NEXV3 SIR Sect I Amend 2.docx

DOCX document 89 KB Posted

Attached to
FAA NEXCOM V3 UHF/VHF Radio Federal contract opportunity
Solicitation number
693KA8-23-R-00005
Issued by
Department of Transportation Federal Aviation Administration Headquarters

View the file

Other files for this federal contract opportunity

Other files attached to FAA NEXCOM V3 UHF/VHF Radio, newest first.
File Type Posted
693KA8-23-R-00005_Amend_0004_20230522.pdf PDF
NEXV3 SIR Sect H Amend 4.docx DOCX document
NEXV3 SIR Sect E Amend 4.docx DOCX document
NEXV3 SIR Sect C Amend 4.docx DOCX document
NEXV3 SIR Sect L Amend 3.docx DOCX document
NEXV3 SIR Sect L Amend 2.docx DOCX document
NEXV3 SIR Sect L_Att L07_Amend 2.docx DOCX document
NEXV3 SIR Sect M_Att M01_OCT Plan_Amend 2.docx DOCX document
NEXV3 SIR Sect M_Att M03_OCT VRTM_Amend 2.pdf PDF
NEXV3 SIR Sect J_Att J02_Amend 2.docx DOCX document
NEXV3 SIR Sect L_Att L04_Amend 2.pdf PDF
NEXV3 SIR Sect M_Att M03_OCT VRTM_Amend 2.xlsx XLSX spreadsheet
693KA8-23-R-00005_Amend_0002_20230426.pdf PDF
NEXV3 SIR Sect C Amend 2.docx DOCX document
693KA8-23-R-00005_Amend_0001_20230420.pdf PDF
NEXV3 SIR Sect F Amend 1.docx DOCX document
NEXV3 SIR Sect B - Pricing Model Amend 1.xlsx XLSX spreadsheet
NEXV3 SIR Sect B - Pricing Model Amend 1.pdf PDF
NEXV3 SIR Sect B - Pricing Model.pdf PDF
NEXV3 SIR Sect F.docx DOCX document
NEXV3 SIR Sect J_Att J02.docx DOCX document
NEXV3 SIR Sect L_Att L01.docx DOCX document
NEXV3 SIR Sect L_Att L03.docx DOCX document
NEXV3 SIR Sect M_Att M01_OCT Plan.docx DOCX document
NEXV3 SIR Sect M_Att M03_OCT VRTM.xlsx XLSX spreadsheet
NEXV3 SIR Sect D.docx DOCX document
NEXV3 SIR Sect H.docx DOCX document
NEXV3 SIR Sect I.docx DOCX document
NEXV3 SIR Sect J.docx DOCX document
NEXV3 SIR Sect J_Att J04.pdf PDF
NEXV3 SIR Sect K.docx DOCX document
NEXV3 SIR Sect L_Att L06.docx DOCX document
NEXV3 SIR Sect G.docx DOCX document
NEXV3 SIR Sect J_Att J01_PD_v2.5_FAA-E-37021.docx DOCX document
NEXV3 SIR Sect J_Att J03.docx DOCX document
NEXV3 SIR Sect L_Att L07.docx DOCX document
NEXV3 SIR Sect L_Att L08.docx DOCX document
NEXV3 SIR Sect M.docx DOCX document
NEXV3 SIR Sect M_Att M03_OCT VRTM.pdf PDF
NEXCOM_V3_Radio_Government_Furnished_Speech_Samples.zip ZIP file
SF-33_693KA8-23-R-00005.pdf PDF
NEXV3 SIR Sect B - Pricing Model.xlsx XLSX spreadsheet
NEXV3 SIR Sect C.docx DOCX document
NEXV3 SIR Sect E.docx DOCX document
NEXV3 SIR Sect J_Att J01_PD_v2.5_FAA-E-37021.pdf PDF
NEXV3 SIR Sect L.docx DOCX document
NEXV3 SIR Sect L_Att L02.docx DOCX document
NEXV3 SIR Sect L_Att L04.pdf PDF
NEXV3 SIR Sect L_Att L05.xlsx XLSX spreadsheet
NEXV3 SIR Sect M_Att M02_VOTER Testing Requirements.docx DOCX document
Show all 50

FAA NEXCOM V3 UHF/VHF Radio has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

693KA8-23-R-00005

Page I-1

PART II – SECTION I

CONTRACT CLAUSES

TABLE OF CONTENTS

I.1AMS CLAUSES AND PROVISIONS BY REFERENCEI-3
I.2AMS CLAUSE AND PROVISIONS BY FULL TEXTI-7
3.1.7-6 Disclosure of Certain Employee Relationships (January 2019)I-7
3.2.2.3-39 Requirements for Certified Cost or Pricing Data or Data Other Than Certified Cost or Pricing Data - Modifications (January 2022)I-9
3.2.4-5 Allowable Cost and Payment (October 2019)I-11
3.2.4-16 Ordering (October 2019)I-16
3.2.4-17 Order Limitations (October 2019)I-17
3.2.4-20 Indefinite Quantity (October 2019)I-18
3.2.4-33 Option for Increased Quantity - Separately Priced Line Item (October 2019)I-18
3.2.4-34 Option to Extend Services (October 2019)I-19
3.2.4-35 Option to Extend the Term of the Contract (July 2021)I-19
3.3.1-11 Availability of Funds for the Next Fiscal Year (April 1996)I-19
3.3.1-32 Performance Based Payments (July 2018)I-20
3.3.1-33 System for Award Management (April 2022)I-25

