This document is a Tabulation of Bids Report for the WY FLAP JOH 14(1) North Fork Crazy Woman Creek Bridge project. The project involves replacing an existing bridge structure on Route 33/Crazy Woman Canyon Road, including reconstruction of the roadway approaches and pullout improvements. The proposed structure is a 14-foot wide, 51-foot long single span prefabricated steel bridge with a gravel deck surface.
The solicitation number is 6982AF24B000023, with bids opened on 10/01/24. The engineer's estimate for the project was $1,370,000. The low bid was submitted by Battle Ridge Builders LLC at $1,085,125, followed by MC2 Engineering and Construction ($1,393,024), TCA Group Inc. ($1,444,110), and Harrison Western Construction Corporation ($1,999,220). Key bid items include mobilization, construction surveying, quality control, micropile foundations, and temporary traffic control. The contract was awarded, but the award date is not specified in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary Sched A WY FLAP JOH 14(1).pdf | ||
| QnA 09.25.24.pdf | ||
| QnA 09.20.24.pdf | ||
| QnA 09.19.24.pdf | ||
| A002.pdf | ||
| QnA 09.17.24.pdf | ||
| QnA 09.10.24.pdf | ||
| Pre-Bid Site Visit Sign In Sheet.pdf | ||
| WY FLAP JOH 14(1)_Prebid presentation.pdf | ||
| QnA 09.03.24.pdf | ||
| A001.pdf | ||
| QnA 08.30.24.pdf | ||
| FP-14.pdf | ||
| 6982AF24B000023.pdf | ||
| HYD Report WY FLAP JOH 14(1).pdf | ||
| GEO Report Addendum WY FLAP JOH 14(1).pdf | ||
| GEO Report WY FLAP JOH 14(1).pdf | ||
| WY FLAP JOH 14(1) Plans Flattened.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 10/03/24
1 out of 9
Project No: WY FLAP JOH 14(1)
Project Name: North Fork Crazy Woman Creek Bridge
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF24B000023
Division: Central Federal Lands
State: WY County: Johnson
Federal Land: USFS Bighorn National Forest Opened at: Lakewood, Colorado
Opened by: Leslie Karsten
Date: 10/01/24
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Battle Ridge Builders LLC $1,085,125.00 354 Countryside LN Belgrade, MT 59714
MC2 Engineering and Construction, PC $1,393,023.96 850 North Main Street Sheridan, WY 82801
TCA Group Inc. $1,444,110.00 2223 Montana Avenue, Suite Billings, MT 59101
HARRISON WESTERN CONSTRUCTION CORPO $1,999,220.00
1208 Quail Street Lakewood, CO 80215
Engineer's Estimate $1,370,000.00
Contract Specialist 10/03/2024
2 out of 9
Project No: WY FLAP JOH 14(1)
Project Name: North Fork Crazy Woman Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0100 15101-0000 MOBILIZATION
Battle Ridge Builders LLC Lump Sum $271,000.00 MC2 Engineering and Construction, PC Lump Sum $38,560.00 TCA Group Inc. Lump Sum $240,000.00 HARRISON WESTERN CONSTRUCTION CORPO Lump Sum $260,000.00 Engineer's Estimate ALL LPSM Lump Sum $188,773.75
A0120 15201-0000 CONSTRUCTION SURVEY AND STAKING
Battle Ridge Builders LLC Lump Sum $9,000.00 MC2 Engineering and Construction, PC Lump Sum $12,050.00 TCA Group Inc. Lump Sum $7,500.00 HARRISON WESTERN CONSTRUCTION CORPO Lump Sum $1,050.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
A0140 15214-1000 SURVEY AND STAKING, BRIDGE
