ATCT Modernization Drawings.pdf
PDF 19 MB Posted
- Solicitation number
- 697DCK-18-R-00165
About this file
ATCT Modernization Drawings (pdf)
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/21/15
N
LEGEND
CLEANOUT
EXISTING
ABBREVIATION
WATER
SANITARY SEWER
POLYVINYL CHLORIDE
SS
P.I.V.
OS&Y
RCP
CONC.
MIN.
O.D.
PVC
CONCRETE
MINIMUM
OUTSIDE DIAMETER
OPEN/SHUT AND YOKE
POST INDICATOR VALVE
G
W
GAS
REINFORCED CONCRETE PIPE
GENERAL NOTES:
RECORD DRAWING NOTES:
ACCESS AND STAGING
EQUIPMENT AND STOCKPILE HEIGHT
COORDINATION AND COMMUNICATION
TRAFFIC CONTROL
RGM
JTS
SPD
ATCT ENTRANACE
BELLEVUE AVE
HAUL ROUTE
CONTRACTOR
H I G
H W
A Y
HAUL ROUTE
CONTRACTOR
ATCT
TOWER
AIRPORT TRAFFIC CONTROL
DAB-D-ATCT-C001
CO
PROPOSED
VALVE VAULT
PUMP STATION
BUILDING
IRRIGATION
ELECTRIC
SANITARY SEWER FORCE MAIN
COMMUNICATION (TELEPHONE)
CHAIN LINK FENCE
FIBER OPTIC
LIFT STATION
FORCE MAIN VAULT
CONTROL PANEL
UNKNOWN LINE/PIPE
TRANSFORMER
VAULT
ASPHALT
CONCRETE
1x2 PULL BOX
3x3 HAND HOLE
STORM STRUCTURE
SANITARY SEWER
NOT TO SCALE
CONSTRUCTION ACCESS AND SAFETY PLAN1
C001
COTR CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE
UE UNDERGROUND ELECTRIC
RESUBMISSION.
RETURNED TO THE CONTRACTOR FOR CORRECTION AND
DRAWINGS ARE CONSIDERED UNACCEPTABLE, THEY SHALL BE
FORMAT OF SUBMITTED RECORD DRAWINGS. IF THE RECORD
THE FAA SHALL REVIEW COMPLETENESS, ACCURACY, AND 4.
FEATURES THAT WERE REVEALED DURING CONSTRUCTION.
INCLUDES BURIED OR CONCEALED CONSTRUCTION AND UTILITY
APPROVED CONSTRUCTION DRAWINGS SHALL BE NOTED. THIS
FROM THE INFORMATION PRESENTED ON THE ORIGINAL,
CONFIGURATIONS, AND ANY OTHER CHANGES OR DEVIATIONS
ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS, AND 3.
DRAWINGS OF COMPLETED CONSTRUCTION.
THESE REVISIONS SHALL BE USED TO PREPARE RECORD
DESIGN DEPICTED ON APPROVED CONSTRUCTION DRAWINGS.
FAA-APPROVED FIELD CONSTRUCTION REVISIONS TO THE
SHALL BE RESPONSIBLE FOR KEEPING TRACK OF ANY
DURING CONSTRUCTION OF THE PROJECT, CONTRACTOR 2.
SUBMITTED TO THE FAA.
PROJECT. CONSTRUCTION RECORD DRAWINGS SHALL BE
DRAWINGS AT ALL TIMES THROUGH THE DURATION OF THE
CONTRACTOR SHALL MAINTAIN UPDATED RECORD 1.
WORK WITHIN THE PERMANENT AND TEMPORARY EASEMENTS.
PERFORMED WITHIN EASEMENTS, CONTRACTOR SHALL CONFINE
WHEN CONSTRUCTION WORK RESTRICTED TO BEING 7.
WORKMANSHIP MANNER USING QUALITY MATERIALS.
ALL WORK SHALL BE CONDUCTED IN A PROFESSIONAL 6.
SHALL BE CONSIDERED FINAL.
ISSUE TO THE FAA IN WRITING. THE DECISION OF THE FAA
REQUIREMENT IS MOST STRINGENT, CONTRACTOR SHALL SUBMIT
STRINGENT. WHERE A QUESTION REMAINS ON WHICH
CONTRACTOR SHALL INCORPORATE WHICHEVER IS MOST
CONTRADICTION OR DISCREPANCY BETWEEN REQUIREMENTS,
CODES, ORDINANCES, AND REGULATIONS. IN CASE OF
THE PLANS AND SPECIFICATIONS AND LOCAL AND GOVERNMENT
ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH 5.
AUTHORIZED PERSONNEL OF THE COTR.
ALL WORK SHALL BE SUBJECT TO INSPECTION BY 4.
UNLESS INDICATED OTHERWISE.
BACK OF CURB, OR OUTSIDE FACE OF FOUNDATION WALL,
TO OR MEASURED TO STRUCTURE CENTER, EDGE OF PAVEMENT,
CALLOUTS, COORDINATES AND DIMENSIONS ARE POINTED 3.
FEET, UNLESS INDICATED OTHERWISE.
ALL DIMENSIONS, ELEVATIONS, AND STATIONS ARE IN 2.
2015.
PERFORMED BY SLIGER AND ASSOCIATES IN SEPTEMBER
TOPOGRAPHIC AND UTILITY LOCATE SURVEY. THE SURVEY WAS
SHOWN IS TAKEN FROM AERIAL PHOTOGRAPHS AND A PARTIAL
BACKGROUND PLANIMETRIC AND UTILITY INFORMATION 1.
C103 C101 C100 C002
AREAS IS PROHIBITED.
STOCKPILING OF MATERIAL WITHIN THE AIRFIELD SAFETY
PLACED AT THE HIGHEST POINT OF THE STOCKPILE.
BE IDENTIFIED WITH A 360-DEGREE RED OBSTRUCTION LIGHT
STOCKPILES ADJACENT TO AIRCRAFT OPERATIONS AREA SHALL
STOCKPILES WOULD PENETRATE AVIATION SURFACES. ALL
MATERIALS, SPOILS, OR DEBRIS IN ANY AREA WHERE SUCH
CONTRACTOR SHALL NOT STOCKPILE CONSTRUCTION 3.
ELEVATION.
SHALL HAVE BOOMS OR ARMS LOWERED TO THEIR LOWEST
WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES 2.
BE ISSUED BY AIRPORT OPERATIONS AND THE FAA.
FAA REGIONAL OFFICE. PERMISSION TO USE CRANES SHALL
COORDINATE THE SUBMITTAL OF FAA FORM 7460-1 TO THE
OPERATIONS PRIOR TO THE START OF CONSTRUCTION TO
A MINIMUM NOTICE OF 45 DAYS TO THE FAA AND AIRPORT
CRANES WILL BE USED ON-SITE, CONTRACTOR SHALL PROVIDE
PENETRATE THE AIRFIELD APPROACH SURFACES OR WHEN
(CURRENT EDITIONS). WHEN EQUIPMENT IS EXPECTED TO
ADVISORY CIRCULAR AC 150/5370-2F AND AC 150/5300-13
GOVERNED BY FEDERAL AVIATION ADMINISTRATION (FAA)
EQUIPMENT OPERATING IN AN AIRCRAFT OPERATIONS AREA IS
THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION 1.
ORIGINAL CONDITION TO THE SATISFACTION OF THE FAA.
REPAIRED TO RESTORE THE ROADS AND PAVEMENTS TO THEIR
TO CONSTRUCTION EQUIPMENT OR TRAFFIC SHALL BE
ANY DAMAGE TO ROADS AND PAVEMENTS-TO-REMAIN DUE 8.
APPROVED THE RE-OPENING OF ACTIVE AREAS.
RE-OPENED UNTIL THE FAA HAS COMPLETED INSPECTION AND
TO SCHEDULE AN INSPECTION. NO ROADWAY SHALL BE
CONTROL DEVICES, THE CONTRACTOR SHALL REQUEST THE FAA
PRIOR TO THE REMOVAL OF BARRICADES AND TRAFFIC 7.
CLOSURE PRIOR TO THE ROAD REQUIRING CLOSURE.
WEEK TO AIRPORT AND THE FAA FOR ROAD OR PARKING LOT
CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 1 6.
CONSTRUCTION LIMITS.
NO PEDESTRIAN TRAFFIC SHALL BE ALLOWED INSIDE THE 5.
EXISTING PAVEMENT-TO-REMAIN.
ONLY RUBBER-TIRE VEHICLES WILL BE ALLOWED ON 4.
REVERSE.
SIGNALING DEVICES TO SOUND AN ALARM WHEN MOVING IN
CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC 3.
MARKINGS, WHICH ARE CLEARLY VISIBLE.
MARKED WITH COMPANY DESIGNS, INSIGNIAS, OR OTHER
ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE 2.
FAA.
ROADWAY AREAS BY USING BARRICADES APPROVED BY THE
OFF THE CONSTRUCTION WORK AREA AND ASSOCIATED
PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON 1.
MEETING
OTHER CONTACTS AS DIRECTED AT PRE-CONSTRUCTION b.
911EMERGENCYa.
FOR CONTRACTOR'S USE IN CASE OF AN EMERGENCY:
THE FOLLOWING CONTACT INFORMATION IS PROVIDED 3.
FAA.
CONTRACTOR SHALL BE REVIEWED AND APPROVED BY THE
THE FAA. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE
CONSTANT COORDINATION BETWEEN ANY SUBCONTRACTORS AND
CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING 2.
PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
CONTACT INFORMATION OF REPRESENTATIVES TO THE FAA
SHALL BE PROVIDED. CONTRACTOR SHALL PROVIDE NAMES AND
ON THE CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE
PRIMARY CONSTRUCTION REPRESENTATIVE IS NOT AVAILABLE
AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S
RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO SHALL BE
CONSTRUCTION SUPERINTENDENT SHALL BE DESIGNATED THE
TIMES WHILE WORK IS IN PROGRESS. THE PRIMARY
TIMES DURING WORKING HOURS AND ACCESSIBLE AT ALL
WHO SHALL BE PRESENT ON THE CONSTRUCTION SITE AT ALL
SUPERINTENDENT, SUBJECT TO THE APPROVAL OF THE FAA,
CONTRACTOR SHALL APPOINT A PRIMARY CONSTRUCTION 1.
LEGEND, ABBREVIATIONS & GENERAL NOTES
DESIGNED
DRAWN
CHECKED D
STORM SEWER
YI YARD INLET
DI DROP INLET
INV INVERT
SD STORM DRAIN
STA STATION
YI YARD INLET
(FOD) ON THE AIRFIELD OR PROJECT SITE.
