SOLICITATION, OFFER
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder"
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED BID (RFP)
ES-18-00696
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
1200 DISTRICT AVENUE
BURLINGTON MA 01803
AAQ510BOS-AFN
Robert Higgins 781-238-7670 x
02/12/2018 63
PURCHASE REQUEST NO.
697DCK-18-R-00165
10. THE CONTRACT AUTHORITY REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Provide all labor, materials, and equipment necessary for the DAB ATCT Modernization Project at Daytona Beach, FL.
In order to business with the Federal Government, you must be registered in the System for Award Management (SAM). See Clause 3.3.1-33 "System for Award Management" (October 2016).
North American Industry Classification System Size Standards (NAICS) 236220 Building
Construction. The small business size standard is: Annual Average gross for the firm's last three fiscal years cannot exceed $36.5 Million.
The FAA, as the Federal Government, is tax exempt. The awarded Prime Contractor will be responsible for any/all local, state, and/or federal taxes.
You must provide your line item lump sump price proposal as required in Section B, as well as a detailed Offer Breakdown in accordance with the divisions of the attached FAA Specs, consisting of how you calculated your proposal, i.e. labor, materials, overhead, profit, etc. If you fail to submit an offer breakdown, your proposal runs the risk of being non-responsive to the solicitation requirements, and as such could be disqualified from further consideration. Your total signed lump sum offer still needs to be provided on page 2 of this SF1442 form.
11. The Contractor shall begin performance within
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award notice to proceed. The performance period is mandatory, negotiable. (See ________________________________________________ .)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and is not required.is, B. An offer guarantee
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers must be publicly opened at that time . Sealed envelopes containing offers shall be marked to show the offeror's name and address. The solicitation number, and the date and time offers are due.
D. Offers providing less than
12B. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in item 12B.)
5 180 calendar days and complete it within ________________ ________________ calendar days after receiving
03/16/2018 x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Contract Authority acceptance after the date offers are due will not be considered and will _________________ be rejected.
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Contract Authority in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13D. Failure to insert any number means the offeror accepts the minimum in item 13D.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (MUST BE FULLY COMPLETED BY OFFEROR)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Contract Authority)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Contract Authority solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. CONTRACT AUTHORITY 31C. AWARD DATE
BY
2PAGE OF
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
1200 DISTRICT AVENUE
BURLINGTON MA 01803
AAQ510BOS-AFN
Robert Higgins
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
Continued...
Total Lump Sum proposal for DAB Modernization Project at Daytona Beach, FL:
Page #3 is left black to insert your proposal Breakdown
Section B - Supplies or Services/Prices
Section B - Schedule
SCOPE: Provide all labor, materials, and equipment necessary for the DAB ATCT Modernization Project in Daytona Beach, FL.
This is a competitive negotiated procurement, available on a Tiered Evaluation, any/all offers received off the National BOA will be evaluated initially. If a contract cannot be successfully awarded, then any/all offers received under #2 will then be considered as described below:
1. Contractors on existing National BOA contracts.
BOA Contractor must enter their BOA # here:___________________________________.
(If a BOA Task Order is ultimately awarded, these terms and clauses will rule over any inconsistencies and/or contradictions in the BOA terms and clauses.)
2. Full and Open Competition.
Resultant award will result in a firm fixed price, one job lump sum contract, which will be awarded to a single contractor.
Your total l ump sum proposal must be recorded and signed on page 2 of the SF1442 form of this solicitation package.
You must also provide your line item prices as required below:
1. DAB ATCT Modernization: ____________________________________
2. DAB ATCT Railing Replacement: ________________________________________
3. DAB Fire Life Safety Upgrades: _________________________________________
The Prime Contractor is responsible for all items of work identified in the attached FAA Specifications and provisions of the Contract as described in Section J.
