About this file

This is a NFPA 72 inspection and testing report for the fire alarm system at Rocky Mountain Metropolitan Airport completed by Siemens Industry on January 31, 2022. The report documents testing of a Siemens XLS fire alarm control panel located in the main lobby at 11755 Airport Way, Broomfield, CO.

The inspection evaluated multiple system components including the control unit, primary/secondary power, notification appliances, initiating devices, and interface equipment. Key findings show that most systems passed functional testing, with two failures noted: Level 6 Elevator Lobby SD 1-159 was not in disables, and PSC-12 had a battery charger fail trouble. The report details testing of 14 control valve switches, 6 duct smoke detectors, 5 heat detectors, 17 manual pull stations, 43 system smoke detectors, and 11 waterflow devices across multiple building levels. Battery testing revealed replacement of failed batteries in Level 1 RPS units was completed during the inspection. The testing was witnessed by property representative David Garcia of the FAA, with notifications made to building management and Siemens CMS monitoring center before and after testing.

View the file

Other files for this federal contract opportunity

Other files attached to Fire Life Safety Maintenance and Testing at DEN, D01, BJC, newest first.
File Type Posted
697DCK-25-R-00096-0005.pdf PDF
697DCK-25-R-00096-0004.pdf PDF
BJC - FireAlarm Inspect Report 062923.pdf PDF
D01 Sprinkler System As-Built Drawings 1992.pdf PDF
DEN-TRACO_Fire Alarm Set.pdf PDF
DIA ATCT-Fire Alarm-FA2.pdf PDF
DIA ATCT Wet 4.pdf PDF
697DCK-25-R-00096-0003.pdf PDF
DIA ATCT-Fire Alarm-FA1.pdf PDF
DIA ATCT Wet 8.pdf PDF
DIA ATCT Wet 5.pdf PDF
ZDV Architecture Drawings.pdf PDF
BJC - System Breakdown 2023.pdf PDF
DEN ATCT Fire Suppression As-Built Binder.pdf PDF
DIA ATCT-Fire Alarm-FA3.pdf PDF
DIA ATCT Dry 1.pdf PDF
DIA ATCT Dry 2.pdf PDF
DIA ATCT Dry 3.pdf PDF
DIA ATCT Wet 6.pdf PDF
DIA ATCT Wet 7.pdf PDF
OandM Sprinkler.PDF PDF
697DCK-25-R-00096-0002.pdf PDF
697DCK-25-R-00096-0001.pdf PDF
16 - 697DCK-25-R-00096.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NFPA 72 REPORT

© Siemens Industry, Inc., Smart Infrastructure Division, 2009-2022. All rights reserved.

This report was created by TechAdvance+™, a service of Siemens Industry, Inc. Page 1 of 7

SYSTEM RECORD OF INSPECTION AND TESTING

System Name: Fire Alarm Control Panel Panel Name: 01 - Rocky Mountain Metro Airport

Inspection/Test Start Date/Time: 31 Jan 2022 0900 Inspection/Test Completion Date/Time: 31 Jan 2022 1530

Contract Info: BCO2-FIS-Denver FAA Fire and Sprinkler S (2600118537) Notification Number: 5102182085

Supplemental Form(s) Attached: Yes

1. PROPERTY INFORMATION

Name of property: ROCKY MOUNTAIN METROPOLITAN AIRPORT (4433-80021-00032)

Address: Main Lobby

Description of property:

Name of property representative: UNITED STATES (30635200), DAVID GARCIA

Address: 2200 S 216TH ST, DES MOINES, WA 98198-6547

Phone: 720-633-8620 Fax: None E-mail: DAVID.B.GARCIA@FAA.GOV

2. TESTING AND MONITORING INFORMATION

Testing organization: SIEMENS

Address: 143 Union Blvd, Suite 300, Lakewood, CO 80228

Phone: 303-279-8500 Fax: NA E-mail: NA

Monitoring organization: Siemens

Address: 8600 N Royal Lane, Suite 100, Irving, TX 75063

Phone: 866-552-7823 Fax: 800-315-4432 E-mail: alarm.admin.industry@siemens.com

Account number: NA Phone line 1: NA Phone line 2: NA

Means of transmission: Parallel Phone

Entity to which alarms are retransmitted: NA Phone: NA

3. DOCUMENTATION

On-site location of the required record documents and site-specific software:

4. DESCRIPTION OF SYSTEM OR SERVICE

4.1 Control Unit

System Name: Fire Alarm Control Panel Panel Name: 01 - Rocky Mountain Metro Airport