MATERIALS AND DEBRIS TO PREVENT FOREIGN OBJECT DEBRIS
14. CONTRACTOR IS RESPONSIBLE FOR SECURING ALL
SATISFACTION OF THE FAA AND AIRPORT.
RESTORED TO THEIR ORIGINAL CONDITION OR BETTER TO THE
OTHER AREAS DISTURBED BY THE CONTRACTOR SHALL BE
13.ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY
CURRENT AND VALID REGISTRATION AND INSURANCE.
SECURITY REQUIREMENTS, AND ALL VEHICLES MUST HAVE
CURRENT AND VALID PHOTO IDENTIFICATION PER AIRPORT
MAY EXPERIENCE DELAYS. ALL PERSONNEL MUST HAVE A
TO SEARCH BY SECURITY WHEN ENTERING THE AIRPORT AND
12.ALL CONTRACTOR VEHICLES AND PERSONNEL ARE SUBJECT
ORIGINAL CONDITION.
SECURITY GATE AND RESTORE SECURITY FENCE TO ITS
AT PROJECT COMPLETION, CONTRACTOR SHALL REMOVE
HOURS AND SHALL BE LOCKED DURING NON-WORKING HOURS.
GATE SHALL BE STAFFED AT ALL TIMES DURING WORKING
EXISTING FENCE STRENGTH, SIZE, AND DIMENSIONS. SECURITY
CONTRACTOR'S WORK AREA SHALL MEET OR EXCEED THE
11.SECURITY FENCING AND GATES ASSOCIATED WITH
SCHEDULED MONDAY-FRIDAY, 8:00 AM TO 3:00 PM.
PRIOR TO THOSE DELIVERIES. DELIVERIES SHALL BE
HOURS TO THE FAA REGARDING CONSTRUCTION DELIVERIES
CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 10.
VENDORS ALLOWED."
THE SIGN SHALL READ "CONSTRUCTION VEHICLES ONLY, NO
EMPLOYEES, AND DELIVERIES TO THE CONSTRUCTION SITE.
MEETING FAA APPROVAL, TO DIRECT MATERIAL SUPPLIERS,
CONSTRUCTION ENTRANCE A PROFESSIONALLY PAINTED SIGN,
CONTRACTOR SHALL PROVIDE AND INSTALL AT THE 9.
IN THE STAGING AREA.
CONTRACTOR'S EQUIPMENT AND VEHICLES SHALL BE PARKED
WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, 8.
AIRPORT.
OPERATIONAL REQUIREMENTS OF THE PROJECT SITE AND
DIRECTION OF THE FAA AND MAY CHANGE BASED ON
CONTRACTOR'S STAGING AREA IS SUBJECT TO CHANGE AT THE
ALTERNATIVES TO THE STAGING AREA LOCATIONS AS SHOWN.
THE APPROVAL OF THE FAA. CONTRACTOR MAY SUBMIT
WITHIN THE LIMITS OF CONSTRUCTION AND IS SUBJECT TO
EQUIPMENT. LOCATION OF CONTRACTOR'S STAGING SHALL BE
STAGING AND STOCKPILE AREA FOR MATERIALS AND
CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A 7.
FENCING AROUND THE ENTIRE SITE DURING CONSTRUCTION.
CONTRACTOR SHALL PROVIDE TEMPORARY CONSTRUCTION 6.
COORDINATED OTHERWISE WITH THE FAA.
AREAS WITHIN THE CONSTRUCTION LIMITS UNLESS
CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO 5.
ACTIVITIES ON A DAILY BASIS.
TO BE FREE FROM DEBRIS CAUSED FROM CONSTRUCTION
CONTRACTOR SHALL MAINTAIN ACCESS AND HAUL ROUTES 4.
EMERGENCY SERVICES OF THE CLOSURE.
FAA, POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER
CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL NOTIFY THE
IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO 3.
RESPONSE TIME.
TIMES WITHOUT DELAY TO EMERGENCY AND SECURITY VEHICLE
AREAS, AIRPORT AREAS, AND EXISTING ROADWAYS AT ALL
ALLOWS UNOBSTRUCTED EMERGENCY ACCESS TO ALL PROJECT
MAINTAIN ALL ACCESS AND HAUL ROUTES IN A MANNER THAT
CONTRACTOR SHALL COORDINATE ACTIVITIES AND 2.
REQUIREMENTS OF THE PROJECT SITE AND AIRPORT.
THE AIRPORT AND MAY CHANGE BASED ON OPERATIONAL
SUBJECT TO CHANGE AT THE DIRECTION OF THE FAA AND
AFFECTED ROUTE. ACCESS ROUTES AND HAUL ROUTES ARE
THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE
RESPONSIBILITY TO COORDINATE OFF-SITE HAUL ROUTES WITH
APPROVAL OF THE FAA. IT SHALL BE THE CONTRACTOR'S
ILLUSTRATED ON THIS DRAWING AND ARE SUBJECT TO THE
PERSONNEL, VEHICLES, EQUIPMENT, AND DELIVERIES ARE
ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR 1.
APPROVER'S TITLE
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
D A
B
A T
C T
D
C .d g n
:3
:0
P
M Z
C li e n t s
A N
F
F A
A
D A
B A
T C
T M
O D
E R
N
D e s ig n
C iv il
S h e e t s
D A
B
A T
C T
D
C .d g n
DATE
APPROVED
SOUTHERN REGION ATLANTA, GEORGIA 30320
DAYTONA FLDAYTONA BEACH INTERNATIONAL AIRPORT
FACILITIES
AIRWAY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
FEDERAL AVIATION ADMINISTRATION
SUBMITTED BY
REVIEWED BY
SUBMITTER'S TITLE
DESIGNED
DRAWN
CHECKED
ISSUED BY DATE
DRAWING NO
JCN
REV
APPROVED BY
MAJOR MODERNIZATION OF THE
AIRPORT TRAFFIC CONTROL TOWER
DAYTONA BEACH
1600018
PH: 770-587-4776
ALPHARETTA, GA 30022
3650 MANSELL ROAD, SUITE 300
PAGE OF 94
0 12/08/2017 ISSUED FOR CONSTRUCTION
12/08/2017
S T
O P
STOP STOP
SPD
RGM
JTS
0 30 6030
1" = 30'-0"
C500
DAB-D-ATCT-C002
CONSTRUCTION PHASING PLAN
C500
D
CO
C O
YI
YI
GENERAL NOTES:
TO BELLEVUE AVE
ACCESS
CONTRACTOR SITE
PHASE 1
ELECTRICAL DRAWINGS
MECHANICAL AND
SEE ARCHITECTURAL,
INTERIOR RENOVATIONS
PAVEMENT PHASING LEGEND
PHASE 3
AND SITE LIGHTING
INCLUDING ASPHALT REHABILITATION
EXTERIOR PARKING LOT RENOVATIONS
SEE NOTE 3
TEMPORARY RESTROOM TRAILER
PHASE 1
BARRICADES
PHASE 3C
BARRICADES
PHASE 3A
BARRICADES
PHASE 3B
BARRICADES
PHASE 3A & 3B
PHASE 2A
PHASE 3A
PHASE 3B
PHASE 3C
TEMPORARY BARRICADE
SCALE: 1" = 30'
CONSTRUCTION PHASING PLAN1
C002
PHASE 3D
M A
T C
H L I
E
C
PHASE 2
5.
4.
3.
2.
1.
CONSTRUCTION SIGN
BARRICADES
PHASE 2A
OPEN DURING NORMAL FAA OPERATION HOURS.
CONTRACTOR SHALL ENSURE ALL POV PARKING AREAS ARE
DOCK, OVERFLOW PARKING AREA, AND DUMPSTER. THE
THE CONTRACTOR SHALL COORDINATE ACCESS TO LOADING
TIME.
NORMAL WORKING HOURS TO MINIMIZE PARKING LOT CLOSURE
PHASE 3C CONSTRUCTION SHALL BE PERFORMED DURING OFF
HOURS OF OPERATION.
RESTROOM IS OPERATIONAL FOR FAA STAFF DURING ALL
RECOMMENDATIONS. CONTRACTOR SHALL ENSURE TRAILER
TEMPORARY POWER IN ACCORDANCE WITH MANUFACTURER'S
TANK. CONTRACTOR SHALL COORDINATE AND PROVIDE
CONTAINED WITH FRESH WATER SUPPLY TANK AND WASTE
ACCORDANCE WITH SPECIFICATIONS. TRAILER SHALL BE SELF
FOR PHASE 1 INTERIOR BATHROOM RECONSTRUCTION IN
CONTRACTOR SHALL PROVIDE TEMPORARY RESTROOM TRAILER
AND FROM BUILDING.
ARRANGEMENTS FOR THE SAFE PASSING FOR PEDESTRIANS TO
DURING CONSTRUCTION. THE CONTRACTOR SHALL MAKE
FAA ATCT AND BASE BUILDING WILL REMAIN OPERATIONAL
SEE ACCESS AND STAGING NOTES ON C001.
REPLACEMENT
SANITARY SEWER FORCEMAIN
PHASE 2B
FINE GRADE EXTERIOR
SEWER INSTALLATION
STORM INLETS AND
AND PUMP STATION REPLACEMENT
SANITARY SEWER GRAVITY OUTFALL
PHASE 2A
APPROVER'S TITLE
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
SOUTHERN REGION ATLANTA, GEORGIA 30320
DAYTONA FLDAYTONA BEACH INTERNATIONAL AIRPORT
FACILITIES
AIRWAY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
FEDERAL AVIATION ADMINISTRATION
SUBMITTED BY
REVIEWED BY
SUBMITTER'S TITLE
DESIGNED
DRAWN
CHECKED
ISSUED BY DATE
DRAWING NO
JCN
REV
APPROVED BY
MAJOR MODERNIZATION OF THE
AIRPORT TRAFFIC CONTROL TOWER
DAYTONA BEACH
1600018
PH: 770-587-4776
ALPHARETTA, GA 30022
3650 MANSELL ROAD, SUITE 300
PAGE OF 94
DEMOLITION NOTES
LEGEND
EXISTING CONDITIONS NOTES
N
JTS
JTG
JTG
0 30 6030
1" = 30'-0"
SCALE: 1" = 30'
EXISTING CONDITIONS AND DEMOLITION PLAN1
C100
SCALE: 1" = 20'
ENLARGED VIEW2
UTILITY PAVEMENT PATCH
UTILITY STRUCTURE DEMOLITION
0 20 4020
1" = 20'-0"
UTILITY LINE DEMOLITION
EXIST. 4" SS
DEMOLISH AND REMOVE
VALVE VAULT
EXIST. PUMP STATION AND
DEMOLISH AND REMOVE
EXIST. 3" PVC FM
DEMOLISH AND REMOVE
DAB-D-ATCT-C100
(N.A.D. 83)
E 638366.4530
N 1761124.8400
ELEV.=28.14' (N.A.V.D. 88)
PK NAIL/DISC LB 3019
BENCHMARK 1
(N.A.D. 83)
E 638266.5630
N 1761417.3550
ELEV.=28.99' (N.A.V.D. 88)
PK NAIL/DISC LB 3019
BENCHMARK 2
M A
T C
H L I
M A
T C
H L I
& DEMOLITION PLAN
EXISTING CONDITIONS
D
VAULT
RE-USE
LP
CONCRETE PAD
COM.