A pre-offer site visit has been scheduled on 2/27/18 at 9:00AM EDT. You must coordinate this meeting location at least 48 hours in advance, by contacting Helayne Fillis at helayne.fillis@faa.gov or at 404-305-7083. Once coordinated, you must email me (Robert.higgins@faa.gov) a list of all attendees for security purposes. If you have any questions, before, during, or even after this site visit, they must be submitted to me in writing for formal response(s). If it’s not captured in writing by me, then I cannot incorporate it or any clarification, nor into this solicitation.
While this site visit is not required, interested offerers are strongly urged and expected to attend. Due to security requirements, all attendees must have a valid photo ID, i.e. state driver’s license. ALL prospective attendees must submit a list of attendance 48 hours prior to the site visit to robert.higgins@faa.gov.
The remainder of this page has been intentionally left blank.
mailto:dkamili.hitchmon@faa.gov mailto:Robert.higgins@faa.gov mailto:robert.higgins@faa.gov.
Section C - Description/Specifications
Scope of Work
1. SPECIFICATIONS and DRAWINGS: Catwalk Railing Repairs project, Daytona Beach (DAB) ATCT, Daytona Beach, Florida. Engineering Package Submittal, December 2017 .
2. FAA SPECIFICATIONS: FAA-DAB-901204 December 2017, Section 28 30 00 - Fire Detection and Alarm System.
2A. FLS UPGRADE DRAWINGS: 1. SO-D-102965-F00
2. SO-D-102965-F01
3. SO-D-102965-F02
4. SO-D-102965-F03
5. SO-D-102965-F04
6. SO-D-102965-F05
3. DAB MODERNIZATION SPECIFICATIONS: Major Modernization of the DAB ATCT Daytona Beach International Airport, FL for the US Department of Transportation Federal Aviation Administration Specifications, December 2017.
3A DAB MODERNIZATION DRAWINGS: See Drawing Index on Drawing #DAB-D-ATCT-G002 for full list of drawings.
3B. DAB MODERNIZATION Design Data Handbook: Major Modernization of the DAB ATCT Daytona Beach International Airport, FL for the US Department of Transportation Federal Aviation Administration Design Data Handbook, December 2017.
Clause List The remainder of this page has been intentionally left blank.
Section D - Packaging and Marking
Clause List
N/A
Section E - Inspection and Acceptance
Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2011)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:
http://conwrite.faa.gov.
(End of clause)
3.10.4-10 INSPECTION OF CONSTRUCTION (SEP 2009)
(a) 'Work' includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not--
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer.
The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless the Government determines that it is in the public interest to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may:
(1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or
(2) terminate for default the Contractor's right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
(j) In the absence of any formal disputes, a project will be deemed physically and financially complete within one year after final acceptance and excess funds will be deobligated at that time.
(End of clause)
Section F - Deliveries or Performance
Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2011)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:
http://conwrite.faa.gov.
(End of clause)
3.10.1-24 NOTICE OF DELAY (MAR 2009)
Section G - Contract Administration Data
Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2011)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:
http://conwrite.faa.gov.
(End of clause)
3.10.1-22 CONTRACTING OFFICER'S REPRESENTATIVE (APR 2012)
(a) The Contracting Officer may designate other Government personnel (known as the Contracting Officer's Representative) to act as his or her authorized representative for contract administration functions which do not involve changes to the scope, price, schedule, or terms and conditions of the contract. The designation will be in writing, signed by the Contracting Officer, and will set forth the authorities and limitations of the representative(s) under the contract. Such designation will not contain authority to sign contractual documents, order contract changes, modify contract terms, or create any commitment or liability on the part of the Government different from that set forth in the contract.
(b) The Contractor shall immediately contact the Contracting Officer if there is any question regarding the authority of an individual to act on behalf of the Contracting Officer under this contract.