3.3.1-36 Availability of Funds - Option Periods under a Continuing

Resolution (April 2008)I-27
3.3.1-40 Electronic Submission of Payment Requests (April 2022)I-27
3.5-13 Rights in Data – General (October 2014)I-30
3.5-13 Alternate II Rights in Data – General (January 2009)I-36
3.5-13 Alternate III Rights in Data – General (January 2009)I-37
3.6.2-14 Employment Reports on Veterans (April 2022)I-38
3.6.4-25 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (July 2022)I-39
3.9.1-1 Contract Disputes (January 2020)I-41
3.10.1-18 Notification of Changes (April 1996)I-43
3.10.2-2 Subcontracts (Cost-Reimbursement and Ceiling Priced Contracts) (July 2017)I-45
3.13-16 Records Management (January 2020)I-48
3.18-1 Bipartisan Infrastructure Law – Reporting Requirements (October 2022)I-51

AMS CLAUSES AND PROVISIONS BY REFERENCE

3.1-1 AMS Clauses and Provisions Incorporated by Reference (July 2019) This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at: https://fast.faa.gov/contractclauses.cfm.

(End of clause)

Clause #
Title
3.1.7-1
Exclusion from Future Agency Contracts (July 2018)
3.1.7-2
Organizational Conflicts of Interest (January 2023)
3.1.8-1
Cancellation, Rescission and Recovery of Funds for Illegal or Improper Activity (October 2014)
3.1.8-2
Price or Fee Adjustment for Illegal or Improper Activity (October 2019)
3.2.2.3-29
Integrity of Unit Prices (July 2004)
3.2.2.3-33
Order of Precedence (March 2009)
3.2.2.3-67
Special Precautions for Work at Operating Airports (April 2022)
3.2.2.3-73
Shipping Spare Parts (March 2009)
3.2.2.3-83
Prohibition Against Contracting with Inverted Domestic Corporations (October 2015)
3.2.2.7-6
Protecting the Government’s Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (April 2011)
3.2.2.7-8
Disclosure of Team Arrangements (April 2008)
3.2.2.8-1
Material Requirement (October 2019)
3.2.5-1
Officials Not to Benefit (April 2021)
3.2.5-3
Gratuities or Gifts (October 2019)
3.2.5-4
Contingent Fees (October 1996)
3.2.5-5
Anti-Kickback Procedures (October 2019)
3.2.5-6
Restrictions on Subcontractor Sales to the FAA (October 2022)
3.2.5-6 Alternate I
Restrictions on Subcontractor Sales to the FAA (October 2022)
3.2.5-8
Whistleblower Protection for Contractor Employees (April 1996)
3.2.5-13
Contractor Code of Business Ethics and Conduct (April 2010)
3.2.5-14
Display of Hotline Poster(s) (April 2008)
3.3.1-1
Payments (July 2018)
3.3.1-5
Payments under Time-and-Materials and Labor-Hour Contracts (October 2021)
3.3.1-6
Discounts for Prompt Payment (July 2018)
3.3.1-7
Limitation on Withholding of Payments (July 2018)
3.3.1-8
Extras (July 2018)
3.3.1-9
Interest (July 2018)
3.3.1-10
Availability of Funds (April 2014)
3.3.1-15
Assignment of Claims (July 2018)
3.3.1-17
Prompt Payment (January 2021)
3.3.1-20
Providing Accelerated Payment to Small Business Subcontractors (October 2012)
3.3.1-27
Invoices for Equipment Delivered (July 2018)
3.3.1-31
Progress Payments (July 2018)
3.3.1-34
Payment by Electronic Funds Transfer-System for Award Management (July 2018)
3.3.1-38
Unenforceability of Unauthorized Obligations (July 2018)
3.3.1-39
Funding - Time-and-Materials and Labor-Hour Contracts (July 2018)
3.3.2-1
FAA Cost Principles (October 2019)
3.4.1-12
Insurance (October 2019)
3.4.2-6
Taxes - Contracts Performed in U.S. Possessions or Puerto Rico (October 1996)
3.4.2-8
Federal, State, and Local Taxes--Fixed Price Contract (July 2019)
3.5-1
Authorization and Consent (January 2019)
3.5-2
Notice and Assistance Regarding Patent and Copyright Infringement (January 2009)
3.5-3
Patent Indemnity (April 2017)
3.5-18
Commercial Computer Software License (January 2009)
3.6.1-3
Utilization of Small, Small Disadvantaged, Women-Owned, Service-Disabled Veteran Owned, and HUBZone Small Business Concerns (January 2021)
3.6.1-4
Small Business Subcontracting Plan (October 2022)
3.6.1-5
Payments to Small Business Subcontractors (October 2022)
3.6.1-6
Liquidated Damages – Subcontracting Plan (October 2022)
3.6.1-7
Limitations on Subcontracting (July 2021)
3.6.1-9
Mentor-Protégé Program (July 2022)
3.6.1-11
Mentor-Protege Requirements and Evaluation (January 2021)
3.6.2-4
Walsh-Healey Public Contracts Act (October 2018)
3.6.2-9
Equal Opportunity (July 2020)
3.6.2-10
Equal Opportunity Preaward Clearance of Subcontracts (January 2020)
3.6.2-12
Equal Opportunity for Veterans (April 2022)
3.6.2-13
Equal Opportunity for Workers With Disabilities (April 2022)
3.6.2-14
Employment Reports on Veterans (April 2022)
3.6.2-16