Battle Ridge Builders LLC Lump Sum $18,000.00 MC2 Engineering and Construction, PC Lump Sum $23,109.62 TCA Group Inc. Lump Sum $7,500.00 HARRISON WESTERN CONSTRUCTION CORPO Lump Sum $1,050.00 Engineer's Estimate ALL LPSM Lump Sum $12,000.00
A0160 15301-0000 CONTRACTOR QUALITY CONTROL
Battle Ridge Builders LLC Lump Sum $16,000.00 MC2 Engineering and Construction, PC Lump Sum $38,703.08 TCA Group Inc. Lump Sum $110,000.00 HARRISON WESTERN CONSTRUCTION CORPO Lump Sum $109,000.00 Engineer's Estimate ALL LPSM Lump Sum $100,000.00
A0180 15401-0000 CONTRACTOR TESTING
Battle Ridge Builders LLC Lump Sum $14,000.00 MC2 Engineering and Construction, PC Lump Sum $23,101.66 TCA Group Inc. Lump Sum $45,000.00 HARRISON WESTERN CONSTRUCTION CORPO Lump Sum $15,600.00 Engineer's Estimate ALL LPSM Lump Sum $35,000.00
A0200 15501-0000 CONSTRUCTION SCHEDULE
Battle Ridge Builders LLC Lump Sum $16,000.00 MC2 Engineering and Construction, PC Lump Sum $24,493.16 TCA Group Inc. Lump Sum $11,000.00 HARRISON WESTERN CONSTRUCTION CORPO Lump Sum $4,950.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
3 out of 9
Project No: WY FLAP JOH 14(1)
Project Name: North Fork Crazy Woman Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0220 15701-0000 SOIL EROSION CONTROL
Battle Ridge Builders LLC Lump Sum $18,000.00 MC2 Engineering and Construction, PC Lump Sum $25,378.66 TCA Group Inc. Lump Sum $18,000.00 HARRISON WESTERN CONSTRUCTION CORPO Lump Sum $55,900.00 Engineer's Estimate ALL LPSM Lump Sum $35,000.00
A0240 15802-0000 WATERING FOR DUST CONTROL
Battle Ridge Builders LLC Lump Sum $6,000.00 MC2 Engineering and Construction, PC Lump Sum $25,188.91 TCA Group Inc. Lump Sum $5,500.00 HARRISON WESTERN CONSTRUCTION CORPO Lump Sum $6,700.00 Engineer's Estimate ALL LPSM Lump Sum $55,000.00
A0260 20103-0000 CLEARING AND GRUBBING
Battle Ridge Builders LLC $40.00 $25,200.00 MC2 Engineering and Construction, PC $42.41 $26,718.30 TCA Group Inc. $32.00 $20,160.00
HARRISON WESTERN CONSTRUCTION CORPO $38.00 $23,940.00
Engineer's Estimate 630 SQYD $3.00 $1,890.00
A0280 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Battle Ridge Builders LLC Lump Sum $24,000.00 MC2 Engineering and Construction, PC Lump Sum $28,541.16 TCA Group Inc. Lump Sum $80,000.00 HARRISON WESTERN CONSTRUCTION CORPO Lump Sum $60,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
A0300 20304-2000 REMOVAL OF BRIDGE
Battle Ridge Builders LLC Lump Sum $64,000.00 MC2 Engineering and Construction, PC Lump Sum $61,431.16 TCA Group Inc. Lump Sum $68,000.00 HARRISON WESTERN CONSTRUCTION CORPO Lump Sum $62,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00
A0320 20420-0000 EMBANKMENT CONSTRUCTION
Battle Ridge Builders LLC $200.00 $13,000.00 MC2 Engineering and Construction, PC $580.19 $37,712.35 TCA Group Inc. $85.00 $5,525.00
HARRISON WESTERN CONSTRUCTION CORPO $620.00 $40,300.00
Engineer's Estimate 65 CUYD $175.00 $11,375.00
4 out of 9
Project No: WY FLAP JOH 14(1)
Project Name: North Fork Crazy Woman Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0340 20466-0000 CONSERVE AND STOCKPILE TOPSOIL
