3
(FILLED AND
TOPPED) 470.000 CUYD
B0230 25101-0400 PLACED RIPRAP,
METHOD A, CLASS 4
(FILLED AND
TOPPED) 50.000 CUYD
B0240 30101-0000 AGGREGATE BASE 47,500.000 TON
Bid Schedule Project: NV FLAP NYE 10(1), BOB RUUD MEM HWY & BELL VISTA AVE
(CONTRACTOR
FURNISHED LAB)
A-11
B0260 30401-5200
FULL DEPTH
RECLAMATION,
METHOD 2, 4-INCH
DEPTH
11.000 MILE
B0270 30401-5500
FULL DEPTH
RECLAMATION,
METHOD 2, 8-INCH
DEPTH
5.000 MILE
B0280 40101-5600
ASPHALT CONCRETE
PAVEMENT,
GYRATORY MIX, 1/2-
INCH OR 3/4-INCH
NOMINAL MAXIMUM
SIZE AGGREGATE, 0.3
TO <3 MILLION ESAL
87,000.000 TON
B0300 40105-3000 ANTISTRIP ADDITIVE,
TYPE 3 870.000 TON
B0320 40601-0000 FOG SEAL 190.000 TON
B0330 41101-1000 PRIME COAT,
METHOD 1 635.000 TON
B0340 41105-0000 BLOTTER 655.000 TON
B0350 41201-0000 TACK COAT 190.000 TON
B0360 50101-0600
MINOR CONCRETE
PAVEMENT,
REINFORCED, 6-INCH
DEPTH
1,620.000 SQYD
B0370 55401-1000 REINFORCING STEEL 3,500.000 LB
B0380 60101-0000 CONCRETE 45.000 CUYD
B0390 60103-0140
CONCRETE,
HEADWALL FOR 24-
INCH PIPE CULVERT
2.000 EACH
B0400 60103-0180
CONCRETE,
HEADWALL FOR 36-
INCH PIPE CULVERT
2.000 EACH
B0410 60103-0220
CONCRETE,
HEADWALL FOR 48-
INCH PIPE CULVERT
8.000 EACH
B0420 60103-0640
CONCRETE,
HEADWALL FOR
DOUBLE 30-INCH PIPE
CULVERT
2.000 EACH
B0430 60103-0740
CONCRETE,
HEADWALL FOR
DOUBLE 60-INCH PIPE
CULVERT
4.000 EACH
B0440 60103-0780
CONCRETE,
HEADWALL FOR
DOUBLE 72-INCH PIPE
CULVERT
2.000 EACH
B0450 60201-0400 12-INCH PIPE
CULVERT 185.000 LNFT
B0460 60201-0600 18-INCH PIPE
CULVERT 280.000 LNFT
B0470 60201-0800 24-INCH PIPE
CULVERT 2,360.000 LNFT
B0480 60201-0900 30-INCH PIPE
CULVERT 315.000 LNFT
B0490 60201-1000 36-INCH PIPE
CULVERT 440.000 LNFT
B0500 60201-1200 48-INCH PIPE
CULVERT 270.000 LNFT
B0510 60201-1400 60-INCH PIPE
CULVERT 190.000 LNFT
B0520 60201-1600 72-INCH PIPE
CULVERT 125.000 LNFT
B0530 60210-0400 END SECTION FOR 12-
INCH PIPE CULVERT 8.000 EACH
Bid Schedule Project: NV FLAP NYE 10(1), BOB RUUD MEM HWY & BELL VISTA AVE
A-12
B0540 60210-0600 END SECTION FOR 18-
INCH PIPE CULVERT 12.000 EACH
B0550 60210-0800 END SECTION FOR 24-
INCH PIPE CULVERT 88.000 EACH
B0560 60210-0900 END SECTION FOR 30-
INCH PIPE CULVERT 8.000 EACH
B0570 60210-1000 END SECTION FOR 36-
INCH PIPE CULVERT 16.000 EACH
B0580 61901-3300 FENCE, TORTOISE
BARRIER 6,000.000 LNFT
B0590 62201-0200
DUMP TRUCK, 8
CUBIC YARD MINIMUM
CAPACITY
160.000 HOUR
B0600 62201-0550
BACKHOE LOADER, 6
CUBIC FOOT MINIMUM
RATED CAPACITY
BUCKET, 24-INCH
WIDTH
120.000 HOUR
B0610 62201-0950
WHEEL LOADER, 3
CUBIC YARD MINIMUM
RATED CAPACITY
120.000 HOUR