Notice to the Government of Labor Disputes (October 2018)
3.6.2-35
Prevention of Sexual Harassment (October 2018)
3.6.2-39
Trafficking in Persons (April 2019)
3.6.2-44
Notification of Employee Rights Under the National Labor Relations Act (January 2019)
3.6.3-14
Use of Environmentally Preferable Products (January 2020)
3.6.3-16
Drug Free Workplace (March 2009)
3.6.3-17
Efficiency in Energy-Consuming Products (January 2020)
3.6.3-23
Delivery of Electronic and Paper Documents (January 2020)
3.6.4-10
Restrictions on Certain Foreign Purchases (January 2010)
3.6.4-20
Correspondence and Deliverables in English (January 2012)
3.6.4-21
Export Control (July 2014)
3.6.4-23
Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (April 2022)
3.6.5-1
Utilization of Indian Organizations and Indian Owned Economic Enterprises (January 2023)
3.8.2-9
Site Visit (April 1996)
3.8.2-10
Protection of Government Buildings, Equipment, and Vegetation (July 2019)
3.8.2-19
Prohibition on Advertising (July 2019)
3.8.4-5
Government Supply Sources (April 1996)
3.9.1-2
Protest After Award (August 1997)
3.10.1-2
Production Progress Reports (April 1996)
3.10.1-7
Bankruptcy (April 1996)
3.10.1-12
Changes - Fixed-Price (April 1996)
3.10.1-12 Alternate II
Changes - Fixed-Price (April 1996)
3.10.1-13 Alternate II
Changes - Cost-Reimbursement (April 1996)
3.10.1-14
Changes - Time and Materials or Labor Hours (April 2022)
3.10.1-25
Novation and Change-Of-Name Agreements (October 2007)
3.10.1-26
Contractor Performance Assessment Reporting System (April 2021)
3.10.2-3
Subcontracts (Time-and-Materials and Labor-Hour Contracts) (April 1996)
3.10.2-5
Competition in Subcontracting (January 1998)
3.10.2-6
Subcontracts for Commercial Items and Commercial Components (April 1996)
3.10.3-2
Government Property - Basic Clause (April 2022)
3.10.3-2 Alternate I
Government Property - Basic Clause (October 2018)
3.10.3-5
Use and Charges (October 2018)
3.10.4-19
Government Industry Data Exchange Program (GIDEP) (January 2018)
3.10.5-1
Product Improvement/Technology Enhancement (April 1996)
3.10.6-1
Termination for Convenience of the Government (Fixed Price) (October 1996)
3.10.6-4
Default (Fixed-Price Supply and Service) (January 2020)
3.10.6-7
Excusable Delays (October 1996)
3.13-5
Seat Belt Use by Contractor Employees (October 2001)
3.13-11
Plain Language (July 2006)
3.13-13
Contractor Policy to Ban Text Messaging While Driving (January 2011)
3.13-14
Reporting Executive Compensation and First-Tier Subcontract Awards (April 2022)
3.14-2
Contractor Personnel Suitability Requirements (April 2022)
3.14-3
Foreign Nationals as Contractor Employees (October 2022)
3.14-4
Access to FAA Facilities, Systems, Government Property, and Sensitive Unclassified Information (October 2021)
3.14-5
Sensitive Unclassified Information (SUI) (January 2022)
3.14-6
Privacy or Security Safeguards (November 2016)

AMS CLAUSE AND PROVISIONS BY FULL TEXT

3.1.7-6 Disclosure of Certain Employee Relationships (January 2019)

a) The policy of the FAA is to avoid doing business with contractors, subcontractors, and consultants who have a conflict of interest or an appearance of a conflict of interest. The purpose of this policy is to maintain the highest level of integrity within its workforce and to ensure that the award of procurement contracts is based upon fairness and merit.

b) The contractor must provide to the Contracting Officer the following information with its proposal and must provide an information update within 30 days of the award of a contract, any subcontract, or any consultant agreement, or within 30 days of the retention of a Subject Individual or former FAA employee subject to this clause:

(1) The names of all Subject Individuals who:

(i) participated in preparation of proposals for award; or

(ii) are planned to be used during performance; or

(iii) are used during performance; and

(2) The name of each individual, retained in any capacity by the contractor, who was employed by FAA during the five-year period immediately prior to the date of award; and

(3) The date on which the initial expression of interest in a future financial arrangement was discussed with the contractor by any former FAA employee whose name is required to be provided by the contractor pursuant to subparagraph (2); and

(4) The location where any Subject Individual or former FAA employee whose name is required to be provided by the contractor pursuant to subparagraphs (1) and (2), are expected to be assigned.