VAULT
RE-USEFIBER OPTIC
TRANSFORMER
1x2 PULL BOX
3x3 HAND HOLE
IRRIGATION
IRRIGATION
FORCE MAIN
VAULT
LIFT STATION
ASPHALT ROAD
CONTROL PANEL
UNKNOWN LINE/PIPE
LP
BUILDING LINE
ASPHALT PAVEMENT
RAMP
P L
A N
T E
R
OVERHANG
DOOR
SIDEWALK
CONCRETE
SCALE: 1" = 10'
ENLARGED VIEW3
0 10 2010
1" = 10'-0"
LANDSCAPING PLANTERS
DEMOLISH AND REMOVE
AND REPLACE MAILBOX
TEMPORARILY RELOCATE
S
ID
E W
A L
K
C O
N C
R E
T E
S C
R E
E N
E D
R O
O M
BUILDING.
10. HAND DIGGING SHALL BE REQUIRED WITHIN 5' OF EXISTING UTILITIES AND
MANUFACTURER'S RECOMMENDATION.
DETECTION LOOP. COORDINATE AND INSTALL IN ACCORDDANCE WITH GATE
CONTRACTOR SHALL DEMOLISH AND REPLACE EXISTING GATE VEHICLE 9.
ACTIVITIES.
REMOVED SHALL BE PROTECTED FROM DEMOLITION OR OTHER CONSTRUCTION
EXISTING VEGETATION AND FACILITIES WHICH ARE NOT INDICATED TO BE 8.
EXCAVATION.
ROOT SYSTEMS OF SHRUBS, PLANTS AND TREES ALONG THE AREA OF
PRACTICABLE. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT
CONTRACTOR SHALL PRESERVE EXISTING TREES AND VEGETATION WHENEVER 7.
OR REMOVED AND REPLACED AT NO ADDITIONAL COST TO OWNER.
ANY DAMAGE TO PAVEMENT AREAS DESIGNATED TO REMAIN SHALL BE REPAIRED 6.
OVER APPROXIMATELY 8 INCHES AGGREGATE BASE.
MATERIAL PRESENT. EXISTING PAVEMENT IS APPROXIMATELY 4 INCHES ASPHALT
PAVEMENT REMOVAL SHALL INCLUDE REMOVAL OF PAVEMENT AND ANY SUBBASE 5.
PAVEMENT DESIGNATED FOR SAWCUT SHALL BE SAWCUT FULL DEPTH. 4.
WITH PROPOSED PAVEMENT LAYOUT AND JOINTING PLAN.
CONTRACTOR SHALL COORDINATE LIMITS OF SAWCUT AND PAVEMENT REMOVAL 3.
TO THE WASTE DISPOSAL SITE.
TO BE CRUSHED AND/OR BROKEN UP FURTHER IN ORDER TO BE HAULED AWAY
MATERIALS: AGGREGATE AND ASPHALT. LARGE PIECES OF MATERIAL MAY NEED
LOCATIONS NOTED FOR DEBRIS REMOVAL MAY CONTAIN ANY OF THE FOLLOWING 2.
DISPOSED OF OFF AIRPORT PROPERTY.
ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY MATERIALS SHALL BE 1.
CONCRETE SIDEWALK
DEMOLISH AND REPLACE
THE OWNER.
REPAIR OR REPLACE DAMAGED OR DISTURBED ITEMS TO THE SATISFACTION OF
DAMAGED DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL
THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT TO BE 6.
THE OWNER.
RESTORED IMMEDIATELY AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF
OR STRUCTURES DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER. ANY UTILITY SERVICES
INTERFERENCE OR CONFLICT IS ENCOUNTERED DURING CONSTRUCTION, THE
OPERATIONAL PLANS. IN THE EVENT AN UNEXPECTED UTILITY OR STRUCTURE
PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE OWNER OF 5.
ENCOUNTERED DURING CONSTRUCTION.
UNDERGROUND UTILITIES INDICATED ARE REPRESENTATIVE OF THOSE TO BE
IMPLIED, THAT THE LOCATIONS, SIZE AND TYPE OF MATERIAL OF EXISTING
LOCATION OF UTILITIES. THERE IS NO GUARANTEE, EITHER EXPRESSED OR
AND ALL ASSOCATED UTILITY COMPANIES AND AGENCIES TO IDENTIFY THE
UTILITIES, PRIOR TO BEGINNING WORK. CONTRACTOR SHALL CONTACT THE OWNER
QUALITY LEVEL A, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND
VERIFY EXISTENCE AND MARK LOCATIONS OF ALL UTILITIES USING SUE
PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL
STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND TO TAKE NECESSARY
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD-VERIFY EXISTING 4.
OWNER BEFORE ANY FURTHER WORK COMMENCES.
DISCREPANCIES IN THE DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE
THOROUGHLY FAMILIAR WITH THE SITE BEFORE ANY WORK COMMENCES. ANY
THE CONTRACTOR SHALL FIELD-CHECK ALL EXISTING CONDITIONS AND BE 3.
DOCUMENTED OR LOCATED.
UNDERGROUND STRUCTURES AND UTILITIES MAY BE PRESENT WHICH ARE NOT
HAVE BEEN OBTAINED FROM EXISTING RECORDS AND FIELD SURVEYS.
THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS INDICATED 2.
SURVEY PROVIDED BY SLIGER AND ASSOCIATES.
AERIAL PHOTOGRAPHS AND A PARTIAL TOPOGRAPHIC AND UTILITY LOCATE
BACKGROUND PLANIMETRIC AND UTILITY INFORMATION SHOWN IS TAKEN FROM 1.
APPROVER'S TITLE
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
SOUTHERN REGION ATLANTA, GEORGIA 30320
DAYTONA FLDAYTONA BEACH INTERNATIONAL AIRPORT
FACILITIES
AIRWAY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
FEDERAL AVIATION ADMINISTRATION
SUBMITTED BY
REVIEWED BY
SUBMITTER'S TITLE
DESIGNED
DRAWN
CHECKED
ISSUED BY DATE
DRAWING NO
JCN
REV
APPROVED BY
MAJOR MODERNIZATION OF THE
AIRPORT TRAFFIC CONTROL TOWER
DAYTONA BEACH
1600018
PH: 770-587-4776
ALPHARETTA, GA 30022
3650 MANSELL ROAD, SUITE 300
PAGE OF 94
RGM
JTS
0 30 6030
1" = 30'-0"
C500
C500
C500
C500
C500
C500
DAB-D-ATCT-C101
SITE & PAVING PLAN
D
S T
O P
STOP STOP
CO
C O
YI
YI
GENERAL NOTES:
LEGEND
SCALE: 1" = 30'
SITE AND PAVING PLAN 1
C101
CRACK SEAL/FILL AND ASPHALT SEAL COAT
C102
(TYP)
(TYP)
(TYP)
(TYP)
(TYP) 6
(TYP)
(TYP)
ACCESSIBLE PARKING SPACES
ACCESSIBLE PARKING DETAIL
PAINTED CROSSWALK
KEY NOTES
PAINTED STOP BAR
7 4" SOLID YELLOW PAINT (45 DEGREE ANGLE @ 2' SPACING)
UTILITY OPEN CUT PAVEMENT REPAIR
8 EXISTING COVERED PARKING AREA
STANDARD PARKING SPACES
(TYP)
STANDARD PARKING SPACE - 4" SOLID WHITE PAINT (10'x18')
(TYP)
(TYP)
(TYP)
(TYP)
M A
T C
H L I
USING QUALITY MATERIALS.
ALL WORK SHALL BE CONDUCTED IN A PROFESSIONAL WORKMANSHIP MANNER6.
DECISION OF THE FAA SHALL BE CONSIDERED FINAL.
STRINGENT, CONTRACTOR SHALL SUBMIT ISSUE TO THE FAA IN WRITING. THE
STRINGENT. WHERE A QUESTION REMAINS ON WHICH REQUIREMENT IS MOST
REQUIREMENTS, CONTRACTOR SHALL INCORPORATE WHICHEVER IS MOST
REGULATIONS. IN CASE OF CONTRADICTION OR DISCREPANCY BETWEEN
SPECIFICATIONS AND LOCAL AND GOVERNMENT CODES, ORDINANCES, AND
ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND5.
LOCAL AND GOVERNMENT REGULATORY AGENCIES AND THE FAA.
ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL OF4.
OR OUTSIDE FACE OF FOUNDATION WALL, UNLESS INDICATED OTHERWISE.
OR MEASURED TO STRUCTURE CENTER, EDGE OF PAVEMENT, BACK OF CURB,
CALLOUTS, COORDINATES, AND DIMENSIONS ARE POINTED TO3.
OTHERWISE.
ALL DIMENSIONS, ELEVATIONS, AND STATIONS ARE IN FEET, UNLESS INDICATED2.
INFORMATION.
SEE DRAWING C100 FOR HORIZONTAL AND VERTICAL CONTROL BENCHMARK1.
APPROVER'S TITLE
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
SOUTHERN REGION ATLANTA, GEORGIA 30320
DAYTONA FLDAYTONA BEACH INTERNATIONAL AIRPORT
FACILITIES
AIRWAY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
FEDERAL AVIATION ADMINISTRATION
SUBMITTED BY
REVIEWED BY
SUBMITTER'S TITLE
DESIGNED
DRAWN
CHECKED
ISSUED BY DATE
DRAWING NO
JCN
REV
APPROVED BY
MAJOR MODERNIZATION OF THE
AIRPORT TRAFFIC CONTROL TOWER
DAYTONA BEACH
1600018
PH: 770-587-4776
ALPHARETTA, GA 30022
3650 MANSELL ROAD, SUITE 300
PAGE OF 94
GENERAL NOTES:
SPD
RGM
JTS0 20 4020
1" = 20'-0"
SS-4SS-3 33
SCALE: 1" = 20'
SANITARY SEWER PROFILE2
C102
SCALE: 1" = 20'
SANITARY SEWER PLAN1
C102
LEGEND
KEY NOTES
SANITARY SEWER CLEAN-OUT
HEADER CURB
4 BEGIN
4 END
C502
C501
C500
C500
C500
DAB-D-ATCT-C102
MECHANICAL THRUST RESTRAINT
C502
5 SILT FENCE
C502
ELECTRICAL PANEL
LOCATION OF NEW
ES101 FOR
SEE SHEET
6 CONCRETE ENCASEMENT
M A
T C
H L I
UTILITY OPEN CUT PAVEMENT REPAIR
LIFT STATION
S
O
T E
C
S101
SEE PLUMBING FOR CONTINUATION, P100
UTILITY PLAN & PROFILE
DESIGNED
DRAWN
CHECKED D
COM.