B0620 62201-1450
BULLDOZER, 350HP
MINIMUM FLYWHEEL
POWER
120.000 HOUR
B0630 62201-2850
MOTOR GRADER, 12
FOOT MINIMUM
BLADE
120.000 HOUR
B0640 62201-3350
HYDRAULIC
EXCAVATOR, 1 CUBIC
YARD MINIMUM
CAPACITY
120.000 HOUR
B0650 62301-0000 GENERAL LABOR 80.000 HOUR
B0660 62302-1100
SPECIAL LABOR,
HIRED SURVEY
SERVICES
80.000 HOUR
B0670 62303-1000
SPECIAL LABOR,
HIRED TECHNICAL
SERVICES
(ADTB)
ALL LPSM
B0680 62406-0100
PLACING
CONSERVED
TOPSOIL, 2-INCH
DEPTH
54.000 ACRE
B0690 62510-2000 SEEDING, HYDRAULIC
METHOD 54.000 ACRE
A001 B0695 62515-2000 MULCHING,
HYDRAULIC METHOD 54.000 ACRE
B0700 63301-0000 SIGN SYSTEM 87.000 EACH
B0710 63301-0000 SIGN SYSTEM (WITH FLASHING
BEACON) 8.000 EACH
B0720 63306-0400 POST, STEEL, 2-INCH
X 2-INCH 44.000 EACH
B0730 63308-2000 OBJECT MARKER,
TYPE 2 72.000 EACH
B0740 63309-0200 DELINEATOR, TYPE 2 1,150.000 EACH
B0750 63314-0000 RUMBLE STRIP 17.000 MILE
B0760 63316-1000 REMOVE AND RESET
SIGN
(PANEL ONLY) 44.000 EACH
B0770 63401-0300
PAVEMENT
MARKINGS, TYPE B,
SOLID
2,200.000 LNFT
B0780 63402-0300
PAVEMENT
MARKINGS, TYPE B,
SOLID
120.000 MILE
B0790 63402-0400
PAVEMENT
MARKINGS, TYPE B,
BROKEN
28.000 MILE
Bid Schedule Project: NV FLAP NYE 10(1), BOB RUUD MEM HWY & BELL VISTA AVE
A-13
B0800 63406-0100
RAISED PAVEMENT
MARKER, NON-
REFLECTIVE
320.000 EACH
B0810 63502-0600
TEMPORARY TRAFFIC
CONTROL,
BARRICADE TYPE 3
20.000 EACH
B0820 63502-1300 TEMPORARY TRAFFIC
CONTROL, DRUM 300.000 EACH
B0830 63502-3900
TEMPORARY TRAFFIC
CONTROL,
CONSTRUCTION SIGN
200.000 EACH
B0840 63503-0400
TEMPORARY TRAFFIC
CONTROL,
CONCRETE BARRIER
2,500.000 LNFT
B0850 63506-0500 TEMPORARY TRAFFIC
CONTROL, FLAGGER 10,000.000 HOUR
B0860 63506-0600 TEMPORARY TRAFFIC
CONTROL, PILOT CAR 1,120.000 HOUR
B0870 63507-0800
TEMPORARY TRAFFIC
CONTROL, PORTABLE
CHANGEABLE
MESSAGE SIGN
200.000 DAY
B0880 63510-0100
TEMPORARY TRAFFIC
CONTROL, TRAFFIC
CONTROL
SUPERVISOR
40.000 WEEK
B0890 63701-0000 FIELD OFFICE 1.000 EACH
B0900 64620-0400 REMOVE AND RESET
MAILBOX 19.000 EACH
Submitted By: Schedule Total:
Bid Schedule Project: NV FLAP NYE 10(1), BOB RUUD MEM HWY & BELL VISTA AVE
B0070 15401-000 CONTRACTOR TESTING ALL LPSM $_________________
BID ALTERNATED ITEM (Government Furnished Lab) See page A-4
A-14
Total-Schedule(s) and Option(s) Bid Total
Schedule A, Schedule B
BID SCHEDULE SUMMARY
Schedule Bid Total
Schedule A - Base
Schedule Bid Total
Schedule B - Base
Bid Schedule Project: NV FLAP NYE 10(1), BOB RUUD MEM HWY & BELL VISTA AVE
A-15
E-38
Do not exceed 520 acres if combined grubbing and grading operations at one time.
