Light Fixtures 2-28-2023.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Janitorial Services at multiple FAA Facilities: NY ARTCC in Ronkonkoma, NY and MMU ATCT in Morristown NJ
- Solicitation number
- 697DCK-23-R-00007
About this file
This document contains a federal solicitation for janitorial services at two FAA facilities and an inventory of lighting fixtures at the NY ARTCC facility. The solicitation requests proposals for janitorial services at the New York Air Route Traffic Control Center in Ronkonkoma, NY and the Morristown Air Traffic Control Tower in Morristown, NJ, with a base period from July 2023 to June 2024 and four one-year option periods. This is a set-aside for a total small business with a firm fixed price contract. Proposals are due by the date and time specified in the solicitation document and must be emailed to the contracting officer. The lighting fixture inventory sheet provides details on the types, quantities, and locations of lighting fixtures at the NY ARTCC facility buildings and floors.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| NY ARTCC Inventory of Lights | ||||||
| BUILDING/FLOOR | ROOM | FIXTURE TYPE | Light Bulb | Fixtures | Total Fixtures | Comments |
| Building Support Wing | ||||||
| Basement | Chase B52 | 1X2 | 2 | 2 |
| Operation Wing | 181 | ||||
| Basement | FTI AREA | 2X4 | T12 | 118 | |
| 1st Floor | Control Room |
| 2nd Floor | M161 | 2X2 | 7 |
| M162 | 2X2 | 10 | |
| M163 | 2X2 | 4 | |
| M164 | 2X2 | 4 | |
| M165 | 2X2 | 4 | |
| M166 | 2X2 | 4 | |
| M167 | 2X2 | 4 | |
| M168 | 2X2 | 4 | |
| Corridor M159 & 157 | 2X2 | 22 |
| Control Wing | 147 | ||||
| Basement | Mechanical Room B110 | 4X1 | T12 | 1 | |
| Chase 1&2 | 4 |
| 2nd Floor | ||||||
| Attic Space | 4X1 | T12 | 67 | |||
| NOM office | 2X2 | T12 | 14 | |||
| M153 | 2X2 | T12 | 6 | |||
| M153A | 2X2 | T12 | 6 | |||
| M154 | 2X2 | T12 | 10 | |||
| M156A | 2X2 | T12 | 12 | |||
| M156B | 2X2 | T12 | 9 | |||
| CPC RM A158 | 4X1 | T12 | 18 | |||
| BUILDING/FLOOR | ROOM | FIXTURE TYPE | Light Bulb | Fixtures | Total Fixtures | Comments |
| Admin Wing | 167 | |||||
| Basement | Telc RM C8C | 4X1 | T12 | 7 | ||
| Telc RM C8B | 4X1 | T12 | 19 | |||
| Telc RM C8D | 4X1 | T12 | 2 | |||
| Telc RM C3 | 4X1 | T12 | 7 | |||
| Telc RM EP5 Printer Rm | 4X1 | T12 | 6 | |||
| Telephone Rm 5 | 4X1 | T12 | 5 | |||
| VTS | 4X1 | T12 | 5 | |||
| Vestibule C12 | 4X1 | T12 | 2 | |||
| Corridor C11 | 1X2 | T12 | 2 | |||
| Corridor C8 | 4X1 | T12 | 4 |
| 1st Floor | Corridor C122 | 4X2 | 11 |
| Ready Rm c13 | 4X2 | 4 | |
| office C130 | 4X2 | 43 | |
| office C130 | 2X2 | 3 | |
| Manager SOC B208 | 4X2 | 4 | |
| Conference rm C134 | 4X2 | 4 | |
| Comm SPVSR | 4X2 | 4 | |
| office C137 | 4X2 | 4 | |
| office C138 | 4X2 | 4 | |
| office C139 | 4X2 | 4 | |
| office C132 | 4X2 | 4 | |
| office B208 | 4X2 | 4 | |
| Storage C12 | 4X2 | 3 | |
| Freight elevator | 4X2 | 2 | |
| Tech Supply Area C119 | 4X2 | 10 |
| Support Wing | 132 | ||||
| Basement | Corridor A114, A109, A110 | 2X2 | T12 | 18 | |
| A115 Mechanical Room | 4X1 | T12 | 24 |
| 1st Floor | Corridor A219 | 2X2 | T12 | 4 | ||
| BUILDING/FLOOR | ROOM | FIXTURE TYPE | Light Bulb | Fixtures | Total Fixtures | Comments |
| 2nd Floor | Corridor 305 & 314A | 2X2 | T12 | 19 | ||
| Office A303 + A303A | 4X2 | T12 | 15 | |||
| Office A302 | 4X2 | T12 | 8 | |||
| Office A306 | 4X2 | T12 | 12 | |||
| Office A308 | 4X2 | T12 | 6 | |||
| Office A308A | 4X2 | T12 | 4 | |||
| Office A309 | 4X2 | T12 | 5 | |||
| Office A310 | 4X2 | T12 | 5 | |||
| Office A311 + A307 | 4X2 | T12 | 4 | |||
| Office A315 | 4X2 | T12 | 8 |
| Annex | 165 | |||||
| 1ST FLOOR | ||||||
| Conference Rm 1 | 2X4 | T12 | 16 | |||
| Conference Rm 1A | 2X4 | T12 | 8 | |||
| NY EFAST Rm 10 | 2X4 | T12 | 24 | 18 (2X4) + 6 (2X2) | ||
| Office Rm 15 | 2X4 | T12 | 2 | |||
| Copy Rm 16 | 2X4 | T12 | 2 | |||
| ISOG NIM Rm 9 | 2X4 | T12 | 2 | |||
| NY EFAST Manager Rm8 | 2X4 | T12 | 2 | |||
| AT training Rm 11 | 2X4 | T12 | 8 | |||
| LAN Support Rm 2 | 2X4 | T12 | 6 | |||
| Mechanical Rm 3 | 2X4 | T12 | 9 | |||
| AT training Rm 12 | 2X4 | T12 | 8 | |||
| Tech Ops Conference Rm 13 | 2X4 | T12 | 8 | |||
| Credit Union Rm 4 | 2X4 | T12 | 6 | 2 bulbs per fixture, High Ceiling | ||
| Credit Union Rm 5 | 2X4 | T12 | 3 | |||
| ESU SUP Rm 6 | 2X4 | T12 | 2 | |||
| Mens Rm 17 | 1X4 | T12 | 3 | 2 (2X2) + 1(1X4) | ||
| Ladies Rm 18 | 1X4 | T12 | 3 | 2 (2X2) + 1(1X4) | ||
| CAEG Rm 14 | 2X4 | T12 | 6 | |||
| Rm 7 Cubicles | 2X4 | T12 | 21 | 18 (2X4) + 3 (2X2) | ||
| Corridor | 2X2 | T12 | 25 | 12 (2X4) + 13 (2X2) | ||
| Utility Closet Rm 19 | 1X2 | T12 | 1 |
| BUILDING/FLOOR | ROOM | FIXTURE TYPE | Light Bulb | Fixtures | Total Fixtures | Comments |
| PSB MOD AREA | 50 | |||||
| 1ST FLOOR | ||||||
| Generator Rm 104 | 1X4 | T12 | 1 | 1 fixture in bathroom | ||
| Generator Rm 110 | 1X4 | T12 | 18 | |||
| Stairwell 106 | 1X4 | T12 | 3 | |||
| Janitor Closet 108 | 1X2 | T12 | 1 | |||
| Toilet 107 | 1X2 | T12 | 1 |
| Mechanical Rm 201 | 1X4 | T12 | 24 |
| Stairwell 202 | 1X4 | 12 | 2 |
File details come from the government source that posted it. Updated .