Q4 ATOP-DSR CONTROL ROOM.pdf

PDF 246 KB Posted

Attached to
Fire Protection System Inspection, Testing and Maintenance Federal contract opportunity
Solicitation number
697DCK-24-R-00343
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This document is a Fire Alarm Inspection Report for the McArthur facility located in Ronkonkoma, NY. The report details the results of testing 145 smoke detectors and 3 pull stations, all of which failed the inspection. The report lists the specific device locations and notes. It also includes a summary of the inspection deficiencies.

The related federal contract opportunity is a Solicitation for Fire Protection System Inspection, Testing and Maintenance services at the LaGuardia Air Traffic Control Tower Center and the New York Air Route Control Center in Ronkonkoma, NY. This is a firm-fixed price procurement set aside for small businesses, with a base year and four one-year option periods. The solicitation requires offerors to inspect the site and submit proposals by the specified due date. Questions must be submitted by the provided deadline, with answers posted via a solicitation amendment.

View the file

Other files for this federal contract opportunity

Other files attached to Fire Protection System Inspection, Testing and Maintenance, newest first.
File Type Posted
Q1 PSB BOILERS CHILLERS EG ROOMS.pdf PDF
Q2 ATOP-DSR CONTROL ROOM.pdf PDF
697DCK-24-R-00343 AMEND 0003.pdf PDF
Simplex ZNY SOW.pdf PDF
Q3 DYSIM ERAM CODEX ADMIN.pdf PDF
Q1 2024 Ronkonkoma Fire Alarm Final Report.pdf PDF
697DCK-24-R-00343 AMEND 0002.pdf PDF
697DCK-24-R-00343 AMEND 00001.pdf PDF
2015-4157 Rev 24.pdf PDF
SIR 697DCK-24-R-00343.pdf PDF
Customery Survey Form.docx DOCX document
2015-4187 rev 28 April 2024.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Firecraft of New York, Inc.

Fire Alarm Inspection Report

SITE: MCARTHUR 4205 JOHNSON AVE. RONKONKOMA NY 11779

Sales & Service: Fire, Smoke & Voice Evacuation Systems

TABLE OF CONTENTS

Monitoring/Jurisdiction Agencies 1

Summary Test Result – Alarm Initiating and Supervisory Devices 2

Detailed Test Results 3

Inspection Deficiencies Summary 7

Fire Alarm Inspection Report PAGE 1

Monitoring Agency: Federal Aviation Administration

Authority Having Jurisdiction” Bohemia Fire Department

Inspection Services: Firecraft of New York Inc.