Panel Location and Address: Main Lobby, 11755 Airport Way, Broonmfield, CO 80021

Manufacturer: Siemens Model number: XLS

4.2 Software and Firmware

Firmware revision number: 12.03

4.3 System Power

4.3.1 Primary (Main) Power

Nominal voltage: 123.5 vac Amps: 5 Location: Main Lobby

Overcurrent protection type: Breaker Amps: 20

Disconnecting means location: Electric Room 124, EBL124, Breaker 34

4.3.2 Secondary Power

Type: Storage Battery Location: Main Lobby

Battery type (if applicable): Sealed Lead Acid Manufactured Date:

This report was created by TechAdvance+™, a service of Siemens Industry, Inc. Page 2 of 7

4.4 Notification Appliance Power Extender Panels

5. NOTIFICATIONS MADE PRIOR TO TESTING

Monitoring organization Contact: Siemens CMS Time: 0959

Building management Contact: David Garcia Time: 0950

Building occupants Contact: Time:

Authority having jurisdiction (AHJ) Contact: Time:

Other, if required Contact: Time:

6. TESTING RESULTS

6.1 Control Unit and Related Equipment

Description Visual Inspection or Functional Test Comments

Control unit Visual, Functional

Disconnect switches Functional

Fuses Not Tested

Ground-fault monitoring Functional

Interface Equipment Not Tested

Lamps/LEDs/LCDs Visual, Functional

Local annunciator Visual, Functional

Primary Power Functional

Remote annunciators Visual, Functional 200 Level 1 Link Vestibule, 201 Level 1 Exit Stair, 208 Level 8 CAB

Remote power panels Functional

Supervision Functional

Trouble signals Functional

6.2 Secondary Power

Description Visual Inspection or Functional Test Comments

Battery condition Visual, Functional

Charger test Functional

Discharge test Functional

Load voltage Functional

Remote panel batteries Visual, Functional Customer replaced failed Batteries in Level 1 RPS's

6.4 Alarm and Supervisory Alarm Initiating Device

Attach supplementary device test sheets for all initiating devices.

6.5 Notification Appliances

Attach supplementary appliance test sheets for all notification appliances.

6.6 Interface Equipment

Attach supplementary interface component test sheets for all interface components.

LOCATION SIZE TEST DATE CHARGE STATIC % GOOD CONNECTION INSTALL DATE COMMENT

FACP 55 AH 1/31/22 27.22 26.25 100% / 100% ok 2/18

Level 1 Electric Room 124 RPS 7 AH 1/31/22 27.46 0% / 40% ok Customer Replaced 1/31/22

Level 1 Link RPS 7 AH 1/31/22 27.41 0% / 40% ok Customer Replaced 1/31/22

Level 6 Tower Room 610 RPS 7 AH 1/31/22 27.55 26.7 100% / 100% ok 1/21

BATTERY TESTING

This report was created by TechAdvance+™, a service of Siemens Industry, Inc. Page 3 of 7

6.7 Supervising Station Monitoring

Description Received Time / Elapsed

Time Pass/Fail Comments

Alarm signal Yes 1014 Pass

Alarm restoration Yes 1145 Pass

Trouble signal Yes 1001 Pass

Trouble restoration Yes 1145 Pass

Supervisory signal Yes 1041 Pass

Supervisory restoration Yes 1111 Pass

7. NOTIFICATIONS THAT TESTING IS COMPLETE

Monitoring organization Contact: Siemens CMS Time: 1500

Building management Contact: David Garcia Time: 1515

Building occupants Contact: Time:

Authority having jurisdiction (AHJ) Contact: Time:

Other, if required Contact: Time:

8. SYSTEM RESTORED TO NORMAL OPERATION

Date: 31 Jan 2022 Time: 1530

9. CERTIFICATION

This Testing Was Performed in Accordance with Applicable NFPA Standards.

Signed: Scott Butler Date: 1/31/22

Printed name: Scott Butler, Casey Johnson Title: Technician License No.:

Organization: SIEMENS Phone: 303-279-8500

Qualifications (refer to NFPA 72, Section 10.5.3): Inspection, Testing, Service, Programming

10. SUMMARY OF EQUIPMENT MARKED AS FAILED WHEN INSPECTED OR TESTED

D1. Level 6 Elevator Lobby SD 1-159 Not In Disables

D2. PSC-12 Has ‘Battery Charger Fail’ Trouble

11. ACCEPTANCE BY OWNER OR OWNER’S REPRESENTATIVE

The undersigned accepted the test report for the system as specified herein:

Signed: Printed name: David Garcia Date:

Organization: UNITED STATES (30635200) Phone: 720-633-8620

Pursuant to applicable codes and standards, the owner or designated representative is responsible for proper maintenance and care of the system(s) identified in this report. During the site inspection, if Siemens has identified code deficiencies or impairments, Siemens will recommend certain corrective actions contained in this report. In the event the owner fails to correct such deficiencies or impairments within the required time period per the code, Siemens may be required to report such deficiencies or impairments to the Local AHJ or Fire Marshall per regulatory requirements. Customer shall hold Siemens harmless and releases Siemens of any and all liability due to Customer’s failure to correct such deficiencies or impairments.