Battle Ridge Builders LLC $100.00 $1,500.00 MC2 Engineering and Construction, PC $1,776.24 $26,643.60 TCA Group Inc. $105.00 $1,575.00
HARRISON WESTERN CONSTRUCTION CORPO $800.00 $12,000.00
Engineer's Estimate 15 CUYD $15.00 $225.00
A0360 20801-0000 STRUCTURE EXCAVATION
Battle Ridge Builders LLC $200.00 $14,000.00 MC2 Engineering and Construction, PC $434.84 $30,438.80 TCA Group Inc. $65.00 $4,550.00
HARRISON WESTERN CONSTRUCTION CORPO $680.00 $47,600.00
Engineer's Estimate 70 CUYD $200.00 $14,000.00
A0380 20803-0000 STRUCTURAL BACKFILL
Battle Ridge Builders LLC $110.00 $2,200.00 MC2 Engineering and Construction, PC $959.61 $19,192.20 TCA Group Inc. $75.00 $1,500.00
HARRISON WESTERN CONSTRUCTION CORPO $690.00 $13,800.00
Engineer's Estimate 20 CUYD $300.00 $6,000.00
A0400 30202-2100 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE
Battle Ridge Builders LLC $80.00 $9,600.00 MC2 Engineering and Construction, PC $189.45 $22,734.00 TCA Group Inc. $95.00 $11,400.00
HARRISON WESTERN CONSTRUCTION CORPO $260.00 $31,200.00
Engineer's Estimate 120 TON $160.00 $19,200.00
A0420 30303-2000 AGGREGATE SURFACE RECONDITIONING
Battle Ridge Builders LLC $20.00 $2,500.00 MC2 Engineering and Construction, PC $263.75 $32,968.75 TCA Group Inc. $45.00 $5,625.00
HARRISON WESTERN CONSTRUCTION CORPO $190.00 $23,750.00
Engineer's Estimate 125 SQYD $15.00 $1,875.00
A0440 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
Battle Ridge Builders LLC $4,000.00 $80,000.00 MC2 Engineering and Construction, PC $2,540.86 $50,817.20 TCA Group Inc. $1,600.00 $32,000.00
HARRISON WESTERN CONSTRUCTION CORPO $11,900.00 $238,000.00
Engineer's Estimate 20 CUYD $3,300.00 $66,000.00
5 out of 9
Project No: WY FLAP JOH 14(1)
Project Name: North Fork Crazy Woman Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0460 55401-1000 REINFORCING STEEL
Battle Ridge Builders LLC $5.00 $11,000.00 MC2 Engineering and Construction, PC $14.70 $32,340.00 TCA Group Inc. $10.00 $22,000.00
HARRISON WESTERN CONSTRUCTION CORPO $17.50 $38,500.00
Engineer's Estimate 2,200 LB $5.00 $11,000.00
A0480 55504-0000 PRE-FABRICATED STEEL BRIDGE (14'x49')
Battle Ridge Builders LLC Lump Sum $190,000.00 MC2 Engineering and Construction, PC Lump Sum $254,278.80 TCA Group Inc. Lump Sum $235,000.00 HARRISON WESTERN CONSTRUCTION CORPO Lump Sum $370,000.00 Engineer's Estimate ALL LPSM Lump Sum $270,000.00
A0500 56320-0000 CONTAINMENT SYSTEM AND WORKER PROTECTION PLAN
Battle Ridge Builders LLC Lump Sum $10,000.00 MC2 Engineering and Construction, PC Lump Sum $36,131.16 TCA Group Inc. Lump Sum $5,000.00 HARRISON WESTERN CONSTRUCTION CORPO Lump Sum $13,400.00 Engineer's Estimate ALL LPSM Lump Sum $105,000.00
A0520 56701-0000 MICROPILE (9" dia)
Battle Ridge Builders LLC $475.00 $152,000.00 MC2 Engineering and Construction, PC $622.86 $199,315.20 TCA Group Inc. $800.00 $256,000.00
HARRISON WESTERN CONSTRUCTION CORPO $500.00 $160,000.00
Engineer's Estimate 320 LNFT $600.00 $192,000.00
A0540 56705-0000 MICROPILE LOAD VERIFICATION TEST
Battle Ridge Builders LLC $39,000.00 $39,000.00 MC2 Engineering and Construction, PC $65,503.08 $65,503.08 TCA Group Inc. $65,000.00 $65,000.00