(End of Clause)
3.10.1-23 CONTRACTING OFFICER'S REPRESENTATIVE-CONSTRUCTION CONTRACTS (APR
2012)
(a) The Contracting Officer may appoint other Government personnel to accomplish certain contract administration matters. While there shall be various titles and divisions of duties for these individuals, generically they are known as Contracting Officer's Representatives (CORs). The Contracting Officer will provide written notice of COR appointment(s), setting forth the authorities and limitations, to the Contractor within __1_ calendar days prior to the notice to proceed. COR duties may include, but are not limited to:
(1) Perform as the authorized representative of the Contracting Officer for technical matters, including interpretation of specifications and drawings, and inspection and review of work performed.
(2) Perform as the authorized representative of the Contracting Officer for administrative matters, including reviewing payments, and updated delivery schedules.
(b) These representatives are authorized to act for the Contracting Officer in all specifically delegated matters pertaining to the contract, except:
(1) contract modifications that change the contract price or cost, technical requirements or time for performance, unless delegated field change order authority;
(2) suspension or termination of the Contractor's right to proceed, either for default or for convenience;
(3) final decisions on any matters subject to appeal, e.g., disputes under the "Contract Disputes" clause; and
(4) final acceptance under the contract.
(End of clause)
G.1 INDEX FOR SPECIFICATION
If an index or table of contents is furnished in connection with specifications, it is understood that such index or table of contents is for convenience only. Its accuracy and completeness is not guaranteed, and it is not to be considered as part of the specification. In case of discrepancy between the index or table of contents and specifications, the specifications shall govern.
G.2 PAYMENTS
The Contractor shall submit an application for payment monthly, or at more frequent intervals if determined by the Contracting Officer. The application for payment shall be submitted to the COR for approval. The COR will forward the payment application to the Contracting Officer for payment processing. The application for payment shall be broken down to include a schedule of values. Also, in accordance with Clause no. 3.3.1-2 entitled “Payments under Fixed Price Construction Contracts”, applications for payments submitted require the certification stated in paragraph (c) of this referenced clause. Requests for payment that do not contain the required certification will not be processed for payment.
Payment Terms will either be Prompt Net 30 or Small Business Net 30. This clause takes precedence over any contradictions, or ambiguities, that may be listed or perceived in any other listed AMS Clause of this Solicitation Package.
Section H - Special Contract Requirements
Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2011)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:
http://conwrite.faa.gov.
(End of clause)
3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2013)
(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:
(1) Contracts written on paper and contracts in electronic form;
(2) Pen-and-ink signatures and electronic signatures; and
(3) Other legally-required written records and the same information in electronic form.
(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.
(c) Certain documents may need to be provided or maintained in original form, such as large scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.
(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.
Contractors may use the following means of electronic signature technology Email transmissions, PDF preferred..
(End of Clause)
H.1 WAGE RATE DETERMINATION
In accordance with Clause No. 3.6.2-18 entitled “Davis-Bacon Act”, for any worker that is employed in a classification that is not listed in the following wage determination, after contract award the contractor is required to submit to the Contracting Officer, Standard Form 1444, Request for Authorization of Additional Classification and Rate. The request shall contain the proposed additional classification and minimum wage rate including any fringe benefit payments.
The applicable Building Construction wage rate determination is U.S. Department of Labor General Decision Number: FL180277, dated 1/5/2018, Volusia County in the state of Florida, attached hereto, and made a part thereof.
Section I - Contract Clauses
Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2011)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:
http://conwrite.faa.gov.