Service Technician: Jake Enderle

NYC Fire Dept. Certificate: #88230529

Fire Alarm Inspection Report PAGE 2

SUMMARY TEST RESULTS –

ALARM INITIATING AND SUPERVISORY DEVICES

Device

Total

Number

Tested

Number

Failed

Number

Not Tested

Duct Detector 0 0 0 0

Heat Detector 0 0

Smoke Detector 145 145 0 0

Pull Station 3 3 0 0

Water Flow Detectors * 0 0 0 0

Tamper Switch* 0 0 0 0

*HEAT DETECTORS – VISUAL INSPECTION

Fire Alarm Inspection Report PAGE 3

DETAILED TEST RESULTS

NODE LOOP DEVICE DEVICE TYPE LOCATION TESTED NOTES

1 5 51 SMOKE ATOPS 1ST FL ST 4 ✓

1 5 50 PULL STATION ATOPS 1ST FL ✓

1 5 54 SMOKE ATOPS 1ST FL ✓

1 5 79 SMOKE ATOPS 1ST FL ✓

1 5 80 SMOKE ATOPS 1ST FL ✓

1 5 81 SMOKE ATOPS 1ST FL ✓

1 5 95 SMOKE ATOPS 1ST FL ✓

1 5 96 SMOKE ATOPS 1ST FL ✓

1 5 94 SMOKE ATOPS 1ST FL ✓

1 5 93 SMOKE ATOPS 1ST FL ✓

1 5 83 SMOKE ATOPS 1ST FL ✓

1 5 78 SMOKE ATOPS 1ST FL ✓

1 5 55 SMOKE ATOPS 1ST FL ✓

1 5 49 SMOKE ATOPS 1ST FL ✓

1 5 99 SMOKE 1ST FL WEATHER RM ✓

1 5 91 SMOKE ATOPS 1ST FL ✓

1 5 84 SMOKE ATOPS 1ST FL ✓

1 5 77 SMOKE ATOPS 1ST FL ✓

1 5 56 SMOKE ATOPS 1ST FL ✓

1 5 57 SMOKE ATOPS 1ST FL ✓

1 5 47 SMOKE 1ST FL CONTROL OPS ✓

1 5 48 SMOKE 1ST FL CONTROL OPS ✓

1 5 46 SMOKE 1ST FL CONTROL OPS ✓

1 5 75 SMOKE ATOP 1ST FL ✓

1 5 76 SMOKE ATOPS 1ST FL ✓

1 5 58 SMOKE ATOPS 1ST FL ✓

1 5 60 SMOKE ATOPS 1ST FL ✓

1 5 61 SMOKE ATOPS 1ST FL ✓

1 5 59 SMOKE ATOPS 1ST FL ✓

1 5 74 SMOKE ATOPS 1ST FL ✓

1 5 85 SMOKE ATOPS 1ST FL ✓

1 5 90 SMOKE ATOPS 1ST FL ✓

1 5 126 SMOKE ATOPS 1ST FL ✓

1 5 73 SMOKE ATOPS 1ST FL ✓

1 5 100 SMOKE ATOPS MAINTENANCE ✓

1 5 101 SMOKE ATOPS MAINTENANCE ✓

1 5 102 SMOKE ATOPS MAINTENANCE ✓

1 5 103 SMOKE ATOPS MAINTENANCE ✓

Fire Alarm Inspection Report PAGE 4

NODE LOOP DEVICE DEVICE TYPE LOCATION TESTED NOTES

1 5 64 SMOKE ATOPS 1ST FL ✓

1 5 62 SMOKE ATOPS 1ST FL ✓

1 5 44 SMOKE 1ST FL CONTROL OPS ✓

1 5 125 SMOKE ATOPS 1ST FL ✓

1 5 45 SMOKE 1ST FL CONTROL OPS ✓

1 5 43 SMOKE 1ST FL CONTROL OPS ✓

1 5 66 SMOKE ATOPS 1ST FL ✓

1 5 63 SMOKE ATOPS 1ST FL ✓

1 5 86 SMOKE ATOPS 1ST FL ✓

1 5 70 SMOKE ATOPS 1ST FL ✓

1 5 69 SMOKE ATOPS 1ST FL ✓

1 5 65 SMOKE ATOPS 1ST FL ✓

1 5 88 SMOKE ATOPS 1ST FL ✓

1 5 127 SMOKE ATOPS 1ST FL ✓

1 5 87 SMOKE ATOPS 1ST FL ✓

1 5 114 SMOKE ATOPS 1ST FL ✓

1 5 115 SMOKE ATOPS 1ST FL ✓

1 5 135 PULL STATION 1ST FL CORR TO STAIR 3 ✓

1 5 41 SMOKE 1ST FL CONTROL OPS ✓

1 5 124 SMOKE ATOPS 1ST FL ✓

1 5 42 SMOKE ATOPS CONTROL OPS ✓

1 5 113 SMOKE ATOPS 1ST FL ✓

1 5 110 SMOKE DSR 1ST FL ✓

2 1 95 SMOKE CONTROL OPEN SPACE ✓

2 1 102 SMOKE C1 OPEN SPACE ✓

2 1 103 SMOKE C1 OPEN SPACE ✓

2 1 100 SMOKE C1 OPEN SPACE ✓

2 1 99 SMOKE C1 OPEN SPACE ✓

2 1 90 SMOKE C1 OPEN SPACE ✓

1 5 118 SMOKE ATOPS 1ST FL ✓

1 5 116 SMOKE ATOPS 1ST FL ✓

1 5 112 SMOKE ATOPS 1ST FL ✓

1 5 119 SMOKE ATOPS 1ST FL ✓

1 5 121 SMOKE ATOPS 1ST FL ✓

1 5 120 SMOKE ATOPS 1ST FL ✓

2 5 111 SMOKE C1 OPEN SPACE ✓

2 5 107 SMOKE C1 OPEN SPACE ✓

