RFP 6973GH-24-R-00036 Mobile Shelter IDIQ RFIs continued.pdf
PDF 122 KB Posted
- Attached to
- 6973GH-24-R-00036 Mobile Shelter IDIQ
- Solicitation number
- 6973GH-24-R-00036
About this file
This document is a Request for Information (RFI) related to a federal contract opportunity for the procurement of pre-cast concrete shelters by the Federal Aviation Administration (FAA).
The key details are as follows: The FAA is seeking a contractor to provide all labor, materials, equipment, transportation, insurance, notifications, licenses, permits, fees, and supervision necessary to perform the work described in the attached Scope of Work. The contract will be a firm-fixed-price construction contract awarded as a result of this solicitation. Responses to the RFI are due by 5:00 p.m. CST on August 26, 2024, and proposals are due by 5:00 p.m. CST on September 2, 2024. Offerors must be registered in the System for Award Management (SAM). The FAA reserves the right to communicate with one or more offerors during the solicitation process. The RFI document addresses questions and clarifications related to the roof, floor, exterior, interior, insulation, sloping, fixture requirements, concrete specifications, and door/awning details.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 6973GH-24-R-00036 Mobile Shelter IDIQ RFIs continued
1. Section 3.9.2 Roof: States “6” Ribbed finish” – Would a solid sloped roof be acceptable with an
EPDM Rubber roof? Yes
2. Section 3.9.3 Floor: states “6” ribbed floor” – would an 8” solid floor be acceptable as this would meet the floor loading required? Yes
3. Section 4.2 Exterior: Would a smooth architectural finish be acceptable (painted tan as in the specification), in lieu of aggregate or the fins? Yes, smooth architectural is acceptable.
4. Section 4.3 Interior: This shows the HDPE material, would the standard FRP be acceptable? Yes
5. Section 4.3.C Insulation: UCP has a solid concrete floor, would it be an option for the site contractor to insulate the foundation under the building? If foundation design requires installation per shelter manufacturer’s design (you,) contractor shall install prior to shelter delivery.
6. Drawing A003 shows a 3” slope to two sides of the building and the specification reads sloped
¼” in all directions please clarify? ¼” slope per foot coming to just over 3” each site.
7. Can a list of the sites be provided for freight purposes? Sites will vary on a national level and need.
8. There is a section for foundation design, please clarify that is being done by the site contractor that would be providing the Geotechnical reports? Foundation design shall be provided by shelter manufacturer (you) with FAA supplied Geotech report.
9. Please specify the detail on Fixture B as the Lithonia CSXW fixture only offers vandal guards and the specification calls for the cut off feature? Another fixture with cutoff feature may be submitted and used. LED’s must meet the EMI requirements from Code of Federal Regulations (CFR) Title 47 Part 15 for
Class A Devices. In certain circumstances, as directed below, LED lighting must meet CFR Title 47 Part 15 standards for Class B Devices.
10. Specification call for lightweight 5000 psi concrete, for the floor we would use 5000 psi normal weight concrete (needed for the floor load). Approved
11. Section 4.4 Doors and Accessories: Letter H. 56” x 24” Fiberglass Awning
A. Would you be able to provide more information on this awning, as UCP has not been able to locate a manufacturer? Other Awning styles can be submitted for approval. FAA requires Fiberglass for this contract.
B. Would you have a manufacturer and model number?
Millbrook Pool, Inc., 334-285-0000, or Wilson Fox (POC), 334-450-4134 has provided them to Modular
Connections on past requirements. They do not have a part number. They come in a grey and tan color.
C. Or is this something that would be supplied by the FAA or site contractor? No
D. Would other materials be acceptable? Fiberglass is required.
12. In regard to your answer to Question #7 for the list of sites; you state that sites will vary on a national level and need.
A. Could you provide what states would be included for the delivery of the buildings? Any state within the continental U.S.
B. We ask this to determine the freight permits and requirements for various states as those may vary. This would also assist in our determination for the manpower required for the installation of each shelter. For example, the rules for the state of CT would not be the same as the state of TX.
13. Sub-Factor 2.2 Work Plan:
A. Please clarify what the mandatory minimum requirements from the work plan needs, is a letter stating that all requirements meet this sufficient? The minimum requirements the work plan must address are listed under sub-factor 2.2. The work plan is a description of how you will fulfill the requirement and should be sufficient length to describe those processes. A typical work plan is 3-5 pages long.
B. Please confirm no additional documents such as stamped drawings, submittals etc. are required with our proposal. Stamped drawings are not required for proposal. These will be site specific for each order.
14. In review of the pricing sheet – confirm the contract may be based over a four-year period?
Confirmed, this contract will have a 4-year ordering period.