157.07 Stormwater Pollution Prevention Plan. Prepare, submit, and implement a Construction SWPPP following the SWPPP template of the state in which the project is located. Include the Federal Highway Administration as an operator on the project in charge of plans and specifications. If the state does not provide a template, follow the SWPPP template provided by the Environmental Protection Agency (EPA) (https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates#swppp).
Provide a SWPPP according to the Stormwater Construction General Permit (CGP).
Provisions in the SWPPP are incorporated by reference into the contract. Provide an electronic copy of the SWPPP.
Based on the approved SWPPP, provide the CO a list of the planned pollution prevention devices for each of the following: erosion controls, sediment controls, and non-stormwater controls.
Implement the SWPPP as required throughout the construction period. Modify the erosion, sediment, and non-stormwater pollution control details and SWPPP plans as necessary to accommodate project site conditions and proposed construction operations. Update the SWPPP when modifying erosion, sediment, and non-stormwater pollution controls. Provide a copy of the updated SWPPP monthly to the CO for review.
157.08 Soil Erosion Control. Apply erosion control measures to stabilize soils and to control temporary concentrated flows throughout the duration of the project. Construct and maintain measures according to manufacturer’s recommendations.
157.09 Sediment Control. Apply sediment control measures to intercept, slow, and detain the flow of stormwater throughout the duration of the project. Construct and maintain measures according to manufacturer’s recommendations.
157.10 Non-Stormwater Controls. Apply non-stormwater measures as needed and as required in the SWPPP to control non-stormwater discharges, and to prevent or limit potential pollutants at their source from contact with stormwater throughout the duration of the project. Construct and maintain measures according to manufacturer’s recommendations.
157.11 Acceptance. Material for erosion, sediment, and non-stormwater pollution control measures will be evaluated under Subsections 106.02 and 106.03.
Construction, maintenance, and removal of erosion control, sediment control, and non-stormwater controls will be evaluated under Subsections 106.02 and 106.04.
Measurement
AMENDMENT A001 05.20.2026
denise.martinez Cross-Out
Sheet and Description
B7 B7 B8 B10-B12 B13 B14 B15-B21 B22-B24 B25
Survey and
Staking
Summary
Miscellaneous
Summary
Grading
Summary
Surfacing
Summary
Drainage
Summary
Headwall and Riprap
Fill Material
Summaries
Permanent
Sign
Summary
Permanent
Pavement
Markings
Summary
Temporary
Traffic
Control
Summary
BID
SCHEDULE
A0010 15101-0000 MOBILIZATION LPSM ALL
A0020 15215-1000 SURVEY AND STAKING, APPROACH ROAD EACH 32 32
A0030 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 52 52
A0040 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING
CONTROL MILE 15.5 15.5
A0050 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 31 31
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0070 15401-0000 CONTRACTOR TESTING LPSM ALL
A0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0090 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0100 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL
A0110 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0120 20101-0000 CLEARING AND GRUBBING ACRE 45 1 46
A0130 20301-0700 REMOVAL OF DELINEATOR EACH 146 146
A0140 20301-2400 REMOVAL OF SIGN EACH 54 54
A0150 20301-2400 REMOVAL OF SIGN,(POST ONLY) EACH 44 44
A0160 20302-2100 REMOVAL OF PIPE CULVERT LNFT 1297 23 1320
A0170 20402-0000 SUBEXCAVATION CUYD 500 As approved by CO
A0180 20420-0000 EMBANKMENT CONSTRUCTION CUYD 8521 1479 10000
A0190 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 787 13 800
A0200 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2,(FILLED AND
TOPPED) CUYD 322 28 350
A0210 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3,(FILLED AND
TOPPED) CUYD 280 20 300
A0220 30101-0000 AGGREGATE BASE TON 25039 2461 27500
A0240 30401-5200 FULL DEPTH RECLAMATION, METHOD 2, 4-INCH DEPTH MILE 10.8 0.2 11
A0250 30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH MILE 4.6 0.4 5
A0260 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH
OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3
TO <3 MILLION ESAL TON 63038 8962 72000
A0280 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 630.4 89.6 720
A0300 40601-0000 FOG SEAL TON 144.5 5.5 150
A0310 41101-1000 PRIME COAT, METHOD 1 TON 481.8 18.2 500
A0320 41105-0000 BLOTTER TON 496.7 13.3 510
A0330 41201-0000 TACK COAT TON 144.5 5.5 150
A0340 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH SQYD 1605.9 14.1 1620
A0350 55401-1000 REINFORCING STEEL LB 3440 60 3500
A0360 60101-0000 CONCRETE CUYD 44.2 0.8 45
A0370 60103-0140 CONCRETE, HEADWALL FOR 24-INCH PIPE CULVERT EACH 2 2
A0380 60103-0180 CONCRETE, HEADWALL FOR 36-INCH PIPE CULVERT EACH 2 2
PAY ITEM
NUMBER
LINE
ITEM
NO.