c) "Subject Individual" means a current FAA employee's father, mother, son, daughter, brother, sister, uncle, aunt, first cousin, nephew, niece, husband, wife, father-in-law, mother-in-law, son-in-law, daughter-in-law, brother-in-law, sister-in-law, stepfather, stepmother, stepson, stepdaughter, stepbrother, stepsister, half-brother, half-sister, spouse of an in-law, or a member of his/her household.

d) The contractor must incorporate this clause into all subcontracts or consultant agreements awarded under this contract and must further require that each such subcontractor or consultant incorporate this clause into all subcontracts or consultant agreements at any tier awarded under this contract unless the Contracting Officer determines otherwise.

e) The information as it is submitted, must be certified as being true and correct. If there is no such information, the certification must so state.

f) Remedies for nondisclosure: The following are possible remedies available to the FAA should a contractor misrepresent or refuse to disclose or misrepresent any information required by this clause:

(1) Termination of the contract.

(2) Exclusion from subsequent FAA contracts.

(3) Other remedial action as may be permitted or provided by law or regulation or policy or by the terms of the contract.

g) Annual Certification. The contractor must provide annually, based on the anniversary date of contract award, the following certification in writing to the Contracting Officer:

ANNUAL CERTIFICATION OF DISCLOSURE OF CERTAIN EMPLOYEE RELATIONSHIPS

The contractor represents and certifies that to the best of its knowledge and belief that during the prior 12 month period:

[ ] A former FAA employee(s) or Subject Individual(s) has been retained to work under the contract or subcontract or consultant agreement and complete disclosure has been made in accordance with subparagraph (b) of AMS Clause 3.1.7-6.
[ ] No former FAA employee(s) or Subject Individual(s) has been retained to work under the contract or subcontract or consultant agreement, and disclosure required by AMS Clause 3.1.7-6 is not applicable.

______________________________________________Authorized Representative

______________________________________________Company Name

______________________________________________Date

h) The contractor agrees to include the substance of this clause in all subcontracts awarded under this contract. The Contracting Officer will consider case-by-case exceptions to this requirement for individual subcontracts in the event that:

(1) the contractor considers this clause to be inappropriate and unnecessary in the case of a particular subcontract;

(2) the contractor provides a written statement affirming absolute unwillingness of a subcontractor to perform, absent some relief from the substance of this prohibition and the reason why;

(3) use of an alternate subcontract source would unreasonably detract from the quality of effort; and

(4) the contractor provides the Contracting Officer timely written advance notice of these and any other extenuating circumstances.

(End of Clause) 3.2.2.3-39 Requirements for Certified Cost or Pricing Data or Data Other Than Certified Cost or Pricing Data - Modifications (January 2022)

(a) Request for exception from certified cost or pricing data requirements.

(1) In lieu of submitting certified cost or pricing data for modifications under this contract, on the date of the agreement on price or the date of the award, whichever is later, the Contractor may submit a written request for exception by submitting the information described in paragraphs (a)(1)(i) and (ii) of this clause. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.

(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.

(ii) Information on modifications of contracts or subcontracts for commercial items.

(A) If—

(1) The original contract or subcontract was granted an exception from certified cost or pricing data requirements because the price agreed upon was based on adequate price competition or prices set by law or regulation, or was a contract or subcontract for the acquisition of a commercial item; and

(2) The modification (to the contract or subcontract) is not exempted based on one of these exceptions, then the Contractor may provide information to establish that the modification would not change the contract or subcontract from a contract or subcontract for the acquisition of a commercial item to a contract or subcontract for the acquisition of an item other than a commercial item.

(B) For a commercial item exception, the Contractor must provide, at a minimum, information on prices at which the same item or similar items have previously been sold that is adequate for evaluating the reasonableness of the price of the modification. Dependent upon the commercial items being catalog items, market-priced items, or items included on an active Federal Supply Service Multiple Award Schedule contract, the Contractor must include the corresponding information pursuant to that of which is described in paragraphs (a)(1)(B)(1); (a)(1)(B)(2) or (a)(1)(B)(3) of this clause:

(1) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities.

(2) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market.

(3) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.

(2) The Contractor grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this clause, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the Contractor’s determination of the prices to be offered in the catalog or marketplace.

(b) Requirements for certified cost or pricing data.

If the offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:

(1) The offeror must prepare and submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in accordance with the information contained at AMS Guidance T3.2.3.G.1 “Instructions for Submitting Certified Cost/Price Proposals for Supplies, Services, or Construction,” which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in AMS T3.2.3.G.1 are incorporated as a mandatory format to be used in this contract.

(2) As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror must submit a Certificate of Current Cost or Pricing Data that conforms to the instructions contained in the Appendix G1 to AMS Guidance T3.2.3, ‘Cost and Price Methodology.”