VAULT
FIBER OPTIC
COM.
VAULT
RE-USE
FIBER OPTIC
1x2 PULL BOX
IRRIGATION
IRRIGATION
(N.A.D. 83) E 638266.5630 N 1761417.3550
ELEV.=28.99' (N.A.V.D. 88
PK NAIL/DISC LB 3019
RECOVERED
LP
BUILDING LINE
CO
C O
11+00
12+00
6" SS
4" SS
6" SS
9+75 10+00
.6
.6
.9
.9
.9
.9
.9
.9
11+00
.4
.4
.3
.3
.2
.2
.9
.9
12+00
.6
.6
12+25
2" SS @ 0.00%
S S
S T
A
.5
I N
V
I
.4
(2
I
V
U
.4
(2
W
R
M
.9
S
S
S T
A
.5
I N
V
.1
(6
I
.4
(2
R
.0
S S
S T
A
.6
I N
V
.6
(6
I
.6
(6
R
.8
6" SS @ 2.00%
S S
S T
A
.8
I N
V
.3
(4
I
.2
(6
R
.2
4" SS @ 2.00%
S S
S T
A
.3
I
.3
(4
R
.7
E X I S
T
U E
E X I S
T
U E
E X I S
T
C O
M M
E X I S
T
C O
M M E
X I S
T
S T
O R
M
E X I S
T I R
R I G
A T I O
N
E X I S
T
C O
M M
6" SS @ 2.00%
CONTINUATION
SEE C103 FOR
- 2" PVC FM
GRADE
EXISTING PAVEMENT REPAIR
OPEN CUT
FOR CONTINUATION
SEE PLUMBING
9/21/15
P R
O P
O S
D
O R
W E
R
YI
YI
3x3 HAND HOLES
ID
E W
A L
K
C O
N C
R E
T E
R O
O M
S C
R E
E N
E D
FILL.
ONLY. BACKFILL WITH FLOWABLE
SCREEN PORCH. HAND EXCAVATE
PROTECT EXISTING SLAB BENEATH
INSTALLATION.
CONTRACTOR SHALL MINIMIZE EXCAVATION AND DISTURBANCE FOR PIPE 21.
SEDIMENTATION.
BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND
RESULTING FROM THE DISPOSITION OF TEMPORARY CONTROL MEASURES SHALL
COMPLETION. TRAPPED SEDIMENT AND OTHER DISTURBED SOIL AREAS
EROSION AND SEDIMENT CONTROL DEVICES SHALL BE REMOVED UPON PROJECT
DISTURBED AREAS SHALL BE REVEGETATED WITH SOD GRASS. ALL TEMPORARY
AFTER COMPLETION OF CONSTRUCTION AND APPROVAL FROM COTR, THE 20.
SDR 35 UNLESS NOTED OTHERWISE.
THE PIPE MATERIAL FOR THE SANITARY SEWER FORCE MAIN SHALL BE PVC 19.
PIPE MAY EXTEND 2" MAXIMUM BEYOND INTERIOR MANHOLE WALL.18.
INSTALLATION.
ANY LIFT LOOPS FOR UTILITY STRUCTURES SHALL BE GROUTED FLUSH AFTER 17.
COVERS THAT MAY BE SUBMERGED SHALL BE WATERTIGHT.16.
RESTRICTIONS.
IN PEDESTRIAN AREAS, EASEMENT AREAS, AND AREAS WITH SPECIAL SECURITY
COVERS AND CASTINGS SHALL BE TAMPER-PROOF FOR STRUCTURES LOCATED 15.
SHALL BE STAMPED PER THE ORIGIN OF MANUFACTURE.
PER THE APPROPRIATE UTILITY TYPE OR PER THE LOCAL STANDARDS, AND
COVERS AND CASTINGS OF MANHOLES AND STRUCTURES SHALL BE STAMPED 14.
SPECIFICATIONS, AND MANUFACTURER'S RECOMMENDATIONS.
OR ELBOWS OF PRESSURIZED PIPING IN ACCORDANCE WITH THE DRAWINGS,
THRUST BLOCKS OR JOINT RESTRAINTS ARE REQUIRED AT ALL TEES, BENDS, 13.
VERTICAL SEPARATION OF 24 INCHES UNLESS INDICATED OTHERWISE.
SEWER LINES SHALL BE INSTALLED BELOW WATER LINES WITH A MINIMUM 12.
PIPING.
SPECIFICATIONS FOR ADDITIONAL CLEARANCE REQUIREMENTS FOR SANITARY
FROM ADJACENT WATER LINES UNLESS INDICATED OTHERWISE. SEE
SEWER LINES SHALL BE INSTALLED A MINIMUM OF 10 FEET HORIZONTALLY 11.
STRUCTURES.
BUILDING CONNECTIONS TO THE CONNECTING SEWER AND BETWEEN UTILITY
ALL SANITARY LINES ARE TO BE LAID AT A UNIFORM SLOPE FROM THE 10.
CONTINUATION.
LINES UNLESS INDICATED OTHERWISE. SEE PLUMBING DRAWINGS FOR
ALL SANITARY SEWER BUILDING CONNECTIONS ARE TO BE MADE USING 6 INCH 9.
ENGINEER AND THE FAA.
ANY CHANGES TO PROPOSED UTILITY DESIGN SHALL BE APPROVED BY 8.
INSPECTION METHODS DETAILED IN THE SPECIFICATIONS.
ALL UNDERGROUND UTILITIES ARE SUBJECT TO ACCEPTANCE TESTING AND 7.
WITH CONNECTION CHARGES AND METERS.
CONSTRUCTION AND CONNECTIONS. THIS INCLUDES ALL FEES ASSOCIATED
CONNECTION FEES AND OBTAINING ALL PERMITS REQUIRED FOR THE UTILITY
CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PAYING ALL UTILITY 6.
UTILITY COMPANIES AND AGENCIES.
CONSTRUCTED IN ACCORDANCE WITH ALL REQUIREMENTS OF ASSOCIATED
CONNECTION TO EXISTING WATER, SEWER, AND STORM MAINS SHALL BE 5.
UTILITY CONNECTIONS WITH THE FAA.
CONTRACTOR SHALL COORDINATE ALL REQUIRED UTILITY SHUTDOWNS FOR 4.
TO COMMENCEMENT OF WORK.
COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF UTILITIES PRIOR
CONTRACTOR SHALL CONTACT THE FAA AND ALL ASSOCIATED UTILITY 3.
AND ELECTRICAL DRAWINGS FOR EACH FACILITY.
WITH BUILDING CONTRACTOR AND THE INFORMATION PROVIDED ON MECHANICAL
CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL BUILDING CONNECTIONS 2.
ALL PIPE SIZES ARE IN INCHES UNLESS INDICATED OTHERWISE.1.
BENEATH WALL AS REQUIRED.
WALL AND FOUNDATION. SLEEVE
REMAIN. PROTECT EXISTING
EXISTING SCREENED PORCH TO
D I
S T
U R
B A
N C
E
M I
N I
M I
Z E
A
X
SECTION 522, CURRENT REVISION)
WITH FDOT SPECIFICATIONS
DESIGN SHALL BE IN ACCORDANCE
CONCRETE PAD (CONCRETE MIX
SAWCUT AND RESTORE EXISTING
APPROVER'S TITLE
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
SOUTHERN REGION ATLANTA, GEORGIA 30320
DAYTONA FLDAYTONA BEACH INTERNATIONAL AIRPORT
FACILITIES
AIRWAY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
FEDERAL AVIATION ADMINISTRATION
SUBMITTED BY
REVIEWED BY
SUBMITTER'S TITLE
DESIGNED
DRAWN
CHECKED
ISSUED BY DATE
DRAWING NO
JCN
REV
APPROVED BY
MAJOR MODERNIZATION OF THE
AIRPORT TRAFFIC CONTROL TOWER
DAYTONA BEACH
1600018
PH: 770-587-4776
ALPHARETTA, GA 30022
3650 MANSELL ROAD, SUITE 300
PAGE OF 94
RGM
JTS
W S
V C
W-MAIN (APPROX.)
C103 SCALE: 1" = 40'
0 40 8040
1" = 40'-0"
EXISTING ACCESS ROAD
HANGAR
EXISTING
SEWER PIPING PLAN
FORCE MAIN SEWER SYSTEM
DAB-D-ATCT-C103
SEWER PIPING PLAN
FORCE MAIN SEWER SYSTEM
HANGAR
EXISTING
PAVEMENT REPAIR
UTILITY OPEN CUT
SILT FENCE
C500
C502
ABANDON IN PLACE UTILITY
2" PVC
45° BEND
2" PVC
2" PVC
2" PVC
2" PVC
2" PVC
45° BEND
45° BEND 45° BEND
45° BEND
45° BEND
45° BEND
2" PVC
45° BEND
2" PVC
2" PVC
45° BEND
45° BEND
2" PVC
2" PVC
2" PVC
45° BEND
45° BEND
TIE TO EXISTING
2" PVC
2" PVC
2" GATE VALVE
EXISTING 3" F-MAIN (APPROX.)
ABANDON IN PLACE UTILITY
EXISTING FENCE
SILT FENCE
SILT FENCE
SILT FENCE
SILT FENCE
SILT FENCE
SILT FENCE
SILT FENCE
EXISTING FENCE
DEMOLISH C.O. (TYP.)
SILT FENCE
SANITARY SEWER FORCE MAIN
GENERAL NOTES:
REQUIREMENTS ABOVE.