c p w w o rk in g \c e n tr a l0
\d
N V F
L A P N
Y E
(1
S c h A
S O
Q .x ls m
]S h e e t
-M a y -2
:0 P
M
A
M
E
N
D
SUMMARY OF QUANTITIES - Schedule A
Milestone: Amendment A001 EE; Date Completed: 5/14/2026
Remarks and/or
Determination of
Estimated Quantity
Estimated
Quantities
ALLOWANCEUNITPAY ITEM DESCRIPTION
PROJECT
B1
NV FLAP NYE 10(1)
BOB RUUD MEM HWY
SHEET
NUMBER
JESSE L.
OMTVEDT
05/15/2026
12/31/2027
Survey and
Staking
Summary
Miscellaneous
Summary
Grading
Summary
Surfacing
Summary
Drainage
Summary
Headwall and Riprap
Fill Material
Summaries
Permanent
Sign
Summary
Permanent
Pavement
Markings
Summary
Temporary
Traffic
Control
Summary
BID
SCHEDULE
A0390 60103-0220 CONCRETE, HEADWALL FOR 48-INCH PIPE CULVERT EACH 8 8
A0400 60103-0640 CONCRETE, HEADWALL FOR DOUBLE 30-INCH PIPE CULVERT EACH 2 2
A0410 60201-0400 12-INCH PIPE CULVERT LNFT 176 9 185
A0420 60201-0600 18-INCH PIPE CULVERT LNFT 264 16 280
A0430 60201-0800 24-INCH PIPE CULVERT LNFT 1192 18 1210
A0440 60201-0900 30-INCH PIPE CULVERT LNFT 188 12 200
A0450 60201-1000 36-INCH PIPE CULVERT LNFT 362 23 385
A0460 60201-1200 48-INCH PIPE CULVERT LNFT 259 11 270
A0470 60210-0400 END SECTION FOR 12-INCH PIPE CULVERT EACH 8 8
A0480 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT EACH 12 12
A0490 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 50 50
A0500 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT EACH 4 4
A0510 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 14 14
A0520 61901-3300 FENCE, TORTOISE BARRIER LNFT 3000 3000
A0530 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 120
A0540 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 24-INCH WIDTH HOUR 100
A0550 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 100
A0560 62201-1450 BULLDOZER, 350HP MINIMUM FLYWHEEL POWER HOUR 100
A0570 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 100
A0580 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 100
A0590 62301-0000 GENERAL LABOR HOUR 60
A0600 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 60
A0610 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES,(ADTB) LPSM ALL
A0620 62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH ACRE 38.7 1.3 40
A0630 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 38.7 1.3 40
A001 A0635 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 38.7 1.3 40
A0640 63301-0000 SIGN SYSTEM EACH 64 64
A0650 63301-0000 SIGN SYSTEM,(WITH FLASHING BEACON) EACH 8 8
A0660 63306-0400 POST, STEEL, 2-INCH X 2-INCH EACH 44 44
A0670 63308-2000 OBJECT MARKER, TYPE 2 EACH 48 48
A0680 63309-0200 DELINEATOR, TYPE 2 EACH 970 970
A0690 63314-0000 RUMBLE STRIP MILE 1.5 0.2 1.7
A0700 63316-1000 REMOVE AND RESET SIGN,(PANEL ONLY) EACH 44 44
A0710 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 2184 66 2250
A0720 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 46.1 0.9 47
A0730 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN MILE 20.9 1.1 22
A0740 63406-0100 RAISED PAVEMENT MARKER, NON-REFLECTIVE EACH 312 8 320
A0750 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 20 20
A0760 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 300 300
ALLOWANCE
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity c p w w o rk in g \c e n tr a l0
\d
N V F
L A P N
Y E
(1
S c h A
S O
Q .x ls m
]S h e e t
(2
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
LINE
ITEM
NO.