(End of clause)
3.1.7-1 EXCLUSION FROM FUTURE AGENCY CONTRACTS (AUG 1997)
3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (AUG 1997)
3.1.7-4 ORGANIZATIONAL CONFLICT OF INTEREST - MITIGATION PLAN REQUIRED (APR 2012)
3.2.2.3-33 ORDER OF PRECEDENCE (MAR 2009)
3.2.2.3-42 DIFFERING SITE CONDITIONS (JUL 2004)
3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (JUL 2004)
3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 2004)
3.2.2.3-46 SUPERVISING THE CONTRACT WORK (JUL 2004)
3.2.2.3-47 PERMITS AND RESPONSIBILITIES (JUL 2004)
3.2.2.3-48 OTHER CONTRACTS (MAR 2009)
3.2.2.3-49 PROTECTING EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (JUL 2004)
3.2.2.3-50 PROPERTY PROTECTION (OCT 2014)
3.2.2.3-51 OPERATIONS AND STORAGE AREAS (APR 2012)
3.2.2.3-52 USE AND POSSESSION BEFORE THE PROJECT IS COMPLETE (JUL 2004)
3.2.2.3-53 CLEANING UP AND ROADWAY MAINTENANCE (JUL 2004)
3.2.2.3-54 PREVENTING ACCIDENTS (JUL 2004)
3.2.2.3-55 AVAILABILITY AND USE OF UTILITY SERVICES (JUL 2004)
3.2.2.3-56 SCHEDULES FOR CONSTRUCTION CONTRACTS (JUL 2004)
3.2.2.3-57 QUANTITY SURVEYS (JUL 2004)
3.2.2.3-58 LAYOUT OF WORK (MAR 2009)
3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (MAR 2009)
3.2.2.3-66 CONTRACTOR'S DAILY LOG (JUL 2004)
3.2.2.3-67 SPECIAL PRECAUTIONS FOR WORK AT OPERATING AIRPORTS (JUL 2004)
3.2.2.3-68 SAFETY AND HEALTH (OCT 2014)
3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
(OCT 2015)
3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2011)
3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)
3.2.5-1 OFFICIALS NOT TO BENEFIT (APR 1996)
3.2.5-3 GRATUITIES OR GIFTS (JAN 1999)
3.2.5-4 CONTINGENT FEES (OCT 1996)
3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2010)
3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 1996)
3.3.1-2 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (APR 1996)
3.3.1-9 INTEREST (SEP 2009)
3.3.1-15 ASSIGNMENT OF CLAIMS (APR 1996)
3.3.1-19 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS (OCT
2012)
3.3.1-31 PROGRESS PAYMENTS (NOV 2000)
3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD MANAGEMENT
(AUG 2012)
3.4.1-6 ADDITIONAL BOND SECURITY (APR 1996)
3.4.1-7 NOTICE TO PROCEED (APR 1996)
3.4.1-9 DEPOSIT OF ASSETS INSTEAD OF SURETY BONDS (APR 1996)
3.4.2-6 TAXES - CONTRACTS PERFORMED IN U.S. POSSESSIONS OR PUERTO RICO (OCT 1996)
3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED PRICE CONTRACT (APR 2013)
3.5-1 AUTHORIZATION AND CONSENT (JAN 2009)
3.5-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (JAN
2009)
3.5-4 PATENT INDEMNITY - CONSTRUCTION CONTRACTS (JAN 2009)
3.6.2-1 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT-OVERTIME COMPENSATION
(JAN 2012)
3.6.2-2 CONVICT LABOR (APR 1996)
3.6.2-9 EQUAL OPPORTUNITY (AUG 1998)
3.6.2-12 EQUAL OPPORTUNITY FOR VETERANS (JAN 2011)
3.6.2-13 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (OCT 2010)
3.6.2-16 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (APR 1996)
3.6.2-19 WITHHOLDING-LABOR VIOLATIONS (JUL 2017)
3.6.2-20 PAYROLLS AND BASIC RECORDS (APR 2017)
3.6.2-35 PREVENTION OF SEXUAL HARASSMENT (AUG 1998)
3.6.2-39 TRAFFICKING IN PERSONS (OCT 2015)
3.6.2-44 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS
ACT (JAN 2012)
3.6.3-9 OZONE DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL
HYDROFLUOROCARBONS (OCT 2016)
3.6.3-13 AFFIRMATIVE PROCUREMENT OF RECYCLED CONTENT AND PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (OCT 2016)