THE NEW PIPE SHALL BE ARRANGED TO MEET THE CROSSING
CLEARANCE, THE NEW PIPE SHALL BE CONSTRUCTED OF DIP AND
EXISTING PIPE WITH LESS THAN 18 INCHES OF VERTICAL
ON THE CROSSING). WHERE A NEW PIPE CONFLICTS WITH AN
ARE EQUIDISTANT FROM THE POINT OF CROSSING (PIPES CENTERED
CROSSINGS SHALL BE ARRANGED SO THAT THE SEWER PIPE JOINTS
OF 6 INCHES MUST BE MAINTAINED AT ALL CROSSINGS. ALL
FEET BETWEEN ANY TWO JOINTS. A MINIMUM VERTICAL CLEARANCE
OF DIP MUST BE USED TO PROVIDE A MINIMUM SEPARATION OF 10
DUCTILE IRON PIPE (DIP) AT THE CROSSING. SUFFICIENT LENGTHS
VERTICAL DISTANCE, THE SEWER SHALL BE CONSTRUCTED OF
SEWERS MUST CROSS A WATER MAIN WITH LESS THAN 18 INCHES
CROWN OF THE LOWER PIPE WHENEVER POSSIBLE. WHERE SANITARY
OF 18 INCHES BETWEEN THE INVERT OF THE UPPER PIPE AND THE
MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE
MAINS WHENEVER POSSIBLE. SANITARY SEWERS CROSSING WATER
SANITARY SEWER FORCE MAIN SHOULD CROSS UNDER WATER 11.
SHALL BE 36 INCHES UNLESS INDICATED OTHERWISE.
THE MINIMUM DEPTH OF COVER FOR ALL UTILITY PIPING 10.
UTILITIES PRIOR TO COMMENCEMENT OF WORK.
UTILITY COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF
CONTRACTOR SHALL CONTACT THE COTR AND ALL ASSOCIATED 9.
THE ENGINEER AND THE COTR
UTILITIES. ANY CHANGES TO THE LAYOUT SHALL BE APPROVED BY
PIPING LAYOUT TO AVOID CONFLICT WITH OTHER UNDERGROUND
THE CONTRACTOR SHALL MAKE REASONABLE CHANGES TO THE
ASSURE THE BEST LOCATION AND DESIGN POSSIBLE.
LOCATION OF PIPING SHALL BE FIELD ADJUSTED, AS REQUIRED TO
THE PIPING LAYOUT SHOWN IN SCHEMATIC ONLY. EXACT 8.
M A
T C
H L I
C
A
ALIGNMENT (TYP.)
PIPE MARKER TO NEW
RELOCATE EXISTING
3" CHECK VALVE
EXISTING
3" GATE VALVE
EXISTING
FORCE MAIN (APPROX.)
EXISTING 3" SANITARY SEWER
SEE NOTE 18
SEE NOTE 18
SEE NOTE 18
ON C502.
THE COTR FOR APPROVAL PRIOR TO CONSTRUCTION. SEE DETAIL 4
CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO 18.
DAYTONA BEACH INTERNATIONAL AIRPORT
D
ABANDONED IN PLACE SHALL BE DISCONNECTED AND CAPPED.
ALL UTILITY SYSTEM STRUCTURES INDICATED TO BE 7.
75-100 psi.
SHALL BE A CEMENT/SAND MIX WITH A COMPRESSIVE STRENGTH OF
SHALL BE PLUGGED TO CONTAIN FLOWABLE FILL. FLOWABLE FILL
FILLED WITH A LOW STRENGTH FLOWABLE FILL. END SECTIONS
DIAMETER AND INDICATED TO BE ABANDONED IN PLACE SHALL BE
ALL UTILITIES EQUAL TO OR GREATER THAN 6 INCHES IN 6.
BACKFILLED TO MEET PROPOSED GRADE.
HAVE FRAME AND COVER REMOVED, FILLED WITH SAND, AND
UTILITY STRUCTURES AND MANHOLES TO BE ABANDONED SHALL 5.
CAPPED OR PLUGGED AT REMOVAL INTERFACE.
PORTION OF EXISTING ABANDONED LINES TO REMAIN SHALL BE
IN AREAS OF UTILITY REMOVAL OF ABANDONED LINES, THE 4.
PROTECTED AND ADJUSTED TO FINISH GRADE.
ALL STRUCTURES, VALVES, ETC. TO REMAIN SHALL BE 3.
THE COR.
IN SERVICE. ALL CAPPING SHALL BE INSPECTED AND APPROVED BY
MANUFACTURER'S RECOMMENDATIONS FOR SPECIFIC PIPE MATERIAL
UTILITY CAPPING METHODS SHALL BE IN ACCORDANCE WITH 2.
COORDINATED WITH THE COTR.
SERVED BY THE UTILITY. ALL RELOCATIONS SHALL BE
UTILITIES TO ENSURE UNINTERRUPTED SERVICE TO THE FACILITIES
UTILITIES SHALL BE CONSTRUCTED BEFORE REMOVAL OF EXISTING
REMOVAL OF EXISTING UTILITIES IN SERVICE. RELOCATED
CONTRACTOR SHALL COORDINATE WITH THE COTR PRIOR TO 1.
SEDIMENTATION.
PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND
THE DISPOSITION OF TEMPORARY CONTROL MEASURES SHALL BE
SEDIMENT AND OTHER DISTURBED SOIL AREAS RESULTING FROM
SHALL BE REMOVED UPON PROJECT COMPLETION. TRAPPED
GRASS. ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES
COTR, THE DISTURBED AREAS SHALL BE REVEGETATED WITH SOD
AFTER COMPLETION OF CONSTRUCTION AND APPROVAL FROM 17.
WITH THE DRAWINGS AND SPECIFICATIONS.
TEES, BENDS, OR ELBOWS OF PRESSURIZED PIPING IN ACCORDANCE
THRUST BLOCKS OR JOINT RESTRAINTS ARE REQUIRED AT ALL 16.
METERS.
INCLUDES ALL FEES ASSOCIATED WITH CONNECTION CHARGES AND
REQUIRED FOR THE UTILITY CONSTRUCTION AND CONNECTIONS. THIS
ALL UTILITY CONNECTION FEES AND OBTAINING ALL PERMITS
CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PAYING 15.
SPECIFICATIONS.
TESTING AND INSPECTION METHODS DETAILED IN THE
ALL UNDERGROUND UTILITIES ARE SUBJECT TO ACCEPTANCE 14.
SEE DETAIL 5 ON C-500 FOR TYPICAL PIPE TRENCH. 13.
CROSSINGS.
8" HDPE DR 11 CASING PIPE SHALL BE UTILIZED AT ALL ROADWAY
SHALL BE PVC SDR 26 CLASS 200 UNLESS NOTED OTHERWISE. AN
THE PIPE MATERIAL FOR THE SANITARY SEWER FORCE MAIN 12.
CLOSE EXISTING VALVE
APPROVER'S TITLE
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
SOUTHERN REGION ATLANTA, GEORGIA 30320
DAYTONA FLDAYTONA BEACH INTERNATIONAL AIRPORT
FACILITIES
AIRWAY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
FEDERAL AVIATION ADMINISTRATION
SUBMITTED BY
REVIEWED BY
SUBMITTER'S TITLE
DESIGNED
DRAWN
CHECKED
ISSUED BY DATE
DRAWING NO
JCN
REV
APPROVED BY
MAJOR MODERNIZATION OF THE
AIRPORT TRAFFIC CONTROL TOWER
DAYTONA BEACH
1600018
PH: 770-587-4776
ALPHARETTA, GA 30022
3650 MANSELL ROAD, SUITE 300
PAGE OF 94
SPD
RGM
JTS0 20 4020
1" = 20'-0"
KEY NOTES
4 END
DAB-D-ATCT-C104
S
T E
1106702
B
COM.
VAULT
FIBER OPTIC
COM.
VAULT
RE-USE
FIBER OPTIC
1x2 PULL BOX
IRRIGATION
IRRIGATION
(N.A.D. 83) E 638266.5630 N 1761417.3550
ELEV.=28.99' (N.A.V.D. 88
PK NAIL/DISC LB 3019
RECOVERED
LP
BUILDING LINE
CONCRETE PAD
CO
C O
SCALE: 1" = 20'
STORM SEWER PLAN1
C104
YI
YI
20+00
21+00
6" TEE
6" 90° ELBOW
YARD INLET
SILT FENCE
C
S101
C502
C503
TRENCH DRAIN
C503
6" PVC
6" PVC
6" PVC
4 BEGIN
4 END
4 BEGIN
6/30/17
#57 STONE
WITH FILTER FABRIC SOCK AND 6"
6" PERFORATED PVC PIPE WRAPPED
8 MAINTAIN AND PROTECT PULL BOX
BEGIN
3x3 HAND HOLE
BEGIN
2 7 END
YI INV = 26.32
YI INV = 26.36
YI RIM = 30.53
YI RIM = 30.60
RIM = 27.80
INV = 25.62
CONNECT TO EXISTING INLET
S C
R E
E N
E D
R O
O M
S
ID
E W
A L
K
C O
N C
R E
INV = 26.10
INV = 25.83
7 BEGIN
15'
7 END
S C
R E
E N
E D
R O
O M
SCALE: 1" = 10'
ENLARGED VIEW2
C104
ENALRGED VIEW
SEE BELOW FOR
2%
2%
5%
LIMITS
APPROXIMATE GRADING
STORM DRAINAGE PLAN
NOTIFY COR IMMEDIATELY IF CHANGE IS REQUIRED.
ELEVATIONS OF THE TRENCH DRAIN MAY NEED TO BE ADJUSTED TO INSTALL.
CONTRACTOR SHALL FIELD VERIFY DEPTH OF CONCRETE SLAB. INVERT 17.
INSTALLATION.
CONTRACTOR SHALL MINIMIZE EXCAVATION AND DISTURBANCE FOR PIPE 16.
SEDIMENTATION.
BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND
RESULTING FROM THE DISPOSITION OF TEMPORARY CONTROL MEASURES SHALL
COMPLETION. TRAPPED SEDIMENT AND OTHER DISTURBED SOIL AREAS
EROSION AND SEDIMENT CONTROL DEVICES SHALL BE REMOVED UPON PROJECT
DISTURBED AREAS SHALL BE REVEGETATED WITH SOD GRASS. ALL TEMPORARY
AFTER COMPLETION OF CONSTRUCTION AND APPROVAL FROM COTR, THE 15.
OTHERWISE. FITTINGS SHALL BE PVC SDR 35.
SCHEDULE 40 WITH A MINIMUM STIFFNESS OF PS 50 UNLESS NOTED
THE PIPE MATERIAL FOR THE STORM SEWER SHALL BE CELLULAR-CORE PVC 14.
PIPE MAY EXTEND 2" MAXIMUM BEYOND INTERIOR MANHOLE WALL.13.
INSTALLATION.
ANY LIFT LOOPS FOR UTILITY STRUCTURES SHALL BE GROUTED FLUSH AFTER 12.