-M a y -2
:0 P
M
Milestone: Amendment A001 EE; Date Completed: 5/14/2026
PAY ITEM
NUMBER
PAY ITEM DESCRIPTION UNIT
PROJECT
B2
NV FLAP NYE 10(1)
BOB RUUD MEM HWY
SHEET
NUMBER
JESSE L.
OMTVEDT
05/15/2026
Survey and
Staking
Summary
Miscellaneous
Summary
Grading
Summary
Surfacing
Summary
Drainage
Summary
Headwall and Riprap
Fill Material
Summaries
Permanent
Sign
Summary
Permanent
Pavement
Markings
Summary
Temporary
Traffic
Control
Summary
BID
SCHEDULE
A0770 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 200 200
A0780 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 2500 2500
A0790 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 8000 8000
A0800 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 1120 1120
A0810 63507-0800 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE
MESSAGE SIGN DAY 165 165
A0820 63510-0100 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL
SUPERVISOR WEEK 33 33
A0830 63701-0000 FIELD OFFICE EACH 1
A0840 64620-0400 REMOVE AND RESET MAILBOX EACH 19 19
ALLOWANCE
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity c p w w o rk in g \c e n tr a l0
\d
N V F
L A P N
Y E
(1
S c h A
S O
Q .x ls m
]S h e e t
(3
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
LINE
ITEM
NO.
-M a y -2
:0 P
M
Milestone: Amendment A001 EE; Date Completed: 5/14/2026
PAY ITEM
NUMBER
PAY ITEM DESCRIPTION UNIT
PROJECT
B3
NV FLAP NYE 10(1)
BOB RUUD MEM HWY
SHEET
NUMBER
JESSE L.
OMTVEDT
05/15/2026
Survey and
Staking
Summary
Miscellaneous
Summary
Grading
Summary
Surfacing
Summary
Drainage
Summary
Headwall and Riprap
Fill Material
Summaries
Permanent
Sign
Summary
Permanent
Pavement
Markings
Summary
Temporary
Traffic
Control
Summary
BID
SCHEDULE
B0010 15101-0000 MOBILIZATION LPSM ALL
B0020 15215-1000 SURVEY AND STAKING, APPROACH ROAD EACH 33 33
B0030 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 80 80
B0040 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING
CONTROL MILE 20.5 20.5
B0050 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 41 41
B0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
B0070 15401-0000 CONTRACTOR TESTING LPSM ALL
B0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0090 15701-0000 SOIL EROSION CONTROL LPSM ALL
B0100 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL
B0110 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
B0120 20101-0000 CLEARING AND GRUBBING ACRE 61.3 1.9 63.2
B0130 20301-0700 REMOVAL OF DELINEATOR EACH 196 196
B0140 20301-2400 REMOVAL OF SIGN EACH 70 70
B0150 20301-2400 REMOVAL OF SIGN,(POST ONLY) EACH 44 44
B0160 20302-2100 REMOVAL OF PIPE CULVERT LNFT 2178 22 2200
B0170 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 12264 236 12500
B0180 20401-0000 ROADWAY EXCAVATION CUYD 27789 3211 31000
B0190 20402-0000 SUBEXCAVATION CUYD 500 As directed by CO
B0200 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 787 13 800
B0210 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2,(FILLED AND
TOPPED) CUYD 571 59 630
B0220 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3,(FILLED AND
TOPPED) CUYD 433 37 470
B0230 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4,(FILLED AND
TOPPED) CUYD 46 4 50
B0240 30101-0000 AGGREGATE BASE TON 43319 4181 47500
B0260 30401-5200 FULL DEPTH RECLAMATION, METHOD 2, 4-INCH DEPTH MILE 10.8 0.2 11
B0270 30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH MILE 4.6 0.4 5
B0280 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH
OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3
TO <3 MILLION ESAL TON 76361 10639 87000
B0300 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 763.6 106.4 870
B0320 40601-0000 FOG SEAL TON 181.4 8.6 190
B0330 41101-1000 PRIME COAT, METHOD 1 TON 604.6 30.4 635
B0340 41105-0000 BLOTTER TON 623.4 31.6 655
B0350 41201-0000 TACK COAT TON 181.4 8.6 190
B0360 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH SQYD 1605.9 14.1 1620
B0370 55401-1000 REINFORCING STEEL LB 3440 60 3500
PAY ITEM
NUMBER
LINE
ITEM
NO.
c p w w o rk in g \c e n tr a l0
\d
N V F
L A P N
Y E
(1
S c h B
S O
Q .x ls m
]S h e e t
-M a y -2
:0 P
M
A
M
E
N
D
SUMMARY OF QUANTITIES - Schedule B
Milestone: Amendment A001 EE; Date Completed: 5/14/2026
Remarks and/or
Determination of
Estimated Quantity
Estimated
Quantities
ALLOWANCEUNITPAY ITEM DESCRIPTION
PROJECT
B4
NV FLAP NYE 10(1)
BOB RUUD MEM HWY
SHEET
NUMBER
JESSE L.