(End of Clause) 3.2.4-5 Allowable Cost and Payment (October 2019)

a) Invoicing. The Government will make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the Contracting Officer in accordance with the Federal Aviation Administration's (FAA) "Contract Cost Principles" in effect on the date of this contract and the terms of this contract (upon request, the Contracting Officer will provide a copy of the FAA Contract Cost Principles). The Contractor may submit to an authorized representative of the Contracting Officer, in such form and reasonable detail as the representative may require, an invoice or voucher supported by a statement of the claimed allowable cost for performing this contract. Any payments for costs under this contract, particularly for costs of Indirect Rates under paragraph (d), must be subject to the provisions of the "Limitation of Costs" clause, or the "Limitation of Funds" clause, if applicable. The Contractor must be responsible to manage and control the allowable cost of performance of the contract, such that payments for any allowable costs, including Indirect Rates under paragraph (d), must not exceed the estimated cost set forth in the schedule, or the funded amount, less an allowance for fee, if the contract is incrementally funded.

b) Reimbursing costs.

(1) For the purpose of reimbursing allowable costs (except as provided in subparagraph (2) below, with respect to pension, deferred profit sharing, and employee stock ownership plan contributions), the term costs includes only:

(i) Those costs the Contractor has incurred and recorded at the time of the request for reimbursement;

(ii) When the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid for

(A) Materials issued from the Contractor's inventory and placed in the production process for use on the contract;

(B) Direct labor;

(C) Direct travel;

(D) Other direct in-house costs; and

(E) Properly allocable and allowable indirect costs, as shown in the records maintained by the Contractor for purposes of obtaining reimbursement under FAA contracts; and

(iii) The amount of payments that have been paid to the Contractor's subcontractors under similar cost standards.

(2) Contractor contributions to any pension or other post-retirement benefit, profit-sharing or employee stock ownership plan funds that are paid quarterly or more often may be included in indirect costs for payment purposes: Provided, that the Contractor pays the contribution to the fund within 30 days after the close of the period covered. Payments made 31 days or more after the close of a period must not be included until the Contractor actually makes the payment. Accrued costs for such contributions that are paid less often than quarterly must be excluded from indirect costs for payment purposes until the Contractor actually makes the payment.

(3) Notwithstanding the audit and adjustment of invoices or vouchers under paragraph (g) below, allowable indirect costs under this contract must be obtained by applying indirect cost rates established in accordance with paragraph (d) below.

(4) Any statements in specifications or other documents incorporated in this contract by reference designating performance of services or furnishing of materials at the Contractor's expense or at no cost to the Government will be disregarded for purposes of cost-reimbursement under this clause.

c) Small business concerns. A small business concern may be paid more often than every 2 weeks and may invoice and be paid for recorded costs for items or services purchased directly for the contract, even though the concern has not yet paid for those items or services.

d) Final indirect cost rates.

(1) Final annual indirect cost rates and the appropriate bases must be established for the period covered by the indirect cost rate proposal.

(2) The Contractor must, within 180 days after the expiration of each of its fiscal years, or by a later date approved by the Contracting Officer, submit to the cognizant Contracting Officer and to the cognizant audit activity proposed certified final indirect cost rates for that period and supporting cost data specifying the contract and/or subcontract to which the rates apply. The proposed rates must be based on the Contractor's actual cost experience for that period. The appropriate Government representative and Contractor will establish the final indirect cost rates as promptly as practical after receipt of the Contractor's proposal.

(i) An adequate indirect cost rate proposal must include the following data unless otherwise specified by the cognizant Contracting Officer:

(A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate.

(B) General and Administrative expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts).

(C) Overhead expenses (final indirect cost pool). Schedule claimed expenses by element of cost as identified in accounting records (Chart of Accounts) for each final indirect cost pool.

(D) Occupancy expenses (intermediate indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Charts of Accounts) and expense reallocation to final indirect cost pools.

(E) Claimed allocation bases, by element of cost, used to distribute indirect costs.

(F) Facilities capital cost of money factors computation.

(G) Reconciliation of books of account (i.e., General Ledger) and claimed direct costs by major cost elements.

(H) Schedule of direct costs by contract and subcontract and indirect expense applied at claimed rates, as well as a subsidiary schedule of Government participation percentages in each of the allocation base amounts.

(I) Schedule of cumulative direct and indirect costs claimed and billed by contract and subcontract.

(J) Subcontract information. Listing of subcontracts awarded to companies for which the contractor is the prime or upper-tier contractor (include prime and subcontract numbers; subcontract value and award type; amount claimed during the fiscal year; and the subcontractor name, address, and point of contract information).

(K) Summary of each time-and-materials and labor-hour contract information, including labor categories, labor rates, hours, and amounts; direct materials; other direct costs; and, indirect expense applied at claimed rates.

(L) Reconciliation of total payroll per IRS form 941 to total labor costs distribution.

(M) Listing of decisions/agreements/approvals and description of accounting/organizational changes.

(N) Certificate of final indirect cost.

(O) Contract closing information for contracts physically completed in this fiscal year (include contract number, period of performance, contract ceiling amounts, contract fee computations, level of effort, and indicate if the contract is ready to close).

(3) The Contractor and the appropriate Government representative will execute a written understanding setting forth the final indirect cost rates. The understanding will specify (i) the agreed-upon final annual indirect cost rates, (ii) the bases to which the rates apply, (iii) the periods for which the rates apply, (iv) any specific indirect cost items treated as direct costs in the settlement, and (v) the affected contract and/or subcontract, identifying any with advance agreements or special terms and the applicable rates. The understanding will not change any monetary ceiling, contract obligation, or specific cost allowance or disallowance provided for in this contract. The understanding is incorporated into this contract upon execution.