HARRISON WESTERN CONSTRUCTION CORPO $85,700.00 $85,700.00
Engineer's Estimate 1 EACH $20,000.00 $20,000.00
A0560 56706-0000 MICROPILE PROOF LOAD TEST
Battle Ridge Builders LLC $6,500.00 $13,000.00 MC2 Engineering and Construction, PC $29,257.02 $58,514.04 TCA Group Inc. $31,500.00 $63,000.00
HARRISON WESTERN CONSTRUCTION CORPO $6,350.00 $12,700.00
Engineer's Estimate 2 EACH $7,000.00 $14,000.00
6 out of 9
Project No: WY FLAP JOH 14(1)
Project Name: North Fork Crazy Woman Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0580 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
Battle Ridge Builders LLC $130.00 $2,600.00 MC2 Engineering and Construction, PC $395.20 $7,904.00 TCA Group Inc. $245.00 $4,900.00
HARRISON WESTERN CONSTRUCTION CORPO $250.00 $5,000.00
Engineer's Estimate 20 HOUR $200.00 $4,000.00
A0600 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
Battle Ridge Builders LLC $100.00 $4,000.00 MC2 Engineering and Construction, PC $180.75 $7,230.00 TCA Group Inc. $245.00 $9,800.00
HARRISON WESTERN CONSTRUCTION CORPO $150.00 $6,000.00
Engineer's Estimate 40 HOUR $180.00 $7,200.00
A0620 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
Battle Ridge Builders LLC $140.00 $2,800.00 MC2 Engineering and Construction, PC $210.88 $4,217.60 TCA Group Inc. $225.00 $4,500.00
HARRISON WESTERN CONSTRUCTION CORPO $350.00 $7,000.00
Engineer's Estimate 20 HOUR $240.00 $4,800.00
A0640 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER
Battle Ridge Builders LLC $140.00 $2,800.00 MC2 Engineering and Construction, PC $271.13 $5,422.60 TCA Group Inc. $245.00 $4,900.00
HARRISON WESTERN CONSTRUCTION CORPO $630.00 $12,600.00
Engineer's Estimate 20 HOUR $280.00 $5,600.00
A0660 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
Battle Ridge Builders LLC $140.00 $2,800.00 MC2 Engineering and Construction, PC $301.25 $6,025.00 TCA Group Inc. $225.00 $4,500.00
HARRISON WESTERN CONSTRUCTION CORPO $650.00 $13,000.00
Engineer's Estimate 20 HOUR $270.00 $5,400.00
A0680 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Battle Ridge Builders LLC $140.00 $2,800.00 MC2 Engineering and Construction, PC $361.50 $7,230.00 TCA Group Inc. $245.00 $4,900.00
HARRISON WESTERN CONSTRUCTION CORPO $140.00 $2,800.00
Engineer's Estimate 20 HOUR $280.00 $5,600.00
7 out of 9
Project No: WY FLAP JOH 14(1)
Project Name: North Fork Crazy Woman Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0700 62301-0000 GENERAL LABOR
Battle Ridge Builders LLC $80.00 $4,000.00 MC2 Engineering and Construction, PC $84.35 $4,217.50 TCA Group Inc. $85.00 $4,250.00
HARRISON WESTERN CONSTRUCTION CORPO $90.00 $4,500.00
Engineer's Estimate 50 HOUR $100.00 $5,000.00
A0720 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Battle Ridge Builders LLC $125.00 $1,250.00 MC2 Engineering and Construction, PC $108.45 $1,084.50 TCA Group Inc. $205.00 $2,050.00
HARRISON WESTERN CONSTRUCTION CORPO $320.00 $3,200.00
Engineer's Estimate 10 HOUR $250.00 $2,500.00
A0740 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Battle Ridge Builders LLC $165.00 $3,300.00 MC2 Engineering and Construction, PC $331.38 $6,627.60 TCA Group Inc. $230.00 $4,600.00