12. OTHER

12.1 Special Procedures

12.2 Comments

This report was created by TechAdvance+™, a service of Siemens Industry, Inc. Page 4 of 7

INITIATING DEVICE SUPPLEMENTARY RECORD OF INSPECTION AND TESTING

System Name: Fire Alarm Control Panel Panel Name: 01 - Rocky Mountain Metro Airport

Inspection/Test Start Date/Time: 31 Jan 2022 0900 Inspection/Test Completion Date/Time: 31 Jan 2022 1530

Contract Info: BCO2-FIS-Denver FAA Fire and Sprinkler S (2600118537) Notification Number: 5102182085

1. PROPERTY INFORMATION

Name of property: ROCKY MOUNTAIN METROPOLITAN AIRPORT (4433-80021-00032)

Address: Main Lobby

2. INITIATING DEVICE TEST RESULTS

2.1 Initiating Devices Equipment Summary by Type

Total Qty Functionally Tested Qty

Functionally Tested %

Visually Tested

Qty

Visually Tested %

Failed Qty Failed % Device or System Type

14 14 100% 0 0% 0 0% Control Valve Switches

6 6 100% 0 0% 0 0% Duct Smoke Detectors (P) (Supv)

1 0 0% 0 0% 0 0% Generator Running

1 0 0% 0 0% 0 0% Generator Trouble

5 3 60% 2 40% 0 0% Heat Detectors

1 1 100% 0 0% 0 0% High- or Low-Pressure Switches

17 17 100% 0 0% 0 0% Manual Pull Stations

1 0 0% 0 0% 0 0% Other Alarm Initiating Devices

43 43 100% 0 0% 0 0% System Smoke Detectors (P)

11 11 100% 0 0% 0 0% Waterflow Devices

2.2 Initiating Devices Testing Results by Type

Control Valve Switches

Row Date Dev.# Location Model Visual/ Functional

Pass/ Fail

1 01/31/22 001-011^1 Main Level Backflow Tamper HTRI-D Functional Pass

2 01/31/22 001-011^2 Main Level Backflow Tamper HTRI-D Functional Pass

3 01/31/22 001-015^2 Main Level Tamper HTRI-D Functional Pass

4 01/31/22 001-048^2 Main Lvl Dry System Tamper Valve HTRI-D Functional Pass

5 01/31/22 001-103^2 Level 1 Tower Standpipe Tamper HTRI-D Functional Pass

6 01/31/22 001-104^2 Level 1 Tower Tamper HTRI-D Functional Pass

7 01/31/22 001-114^2 Level 2 Tower Tamper HTRI-D Functional Pass

8 01/31/22 001-121^2 Level 3 Tower Tamper HTRI-D Functional Pass

9 01/31/22 001-124^1 Lvl 6 Elevator Closet Tamper HTRI-R Functional Pass

10 01/31/22 001-128^2 Level 4 Tower Tamper HTRI-D Functional Pass

11 01/31/22 001-135^2 Level 5 Tower Tamper HTRI-D Functional Pass

12 01/31/22 001-151^2 Level 6 Tower Tamper HTRI-D Functional Pass

13 01/31/22 001-169^2 Level 7 Tower Tamper HTRI-D Functional Pass

14 01/31/22 001-170^2 Level 8 Tower Tamper HTRI-D Functional Pass

Duct Smoke Detectors (P) (Supv)

Functional

Pass/ Fail

1 01/31/22 001-017 Main Lvl AHU-1 Duct HFP-11 Functional Pass

2 01/31/22 001-046^1 Main Lvl Rm 132 CRAC Unit #1 HTRI-D

3 01/31/22 001-046^2 Main Lvl Rm 132 CRAC Unit #2 HTRI-D

4 01/31/22 001-138 Level 5 SPF-1 Duct HFP-11 Functional Pass

5 01/31/22 001-152 Level 6 AHU-2 Duct HFP-11 Functional Pass

This report was created by TechAdvance+™, a service of Siemens Industry, Inc. Page 5 of 7

Duct Smoke Detectors (P) (Supv)