(4) After final annual direct cost rates are established for specific period, the contractor must update the billings on all contracts to reflect the final settled rates and update the schedule of cumulative direct and indirect costs claimed and billed as required by paragraph d(2)(i)(l) of this clause.

(5) Failure by the parties to agree on a final annual indirect cost rate may be the basis of a claim under the "Contract Disputes" clause.

e) Billing rates. Until final annual indirect cost rates are established for any period, the Government will reimburse the Contractor at billing rates established by the Contracting Officer or by an authorized representative (the cognizant auditor), subject to adjustment when the final rates are established. These billing rates-

(1) Must be the anticipated final rates; and

(2) May be prospectively or retroactively revised by mutual agreement, at either party's request, to prevent substantial overpayment or underpayment.

f) Quick-close-out procedures. When the Contractor and Contracting Officer agree, the quick-close-out procedures may be used.

(1) Procedures. Settlement of indirect cost rates must apply to this contract, in advance of the determination of final indirect cost rates, if:

(i) The contract is physically complete;

(ii) The amount of unsettled indirect cost to be allocated to this contract is not more than $5,000,000 and the cumulative unsettled indirect costs to be allocated to one or more contracts in a single fiscal year do not exceed 15 percent of the estimated, total unsettled indirect costs allocable to cost-type contracts for that fiscal year; and

(iii) Agreement can be reached on a reasonable estimate of allocable dollars.

(2) The settlement must be final for this contract and no adjustment will be made to other contracts for over- or under-recoveries of costs allocated or allocable to this contract.

(3) The settlement will not be considered a binding precedent when establishing the final indirect costs for other contracts.

(4) These procedures may also be used for the settlement of direct and indirect costs for individual task and delivery orders.

g) Audit. At any time or times before final payment, the Contracting Officer may have the Contractor's invoices or vouchers and statements of cost audited. Any payment may be (1) reduced by amounts found by the Contracting Officer not to constitute allowable costs or (2) adjusted for prior overpayments or underpayments.

h) Final payment.

(1) The Contractor must submit a completion invoice or voucher, designated as such, promptly upon completion of the work, but no later than 120 days (or longer, as the Contracting Officer may approve in writing) after settlement of final annual indirect rates for all years. Upon approval of that invoice or voucher, and upon the Contractor's compliance with all terms of this contract, the Government will promptly pay any balance of allowable costs and that part of the fee (if any) not previously paid.

(2) The Contractor must pay to the Government any refunds, rebates, credits, or other amounts (including interest, if any) accruing to or received by the Contractor or any assignee under this contract, to the extent that those amounts are properly allocable to costs for which the Contractor has been reimbursed by the Government. Reasonable expenses incurred by the Contractor for securing refunds, rebates, credits, or other amounts will be allowable costs if approved by the Contracting Officer. Before final payment under this contract, the Contractor and each assignee whose assignment is in effect at the time of final payment must execute and deliver-

(i) An assignment to the Government, in form and substance satisfactory to the Contracting Officer, of refunds, rebates, credits, or other amounts (including interest, if any) properly allocable to costs for which the Contractor has been reimbursed by the Government under this contract; and

(ii) A release discharging the Government, its officers, agents, and employees from all liabilities, obligations, and claims arising out of or under this contract, except-

(A) Specified claims stated in exact amounts, or in estimated amounts when the exact amounts are not known;

(B) Claims (including reasonable incidental expenses) based upon liabilities of the Contractor to third parties arising out of the performance of this contract; provided, that the claims are not known to the Contractor on the date of the execution of the release, and that the Contractor gives notice of the claims in writing to the Contracting Officer within 6 years following the release date or notice of final payment date, whichever is earlier; and

(C) Claims for reimbursement of costs, including reasonable incidental expenses, incurred by the Contractor under the patent clauses of this contract, excluding, however, any expenses arising from the Contractor's indemnification of the Government against patent liability.

(End of Clause) 3.2.4-16 Ordering (October 2019)

a) Any supplies and services to be furnished under this contract must be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract. Such orders may be issued from ________ through ________ [CO to insert dates].

b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract must control.

c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders issued by facsimile, email or other electronic commerce methods are considered "issued" when the Government sends the order. Orders may be issued orally only if authorized in the contract.

(End of Clause) 3.2.4-17 Order Limitations (October 2019)

a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than ______ [insert dollar figure or quantity], the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

b) Maximum order. The Contractor is not obligated to honor-

(1) Any order for a single item in excess of ______ [insert dollar figure or quantity];

(2) Any order for a combination of items in excess of ______ [insert dollar figure or quantity]; or

(3) A series of orders from the same ordering office within _____ days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

c) If this is a requirements contract, the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

d) Notwithstanding paragraphs (b) and (c) above, the Contractor must honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within _____ days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of Clause)

3.2.4-20 Indefinite Quantity (October 2019)

a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

b) Delivery or performance must be made only as authorized by orders issued in accordance with the "Ordering" clause. The Contractor must furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the maximum. The Government will order at least the quantity of supplies or services designated in the Schedule as the minimum.

c) Except for any limitations on quantities in the "Order Limitations" clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

d) Any order issued during the effective period of this contract and not completed within that period must be completed by the Contractor within the time specified in the order. The contract must govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor must not be required to make any deliveries under this contract after ______ [insert date].