COVERS THAT MAY BE SUBMERGED SHALL BE WATERTIGHT.11.
AREAS WITH SPECIAL SECURITY RESTRICTIONS.
FOR STRUCTURES LOCATED IN PEDESTRIAN AREAS, EASEMENT AREAS, AND
COVERS AND CASTINGS SHALL BE TAMPER-PROOF AND ABLE TO BE LOCKED 10.
SHALL BE STAMPED PER THE ORIGIN OF MANUFACTURE.
PER THE APPROPRIATE UTILITY TYPE OR PER THE LOCAL STANDARDS, AND
COVERS AND CASTINGS OF MANHOLES AND STRUCTURES SHALL BE STAMPED 9.
ENGINEER AND THE FAA.
ANY CHANGES TO PROPOSED UTILITY DESIGN SHALL BE APPROVED BY 8.
INSPECTION METHODS DETAILED IN THE SPECIFICATIONS.
ALL UNDERGROUND UTILITIES ARE SUBJECT TO ACCEPTANCE TESTING AND 7.
WITH CONNECTION CHARGES AND METERS.
CONSTRUCTION AND CONNECTIONS. THIS INCLUDES ALL FEES ASSOCIATED
CONNECTION FEES AND OBTAINING ALL PERMITS REQUIRED FOR THE UTILITY
CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PAYING ALL UTILITY 6.
UTILITY COMPANIES AND AGENCIES.
CONSTRUCTED IN ACCORDANCE WITH ALL REQUIREMENTS OF ASSOCIATED
CONNECTION TO EXISTING WATER, SEWER, AND STORM MAINS SHALL BE 5.
UTILITY CONNECTIONS WITH THE FAA.
CONTRACTOR SHALL COORDINATE ALL REQUIRED UTILITY SHUTDOWNS FOR 4.
TO COMMENCEMENT OF WORK.
COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF UTILITIES PRIOR
CONTRACTOR SHALL CONTACT THE FAA AND ALL ASSOCIATED UTILITY 3.
AND ELECTRICAL DRAWINGS FOR EACH FACILITY.
WITH BUILDING CONTRACTOR AND THE INFORMATION PROVIDED ON MECHANICAL
CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL BUILDING CONNECTIONS 2.
ALL PIPE SIZES ARE IN INCHES UNLESS INDICATED OTHERWISE.1.
SEE DETAIL 2, DWG C-105
TOWARDS YARD INLETS, STABILIZE AND SED
FINE GRADE AREA TO PROVIDE DRAINAGE
SECTION 522, CURRENT REVISION)
WITH FDOT SPECIFICATIONS
DESIGN SHALL BE IN ACCORDANCE
CONCRETE PAD (CONCRETE MIX
SAWCUT AND RESTORE EXISTING
APPROVER'S TITLE
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
SOUTHERN REGION ATLANTA, GEORGIA 30320
DAYTONA FLDAYTONA BEACH INTERNATIONAL AIRPORT
FACILITIES
AIRWAY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
FEDERAL AVIATION ADMINISTRATION
SUBMITTED BY
REVIEWED BY
SUBMITTER'S TITLE
DESIGNED
DRAWN
CHECKED
ISSUED BY DATE
DRAWING NO
JCN
REV
APPROVED BY
MAJOR MODERNIZATION OF THE
AIRPORT TRAFFIC CONTROL TOWER
DAYTONA BEACH
1600018
PH: 770-587-4776
ALPHARETTA, GA 30022
3650 MANSELL ROAD, SUITE 300
PAGE OF 94
JTS
JTG
JTG0 10 2010
1" = 10'-0" DAB-D-ATCT-C105 B
GRADING PLAN
-24"
T
P
F
B
N K
LANDSCAPE AREA
CONCRETE SIDEWALK
C O
N C
R E
ID
E W
A L
K
CONCRETE SIDEWALK
ASPHALT PAVEMENT
RAMP
H E
D G
E
P L
A N
T
LANDSCAPE AREA
2' WINDOWS
GROUND ROD
2' WINDOWS
HOSE BIB
GROUND ROD
OVERHANG
DOOR
BUILDING LINE
.9
30.0
29.0
29.
529.5
30.
30.5
SCALE: 1" = 10'
GRADING PLAN1
C105
AREA
LANDSCAPE
LEGEND
.35
.30
XX.X
EXISTING SPOT ELEVATION
PROPOSED SPOT ELEVATION
EXISTING CONTOUR
6/30/17
.02
.17
.0
MATCH MATCH
.39
.0
.0
.35
SIDEWALK
CONCRETE
PROPOSED
DRAINAGE AWAY FROM BUILDINGS AND PAVEMENTS.
SURFACES AROUND FACILITY SHALL BE GRADED TO PROVIDE POSITIVE 4.
SUBJECT TO THE APPROVAL OF THE COR.
CONSTRUCTION SHALL BE RESTORED TO EXISTING CONDITIONS OR BETTER
CONSTRUCTION. ANY DRAINAGE FEATURE OR STRUCTURE DISTURBED DURING
ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES DURING 3.
PRIOR TO BEGINNING CONSTRUCTION.
CONTRACTOR SHALL VERIFY ELEVATIONS AT TIE-INS AND MATCH POINTS 2.
STRUCTURE UNLESS INDICATED OTHERWISE.
ELEVATIONS INDICATED ARE FOR TOP OF FINAL GRADE, PAVEMENT, OR 1.
PAVESTONE OR APPROVED EQUAL.
WHITE ALL PURPOSE STONE BY
SURFACE TREATMENT WITH
DRAINAGE AWAY FROM BUILDING.
GRADE AREA TO PROVIDE POSITIVE
1x2 PULL BOX
YI
YI
3x3 HAND HOLE
S C
R E
E N
E D
R O
O M
S
ID
E W
A L
K
C O
N C
R E
T E
SCALE: 1" = 10'
GRADING PLAN2
C104
.5
.7
YI RIM = 30.53
YI RIM = 30.60
-2%
.8
.8
.7
APPROVER'S TITLE
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
SOUTHERN REGION ATLANTA, GEORGIA 30320
DAYTONA FLDAYTONA BEACH INTERNATIONAL AIRPORT
FACILITIES
AIRWAY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
FEDERAL AVIATION ADMINISTRATION
SUBMITTED BY
REVIEWED BY
SUBMITTER'S TITLE
DESIGNED
DRAWN
CHECKED
ISSUED BY DATE
DRAWING NO
JCN
REV
APPROVED BY
MAJOR MODERNIZATION OF THE
AIRPORT TRAFFIC CONTROL TOWER
DAYTONA BEACH
1600018
PH: 770-587-4776
ALPHARETTA, GA 30022
3650 MANSELL ROAD, SUITE 300
PAGE OF 94
3'-0"
(T
Y P
14"
3 1/2"
"R
5"
14-1/4"
2"
SCALE: NOT TO SCALE
ACCESSIBLE PARKING SPACES7
C101 SCALE: NOT TO SCALE
ACCESSIBLE PARKING DETAIL8
C101
8"D
7"
C PARKING STALLL
2"
POTS
SCALE: NOT TO SCALE
PAINTED STOP BAR10
C101SCALE: NOT TO SCALE
PAINTED CROSSWALK9
C101
CENTER
ON
(TYP)
3'
24" GAP (TYP)
(T
Y P
WHITE (TYP)
12" SOLID
SOLID WHITE
SOLID WHITE
6" WIDE
9" (TYP)
9" (TYP) (TYP)
18"
3"
SOLID WHITE (TYP.)
10/1/15
SITE DETAILS
10'
(T
Y P
NOTES:
3.
2.
1.
SPD
RGM
JTS
COMMON BRICKS
3-25 LB. BAGS FILLED WITH
POWERED HAZARD LIGHTS
2-FLASHING RED SOLAR
36"
NOTES:
PIPE RISER
PROVIDE WYE BRANCH FOR
TYPICAL IN-LINE CLEANOUTS
AND 45 DEGREE BEND AT
END OF LINE
PIPE
ELEVATION
FINISHED
GRADE
FLOWFLOW
45 DEGREE BEND
CONCRETE CRADLE
8'-0"
4'-0" 4'-0"
2'-11" 1'-1"2'-11"1'-1"
Federal Aviation Administration Project
PLANNED COMPLETION DATE:
MONTH OF YEAR
GENERAL
CONTRACTOR
INFORMATION
F E
E
RAL
D
AVA
T
IO
N
I
A D
M
INISTRA
T
IO
N
U N
IT
E
D
STATESOF A
M
ER
IC
A
D E
PA
R
TM
E
NT
OFTRANSPO
R
TA
T
N
OI
3650 MANSELL RD SUITE 300
ALPHARETTA, GA 30022
ARCHITECT ENGINEER4
5" 1'-4"
1'-6"
CL
CL
CL
CL
CL
1'-6"
1-7/8" FONT SIZE
COLOR BLACK
1-7/8" FONT SIZE
COLOR BLACK
COLOR BLACK
COLOR BLACK
3" FONT SIZE
3" FONT SIZE
5"1'-4"
COLOR WHITECOLOR BLACK
"PROJECT NAME 1
PROJECT NAME 2
(TYP)
(T Y
P
10 BAR ALL AROUND (6" LAP)#
4" MIN. BEDDINGTRENCH WALL
SLOPING
Z O
N E
H A
U N
C H
SPRINGLINE
CLEARANCE
SIDE
TRENCH WIDTH
FINAL BACKFILL
CLEARANCE
SIDE B
M I N
B A
C K
F I L
L
I N I T I A
L
P I
B E
D M
E N
T
ASPHALT PAVEMENT REMOVAL AND REPLACEMENT
FOR UTILITY TRENCH
EXISTING
ASPHALTIC
CONCRETE
ASPHALTIC
CONCRETE (2" MIN)
TACK COAT
6" COMPACTED
SUBGRADE
SAW CUT (TYP)
SCALE: NOT TO SCALE
TEMPORARY BARRICADE1
C002
SCALE: NOT TO SCALE
PIPE TRENCH5
C102 SCALE: NOT TO SCALE
SANITARY SEWER CLEAN-OUT6
C102
GRADE
PAVEMENT
FINISH
DOWELS (SEE NOTES)
#5 x 24" SMOOTH
(MIN)
12"
(TYP)
12"
7" 1"
1/
R
1/ " R
AGGREGATE BASE
COURSE (6" MIN)
VARIES
EXCAVATION LIMITS
Z O
N E
P I P
E
DAB-D-ATCT-C500
C500
"4
8 1
HAUNCHING
WALL
TRENCH
VERTICAL
C
MINIMIZE EXCAVATION WIDTH
SEE NOTE 2
NOTES:
1. TRENCH PARAMETERS PER OSHA REQUIREMENTS SEE PROJECT
SPECIFICATIONS FOR ADDITIONAL INFORATION.
