This is a Summary of Work document for a federal construction contract (JCN 1703883) with the Federal Aviation Administration (FAA) for repair and maintenance of an ARSR (Air Route Surveillance Radar) equipment building located approximately 12 miles south of Hallettsville, Texas. The contract focuses on correcting water damage and preventing water intrusion to the building's exterior and interior components.

The primary scope of work includes: power washing the entire exterior building including CMU walls, doors, soffits, fascia, and concrete foundation using pressures between 1,200 to 3,500 psi depending on material type; resealing the entire building including all vertical control joints, foundation joints, door stoops, ductwork and pipe penetrations using Sika WS-295 silicone sealant; applying two coats of Foundation Armor SX5000 water-repellent to exterior CMU and concrete surfaces; replacing exterior door hardware with BHMA Grade 1 systems and installing fire-rated doors in the Equipment Room; replacing damaged acoustical ceiling tiles (24 by 48 inch pattern) with six extras provided to the Contracting Officer; replacing vinyl composition tile flooring and 4-inch resilient base throughout with Armstrong Standard Excelon Imperial tiles; preparing and repainting all interior plywood and gypsum board walls and ceilings with white latex paint; repainting exterior metal siding, gables, and cable trays; replacing two gable attic exhaust fans with Greenheck fans and installing weatherhoods; painting bollards with yellow exterior paint and providing polyethylene bollard covers; and providing a portable toilet on-site. Work hours are Monday through Friday 0700-1600 hours with 48-hour advance notice required for schedule changes. The contractor must maintain security protocols, provide a current personnel access list, obtain weather approval from the RE/COR daily, comply with FAA safety requirements, and complete all work within the contract schedule including operational testing of new exhaust fans and control systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JCN 1703883, QNA ARSR, Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, Morales TX

SUMMARY OF WORK 0101 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. Contractor shall provide all plant, labor, materials and equipment necessary to fully meet all requirements of this Summary of Work, Construction Specifications, Construction Drawings and all other Contract Documents related to and/or titled: JCN 1703883. QNA ARSR. Repair Building and Exterior Items, Correct Water Damage and Prevent Water Intrusion, Morales (Hallettsville)

TX.

B. This Section includes the following:

1. Work covered by the Contract Documents.

2. Use of premises.

3. Work restrictions.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Identification: JCN 1703883 QNA ARSR Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, Morales TX.

a. Project Location: about 12 miles south of Hallettsville TX.

b. Access road through 2nd gate on left pass bridge off CR-12.

c. Coordinates are 29°20'28.71"N, 96°52'19.69"W or 29.341420, -96.871910

2. FAA's Representative: FAA Resident Engineer/Contracting Officers Representative (RE/COR)

a. All work performed and all materials and equipment used are subject to approval by the “Contracting Officer and/or Resident Engineer/Contracting Officer’s Representative

(RE/COR)”.

B. Designers: Engineering Services, AJW-2C18D.

C. The Work includes (but not limited to):

Note: Where these specifications specify certain products, equivalent or better is acceptable per Section 01 63 00 provided product substitutions are approved by the Project Engineer and/or Contracting Officer. Please note that if other items herein the contract documents are not applicable, then they are for reference only.

1. Power wash the entire exterior of the building including CMU walls, doors, soffits, fascia, discolored concrete foundation next to the building, gable metal siding. Power washing a building, the recommended pressure typically ranges between 1,200 to 3,500 psi depending on the building material, with softer materials like stucco or vinyl siding requiring lower pressure (around 1,200 psi) and tougher materials like brick or concrete handling higher pressure (up to 2,500 psi) and structural steel (up to 3,500 psi).

JCN 1703883, QNA ARSR, Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, Morales TX

SUMMARY OF WORK 0101 11 00 - 2

a. Clean exterior CMU walls, exposed foundation and concrete next to building by chemical, brush and rinse where they are discolored.

b. Power wash top and sides of metal cable trays and the steel supports. Protect the underside of the cable trays that may damage the cables.

2. Reseal the ARSR equipment building.

(See specification Sections 01 56 00, 07 92 00 and 09 21 16)

a. Remove all old dried, cracked or compromised sealant and replace with new for the entire building.

b. This includes inside and outside building vertical control joints, building to foundation joints, concrete door stoops, ductwork and pipe penetrations, soffit, siding and frieze board to wall joints and weatherhoods.

c. Clean out and reseal the building eight vertical wall control joints, outside CMU and inside 5/8” fire retardant plywood walls. Replace backer rods and reseal joints.