(End of Clause) 3.2.4-33 Option for Increased Quantity - Separately Priced Line Item (October 2019) The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within a minimum of 30 calendar days prior to the start of the option period. Delivery of added items must continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

3.2.4-34 Option to Extend Services (October 2019) The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder must not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within the period specified in the Schedule.

(End of Clause) 3.2.4-35 Option to Extend the Term of the Contract (July 2021)

(a) The Government may extend the term of this contract by written notice (contract modification) to the Contractor prior to the expiration of the current period of performance provided, that the Government will give the Contractor a preliminary written notice of its intent to extend at least_______________ days [60 days unless a different number of days is inserted] before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract must be considered to include this option provision.

(c) The total duration of this contract, including the exercise of any options under this clause, must not exceed ___ (months) ____ (years).

(End of Clause) 3.3.1-11 Availability of Funds for the Next Fiscal Year (April 1996) Funds are not presently available for performance under this contract beyond ______. The FAA's obligation for performance of this contract beyond that date is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the FAA for any payment may arise for performance under this contract beyond ______, until funds are made available to the Contracting Officer for performance and until the Contractor receives notice of availability, to be confirmed in writing by the Contracting Officer.

3.3.1-32 Performance Based Payments (July 2018)

a) Amount of payments and limitations on payments. Subject to such other limitations and conditions as are specified in this contract and this clause, the amount of payments and limitations on payments will be specified in the contract's description of the basis for payment.

b) Contractor request for performance-based payment. The Contractor may submit requests for payment of performance-based payments not more frequently than monthly, in a form and manner acceptable to the Contracting Officer. Unless otherwise authorized by the Contracting Officer, all performance-based payments in any period for which payment is being requested must be included in a single request, appropriately itemized and totaled. The Contractor's request must contain the information and certification detailed in paragraphs (l) and (m) of this clause.

c) Approval and payment of requests.

(1) The Contractor will not be entitled to payment of a request for performance-based payment prior to successful accomplishment of the event or performance criterion for which payment is requested. The Contracting Officer will determine whether the event or performance criterion for which payment is requested has been successfully accomplished in accordance with the terms of the contract. The Contracting Officer may, at any time, require the Contractor to substantiate the successful performance of any event or performance criterion which has been or is represented as being payable.

(2) A payment under this performance-based payment clause is a contract financing payment under the Prompt Payment clause of this contract, and approved requests will be paid in accordance with the prompt payment period and provisions specified for contract financing payments by that clause. However, if the Contracting Officer requires substantiation as provided in paragraph (c) (1) of this clause, or inquires into the status of an event or performance criterion, or into any of the conditions listed in paragraph (e) of this clause, or into the Contractor certification, payment is not required, and the prompt payment period will not begin until the Contracting Officer approves the request.

(3) The approval by the Contracting Officer of a request for performance-based payment does not constitute an acceptance by the Government and does not excuse the Contractor from performance of obligations under this contract.

d) Liquidation of performance-based payments.

(1) Performance-based finance amounts paid prior to payment for delivery of an item will be liquidated by deducting a percentage or a designated dollar amount from the delivery payment. If the performance-based finance payments are on a delivery item basis, the liquidation amount for each such line item will be the percent of that delivery item price that was previously paid under performance-based finance payments or the designated dollar amount. If the performance-based finance payments are on a whole contract basis, liquidation will be by either predesignated liquidation amounts or a liquidation percentage.

(2) If at any time the amount of payments under this contract exceeds any limitation in this contract, the Contractor must repay to the Government the excess. Unless otherwise determined by the Contracting Officer, such excess must be credited as a reduction in the unliquidated performance-based payment balance(s), after adjustment of invoice payments and balances for any retroactive price adjustments.

e) Reduction or suspension of performance-based payments. The Contracting Officer may reduce or suspend performance-based payments, liquidate performance-based payments by deduction from any payment under the contract, or take a combination of these actions after finding upon substantial evidence any of the following conditions:

(1) The Contractor failed to comply with any material requirement of this contract (which includes paragraphs (h) and (i) of this clause).

(2) Performance of this contract is endangered by the Contractor's—

(i) Failure to make progress; or

(ii) Unsatisfactory financial condition.

(3) The Contractor is delinquent in payment of any subcontractor or supplier under this contract in the ordinary course of business.

f) Title.

(1) Title to the property described in this paragraph (f) will vest in the Government. Vestiture will be immediately upon the date of the first performance-based payment under this contract, for property acquired or produced before that date. Otherwise, vestiture will occur when the property is or should have been allocable or properly chargeable to this contract.

(2) "Property," as used in this clause, includes all of the following described items acquired or produced by the Contractor that are or should be allocable or properly chargeable to this contract under sound and generally accepted accounting principles and practices:

(i) Parts, materials, inventories, and work in process;

(ii) Special tooling and special test equipment to which the Government is to acquire title under any other clause of this contract;

(iii) Nondurable (i.e., noncapital) tools, jigs, dies, fixtures, molds, patterns, taps, gauges, test equipment and other similar manufacturing aids, title to which would not be obtained as special tooling under subparagraph (f)(2)(ii) of this clause; and

(iv) Drawings and technical data, to the extent the Contractor or subcontractors are required to deliver them to the Government by other clauses of this contract.

