This document is a Questions and Answers (Q&A) file for Solicitation 6973GH-25-R-00066, addressing the Federal Aviation Administration's National Test Equipment Program (NTEP) Test Equipment Calibration opportunity. The nine questions and responses clarify key proposal submission details, including: resumes are now included in the 100-page technical volume page count, Schedule B should be included in Volume IV, the Table of Contents page limit is increased to two pages, and no past performance questionnaire is currently required. The anticipated contract start date is October 1, 2025 (potentially no later than January 1, 2026), and certain attachments like Calibration Procedures Inventory and Facility Working Standards Inventory will be provided post-award rather than with the initial proposal. The solicitation requires comprehensive calibration services for FAA-owned Test Equipment, with an Indefinite Delivery/Indefinite Quantity contract structure featuring a 1-year base period and four 1-year option periods.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIR 6973GH-25-R-00066 - Questions
Question #1 Reference: SIR Section L. page 58 L.6(a) states that resumes are excluded from tech volume page count. Pg. 58, Factor 1.2, Subfactor 1.2.1 para 2 states resumes are included in the page count.
Question: Please clarify if Resumes are included or excluded from the 100 page technical volume page limit?
Answer: The Resumes are included in the 100 page count. SIR Section L (page 58) L.6(a) is updated from: excluding resumes to: including resumes.
Question #2 Reference: SIR Section L. Page 56, Table L.1 states Part III, includes Section B, Schedule.
In addition, Section L. Page 56, (c) Contract Documentation - Volume I, 1), includes Section B, Supplies and Services and Prices/Cost; Government format.
Question: Please confirm in which Volume to include Schedule B.
Answer: Schedule B is included in Volume IV. Section L. Page 56, (c) Contract Documentation - Volume I, 1) is updated from: Section B, Supplies or Services and Prices/Costs; Government format to: Signed Offer (Solicitation, Offer and Award Form, Section A). Offerors must complete Section A (Solicitation Offer and Award), blocks 12 through 17.
Question #3 SIR Section L.5(a), Table L.1 – Proposal Organization, Volume II, Tab Number i. and ii., indicate a one (1) page limit for the Table of Contents and Evaluation Factor Matrix. SIR Section L.5(b) 4) indicates these are excluded from the page count.
Question: Would the Government remove the Table of Contents and Evaluation Factor Matrix page limit from Table L.1?
The Table of Contents and Evaluation Factor Matrix page limit is increased from: 1 page to: 2 pages.
Question #4 Reference SIR Section L.6. Page 59, (b) Past Performance Proposal – Volume III, 2.1 states, “A Past Performance Questionnaire may be used to collect information on an offeror’s recent and relevant Past Performance.”
Question: Does the Government want a past performance questionnaire sent to points of contact for cited contracts? If so, please provide the questionnaire and instructions for submission.
Answer: If the government determines that a past performance questionnaire is necessary at any point during the solicitation period, the questionnaire will be provided at that time. The government is currently not requiring a past performance questionnaire.
Question #5 Please provide the current Collective Bargaining Agreement (CBA) and Wage Determination.
Answer: This is not subject to a Collective Bargaining Agreement. Wage Determination 2015-5227 rev. 24 is added as Attachment 26.
Question #6 Please provide the current calibration schedule with site break dates for all locations.
Answer: Current calibration schedule will not be provided. We provided all locations on the CONUS/OCONUS attachments and equipment per locations. Specifics would be during post award.
Question #7 01 - Schedule B Table does not have an anticipated start date. For pricing purposes, please provide an anticipated start date.
Answer: The anticipated start date for the contract is October 1, 2025. This date is subject to change, but is not anticipated to be later than January 1, 2026.
Question #8 SIR attachment 09-CDRL-Calibration Procedures Inventory (R002) indicates that the first submission shall be provided with the bid package. This is not referenced anywhere else in the SIR.
Question: Does the Government want this information with the proposal? If so, please identify how/where it should be included.
Answer: This should be provided upon request during post award. SIR attachment 09-CDRL-Calibration Procedures Inventory (R002) is updated to remove the statement “Block 12: First submission shall be provided with bid package”.
Question #9 SIR attachment 11-CDRL-Facility Working Standards Inventory (R004) indicates that the first submission shall be provided with the bid package. This is not referenced anywhere else in the SIR.
Question: Does the Government want this information with the proposal? If so, please identify how/where it should be included.
Answer: This should be provided upon request during post award. SIR attachment 11-CDRL-Facility Working Standards Inventory (R004) is updated to remove the statement “Block 12: First submission shall be provided with bid package”.