Row Date Dev.# Location Model Visual/ Functional

Pass/ Fail

6 01/31/22 001-154 Level 6 AHU-3 Duct HFP-11 Functional Pass

Generator Running

Functional

Pass/ Fail

1 001-043^1 Main Lvl Generator Running HTRI-D

Comment: Tested By Others

Generator Trouble

Functional

Pass/ Fail

1 001-043^2 Main Lvl Generator Trouble HTRI-D

Heat Detectors

Functional

Pass/ Fail

1 01/31/22 001-007 Main Lvl Break Room 113 Heat HFPT-11 Functional Pass

2 01/31/22 001-010 Main Lvl Break Room 113 Heat HFPT-11 Functional Pass

3 01/31/22 001-014 Main Lvl Mech Room 123 Heat HFPT-11 Functional Pass

4 01/31/22 001-021^1 Main Lvl Generator Room 125 Heat HTRI-M Visual Pass

Comment: One Use HD, Visual Only

5 01/31/22 001-142^1 Level 6 Elevator Closet 608 Heat HTRI-M Visual Pass

Comment: One Use Heat Detector, Visual Only

High- or Low-Pressure Switches

Functional

Pass/ Fail

1 01/31/22 001-049^1 Main Lvl Dry System Low Air HTRI-M Functional Pass

Comment: Tested Signaling Only

Manual Pull Stations

Functional

Pass/ Fail

1 01/31/22 001-002 Main Lvl Reception 102 Pull HMS Functional Pass

2 01/31/22 001-009 Main Lvl Break Room 113 Pull HMS Functional Pass

3 01/31/22 001-013 Main Lvl Mech Room 123 Pull HMS Functional Pass

4 01/31/22 001-020 Main Lvl Generator Room 125 Pull HMS Functional Pass

5 01/31/22 001-022 Main Lvl Electric Room 124 Pull HMS Functional Pass

6 01/31/22 001-024 Main Lvl Exit Vestibule 127 Pull HMS Functional Pass

7 01/31/22 001-027 Main Lvl Tech Area 129 Exit Pull HMS Functional Pass

8 01/31/22 001-038 Main Lvl Link 134 Exit Pull HMS Functional Pass

9 01/31/22 001-040 Main Lvl Link Vestibule136 Pull HMS Functional Pass

10 01/31/22 001-106 Level 1 Exit Stair Pull HMS Functional Pass

11 01/31/22 001-112 Level 2 Elevator Lobby Pull HMS Functional Pass

12 01/31/22 001-120 Level 3 Elevator Lobby Pull HMS Functional Pass

13 01/31/22 001-127 Level 4 Elevator Lobby Pull HMS Functional Pass

14 01/31/22 001-134 Level 5 Elevator Lobby Pull HMS Functional Pass

15 01/31/22 001-148 Level 6 Stair Vestibule Pull HMS Functional Pass

16 01/31/22 001-174 Level 7 Stair Vestibule Pull HMS Functional Pass

17 01/31/22 001-178 Level 8 CAB Pull HMS Functional Pass

This report was created by TechAdvance+™, a service of Siemens Industry, Inc. Page 6 of 7

Other Alarm Initiating Devices

Row Date Dev.# Location Model Visual/ Functional

Pass/ Fail

1 001-034^1 Main Lvl Break Room 113 Hood Sys HTRI-M

System Smoke Detectors (P)