(3) Although title to property is in the Government under this clause, other applicable clauses of this contract (e.g., the termination or special tooling clauses) will determine the handling and disposition of the property.

(4) The Contractor may sell any scrap resulting from production under this contract, without requesting the Contracting Officer's approval, provided that any significant reduction in the value of the property to which the Government has title under this clause is reported in writing to the Contracting Officer. The contractor must credit the proceeds against the cost of performance.

(5) In order to acquire for its own use or dispose of property to which title is vested in the Government under this clause, the Contractor must obtain the Contracting Officer's advance approval of the action and the terms. If approved, the contractor must exclude the allocable costs of the property from the costs of contract performance, and repay to the Government any amount of unliquidated payments allocable to the property.

(6) When the Contractor completes all of the obligations under this contract, including liquidation of all performance-based payments, title will vest in the Contractor for all property (or the proceeds thereof) not—

(i) Delivered to, and accepted by, the Government under this contract; or

(ii) Incorporated in supplies delivered to, and accepted by, the Government under this contract and to which title is vested in the Government under this clause.

(7) The terms of this contract concerning liability for Government-furnished property will not apply to property to which the Government acquired title solely under this clause.

g) Risk of loss. Before delivery to and acceptance by the Government, the Contractor will bear the risk of loss for property, the title to which vests in the Government under this clause, except to the extent the Government expressly assumes the risk. If any property is damaged, lost, stolen, or destroyed, the basis of payment (the events or performance criteria) to which the property is related will be deemed to be not in compliance with the terms of the contract and not payable (if the property is part of or needed for performance), and the Contractor must refund the related performance-based payments in accordance with paragraph (d) of this clause.

h) Records and controls. The Contractor must maintain records and controls adequate for administration of this clause. The Contractor will have no entitlement to performance-based payments during any time the Contractor's records or controls are determined by the Contracting Officer to be inadequate for administration of this clause.

i) Reports and Government access. The Contractor must promptly furnish reports, certificates, financial statements, and other pertinent information requested by the Contracting Officer for the administration of this clause and to determine that an event or other criterion prompting a financing payment has been successfully accomplished. The Contractor must give the Government reasonable opportunity to examine and verify the Contractor's records and to examine and verify the Contractor's performance of this contract for administration of this clause.

j) Special terms regarding default. If this contract is terminated under the default provisions of any termination clause,

(1) the Contractor must, on demand, repay to the Government the amount of unliquidated performance-based payments, and

(2) title will vest in the Contractor, on full liquidation of all performance-based payments, for all property for which the Government elects not to require delivery under the Default clause of this contract. The Government will be liable for no payment except as provided by the Default clause.

k) Reservation of rights.

(1) No payment or vesting of title under this clause will—

(i) Excuse the Contractor from performance of obligations under this contract; or

(ii) Constitute a waiver of any of the rights or remedies of the parties under the contract.

(2) The Government's rights and remedies under this clause—

(i) Will not be exclusive, but rather will be in addition to any other rights and remedies provided by law or this contract; and

(ii) Will not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or privilege, nor will such exercise or any single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.

l) Content of Contractor's request for performance-based payment. The Contractor's request for performance-based payment must contain the following:

(1) The name and address of the Contractor;

(2) The date of the request for performance-based payment;

(3) The contract number and/or other identifier of the contract or order under which the request is made;

(4) Such information and documentation as is required by the contract's description of the basis for payment; and

(5) A certification by a Contractor official authorized to bind the Contractor, as specified in paragraph (m) of this clause.

m) Content of Contractor's certification. As required in paragraph (l)(5) of this clause, the Contractor must make the following certification in each request for performance-based payment:

I certify to the best of my knowledge and belief that—

(1) This request for performance-based payment is true and correct; this request (and attachments) has been prepared from the books and records of the Contractor, in accordance with the contract and the instructions of the Contracting Officer;
(2) (Except as reported in writing on __________), all payments to subcontractors and suppliers under this contract have been paid, or will be paid, currently, when due in the ordinary course of business;
(3) There are no encumbrances (except as reported in writing on _________) against the property acquired or produced for, and allocated or properly chargeable to, the contract which would affect or impair the Government's title;
(4) There has been no materially adverse change in the financial condition of the Contractor since the submission by the Contractor to the Government of the most recent written information dated _____________; and
(5) After the making of this requested performance-based payment, the amount of all payments for each deliverable item for which performance-based payments have been requested will not exceed any limitation in the contract, and the amount of all payments under the contract will not exceed any limitation in the contract.

(End of Clause) 3.3.1-33 System for Award Management (April 2022)

(a) Definitions. As used in this clause "Registered in the SAM database" means that the Contractor has entered all mandatory information, including the Unique Identity Identifier (UEI) or the Electronic Funds Transfer indicator, into the SAM database "System for Award Management (SAM) Database" means the primary Government repository for Contractor information required for the conduct of business with the Government.

"Unique Entity Identifier (UEI)" (also known as the Unique Entity ID) means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .