St Pete Layout.pdf
PDF 3 MB Posted
- Solicitation number
- 697DCK-20-R-00322
About this file
This document includes a floor plan layout and spreadsheet estimating square footage for a proposed building beautification project, along with a related federal solicitation for consolidated janitorial services.
The solicitation seeks proposals for consolidated janitorial services covering multiple sites in the Tampa, Florida area, including Tampa, Fort Myers, Sarasota and Clearwater/St. Petersburg. Vendors should review the attached solicitation, statement of work, wage determinations and site visit registration instructions. Questions are due by September 11, 2020 at 5pm Eastern and final proposals are due October 2, 2020 at 5pm Eastern. The soliciting agency is listed as the Department of Transportation Federal Aviation Administration Southwestern Region. The floor plan layout and square footage spreadsheet appear to relate to one of the sites, a PIE base building in St. Petersburg, but do not contain direct requirements for the janitorial services solicitation.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
St. Petersburg PIE Base Building Beautification Project
File: PIE Footage.xlsx Sheet: Sheet1 DRAFT 8/6/19 Version 0 Page 1 of 1
DRAFT 8/6/19 Version 0 Room # Room Name Length Width Floor (Ft2) Base (Lf) South West North East Remarks
101 Vestible 6.73 8.5 57.21 30.46 102 AT/AF Sect. w/o NewCorridor 102A 25.9 19.5 505.05 90.80
102A Corridor 6 21.5 129.00 55.00 102 AT/AF Sect. w/NewCorridor 102A 19.9 19.5 376.05 103 AF Manager 16.875 11.9 200.81 57.55 104 AF Supply 10.5 7.5 78.75 36.00
104A 102-104 9 7.5 67.50 33.00 105 Area Supervisor 8.93 11.9 106.27 41.66 106 AT Manager 11.04 16.833 185.84 55.75 107 AT Storage 11.81 5.19 61.29 34.00 108 Corridor 79.27 5.17 409.83 168.88
109 OATS 11.81 13.17 155.54 49.96
110 REC/Play 11.81 6.5 76.77 36.62
111 AT CBI 11.81 15 177.15 53.62
112 Mechanical 0.00 0.00 113 Vestible 7.33 5.17 37.90 25.00
114 AF CBI 10.68 22 234.96 65.36
115 Confer. & Training Rm 11 8.86 97.46 39.72 116 Confer. & Training Rm 11 8.86 97.46 39.72 117 Corridor 79.44 5.17 410.70 169.22 118 Equipment 0.00 0.00 119 GSS/ Logistics Storage 0.00 0.00 120 Telec 0.00 0.00 121 E/G Room 0.00 0.00 122 Equipment 0.00 0.00 123 Janitor 0.00 0.00 124 Break Room 19.5 12.42 242.19 63.84
124A Kitchen 12 7 84.00 38.00 125 Lockers 13.58 6.5 88.27 40.16 126 Men 0.00 0.00 127 Women 0.00 0.00 128 Cooridor 20 5 100.00 50.00 129 Link 28 5 140.00 66.00
Elevator Lobby 0.00 0.00 Elevator 8 4 32.00 24.00
LEGEND:
Carpet Tile 1915.84 Square Feet
VCT Tile 1635.99 Square Feet No Change
Walls
| PIE Square Footage Estimate Spreadsheet.pdf |
| Sheet1 |
File details come from the government source that posted it. Updated .