SIR 6973GH-25-R-00066 Amendment 0001.pdf
PDF 90 KB Posted
- Attached to
- Federal Aviation Administration’s National Test Equipment Program (NTEP) Test Equipment (TE) Calibration
- Solicitation number
- 6973GH-25-R-00066
About this file
This document is an Amendment (Amendment 0001) to Solicitation 6973GH-25-R-00066 for the Federal Aviation Administration's National Test Equipment Program (NTEP) Test Equipment Calibration services. The amendment includes several key modifications: updating Section L to now include resumes, increasing the page limit for the Proposal Organization's Table of Contents from 1 to 2 pages, adding Wage Determination 2015-5227 rev. 24 as Attachment 26, and replacing Attachments 09 and 11 (CDRL R002 and CDRL R004) to remove specific language about first submission requirements. The solicitation seeks a contractor to provide comprehensive calibration services for FAA-owned Test Equipment, with an anticipated Indefinite Delivery/Indefinite Quantity contract structure featuring a 1-year base period and four 1-year option periods. Technical and cost proposals are due by 5:00 PM CST on April 18, 2025, and must be submitted electronically to the Contracting Specialist.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 2
0001 03/18/2025
AAQ-740 TRAINING & AVIATION ACQ
FAA AERONAUTICAL CENTER
PO BOX 25082
BLDG 014-AHQ, ROOM 233A
AAQ740-AFN
OKLAHOMA CITY OK 73125
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x
6973GH-25-R-00066
copies to the issuing office.
03/18/2025
(x)
Amendment 0001 to SIR 6973GH-25-R-00066 is issued to make changes in Sections L and J of the SIR, add a Wage Determination Attachment, replace Attachments 09 and 11 and provide responses to questions from industry. SEE BELOW:
FIRST: SIR 6973GH-25-R-00066 is removed and replaced with SIR 6973GH-25-R-00066 Rev. 1 and includes the following changes:
• SIR Section L. page 58 L.6(a) is updated from: excluding resumes to: including resumes.
• Section L. Page 56, (c) Contract Documentation - Volume I, 1) is updated from: Section B, Supplies or Services and Prices/Costs; Government format to: Signed Offer (Solicitation, Offer and Award Form, Section A). Offerors must complete Section A (Solicitation Offer and
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Cilony Alejandro
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-25-R-00066/0001
Award), blocks 12 through 17.
• Under Section L.5(a), Table L.1 – Proposal
Organization, Volume II, Tab Number i. and ii, the Table of Contents and Evaluation Factor
Matrix page limit is increased from: 1 page to: 2 pages.
• Section J is changed to reflect adding
Attachment 26 and updating Attachments 09 and 11.
SECOND: Wage Determination 2015-5227 rev. 24 is added as Attachment 26.
THIRD: CDRL R002 (Attachment 09) is replaced by
CDRL R002 Rev 1 (Attachment 09) that removes the statement “Block 12: First submission shall be provided with bid package”.
FOURTH: CDRL R004 (Attachment 11) is replaced by
CDRL R004 Rev 1 (Attachment 11) that removes the statement “Block 12: First submission shall be provided with bid package”.
FIFTH: Questions and Answers document is attached to the public announcement.
SIXTH: All other terms and conditions remain in full force and effect.
File details come from the government source that posted it. Updated .