3.6.3-14 USE OF ENVIRONMENTALLY PREFERABLE PRODUCTS (OCT 2016)
3.6.3-16 DRUG FREE WORKPLACE (MAR 2009)
3.6.3-17 EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (OCT 2016)
3.6.3-19 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND
CONSTRUCTION CONTRACTS (OCT 2016)
3.6.3-23 DELIVERY OF ELECTRONIC AND PAPER DOCUMENTS (OCT 2016)
3.6.3-24 ASBESTOS NESHAP COMPLIANCE (OCT 2015)
3.6.3-25 AEROSOLS (OCT 2016)
3.6.3-26 FOAMS (OCT 2016)
3.6.4-5 BUY AMERICAN - STEEL AND MANUFACTURED PRODUCTS (JUL 2010)
3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)
3.6.4-11 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION OF CONTRACT
(APR 1996)
3.9.1-1 CONTRACT DISPUTES (OCT 2011)
3.9.1-2 PROTEST AFTER AWARD (AUG 1997)
3.10.1-7 BANKRUPTCY (APR 1996)
3.10.1-8 SUSPENSION OF WORK (SEP 1998)
3.10.1-15 CHANGES-CONSTRUCTION, DISMANTLING, DEMOLITION, OR REMOVAL OF
IMPROVEMENTS (JUL 1996)
3.10.1-16 CHANGES AND CHANGED CONDITIONS (APR 1996)
3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)
3.10.2-6 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS (APR
1996)
3.10.3-1 DEFINITIONS (APR 2012)
3.10.3-2 GOVERNMENT PROPERTY - BASIC CLAUSE (APR 2012)
3.10.3-2 GOVERNMENT PROPERTY - BASIC CLAUSE (APR 2012) - ALTERNATE I (APR 2004)
3.10.4-23 CONTRACTOR AND SUBCONTRACTOR COMPLIANCE WITH FASTENER ACT (NOV
1997) 3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT
1996) 3.10.6-6 DEFAULT (FIXED PRICE CONSTRUCTION) (OCT 1996)
3.13-5 SEAT BELT USE BY CONTRACTOR EMPLOYEES (OCT 2001)
3.13-11 PLAIN LANGUAGE (JUL 2006)
3.13-13 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JAN 2011)
3.13-14 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS
(OCT 2012)
3.2.2.3-41 PERFORMING WORK (JUL 2004)
The Contractor (you) must perform, using your own organization, work equivalent to at least 25 percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if you request a reduction and the CO determines that it would be to the Government's advantage to do so.
(End of clause)
3.2.2.3-50 PROPERTY PROTECTION (OCT 2014) - ALTERNATE I (JUL 2009)
(a) The Contractor (you) must construct and maintain any temporary fences, gates and other facilities needed to preserve crops, control livestock, and protect property. Before cutting a fence, you must take necessary precautions to prevent livestock from straying. You must also prevent loss of tension in or damage to adjacent portions of the fence. You must immediately replace all fencing and gates you cut, remove, damage, or destroy with new materials to the original standard. You may reuse undamaged gates.
(b) You must comply with the property owner's requests to leave gates open or closed.
(c) You must use all necessary precautions to avoid destroying surveying markers such as section corners, witness trees, property corners, mining claim markers, bench markers, triangulation stations, and the like. If you must destroy any marker, you must first notify the agency responsible for the marker, as well as the Contracting Officer's (CO) representative, and replace the markers.
(d) You must use care to prevent unnecessary damage to property in or near the work area caused by your work.
Unnecessary damage is that which you can avoid through efficient and careful performance of the work, taking into account the land rights you have. If you damage any property, you must at once notify the owner or custodian and make or arrange to make prompt and full restitution.
(e) Maps and specifications FAA (we, us) provides may not give the location of all water supply, drainage, irrigation, and other underground facilities. Before entering a tract of land for contract purposes, you must find out from the property owner (or other reasonably available source) the location of any irrigation system, domestic water system, source of water, and drainage system existing on the property, whether serving that property or other property. You must avoid damaging or obstructing these facilities or polluting water supplies.
(f) You must hold us harmless from any and all suits, actions, and claims for damages, including environmental impairment, to property arising from any of your acts or omissions, your subcontractors, or any of your employees or subcontractor employees, in any way related to the work or operations under this contract.
(g) You must indemnify and hold harmless the property owners or parties lawfully in possession against all claims or liabilities asserted by third parties, including all governmental agencies, resulting directly or indirectly from your wrongful or negligent acts or omissions.
(h) Managing and disposing of hazardous wastes and materials may expose the Contractor (you) and FAA (we) to short- and long-term liabilities. To reduce these possible liabilities you must be fully aware of the hazards and regulatory requirements associated with the hazardous materials involved in this project. You must use qualified personnel to handle and transport hazardous materials.
(i) Before commencing work, you must:
(1) Do an environmental assessment of the work the contract requires, identifying tasks which involve using, handling or transporting hazardous materials or wastes. The following work items are known to involve such substances: NONE KNOWN AT THIS TIME
(2) Submit an environmental plan identifying and dealing with each specific task involving the wastes. The plan must be specific enough to demonstrate a thorough understanding of the environmental risks and the appropriate method for dealing with them. The plan must also list the required permits and reference the regulations that govern the activities needed to deal with the materials or wastes.
(3) Meet with the CO's representatives during the preconstruction conference to discuss and to develop a mutual understanding on implementing the plan.
(4) The CO may require other tasks to be added to the plan. If the CO considers your planned methods for dealing with the risks insufficient, the CO may require you to revise the plan. Work involving hazardous materials or wastes must not start until we have approved your plan. Our review of your plan does not relieve you of liability for environmental law and regulatory compliance.
(End of clause)
3.2.2.3-68 SAFETY AND HEALTH (OCT 2014) - ALTERNATE I (JUL 2004)
(a) Before beginning work, the Contractor (you) must:
(1) Perform a hazards analysis of the work specified in this contract. Consider both the site and adjacent conditions.
Identify all significant hazards. Some of the hazards you might encounter are NONE KNOWN AT THIS TIME
(2) Submit a safety plan for dealing with each specific hazard identified, whether you or FAA identified it.
(3) Meet with the CO's representatives during the preconstruction conference to discuss and to develop a mutual understanding about the content and implementation of the plan.
(4) The CO or her or his representatives may require other hazards to be added to the plan. If the CO determines that your planned hazard avoidance measures are insufficient, the CO or a designated representative may require you to revise the plan. You may not begin work involving identified hazards unless you have submitted adequate plans to the CO and the CO has reviewed them. This approval does not relieve you of your liability for safe performance.
(End of clause)
3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (JUL 2004)
The Contractor (you) must
(a) begin work under this contract within 5 calendar days after the date you receive the notice to proceed,
(b) perform the work diligently, and
(c) complete the entire work ready for use not later than 180. The time allowed for completion must include final cleanup of the premises.
(End of clause)
3.3.1-33 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)
(a) Definitions. As used in this clause
"Data Universal Numbering System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
"Data Universal Numbering System +4 (DUNS+4) number" means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.)
This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.
"Registered in the SAM database" means that the Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the SAM database.
"System for Award Management (SAM) Database" means the primary Government repository for Contractor information required for the conduct of business with the Government.
(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the DUNS or DUNS +4 number that identifies the offeror's name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number
(i) If located within the United States, by calling Dun and Bradstreet at 1-866-705-5711 or via the Internet at http://fedgov.dnb.com/webform; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company Physical Street Address, City, State, and ZIP Code.
(iv) Company Mailing Address, City, State and ZIP Code (if different from physical street address).