OMTVEDT
05/15/2026
Survey and
Staking
Summary
Miscellaneous
Summary
Grading
Summary
Surfacing
Summary
Drainage
Summary
Headwall and Riprap
Fill Material
Summaries
Permanent
Sign
Summary
Permanent
Pavement
Markings
Summary
Temporary
Traffic
Control
Summary
BID
SCHEDULE
B0380 60101-0000 CONCRETE CUYD 44.2 0.8 45
B0390 60103-0140 CONCRETE, HEADWALL FOR 24-INCH PIPE CULVERT EACH 2 2
B0400 60103-0180 CONCRETE, HEADWALL FOR 36-INCH PIPE CULVERT EACH 2 2
B0410 60103-0220 CONCRETE, HEADWALL FOR 48-INCH PIPE CULVERT EACH 8 8
B0420 60103-0640 CONCRETE, HEADWALL FOR DOUBLE 30-INCH PIPE CULVERT EACH 2 2
B0430 60103-0740 CONCRETE, HEADWALL FOR DOUBLE 60-INCH PIPE CULVERT EACH 4 4
B0440 60103-0780 CONCRETE, HEADWALL FOR DOUBLE 72-INCH PIPE CULVERT EACH 2 2
B0450 60201-0400 12-INCH PIPE CULVERT LNFT 176 9 185
B0460 60201-0600 18-INCH PIPE CULVERT LNFT 264 16 280
B0470 60201-0800 24-INCH PIPE CULVERT LNFT 2241 119 2360
B0480 60201-0900 30-INCH PIPE CULVERT LNFT 298 17 315
B0490 60201-1000 36-INCH PIPE CULVERT LNFT 419 21 440
B0500 60201-1200 48-INCH PIPE CULVERT LNFT 259 11 270
B0510 60201-1400 60-INCH PIPE CULVERT LNFT 174 16 190
B0520 60201-1600 72-INCH PIPE CULVERT LNFT 120 5 125
B0530 60210-0400 END SECTION FOR 12-INCH PIPE CULVERT EACH 8 8
B0540 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT EACH 12 12
B0550 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 88 88
B0560 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT EACH 8 8
B0570 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 16 16
B0580 61901-3300 FENCE, TORTOISE BARRIER LNFT 6000 6000 Staging areas
B0590 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 160
B0600 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 24-INCH WIDTH HOUR 120
B0610 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 120
B0620 62201-1450 BULLDOZER, 350HP MINIMUM FLYWHEEL POWER HOUR 120
B0630 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 120
B0640 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 120
B0650 62301-0000 GENERAL LABOR HOUR 80
B0660 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 80
B0670 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES,(ADTB) LPSM ALL
B0680 62406-0100 PLACING CONSERVED TOPSOIL, 2-INCH DEPTH ACRE 52.5 1.5 54
B0690 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 52.5 1.5 54
A001 B0695 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 52.5 1.5 54
B0700 63301-0000 SIGN SYSTEM EACH 87 87
B0710 63301-0000 SIGN SYSTEM,(WITH FLASHING BEACON) EACH 8 8
B0720 63306-0400 POST, STEEL, 2-INCH X 2-INCH EACH 44 44
B0730 63308-2000 OBJECT MARKER, TYPE 2 EACH 72 72
B0740 63309-0200 DELINEATOR, TYPE 2 EACH 1150 1150
B0750 63314-0000 RUMBLE STRIP MILE 16.7 0.3 17
-M a y -2
:0 P
M
Milestone: Amendment A001 EE; Date Completed: 5/14/2026
PAY ITEM
NUMBER
PAY ITEM DESCRIPTION UNIT ALLOWANCE
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity c p w w o rk in g \c e n tr a l0
\d
N V F
L A P N
Y E
(1
S c h B
S O
Q .x ls m
]S h e e t
(2
SUMMARY OF QUANTITIES - Schedule B
A
M
E
N
D
LINE
ITEM
NO.
