Questions and Answers as of 10.22.2025.pdf

PDF 207 KB Posted

Attached to
SAV TOWB Parking Lot Refurbishment
Solicitation number
6973GH-26-C-00010
Issued by

About this file

This document is a Questions and Answers (Q&A) file for solicitation 6973GH-24-R-00212, a SAV TOWB Parking Lot Replacement project for the Federal Aviation Administration (FAA). The Q&A document covers multiple Request for Information (RFI) dates from 10/14/2025 to 10/22/2025, addressing specific project details such as dumpster gate dimensions (19'11" wide), lift replacement specifications, and project requirements. Key project elements include replacing a material handling lift, performing asphalt repairs, managing multiple parking lot phases (minimum of two), and ensuring tax-exempt status as a government project.

Notable technical details include a lift pit measurement of 39½" wide by 80" long and 10" deep, an 8 YD dumpster, and flexible requirements around concrete modifications and crack repairs. The project allows existing power supply conduit to be reused, does not require three separate personnel for Superintendent, SSHO, and QC Manager roles, and mandates that the contractor dispose of the existing material handling lift. No site drawings will be provided, and interested parties are encouraged to conduct site visits to assess specific project conditions.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

6973GH-24-R-00212

SAV TOWB Parking Lot Replacement

RFI 10/14/2025

1. Q: Under the SOW - Section i, it talks about the dumpster doors. What are the dimensions of the gate - height, width, and opening?

A.

RFI 10/15/2025

2. Q; Will a complete demolition of the concrete pad around the existing lift designated for replacement be needed or will the contractor have to remain within the existing concrete footprint for lift replacement A. Coordinate the need for concrete modifications with new lift manufacturer’s written instructions and recommendations to ensure final installation is compliant with warranty conditions.

3. Q: Can the existing power supply conduit to the existing lift be utilized for the replacement lift, or will the SOW require a new path for power / hydraulic/ air supply for the new lift?

A. Existing conduit may be utilized.

RFIs 10/21/2025

4. Q: Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?

A. No.

5. Q: Are there any phasing requirements?

A. Yes. I would plan on three phases with a minimum of two in support of employee parking needs

6. Q: Please provide the site visit attendee sign-in sheet.

A. The site visit list will not be provided

7. Q: Is this project tax-exempt?

A. The FAA is a government entity and is therefore exempt from taxes.

8. Q: How many "bad spots" in the asphalt as called out in the SOW. How many locations?

How large? To what depth?

A. Multiple spots and multiple depths in the parking lot. A site visit from interested parties may be necessary to gather requested information.

9. Q: What are the dimensions of the existing lift?

A. The existing lift is being replaced. Refer to the SOW. The lift pit dimensions are 39 ½” wide, 80” long and 10” deep.

10. Q: What are the dimensions of the dumpster and gates?

A. Already provided gate dimension to the dumpster area. The dumpster is an 8 YD dumpster

11. Q: How wide are existing cracks?

A. Multiple cracks similar to question 8. A site visit by interested parties may be necessary to assess.

12. Q: Is there an electrical scope outside of connections to the new lift?

A. refer to the SOW and question 3.

13. Q: Are we replacing any signage?

A. Follow what’s listed or shown in the SOW

14. Q: Can you provide a drawing of the site to be able to do a takeoff from?

A. No drawings are available. Site visits by interested parties may be necessary to assess property.

15. Q: Are we required to route all existing cracks prior to filling and sealing?

A. Follow industry standards, crack and asphalt sealer manufacture’s recommendations and instructions for repairing cracks.

RFIs 10/22/2025

16. Q: Could you please confirm whether the existing material handling lift that will be removed is to be disposed of by the contractor, or if the FAA intends to retain the old unit?

A. Disposed of by the contractor.

File details come from the government source that posted it. Updated .