(v) Company Telephone Number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document. If registered in SAM as a Service-Disabled Veteran-Owned Small Business (SDVOSB), by submission of an offer, the offeror acknowledges that they are designated as a SDVOSB by the Department of Veterans Affairs, and this designation appears as such on the Veteran Affairs website, https://www.vip.vetbiz.gov.
(g)(1)(i) If a Contractor has legally changed its business name, "doing business as" name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in AMS Procurement Guidance, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to:
(A) change the name in the SAM database;
(B) comply with the requirements of AMS regarding novation and change-of-name agreements; and
(C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide the Contracting Officer with the notification, sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims. Assignees shall be separately registered in the SAM database. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the "Suspension of payment" paragraph of the EFT clause of this contract.
(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the internet at http://www.sam.gov.
(End of Clause)
3.4.1-2 DEPOSIT OF ASSETS REQUIREMENTS (JAN 2017)
(a) Except for payment bonds required for construction contracts, any offeror required to submit a surety bond as a result of this Screening Information Request may instead deposit assets in a form acceptable to the Federal Aviation Administration in an amount of 100% of total contract value.
(b) When assets are deposited, the offeror must execute the bond form made a part of this SIR. Failure to deposit assets acceptable to the Federal Aviation Administration may be cause for termination of the contract for default.
(End of clause)
3.4.1-4 PERFORMANCE BOND REQUIREMENTS (JAN 2017)
(a) The contractor is required to submit a performance bond in a penal amount equal to 100 percent of the contract price, but for this contract the amount required by the Contracting Officer is 100% of total contract value.
(b) The bond must be executed on specified forms, and sureties must be acceptable to the Federal Aviation Administration. Corporate sureties must appear on the list in Treasury Circular 570, and the amount of the bond may not exceed the underwriting limit stated for the surety on that list.
(c) Failure to submit an acceptable bond may be cause for termination of the contract for default.
(End of clause)
3.4.1-5 PAYMENT BOND REQUIREMENTS (JAN 2017)
(a) The contractor is required to submit a payment bond in the penal amount of 100% of total contract value within the time required by the Contracting Officer.
(b) The bond must be executed on the forms attached to this SIR, and sureties must be acceptable to the Federal Aviation Administration. Corporate sureties must appear on the list in Treasury Circular 570, and the amount of the bond may not exceed the underwriting limit stated for the surety on that list.
(c) Failure to submit an acceptable bond may be cause for termination of the contract for default.
3.4.1-10 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (JUL 1996)
(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the "Schedule" or elsewhere in the contract.
(b) Before commencing work under this contract, the Contractor shall certify to the Contracting Officer in writing by letter or certificate of insurance, reflecting the FAA's contract number, that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Federal Aviation Administration's interest shall not be effective:
(1) for such period as the laws of the State in which this contract is to be performed prescribe, or
(2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the "Schedule" or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies (reflecting the FAA's contract number to ensure proper filing of documents) available to the Contracting Officer upon request.
(End of clause)
3.4.1-12 INSURANCE (JUL 1996)
(a) During the term of this contract and any extension, the contractor shall maintain at its own expense the insurance required by this clause. Insurance companies shall be acceptable to the Federal Aviation Administration. Policies shall include all terms and provisions required by the Federal Aviation Administration.
(b) The contractor shall maintain and furnish evidence of the following insurance, with the stated minimum limits:
(1) Worker's Compensation and Employer's Liability. The contractor shall comply with applicable Federal and State workers' compensation and occupational disease statutes. The contractor shall maintain employer's liability coverage of at least $100,000, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.
(2) General Liability. The contractor shall maintain bodily injury general liability insurance written on a comprehensive form of policy of at least $100,000* per person and $500,000* per occurrence. Property damage limits, if any, will be set forth elsewhere in the "Schedule."
(3) Automobile Liability. If automobiles will be used in connection with performance of this contract, the contractor shall maintain automobile liability insurance written on a comprehensive form of policy with coverage of at least $200,000* per person and $500,000* per occurrence for bodily injury and $20,000* per occurrence for property damage.