PROJECT
B5
NV FLAP NYE 10(1)
BOB RUUD MEM HWY
SHEET
NUMBER
JESSE L.
OMTVEDT
05/15/2026
Survey and
Staking
Summary
Miscellaneous
Summary
Grading
Summary
Surfacing
Summary
Drainage
Summary
Headwall and Riprap
Fill Material
Summaries
Permanent
Sign
Summary
Permanent
Pavement
Markings
Summary
Temporary
Traffic
Control
Summary
BID
SCHEDULE
B0760 63316-1000 REMOVE AND RESET SIGN,(PANEL ONLY) EACH 44 44
B0770 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 2184 16 2200
B0780 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 117.6 2.4 120
B0790 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN MILE 26.7 1.3 28
B0800 63406-0100 RAISED PAVEMENT MARKER, NON-REFLECTIVE EACH 312 8 320
B0810 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 20 20
B0820 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 300 300
B0830 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 200 200
B0840 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 2500 2500
B0850 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 10000 10000
B0860 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 1120 1120
B0870 63507-0800 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE
MESSAGE SIGN DAY 200 200
B0880 63510-0100 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL
SUPERVISOR WEEK 40 40
B0890 63701-0000 FIELD OFFICE EACH 1
B0900 64620-0400 REMOVE AND RESET MAILBOX EACH 19 19
-M a y -2
:0 P
M
Milestone: Amendment A001 EE; Date Completed: 5/14/2026
PAY ITEM
NUMBER
PAY ITEM DESCRIPTION UNIT ALLOWANCE
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity c p w w o rk in g \c e n tr a l0
\d
N V F
L A P N
Y E
(1
S c h B
S O
Q .x ls m
]S h e e t
(3
SUMMARY OF QUANTITIES - Schedule B
A
M
E
N
D
LINE
ITEM
NO.
PROJECT
B6
NV FLAP NYE 10(1)
BOB RUUD MEM HWY
SHEET
NUMBER
JESSE L.
OMTVEDT
05/15/2026
MISCELLANEOUS SUMMARIES
SURVEY AND STAKING AND
moved tortoise fencing quantity to bottom project wide line.
AMENDMENT A001: Added Mulching Hydraulic Method item and quantities, REVISED 5/14/2026
S
U R
V E
Y A
N D
S T
A K
IN
G
A N
D M
IS
C
E L
L A
N E
O U
S S
U M
M A
R
IE
S
S h e e t] c p w w o rk in g \c e n tr a l0
\d
\T
A B
(N V
F
L A
P )N
Y E
(1 d g n
:0
A
M
M a y
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
NV
NV FLAP NYE 10(1)
B6
BOB RUUD MEM HWY
JESSE L.
OMTVEDT
05/15/2026
12/31/2027
B7
| 1 CONTRACT ID CODE: 1 |
| 2 AMENDMENTMODIFICATION NUMBER: A001 |
| 4 REQUISITIONPURCHASE REQUISITION NUMBER: HFLCEO260125PR |
| 3 EFFECTIVE DATE6 ISSUED BY CODE: |
| 5 PROJECT NUMBER If applicableRow1: |
| 9A AMENDMENT OF SOLICITATION NUMBER: 6982AF26B0000003 |
| undefined: |
| undefined_2: |
| 10A MODIFICATION OF CONTRACTORDER NUMBER: |
| CODE: |
| FACILITY CODE: |
| 10B DATED SEE ITEM 13: |
| The above numbered solicitation is amended as set forth in Item 14 The hour and date specified for receipt of Offers: Off |
| is extended: On |
| is not extended: Off |
| 13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSORDERS: |
| undefined_3: |
| A THIS CHANGE ORDER IS ISSUED PURSUANT TO Specify authority THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A: |
| undefined_4: |
| undefined_5: |
| C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: |
| undefined_6: |
| D OTHER Specify type of modification and authority: |
| is not: Off |
| is required to sign this document and return: Off |
| Date1_af_date: 5/1/26 |
| Date2_af_date: 5/20/26 |
| Text3: IFB: Remove and replace A-1 sheet. |
Bid Schedule: Remove and replace sheets A-6 through A-15 SCR's: Remove and replace sheet E-38.
Plans: Remove and replace sheets B1 through B7.