HARRISON WESTERN CONSTRUCTION CORPO $250.00 $5,000.00
Engineer's Estimate 20 HOUR $250.00 $5,000.00
A0760 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGIST)
Battle Ridge Builders LLC Lump Sum $5,000.00 MC2 Engineering and Construction, PC Lump Sum $10,242.50 TCA Group Inc. Lump Sum $3,625.00 HARRISON WESTERN CONSTRUCTION CORPO Lump Sum $4,550.00 Engineer's Estimate ALL LPSM Lump Sum $6,000.00
A0780 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
Battle Ridge Builders LLC $45.00 $6,075.00 MC2 Engineering and Construction, PC $60.25 $8,133.75 TCA Group Inc. $45.00 $6,075.00
HARRISON WESTERN CONSTRUCTION CORPO $74.00 $9,990.00
Engineer's Estimate 135 SQYD $40.00 $5,400.00
A0800 62511-1000 SEEDING, DRY METHOD
Battle Ridge Builders LLC $18.00 $5,310.00 MC2 Engineering and Construction, PC $37.31 $11,006.45 TCA Group Inc. $30.00 $8,850.00
HARRISON WESTERN CONSTRUCTION CORPO $23.00 $6,785.00
Engineer's Estimate 295 SQYD $6.00 $1,770.00
8 out of 9
Project No: WY FLAP JOH 14(1)
Project Name: North Fork Crazy Woman Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0820 62516-1000 MULCHING, DRY METHOD
Battle Ridge Builders LLC $12.00 $3,540.00 MC2 Engineering and Construction, PC $46.16 $13,617.20 TCA Group Inc. $25.00 $7,375.00
HARRISON WESTERN CONSTRUCTION CORPO $23.00 $6,785.00
Engineer's Estimate 295 SQYD $4.75 $1,401.25
A0840 63301-0000 SIGN SYSTEM
Battle Ridge Builders LLC $1,400.00 $1,400.00 MC2 Engineering and Construction, PC $32,182.29 $32,182.29 TCA Group Inc. $6,000.00 $6,000.00
HARRISON WESTERN CONSTRUCTION CORPO $2,700.00 $2,700.00
Engineer's Estimate 1 EACH $1,300.00 $1,300.00
A0860 63308-3000 OBJECT MARKER, TYPE 3
Battle Ridge Builders LLC $350.00 $1,400.00 MC2 Engineering and Construction, PC $2,147.51 $8,590.04 TCA Group Inc. $2,000.00 $8,000.00
HARRISON WESTERN CONSTRUCTION CORPO $740.00 $2,960.00
Engineer's Estimate 4 EACH $420.00 $1,680.00
A0880 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
Battle Ridge Builders LLC $5.00 $650.00 MC2 Engineering and Construction, PC $140.52 $18,267.60 TCA Group Inc. $15.00 $1,950.00
HARRISON WESTERN CONSTRUCTION CORPO $17.00 $2,210.00
Engineer's Estimate 130 LNFT $17.00 $2,210.00
A0900 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Battle Ridge Builders LLC $60.00 $8,400.00 MC2 Engineering and Construction, PC $125.51 $17,571.40 TCA Group Inc. $150.00 $21,000.00
HARRISON WESTERN CONSTRUCTION CORPO $250.00 $35,000.00
Engineer's Estimate 140 SQFT $120.00 $16,800.00
A0920 63701-0000 FIELD OFFICE
Battle Ridge Builders LLC $8,000.00 $8,000.00 MC2 Engineering and Construction, PC $29,589.04 $29,589.04 TCA Group Inc. $16,000.00 $16,000.00
HARRISON WESTERN CONSTRUCTION CORPO $182,000.00 $182,000.00
Engineer's Estimate 1 EACH $35,000.00 $35,000.00
9 out of 9
Project No: WY FLAP JOH 14(1)
Project Name: North Fork Crazy Woman Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Total Schedule - All Items
Battle Ridge Builders LLC $1,085,125.00 MC2 Engineering and Construction, PC $1,393,023.96 TCA Group Inc. $1,444,110.00
HARRISON WESTERN CONSTRUCTION CORPO $1,999,220.00
Engineer's Estimate $1,370,000.00