(4) Aircraft Liability. If aircraft will be used in connection with performance of this contract, the contractor shall maintain aircraft public and passenger liability insurance with coverage of at least $200,000* per person and $500,000* per occurrence for bodily injury other than passenger liability, and $200,000* per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000* multiplied by the number of seats or passengers, whichever is greater.
(5) Watercraft Liability When watercraft will be used in connection with performing the contract, the contractor shall provide watercraft liability insurance. Limits shall be at least $1,000,000* per occurrence. The policy shall include coverage for owned, non-owned and hired watercraft.
(6) Environmental Impairment Liability. When the contract may involve hazardous wastes, the contractor shall provide environmental impairment liability insurance with coverage of at least $1,000,000* bodily injury per occurrence and $1,000,000* property damage per occurrence. Such insurance shall include coverage for the clean up, removal, storage, disposal, transportation, and use of pollutants.
(7) Medical Malpractice. When the contract will involve health care services, the contractor shall maintain medical malpractice liability insurance with coverage of at least $500,000* per occurrence.
(c) Each policy shall include substantially the following provision:
"It is a condition of this policy that the company furnish written notice to the U.S. Federal Aviation Administration 30 days in advance of the effective date of any reduction in or cancellation of this policy."
(d) The contractor shall furnish a certificate of insurance or, if required by the Contracting Officer, true copies of liability policies and manually countersigned endorsements of any changes, including the FAA's contract number to ensure proper filing of documents. Insurance shall be effective, and evidence of acceptable insurance furnished, before beginning performance under this contract. Evidence of renewal shall be furnished not later than five days before a policy expires.
(e) The maintenance of insurance coverage as required by this clause is a continuing obligation, and the lapse or termination of insurance coverage without replacement coverage being obtained will be grounds for termination for default.
*Unless modified in the "Schedule"
(End of clause)
3.6.2-14 EMPLOYMENT REPORTS ON VETERANS (JAN 2011)
(a) Unless the contractor is a State or local government agency, the contractor must report at least annually, as required by the Secretary of Labor, on:
(1) The total number of employees in the contractor's workforce, by job category and hiring location, who are disabled veterans, other protected veterans, Armed Forces service medal veterans, and recently separated veterans,
(2) The total number of new employees hired during the period covered by the report, and of the total, the number of disabled veterans, other protected veterans, Armed Forces service medal veterans, and recently separated veterans;
and
(3) The maximum number and minimum number of employees of the Contractor or subcontractor at each hiring location during the period covered by the report.
(b) The above items must be reported by completing the form titled 'Federal Contractor Veterans' Employment Report VETS-100A.'
(c) Reports shall be submitted no later than September 30 of each year.
(d) The employment activity report required by paragraph (a)(2) of this clause must reflect total hires during the most recent 12-month period as of the ending date selected for the employment profile report required by paragraph (a)(1) of this clause. Contractors may select an ending date: (1) As of the end of any pay period during the period January through March 1st of the year the report is due, or (2) as of December 31, if the contractor has previous written approval from the Equal Employment Opportunity Commission to do so for purposes of submitting the Employer Information Report EEO-1 (Standard Form 100).
(e) The count of veterans reported according to paragraph (a) of this clause must be based on data known to the contractor when completing the VETS-100A. .The Contractor's knowledge of veterans status may be obtained in a variety of ways, including an invitation to applicants to self-identify (in accordance with 41 CFR 60-300.42), voluntary self-disclosure by employees, or actual knowledge of veteran status by the contractor. This paragraph does not relieve the employer of liability for a determination under 38 U.S.C. 4212.
(f) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order of $100,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor.
(End of clause)
3.6.2-18 DAVIS BACON ACT (APR 2017)
(a) All laborers and mechanics employed or working upon the site of the work will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR Part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics.