3. SWF Janitorial SOW (1) Updated.pdf
PDF 167 KB Posted
- Solicitation number
- 697DCK-23-R-00180
About this file
This document contains a scope of work (SOW) and related federal contract opportunity solicitation for janitorial services. The SOW outlines daily, weekly, bi-weekly, monthly, quarterly, and semi-annual cleaning tasks required at the Stewart International Airport Traffic Control Tower. The related solicitation seeks proposals for janitorial services at five locations: Stewart ATCT, Westchester County Airport ATCT, Hudson Valley Regional Airport ATCT, Farmingdale Flight Standard District Office, and Farmingdale Manufacturing Inspection District Office. The procurement is set aside for total small business and consists of a base year and four one-year options, running from July 2023 through June 2028. Proposals are due by the date and time specified in the solicitation to the contact listed. The contractor must supply all materials and tools to complete the tasks outlined in the SOWs and in accordance with the Department of Labor wage determinations.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STEWART INTERNATIONAL AIRPORT (SWF) TRAFFIC CONTROL TOWER
JANITORIAL SCOPE OF WORK
GENERAL: The SWF Air Traffic Control Tower is operational and staffed seven days per week, including holidays. BASIC SERVICES* must be performed seven days per week, Monday – Sunday TO INCLUDE ALL HOLIDAYS. ALL OTHER TASKS must be accomplished Monday – Sunday, between the hours of 7AM and 10AM, EXCLUDING
HOLIDAYS.
Prior to the commencement of work, a scheduled meeting must be held between the contractor and FAA. This pre-commencement meeting must establish the agreed upon hours of service, materials and supplies to be employed and check list of services rendered.
The contractor must supply all materials, supplies, and tools necessary to accomplish all tasks as outlined. All materials and supplies must be of commercial grade, acceptance of which must be approved by the FAA. The use of subcontractors must be permitted for tasks normally outside the scope of commercial janitorial/custodial services.
*Basic service requirements means cleaning and restocking of all bathrooms, emptying and disposal of all trash, vacuuming ATCT cab carpet and cleaning of break room.
TASKS & FREQUENCY
DAILY:
1) REMOVE ALL TRASH FROM BUILDING. EMPTY ALL WASTEPAPER/TRASH
CANS AND REPLACE TRASH CAN LINERS. PLACE ALL GARBAGE IN FAA
PROVIDED DUMPSTER.
2) CLEAN ALL BATHROOMS. WASH AND DISINFECT ALL SINKS, TOILET
BOWLS. RESTOCK ALL BATHROOM SUPPLIES, CLEAN MIRRORS WITH
WINDOW CLEANER. CLEAN AND DISINFECT ALL FIXTURES.
3) CLEAN AND DISINFECT BREAK ROOM IN BASE BUILDING AND
KITCHENETTE AREA IN ATCT CAB, TO INCLUDE ALL TABLES, SINKS,
COUNTER TOPS, SHADES, APPLIANCES AND TV.
4) SWEEP AND MOP ALL TILED AREAS ON EACH FLOOR AND VACUUM ALL
CARPETED AREAS.
WEEKLY:
1) REMOVE FINGER PRINTS, SMUDGES, GRIME FROM ALL DOORS, DOOR
FRAMES, GLASS, BRIGHT WORK AND WALLS.
2) DUST ALL HORIZONTAL WORK SURFACES AND OFFICE FURNISHINGS, TO
INCLUDE DESKS, COUNTERS, RADIATORS, HVAC UNITS, ATCT CAB
CONSOLES AND ALL WALL-MOUNTED PICTURES, FRAMES AND PLAQUES
(IN PLACE).
3) DUST AND WIPE ALL WINDOW SHADES, INCLDING ATCT CAB SUN SHADES
AND BASE BUILDING WINDOW BLINDS
4) CLEAN WITH DAMP WIPE AND DISINFECTANT SOLUTION ALL BATHROOM
WALLS AND STALLS. POLISH ALL BATHROOM FIXTURES.
5) SWEEP AND MOP STAIRS OF TOWER, INCLUDING ALL LANDINGS. DUST OFF
WALLS AND RAILINGS OF STAIRWELL.
6) VACUUM WINDOW SILLS IN ATCT CAB AND BASE BUILDING
7) CLEAN AND DISINFECT ALL ADMINISTRATIVE PHONES AND HANDSETS
BI-WEEKLY:
1) CLEAN THE FOLLOWING AREAS OF BEBRIS (PAPER, GARBAGE, ETC):
a. PARKING LOT AND WALKWAYS
b. DUMPSTER AREA
c. YARD AREA
2) EMPTY OUT AND WIPE DOWN ALL OUTDOOR SMOKER CIGARETTE
STATIONS
MONTHLY:
1) SPRAY AND BUFF ALL HARD SURFACE FLOOR SURFACES
2) CLEAN ROOM BEHIND ATCT CAB BATHROOM, SWEEP AND MOP THE
FLOOR
3) WASH ALL WINDOWS INSIDE AND OUT, INCLUDING ATCT CAB AND BASE
BUILDING
QUARTERLY:
1) CLEAN AND DAMP WIPE WITH DISINFECTANT ALL AIR CONDITIONER
GRILLS, TO INCLUDE SUPPLY AND RETURN GRILLS THROUGHOUT THE
ATCT AND BASE BUILDING
SEMI-ANNUAL:
1) SWEEP/STRIP/WAX/POLISH ALL HARD FLOOR SURFACES THROUGHOUT
THE ATCT AND BASE BUILDING, TO INCLUDE THE FOLLOWING REMOTE
SITES:
a. HPN ASR (RADAR SITE)
b. HPN RTR (TRANSMITTER SITE)
2) STEAM CLEAN/SHAMPOO ALL CARPETED AREAS IN ATCT AND BASE
File details come from the government source that posted it. Updated .