2. CONTRACTOR SHALL RESTORE ALL AREAS
DISTURBED TO PREDEVELOPMENT CONDITIONS.
10'
WHITE (TYP)
4" WIDE SOLID
FORM NOT REQUIRED BELOW GRADE.
THROUGH THE ENTIRE CURB SECTION.
APPROXIMATELY 15' INTERVALS. THESE JOINTS SHALL PASS
INSTALL 1-1/2" DEEP CONTRACTION JOINTS AT
WITH EXPANSION TUBES.
DOWELS SHALL BE GREASED AND WRAPPED ON ONE END
POINTS OR A MAXIMUM OF 60' ON STRAIGHT SECTIONS. THESE
PLACE 3/4" EXPANSION JOINTS WITH 24" DOWELS AT RADIUS
SCALE: NOT TO SCALE
HEADER CURB4
C102
SCALE: NOT TO SCALE
STANDARD PARKING SPACES11
C101
TACK COAT (TYP.)
BY THE ENGINEER.
REPLACEMENT SHALL BE FILLED WITH AN EPOXY-BASED GROUT APPROVED
SAWCUTS THAT EXTEND OUTSIDE THE AREA OF REMOVAL AND 2.
EXISTING BUT SHALL NOT BE LESS THAN INDICATED.
THICKNESS OF ALL REPLACEMENT COURSES SHALL BE EQUAL TO 1.
SCALE: NOT TO SCALE
UTILITY OPEN CUT PAVEMENT REPAIR3
C103 C102 C101
4" BLUE STRIPE
CENTERS
MARKS ON 2'
4" BLUE HASH
10'
STRIPE
4" BLUE
12' MIN.
SCALE: NOT TO SCALE
CONSTRUCTION SIGN2
C102
HEAVY DUTY CLEAN-OUT COVER
DEETER 1815 OR APPROVED
EQUAL. COVER SHALL BE
STAMPED "SEWER" OR PER
LOCAL STANDARD
CONCRETE COLLAR
D
APPROVER'S TITLE
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
SOUTHERN REGION ATLANTA, GEORGIA 30320
DAYTONA FLDAYTONA BEACH INTERNATIONAL AIRPORT
FACILITIES
AIRWAY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
FEDERAL AVIATION ADMINISTRATION
SUBMITTED BY
REVIEWED BY
SUBMITTER'S TITLE
DESIGNED
DRAWN
CHECKED
ISSUED BY DATE
DRAWING NO
JCN
REV
APPROVED BY
MAJOR MODERNIZATION OF THE
AIRPORT TRAFFIC CONTROL TOWER
DAYTONA BEACH
1600018
PH: 770-587-4776
ALPHARETTA, GA 30022
3650 MANSELL ROAD, SUITE 300
PAGE OF 94
10/1/15
RGM
JTS
TOC EL
300 LB/SF MIN LOADING
ACCESS FRAME AND COVER,
LOCKABLE, ALUMINUM
24"x37" CLR. OPENING, RAIL HOLDER
UPPER GUIDE
L I
A T I O
N
C E
N T
L
N
E
V A
L
U L
T
C E
N T
N
E
1.
LIFT STATION NOTES:
2.
3.
START LEAD PUMP.
LOW:
HIGH:
DRAWINGS):
4.
5.
6.
7.
8.
SELF CLEANING OF LIFT STATION WET WELL.
EQUIPPED WITH A MIX-FLUSH VALVE TO PROVIDE
SHUT-OFF THROUGH RUN-OUT. EACH PUMP SHALL BE
THE ENTIRE PUMP PERFORMANCE CURVE FROM
BE ADEQUATE SO THAT THE PUMP IS ON THROUGHOUT
CAST-IRON CASING. THE MOTOR HORSEPOWER SHALL
SEAL. STAINLESS STEEL SHAFT, HEAVY DUTY
AT 65 FEET TDH. PUMPS SHALL HAVE MECHANICAL
CONNECTION AND BE CAPABLE OF DELIVERING 45 GPM
PUMP SHALL BE SUPPLIED WITH A 2" INCH DISCHARGE
MOUNTING HEIGHTS ARE INDICATED ON THE
WHEN IN THE "AUTO" MODE (FLOAT SWITCH
FOLLOWING MANNER AT THE FOLLOWING LEVELS
SWITCHES THAT CONTROL THE PUMPS IN THE
HERMETICALLY SEALED, MERCURY TYPE FLOAT
PROVIDE AND INSTALL INTRINSICALLY SAFE,
LEAD PUMP.
BOTH PUMPS. ALTERNATE
POSITIVELY SHUT OFF
CONTROL PANEL.
AND ALARM LIGHT MOUNTED ON
ACTIVATE AN EXTERNAL HORN
HOLDER AND BE ATTACHED THERETO.
LIFTING CHAIN SHALL EXTEND TO UPPER GUIDE RAIL
FRAME CORNER.
ALL "RE-ENTRANT" LOCATIONS AT EACH ACCESS
EACH WAY. PROVIDE MIN 18" LENGTH #4 BARS AT
REINFORCED WITH #4 REBAR @ 8" ON CENTER,
CONCRETE PAD SHALL BE 12" THICK AND
9.
2" SDR21 CLASS
200 PVC
2" GALVANIZED STEEL PIPE
TWO COUPLING JOINTS PER
PIPE BETWEEN LIFT STATION
AND VALVE VAULT
2" SCH 80 PVC
DISCHARGE PIPE
GALVANIZED CAST IRON VANDAL PROOF HOODED
VENT, OR APPROVED EQUAL
GROUT
TOP EL
24"x37" CLR. OPENING, LOCKABLE, ALUMINUM
ACCESS FRAME AND COVER, 300 LB/SF MIN LOADING
2" CHECK VALVE (TYP 2)
2" BRONZE GATE VALVE (TYP 2)
PRECAST CONCRETE VALVE
VAULT AND COVER
2" GALVANIZED STEEL PIPE
2" SDR21 CLASS 200 PVC
2" SCH 80 PVC DISCHARGE PIPE AND FITTINGS
STAINLESS STEEL PIPE GUIDE RAILS
STAINLESS STEEL LIFTING CHAIN
PRECAST CONCRETE
WET WELL AND COVER
REINFORCED PER ASTM C-478
BREAKAWAY FITTING
FILL CONCRETE ALL AROUND
ENSURE THAT CONCRETE DOES NOT
INTERFERE WITH FLOAT SWITCH OPERATION
#4 @ 8" ON
CENTER EACH WAY
SUBMERSIBLE DUPLEX
WASTEWATER PUMP
NO. 57 STONE BEDDING, 6"
DEEP AND EXTENDING 12"
BEYOND CONCRETE BASE
WATERPROOF EXTERIOR COATING
6" SS
SEE PROFILE
LIQUID
LEVEL
SENSOR
(TYP)
3" FLOOR DRAIN W/ TRAP
3" FLAP VALVE
PLAN VIEW
SECTION A-A
A
7'-0"
12"
4'-0" SQR
M I N
6'-0" DIA
DAB-D-ATCT-C501
SCALE: NOT TO SCALE
LIFT STATION DETAIL1
C102
UTILITY DETAILS - 1
ALARM/HIGH-HIGH:
CONTROL PANEL.
AND ALARM LIGHT MOUNTED ON
ACTIVATE AN EXTERNAL HORN EMERGENCY OFF:
BASE EL 15.5
TOP OF CONCRETE
EMERGENCY OFF EL 17.0
LOW EL 17.5
HIGH EL 19.5
ALARM/HIGH-HIGH EL 20.5
24.5
LEVEL.
ALARM SYSTEM AT "HIGH-HIGH"
AUXILIARY RELAY TO SIGNAL
"LOW" LEVEL. PROVIDE
PUMPS AND PUMP DOWN TO
START BOTH LEAD AND LAG
CABLE WEIGHTS MOUNTED 6"-8" ABOVE FLOATS.
SEE SPECIFICATIONS FOR CABLE TYPE. PROVIDE
FLOAT SWITCH CABLE SHALL BE 2#16 (TYP. OF 4),
SEE DETAIL 1/E501
TO CONTROLPANEL,
STEEL CONDUITS
PVC COATED RIGID
POWER AND FLOAT CONTROL CABLE (TYPICAL OF 4)
208V GENERATOR.
POWER TO EMERGENCY BACK-UP WITH TEMPORARY
TRANSFER SWITCHES TO SWITCH FROM EXISTING
INSTALL AUXILIARY 208V POWER RECEPTACLE AND
PANEL AND LABEL APPROPRIATELY. PROVIDE AND
"MINI-CAS" ALARMS TO INDICATOR LIGHTS ON INNER
OVERLOAD AND PUMP SEAL PROTECTION. WIRE
PROTECTIVE RELAY (OR EQUAL) FOR THERMAL
DESIGNATIONS. PROVIDE FLYGT "MINI CAS"
CORRESPONDING TO ELECTRICAL SCHEMATIC
STRIPS SHALL BE PROMINENTLY MARKED
600 VOLT RATED TERMINAL STRIPS. TERMINAL
EXTERNAL WIRING CONNECTIONS SHALL BE MADE TO
(BARRIERS) IN PANEL FOR LEVEL SWITCHES. ALL
PROVIDE INTRINSICALLY SAFE INTERFACE CONTROLS
HAND-OFF-AUTOMATIC SWITCHES FOR EACH PUMP
PUMP RUNNING INDICATOR LIGHTS AND
A 208:24 VAC TRANSFORMER. PROVIDE INDIVIDUAL
208:120 VAC TRANSFORMER, THE OTHER CONTAINING
COMBINATION MOTOR STARTERS, ONE CONTAINING A
MAGNETIC CIRCUIT BREAKER TYPE NEMA SIZE O
PREVENT TAMPERING. PROVIDE TWO THERMAL
SWITCHES SHALL BE MOUNTED ON INNER DOOR TO
AUDIBLE ALARM. ALL INDICATING LIGHTS AND
DESIGN, WITH AN EXTERIOR MOUNTED VISUAL AND
STEEL RATED ENCLOSURE, UL LISTED, DOOR-IN-DOOR
CONTROL PANEL SHALL BE A NEMA 4X STAINLESS
AREAS.
SEALS ON ALL CONDUITS ENTERING HAZARDOUS
AREA AS DEFINED BY THE NEC. INSTALL CONDUIT
CLASS 1, DIVISION 1, GROUPS C AND D HAZARDOUS
INTERIOR OF LIFT STATION SHALL BE CONSIDERED A
SHALL BE PVC COATED RIGID STEEL CONDUIT.