Sika WS-295 silicone sealant meets ASTM C920.

d. Move furniture, shelves, et cetera, temporarily to perform the interior floor wall and ceiling joint repairs and painting then return it to the initial location when the work is completed. Protect the items attached to the walls not to be painted and equipment that cannot be moved from paint drips and damage, e.g. conduits, remove receptacle and switch covers temporarily for painting, shield ARSR equipment, et cetera.

e. Plywood Sheathing. Where the interior walls are covered with 5/8” 4’ x 8’ fire retardant plywood sheets, strip and clean off all of the accessible joint compound taped plywood panel joints, cut about a 3/8” deep vee groove in joints where sheets meet. Fill the vee grooved joints with water based DAP 3 in 1 Premium

Wood Filler, Item no. 101513. Then sand for surface smooth for painting per item

6.a. below.

f. Gypsum Board Sheathing. Where the walls and suspended ceiling are gypsum board, clean off all the existing taped joints, cut about a 3/8” vee in joints where sheets meet. Fill the vee grooved joints with joint compound, cover joints with mesh tape (aka FIBA tape). Apply joint compound smoother out over the tape.

Then sand surface for painting per item 6.a. below.

g. Seal bottom of metal panels at the sill plates at the top of the perimeter CMU walls.

h. Add or replace damaged or missing exterior doors items: exterior moldings Door

Jamb Adhesive-Backed Fire/Smoke Silicon Gasketing around all 8 door frames;

Heavy Duty Aluminum Brush Door Sweep for thresholds flush mounted on each of the 8 door leaf’s. Products to meet grade 1 ANSI/BHMA A156 standards as applicable.

3. Apply blended water-based silane/siloxane water repellent.

(See specification Section 07 19 00).

JCN 1703883, QNA ARSR, Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, Morales TX

SUMMARY OF WORK 0101 11 00 - 3

a. Apply two coats of water repellant per manufacturer directions to all surfaces of the exterior CMU block wall surfaces and exposed concrete foundation after they have been power washed, cleaned and dried properly. Protect adjacent surfaces and items from repellant drips and spray.

b. Use Foundation Armor SX5000 siloxane-silane blend.

4. Exterior Door Hardware and Cylinders.

(See specification Section 08 71 00).

a. Contractor shall include field verification of all existing exterior doors that are to remain and take note of hardware to be replaced. Replace existing door hardware with BHMA Grade 1 system that accepts a universal 7-pin removable and interchangeable core.

b. Provide new lever handles, hardware and replace lockset cylinders on exterior doors.

Provide new rim cylinders, mortise cylinders, SFIC cores, gasketing, door sweeps, thresholds.

c. Provide the appropriate keying system and coordinate it with RE/COR and SSCM unless instructed otherwise by Project Engineer/Contracting Officer.

d. Provide panic hardware on Emergency Generator Room and Equipment Room steel hollow metal exterior doors.

e. Only replace the exterior Equipment Room doors and frames with 14 gauge steel, label “B” fire rated doors that will comply with FAA 1600.69D 4-3-13, Perimeter

Doors and Door Locks requirements. The other existing exterior doors remain.

f. The main entrance double doors to the Equipment Room has a CDX-10 lock and a

Hoffman box. Contractor must include their bid cost to coordinate and pay for a

GSA-certified locksmith to remove it and reinstall it in the new door.

5. Acoustical ceiling tiles.

(See specification Sections 01 56 00 and 09 51 00).

a. Replace all damaged and mold/mildew stained acoustical ceiling tiles. Maintain the existing ceiling tile pattern of 24 by 48 inch tiles. Field verify the number to be replaced prior to ordering and provide 6 extra tiles to the COR for the SSC future use.

b. Provide any additional suspended ceiling tile framing or wires to support the ceiling as needed.

c. Contain dust to protect ARSR equipment, shield the equipment, do not cover to prevent any equipment overheating damage.

6. Vinyl flooring tiles and base.

(See specification Section 09 65 00).

a. Replace all vinyl composition tiles (VCT) floor tiles and bases with new Contractor Furnished Material (CFM) floor tiles except for those areas specifically covered by the

JCN 1703883, QNA ARSR, Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, Morales TX

SUMMARY OF WORK 0101 11 00 - 4

equipment. Provide Armstrong - Standard Excelon Imperial texture, 1/8” Fortress White 12" x12" SKU: 51839 (45 sf/box) or Contracting Officer approved equivalent or better. Cut the existing tiles along the edges next to where the equipment that remains in place meets the tile flooring. Maintain the tile floor 12” x 12” grid layout pattern and run the tile texture pattern all in the same direction, not checkerboarded.

b. Move furniture to perform the new flooring installation and return it to the initial location when the work is completed. Provide enough storage boxes (aka Conex boxes) for temporary storage of furniture, shelving, et cetera on site to execute the project work until all stored items are returned to their initial locations inside of the building.

c. Replace all 4” resilient base where new VCT are installed except where equipment cannot be moved for access. Replace all 4” resilient base elsewhere in the building where it is accessible. Field verify quantity required prior to ordering materials.

d. Remove debris beforehand. Sweep from corners to the center of the rooms or vacuum. Wet mop the new VCT flooring applying cleaning solution per manufacturer’s instructions using only the amount needed. Rinse well to avoid sticky floors. When VCT flooring is dry, apply floor wax and buff.

e. Clean all of the building floors thoroughly prior to final inspection.