2 1 110 SMOKE C1 OPEN SPACE ✓

2 1 108 SMOKE C1 OPEN SPACE ✓

2 1 85 SMOKE C1 OPEN SPACE ✓

Fire Alarm Inspection Report PAGE 5

NODE LOOP DEVICE DEVICE TYPE LOCATION ✓ NOTES

2 1 82 SMOKE C1 OPEN SPACE ✓

2 1 83 SMOKE C1 OPEN SPACE ✓

2 1 86 SMOKE C1 OPEN SPACE ✓

2 1 87 SMOKE C1 OPEN SPACE ✓

2 1 89 SMOKE C1 OPEN SPACE ✓

2 1 91 SMOKE C1 OPEN SPACE ✓

2 3 17 SMOKE C1 ISS CONTROL ✓

2 3 3 SMOKE C1 ISS CONTROL ✓

2 3 5 SMOKE C1 ISS CONTROL ✓

2 3 17 SMOKE C1 ISS CONTROL ✓

2 3 11 SMOKE C1 ISS CONTROL ✓

2 3 12 SMOKE C1 ISS CONTROL ✓

2 3 15 SMOKE C1 ISS CONTROL ✓

2 3 14 SMOKE C1 ISS CONTROL ✓

2 3 87 SMOKE C1 ISS CONTROL ✓

2 3 9 SMOKE C1 ISS CONTROL ✓

2 3 91 SMOKE C1 ISS CONTROL ✓

2 3 8 SMOKE C1 ISS CONTROL ✓

2 3 7 SMOKE C1 ISS CONTROL ✓

2 3 6 SMOKE C1 ISS CONTROL ✓

2 3 0 SMOKE C1 ISS CONTROL ✓

2 3 29 SMOKE C1 ISS CONTROL ✓

2 3 26 SMOKE C1 ISS CONTROL ✓

2 3 27 SMOKE C1 ISS CONTROL ✓

2 3 23 SMOKE C1 DRPS ROOM ✓

2 3 22 SMOKE C1 DRPS ROOM ✓

2 3 18 SMOKE C1 LCN ROOM ✓

2 3 20 SMOKE C1 LCN ROOM ✓

2 3 21 SMOKE C1 LCN ROOM ✓

2 1 9 SMOKE C1 ROOM BY STAIR ✓

2 3 39 SMOKE C1 ISS CONTROL ✓

2 3 38 SMOKE C1 ISS CONTROL ✓

2 3 36 SMOKE C1 ISS CONTROL ✓

2 3 35 SMOKE C1 ISS CONTROL ✓

2 3 34 SMOKE C1 ISS CONTROL ✓

2 3 32 SMOKE C1 ISS CONTROL ✓

2 3 56 SMOKE C1 ISS CONTROL ✓

2 3 55 SMOKE C1 ISS CONTROL ✓

2 3 48 SMOKE C1 ISS CONTROL ✓

2 3 49 SMOKE C1 ISS CONTROL ✓

Fire Alarm Inspection Report PAGE 6

NODE LOOP DEVICE DEVICE TYPE LOCATION ✓ NOTES

2 3 32 SMOKE C1 ISS CONTROL ✓

2 3 36 SMOKE C1 ISS CONTROL ✓

2 3 47 SMOKE C1 ISS CONTROL ✓

2 3 51 SMOKE C1 ISS CONTROL ✓

2 3 52 SMOKE C1 ISS CONTROL ✓

2 3 53 SMOKE C1 ISS CONTROL ✓

2 3 54 SMOKE C1 ISS CONTROL ✓

2 3 58 SMOKE C1 ISS CONTROL ✓

2 3 61 SMOKE C1 ISS CONTROL ✓

2 3 59 SMOKE C1 ISS CONTROL ✓

2 3 63 SMOKE C1 ISS CONTROL ✓

2 3 64 SMOKE C1 ISS CONTROL ✓

2 3 68 SMOKE C1 ISS CONTROL ✓

2 3 65 PULL STATION C1 ISS CONTROL ✓

2 3 69 SMOKE C1 ISS CONTROL ✓

2 3 108 SMOKE DSR NW ✓

2 3 87 SMOKE ISS CONTROL OPS ✓

2 3 86 SMOKE ISS CONTROL OPS ✓

2 3 71 SMOKE ISS CONTROL OPS ✓

2 3 72 SMOKE ISS CONTROL OPS ✓

2 3 73 SMOKE ISS CONTROL OPS ✓

2 3 75 SMOKE ISS CONTROL OPS ✓

2 3 107 SMOKE DSR NE ✓

2 3 81 SMOKE C1 CONTROL OPS ✓

2 3 76 SMOKE C1 CONTROL OPS ✓

2 3 77 SMOKE C1 CONTROL OPS ✓

2 3 80 SMOKE C1 CONTROL OPS ✓

2 3 83 SMOKE C1 CONTROL OPS ✓

2 3 85 SMOKE C1 CONTROL OPS ✓

2 3 88 SMOKE C1 CONTROL OPS ✓

Fire Alarm Inspection Report PAGE 7

58INSPECTION DEFICIENCIES SUMMARY

LOCATIONS TESTED:

• ATOPS 1ST FL

• 1ST FL WEATHER ROOM

• 1ST FL CONTROL OPS

• ATOPS MAINTENANCE

• 1ST FL CORR

• CONTROL OPEN SPACE

• C1 OPN SPACE

• C1 ISS CONTROL

• C1 DRDS ROOM

*NOTE –

Fire Alarm Inspection Report PAGE 8

10/18/23 Customer (signature On-File) Date

Rogelio Smith Date

Salvatore Geraci Date

1 Ronkonkoma Q4 2023-Cover Letter
2 RONKONKOMA Fire Alarm Inspection Report September 2023

File details come from the government source that posted it. Updated .