Functional

Pass/ Fail

1 01/31/22 001-001 Main Lvl Entrance Vestibule 100 HFP-11 Functional Pass

2 01/31/22 001-003 Main Lvl Corridor 103 HFP-11 Functional Pass

3 01/31/22 001-004 Main Lvl Reception 102 HFP-11 Functional Pass

4 01/31/22 001-005 Main Lvl Waiting Area 101 HFP-11 Functional Pass

5 01/31/22 001-006 Main Lvl Lockers 117 HFP-11 Functional Pass

6 01/31/22 001-016 Main Lvl Exit Vestibule 127 HFP-11 Functional Pass

7 01/31/22 001-019 Main Lvl Electric Room 124 HFP-11 Functional Pass

8 01/31/22 001-023 Main Lvl Electric Room 124 HFP-11 Functional Pass

9 01/31/22 001-025 Main Lvl Corridor 121 HFP-11 Functional Pass

10 01/31/22 001-026 Main Lvl Tech Work Area 129 HFP-11 Functional Pass

11 01/31/22 001-028 Main Lvl Tech Work Area 129 HFP-11 Functional Pass

12 01/31/22 001-029 Main Lvl Telco/LAN Room 131 HFP-11 Functional Pass

13 01/31/22 001-030 Main Lvl Electronics Room 132 HFP-11 Functional Pass

14 01/31/22 001-031 Main Lvl Electronics 132 Underfl HFP-11 Functional Pass

15 01/31/22 001-033 Main Lvl Electronics 132 Underfl HFP-11 Functional Pass

16 01/31/22 001-035 Main Lvl Corridor 114 HFP-11 Functional Pass

17 01/31/22 001-036 Main Lvl Corridor 133 HFP-11 Functional Pass

18 01/31/22 001-039 Main Lvl Link Room 135 HFP-11 Functional Pass

19 01/31/22 001-041 Main Lvl Link 134 HFP-11 Functional Pass

20 01/31/22 001-044 Main Lvl Link Vestibule 136 HFP-11 Functional Pass

21 01/31/22 001-101 Level 1 Elevator Lobby HFP-11 Functional Pass

22 01/31/22 001-111 Level 2 Elevator Lobby HFP-11 Functional Pass

23 01/31/22 001-119 Level 3 Elevator Lobby HFP-11 Functional Pass

24 01/31/22 001-126 Level 4 Elevator Lobby HFP-11 Functional Pass

25 01/31/22 001-133 Level 5 Elevator Lobby HFP-11 Functional Pass

26 01/31/22 001-136 Level 5 Data 503 HFP-11 Functional Pass

27 01/31/22 001-137 Level 5 Plumbing 504 HFP-11 Functional Pass

28 01/31/22 001-140 Level 6 Open Area 609 HFP-11 Functional Pass

29 01/31/22 001-141 Level 6 Elevator Closet 608 HFP-11 Functional Pass

30 01/31/22 001-146 Level 6 Central Vacuum Unit 603 HFP-11 Functional Pass

31 01/31/22 001-147 Level 6 Corridor by Restrooms HFP-11 Functional Pass

32 01/31/22 001-149 Level 6 Stair Vestibule HFP-11 Functional Pass

33 01/31/22 001-150 Level 6 Mechanical Room 611 HFP-11 Functional Pass

34 01/31/22 001-156 Level 6 Mechanical Room 611 HFP-11 Functional Pass

35 01/31/22 001-157 Level 6 Electronics Room 610 HFP-11 Functional Pass

36 01/31/22 001-159 Level 6 Elevator Lobby HFP-11 Functional Pass

37 01/31/22 001-163 Level 7 Stair 701 HFP-11 Functional Pass

38 01/31/22 001-166 Level 7 Elevator Shaft Access HFP-11 Functional Pass

39 01/31/22 001-168 Level 7 Console Access Ring HFP-11 Functional Pass

40 01/31/22 001-171 Level 7 Stair Vestibule HFP-11 Functional Pass

41 01/31/22 001-172 Level 7 Console Access Ring HFP-11 Functional Pass

42 01/31/22 001-173 Level 7 Stair 701 HFP-11 Functional Pass

43 01/31/22 001-179 Level 8 CAB HFP-11 Functional Pass

This report was created by TechAdvance+™, a service of Siemens Industry, Inc. Page 7 of 7

Waterflow Devices

Row Date Dev.# Location Model Visual/ Functional

Pass/ Fail

1 01/31/22 001-015^1 Main Level Water Flow HTRI-D Functional Pass

Comment: Tested Signaling Only

2 01/31/22 001-048^1 Main Lvl Dry System Waterflow HTRI-D Functional Pass

Comment: Tested Signaling Only

3 01/31/22 001-103^1 Lvl 1 Tower Standpipe Water Flow HTRI-D Functional Pass

Comment: Tested Signaling Only

4 01/31/22 001-104^1 Level 1 Tower Water Flow HTRI-D Functional Pass

Comment: Tested Signaling Only

5 01/31/22 001-114^1 Level 2 Tower Water Flow HTRI-D Functional Pass

Comment: Tested Signaling Only

6 01/31/22 001-121^1 Level 3 Tower Water Flow HTRI-D Functional Pass

Comment: Tested Signaling Only

7 01/31/22 001-128^1 Level 4 Tower Water Flow HTRI-D Functional Pass

Comment: Tested Signaling Only

8 01/31/22 001-135^1 Level 5 Tower Water Flow HTRI-D Functional Pass

Comment: Tested Signaling Only

9 01/31/22 001-151^1 Level 6 Tower Water Flow HTRI-D Functional Pass

Comment: Tested Signaling Only

10 01/31/22 001-169^1 Level 7 Tower Water Flow HTRI-D Functional Pass

Comment: Tested Signaling Only

11 01/31/22 001-170^1 Level 8 Tower Water Flow HTRI-D Functional Pass

Comment: Tested Signaling Only

See main System Record of Inspection and Testing for additional information, certifications, and approvals.