7. Prepare surfaces as required and repaint, prime, and two coats.

(See specification Section 09 90 00).

a. Reference notes 2.d. And 2.e. above: for all interior plywood and gypsum board walls and ceilings, and interior CMU walls, prime and paint with two coats of interior white latex paint. Protect all wall attached items and equipment that is not to be painted, e.g. conduits, remove receptacle and switch covers temporarily for painting, shield ARSR equipment, et cetera.

b. Paint the existing metal gable siding, roof edges and vertical face of metal roof overhang matching existing color.

c. Paint soffit and metal siding above the top of exterior building CMU walls with paint matching existing color.

d. Paint all exterior single and double doors and frames inside and outside matching existing colors.

e. Following power washing of cable trays, reattach the underside loose cover.

Galvanized cable trays from equipment building to tower and the structural supports and similar adjacent items shall be abraded, sand medium, clean, non-greasy, and uncontaminated from salt and other chemicals for paint coats to adhere better. Apply 3 coats of Rust Grip® per Section 0991 13.42 Miscellaneous Exterior Paint. Second and third coat must be applied before Rust Grip® first coat has fully cured to avoid adhesion issues. The surface must also be dry during application. Protect adjacent surfaces from the spray and dripping. Follow manufacturer instructions.

8. Gables, exhaust fans and weatherhoods.

JCN 1703883, QNA ARSR, Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, Morales TX

SUMMARY OF WORK 0101 11 00 - 5

a. Replace the two existing gable attic louver exhaust fans, controls, and provide grounding in accordance with FAA-STD-19G. After fan and control installation, test for functionality. Reference Sections D/A002, E/A002 and 3/A006 Wall Mounted Fan. The as-built drawings indicate the two attic existing exhaust fans are Greenheck Sidewall Propeller Exhaust Fans, Product #SE1-16-428-A5X-QD, 1666- 3373 CFM. Field verify prior to ordering the new ones and verify with the manufacturer’s representative the related items ordered are all compatible.

Existing wiring can be used for the new fan/control installation if not damaged or deteriorated.

b. Fan speed control: -40°F to 140°F, 0 psi to 754 psi, 208/240v ac, 8A output, 3R, item 40G352 mfr. Model P266ACA-100C, Johnson controls, and associated electrical wiring. Set the temperature controls to turn exhaust fans on when attic space is above 90 degrees F and turn off when the attic space is below 90 degrees F.

c. Provide and install Greenheck wall housing for the two new 16 inch sidewall propeller fans , product #H-16 for the two gable exhaust fans to be replaced.

d. Add and install 2 new weatherhoods, Greenheck weatherhood kits for the 16 inch sidewall propeller fan louvers, with 90 degree turn-down. Field verify the right size prior to ordering, two #WTHD-16-90 and one #WTHD-18-90. Weatherhoods are galvanized steel with wire mesh birdscreen.

e. Provide and install Greenheck weatherhood kit for the 18 by 18 inch gable louver, 90 degree turn-down, product #WTHD-18-90. Weatherhoods are galvanized steel with wire mesh birdscreen. Field verify the right size prior to ordering.

f. Replace round wall fan UPS Room wall in kind. Verify if it is a Greenheck P/N: CW- 099A Exhaust Fan. Reference: 099-CUE/099-CW Series Direct Drive Greenheck Exhaust Fan, sidewall mounted. Field verify the exact make and model prior to ordering. Seal all around the new exhaust fan exterior CMU wall penetration.

9. Prepare surfaces, sand medium and clean for primer to adhere better. Paint all existing steel pipe bollards with primer and two coats of exterior yellow paint. Provide new yellow, high density polyethylene, ¼ inch heavy duty bollard covers with 2 red 3/4” reflective stripes by Bollards and Sleeves, LLC over each bollard. Field verify bollards are 6” pipe posts, height and the number required, about 24, prior to ordering bollard covers.

10. Provide and maintain a portable toilet on site for the duration for as long as the construction personnel are on site.

11. Provide specified manufacturer and contractor warranties.

D. Drawing Convention – All drawings dimensions, equipment, utility piping/cabling, and location presented on the drawing are for informational purposes only and must be field verified by the Contractor.