ALL CONDUITS ASSOCIATED WITH THE LIFT STATION
10.
NUMBER ARE INDICATED ON SHEET ES101.
ADDITIONAL INFORMATION. PANEL AND CIRCUIT
SEE ELECTRICAL SHEETS ES101 AND E501 FOR
COMPLETE BASIN PACKAGE.
APPROVED EQUIVALENT JOB SITE WIRED
WET WELL TO BE PRECAST CONCRETE OR
NECESSARY.
ADJUST LIFT STATION ELEVATIONS AS
FIELD VERIFY EXISTING ELEVATIONS AND
DRAWING INFORMATION. CONTRACTOR SHALL
BASED ON THE BEST AVAILABLE DESIGN
SANITARY SEWER INVERT ELEVATIONS ARE
LIFT STATION TOP ELEVATION AND EXISTING
HORSEPOWER : 3.75 HP.
CONTROL CONDUIT AND WIRING. MAXIMUM PUMP
CONTROL PANEL SPACE AND ALL POWER AND
SUBCONTRACTOR SHALL FURNISH AND INSTALL PUMP
SUBMERSIBLE PUMP POWER & CONTROL CABLE.
VOLTS, SINGLE PHASE, 60 Hz, 2-WIRE SERVICE WITH
PUMP SHALL BE DESIGNED FOR OPERATION ON 208
WITH PUMP CONTROL PANEL AND LEVEL CONTROLS.
SUBMERSIBLE GRINDER WASTEWATER PUMPS COMPLETE
FURNISH AND INSTALL TWO
SEE NOTE 7 FOR ADDITIONAL INFORMATION
CAST-IN-PLACE CONCRETE SLAB
ADDITIONAL INFORMATION
SEE NOTE 7 FOR
CONCRETE SLAB
CAST-IN-PLACE
D
APPROVER'S TITLE
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
F
IL
E
D
A T
E
T
IM
E
N
A M
E
DATE
APPROVED
SOUTHERN REGION ATLANTA, GEORGIA 30320
DAYTONA FLDAYTONA BEACH INTERNATIONAL AIRPORT
FACILITIES
AIRWAY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
FEDERAL AVIATION ADMINISTRATION
SUBMITTED BY
REVIEWED BY
SUBMITTER'S TITLE
DESIGNED
DRAWN
CHECKED
ISSUED BY DATE
DRAWING NO
JCN
REV
APPROVED BY
MAJOR MODERNIZATION OF THE
AIRPORT TRAFFIC CONTROL TOWER
DAYTONA BEACH
1600018
PH: 770-587-4776
ALPHARETTA, GA 30022
3650 MANSELL ROAD, SUITE 300
PAGE OF 94
10/1/15
RGM
JTS
DAB-D-ATCT-C502
<4 18 8 4 2 39
(IN.)
SIZE
PIPE
NOMINAL
L (FT.)
BENDS
L (FT.)
BENDS
L (FT.)
BENDS
L (FT.)
BENDS
HORIZONTAL BENDS VERTICAL BENDS
L (FT.)
ENDS
OR DEAD
VALVES
17 8 4
L (FT.)
BENDS
L (FT.)
BENDS
L (FT.)
BENDS
P.V.C. PIPE FITTING, PLUGS & VALVES - L (FT.)
<4 6 8 10 12 14 16 18 20 24 30 36 42
BRANCH SIZE (IN.)
P.V.C. PIPE TEE - L (FT.) SEE NOTE 5. FOR
<4
(IN.)
SIZE
RUN
RESTRAINED BELL JOINT
BELL JOINT TO PLAIN END
W/MECHANICAL RESTRAINERS
TEE BOLT
RESTRAINED MECHANICAL JOINT
W/MECHANICAL RESTRAINERS
MECHANICAL JOINT TO PLAIN END
TEE BOLT
BELL Jt. P.V.C. M.J. D.I. FITTINGS
PLAIN END P.V.C.
PLAIN END P.V.C.
RING
BELL
RING
CLAMPING
RUN
RUN
BRANCH
LENGT
H'
REST
RAIN
T
OT
AL
TEE
DIRECTION CHANGE
DIRECTION CHANGE
CHANGE
ANGLE OF DIRECTION
VALVE
HORIZONTAL BEND
DEAD END
BEND
LOWER
UPPER BEND
VERTICAL OFFSET PROFILE
TYPICAL PROFILE TYPICAL PROFILE
MECHANICAL JOINT SLEEVES
SECTION
SCALE: NOT TO SCALE
MECHANICAL THRUST RESTRAINT1
C102
UTILITY DETAILS - 2
L
Lu
Li
A S
S U
M
P R
O X
E T
A S
S U
M
P R
O X
E T
S
T E
E T
(M
I N
R E
S T
R A I N
N G
T H
L L L
P R
O F I L
E
S
(M
I N
(M
I N
SEWER LINE
ENCASEMENT
CONCRETE
LINE
STORM
6" (TYP)
LINE
SEWER
PLAN
SECTION
ENCASEMENT
CONCRETE
COINCIDENT WITH PIPE JOINTS
BEGIN AND END ENCASEMENT
SCALE: NOT TO SCALE
CONCRETE ENCASEMENT DETAIL2
C102
1. PORTION OF PIPING BEING ENCASED SHALL BE CONTINUOUS.
NOTES
LINE
STORM
SCALE: NOT TO SCALE
SILT FENCE DETAIL3
C102
OF BEFORE THE BARRIER IS REMOVED.
SEDIMENT ACCUMULATED AT THE BARRIER SHALL BE REMOVED AND PROPERLY DISPOSED
IN PLACE UNTIL DISTURBED AREAS HAVE BEEN PERMANENTLY STABILIZED. ALL
REDUCED (APPROXIMATELY SIX MONTHS). TEMPORARY SEDIMENT BARRIERS SHALL REMAIN
DETERIORATED TO SUCH AN EXTENT THAT THE EFFECTIVENESS OF THE FABRIC IS
HEIGHT OF THE BARRIER. FILTER FABRIC SHALL BE REPLACED WHENEVER IT HAS
SEDIMENT SHALL BE REMOVED ONCE IT HAS ACCUMULATED TO ONE-HALF THE ORIGINAL
MAINTENANCE
M I N
FLOW
2"
M I N
(TYP.)
POST
END OF FABRIC FENCE
FLOW 18" BEGINNING OF FABRIC FENCE
FLOW
6' O.C. MAX
OVERLAP AT FABRIC ENDS
4' MAX O.C.
FENCE BACKING
WOVEN WIRE
FABRIC
TRENCH
6"
USE 36" D.O.T. APPROVED FABRIC.
NOTE:
M I N
M I N
USE STEEL POSTS. - ONLY
VIEW
TOP
VIEW
SIDE
VIEW
FRONT
FLAGGER
FLAGGER
APPROACH SIGNAGE
STANDARDS (TYP.)
APPROACH SIGNAGE
STANDARDS (TYP.)
CONSTRUCTION FENCING
SEE NOTE 1
STEEL PLATE OVER OPEN EXCAVATIONS
AFTER WORK DAY.
1.
WORK IN TRAVEL LANE ON MINOR URBAN STREET
(MAINTAIN TWO-WAY TRAFFIC)
SCALE: NOT TO SCALE
TYPICAL ROADWAY TRAFFIC CONTROL PLANS4
C002
WORK AREA
PER FDOT AND MUTCD
PER FDOT AND MUTCD
FLAGGER
FLAGGER
APPROACH SIGNAGE
STANDARDS (TYP.)
APPROACH SIGNAGE
STANDARDS (TYP.)
CONSTRUCTION FENCING
SEE NOTE 1
STEEL PLATE OVER OPEN EXCAVATIONS
AFTER WORK DAY.
WORK AREA
PER FDOT AND MUTCD
PER FDOT AND MUTCD
WORK IN TRAVEL LANE ON MINOR URBAN STREET
(MAINTAIN ONE-WAY TRAFFIC WITH FLAGGER OPERATION
SEE NOTE 4SEE NOTE 4
NOTES (DETAIL 4)
2.
3.
4.
ADJACENT SOILS SHALL BE SUFFICIENTLY STABILIZED PRIOR TO THE USE OF STEEL PLATES USED FOR BRIDGING.
PROPERTY BACKFILLED AND PATCHED PRIOR TO THE END OF THE WORKDAY SHALL BE BRIDGED. TRENCH WALLS AND TRENCHES OR EXCAVATIONS WITHIN ROADWAYS THAT REQUIRE REOPENING TO UNOBSTRUCTED TRAFFIC AND THAT CANNOT BE
CONTRACTOR SHALL ENSURE ACCESS TO ADJACENT AIRPORT FACILITIES IS MAINTAINED AT ALL TIMES.
ALL CONSTRUCTION BARRICADES, SIGNAGE AND SPACING SHALL MEET FDOT AND MUTCD REQUIREMENTS.
CONTRACTOR SHALL SUBMIT CONSTRUCTION TRAFFIC CONTROL PLANS FOR APPROVAL TO COTR PRIOR TO ROADWAY CLOSURES.
CAUSE A FAILURE AT THE BELL RESULTING IN A SERVICE OUTAGE.
SHOULD ALWAYS BE VISIBLE AFTER THE RESTRAINT IS INSTALLED. OVERHOMING THE JOINT MAY
PARALLEL RODS/NUTS. THESE NUTS SHOULD ONLY BE SNUG TIGHT. THE HOME MARKS ON THE PIPE
COMPLETED PER THE MANUFACTURERS RECOMMENDATION, WHICH INCLUDES NOT OVER TIGHTENING THE
THE INSTALLATION OF BELL HARNESS RESTRAINTS AT PVC JOINTS (DR-18 & 25 PIPE) SHALL BE 7.
HDPE TO PVC TRANSITIONS: THE PVC PIPE SIDE SHALL BE RESTRAINED 35 FT (MIN).6.
RESTRAINS REQUIRED ON THE BRANCH SIDE. ANY CHANGES MUST BE APPROVED BY COTR.
ON TEE "BRANCH" LINE. THE PROJECT ENGINEER CAN INCREASE THIS DISTANCE TO REDUCE THE
(RUN) SHALL BE A TOTAL DISTANCE OF 3 FEET (MIN). SEE SCHEDULE ABOVE FOR RESTRAINT LENGTH
TEES: TOTAL LENGTH BETWEEN FIRST JOINTS OR RESTRAINED LENGTH ON EITHER SIDE OF TEE 5.
RESTRAINED LENGTH FOR THE LOWER (DEEPER) LEVEL.
This is the start of the file's text. The full file is on GovTribe.