JCN 1703883, QNA ARSR, Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, Morales TX

SUMMARY OF WORK 0101 11 00 - 6

E. Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work, but shall be performed as if fully and correctly set forth and described in the drawings and specifications.

F. Where conflicts between the drawings and specifications occur, specifications shall govern in accordance with FAR 52.236-21.

1.3 PROTECTION:

A. Upon beginning work on the existing facility, Contractor shall protect existing buildings, equipment, pavement, sidewalks, fencing, gates, and landscaping as required.

B. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

C. Repair or replace portions of existing work, which have been altered during construction operations to match existing or adjoining work, as approved by the Project Engineer and/or Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

D. Contractor shall protect all Government property against damage, to include but not limited to dust, fumes, impact, scratching, water, paint, joint compound, power failure, power surges, weather, heavy equipment, et cetera. Especially protect sensitive equipment from dust or damage, see Section 01 56 00. All damages caused by the Contractor, whether to equipment, furniture, roads, landscaping, building components or any other type of Government property encountered at or near the project site shall be repaired or replaced to match existing to the satisfaction of the RE/COR at no cost to the Government.

1.4 USE OF PREMISES

A. General: Contractor shall have limited and restricted use of the premises for construction operations as indicated by RE/COR in coordination with facility operations personnel. Any potential impacts are to be brought to the attention of the RE/COR immediately.

1.5 OWNER'S OCCUPANCY REQUIREMENTS

A. Full FAA Access: FAA will access site and building during entire construction period. Cooperate with FAA during construction operations to minimize conflicts and facilitate FAA usage. Perform the Work so as not to interfere with FAA's day-to-day operations. Maintain existing exits, unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from FAA and authorities having jurisdiction.

2. Provide not less than 72 hours’ advance notice in writing to RE/COR of activities that will affect FAA's operations.

1.6 WORK RESTRICTIONS

JCN 1703883, QNA ARSR, Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, Morales TX

SUMMARY OF WORK 0101 11 00 - 7

A. Contractor shall complete this project, including final clean-up of the premises and storage and equipment areas within the duration approved in the contract schedule. This shall include operational testing of new exhaust fans and controls systems.

B. Work Hours:

Regular Work Hours: Monday – Friday from 0700 – 1600 hours.

*SSC FAA employees with the required clearance to escort contractor workers in the Equipment Room with classified equipment may work four 10 hour days per week. The Contractor shall coordinate when SSC FAA escorts are available and may be limited to four days to perform work in secure areas.

Notify the RE/COR 48 hours in advance of any changes in work hours, shift changes, or anticipated overtime work.

C. Holiday Work Hours: The Contractor shall observe all federal holidays and weekends. No work shall be planned for these days unless approved in writing by the Contracting Officer.

D. No Work Moratoriums: There shall be no work done during the FAA Moratoriums unless a waiver has been granted. Coordinate with local SSC, RE/COR for dates/times of moratoriums.

E. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by FAA or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify the RE/COR 72 Hours prior to proposed utility interruptions or outage.

2. Do not proceed with utility interruptions without the RE/COR written permission.

1.7 SECURITY REQUIREMENTS

A. Site Access and Security:

1. Access to the site shall be determined by the RE/COR through coordination with SSC personnel and will be given to the Contractor at the Pre-Construction Meeting. The Contractor shall maintain the security integrity. SSC personnel with the required security clearance are required to escort the RE/COR and Contractor personnel for access inside of the ARSR building.

B. PERSONNEL LIST:

1. Contractor shall provide the facility FAA SSC and RE/COR with a list of contractor’s personnel who will require access to the site. The list shall be kept current during project work.

C. SECURITY INVESTIGATION:

JCN 1703883, QNA ARSR, Repair Building & Exterior Items, Correct Water Damage, Prevent Water Intrusion, Morales TX

SUMMARY OF WORK 0101 11 00 - 8

1. Contractor’s personnel may have a security investigation by the FAA. Upon request by the RE/COR, the contractor shall promptly complete all security forms provided by RE/COR.

D. Weather Delay:

1. The Contractor shall obtain the approval of the RE/COR each day prior to beginning the next day’s work activity. The RE/COR may suspend all work activity in the event that outdoor weather conditions pose a threat of damage to the site work, the equipment or the building.

E. Construction Safety:

1. The Contractor is responsible for providing a safe work environment for all construction and inspection personal working on site. The Contractor shall follow all national, state, and local safety procedures mandated by FAA, OSHA, law, and local ordinance.

F. RIGHT TO SEARCH:

1. Current procedures at FAA facilities include the “right to search.” If in the judgment of the FAA, a reason to search for a vehicle or person exists, such search will be made.

--END OF SECTION--