Attachment J-13 - Price Proposal Bid Model.xlsx
XLSX spreadsheet 80 KB Posted
- Attached to
- Screening for Information Request (SIR) for the Tactical Air Navigation (TACAN) Antenna System
- Solicitation number
- 693KA8-22-R-00001
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
&"Times New Roman,Bold"&12J-13. Price Proposal Bid Model Instructions
Instructions for Completion of Price Bid Model
There are 6 separate worksheets in this workbook. All 6 must be completed, although not all prices will be used to calculate the Total Evaluated Price (TEP) for the TACAN Antenna procurement.
The TEP will be calculated by adding the proposed price of Task Order 001 and the Most Probably Cost of Task Order 002, including the NTE amounts provided for ODCs and travel. The material prices in the Price List and the labor rates will be evaluated for reasonableness, but not included in the TEP.
Tab 1. Price List - Materials
The Offeror needs to identify the part, part number, and manufacturer. In Column D "Year 1", the Offeror must populate the base price of each part. In Row 2, Columns E-M, the Offeror must populate the annual escalation factor for the parts. Once both Column D and Row 2 have been completed, the process for each part for each year will populate.
Although a proposed list of materials is provided, the Offeror must identify and price any other materials it would need to complete the requirements of the SOW.
Tab 2. Rate Build-Up
This spreadsheet provides both the base labor rates for the Cost Reimbursable Task Order 002, as well as the fully burdened labor rates (FBLR) that will provide the basis for the Firm Fixed Price, Time and Materials and Labor Hour task orders, including Task Order 001.
The Offeror must populate the base labor rate for each labor category in both Column B and Column H. In Row 3, the Offeror must populate its indirect rates for fringe, overhead, and G&A for both work at a Government site and at the Offeror's own location (Contractor Site - CS). A profit percentage must also be populated in Row 3, Column F and Column L. Based on the numbers inputted, fully burdened labor rates will be calculated for both locations.
These rates will automatically populate the Year 1 columns of tabs 5 and 6.
Tab 3. Task Order 001 - Program Management
This task order is T&M. The Offeror must select the labor categories it believes are required to perform the SIR requirements for Program Management. The Key Personnel for this task order have been pre-populated, but the Offeror may add any labor categories it deems necessary. The rates should match those from tab 6. If a discount is being offered, the discounted rate should be identified in Column C. If no discount is being offered, Column C should match Column B. The Offeror must populate Column D with the hours for each labor category for each year. The labor costs will calculate automatically.
Travel is a Not-to-Exceed amount that is inclusive of any indirect costs. The Offeror should not change the line for Travel.
Tab 4. Task Order 002 - First Article
This is a cost plus fixed fee task order.
Labor
The Offeror must select the labor categories it believes are required to perform the SIR requirements for First Article. The Key Personnel for this task order have been pre-populated, but the Offeror may add any labor categories it deems necessary. The Base Period - Year 1 rates should match those from tab 2, as should the indirect rates (Row 3). The Offeror must populate Column G with the hours for each labor category for each year. The labor costs will calculate automatically. The Offeror must populate Rows 58, 113, 168, and 223 with labor escalation in Column B and the appropriate indirect rates in Columns C, D, and E. Is this a direction to the offeror, or an indication of what will happen automatically? If the former, I suggest rephrasing in active voice in terms of what the “offeror must” do.
The labor costs will populate automatically.
Materials
The Offeror must populate the Materials section as follows: Column A with the Part Name, Column B with the Part Number, Column C with the Manufacturer, Column D with the Unit Price, and Column E with the QuantityThe Offeror must populate Rows 35, 91, 146, 201, and 256 with the appropriate indirect rate(s) such as G&A in Column G. All calculations will be automatic. The parts and unit prices should match the Price List proposed.
Travel and ODCs
Travel and ODCs are Not-to-Exceed amounts that are inclusive of any indirect costs. The Offeror should not change the lines for Travel or ODCs.
Fee
The Offeror must populate the fee percentage for each of the five periods. The fee amount will calculate automatically.
Tabs 5 and 6. Labor - GS and Labor - CS
The Offeror must populate Row 3 with the escalation percentages for each year on each tab. The rates will calculate automatically. These rates will become the ceiling rates for T&M and Labor Hour task orders, and the basis for any labor on future FFP task orders.
1. Price List - Materials
| Yearly Escalation | ||||||||||||
| Part | Part Number | Manufacturer | ||||||||||
| YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | YEAR 6 | YEAR 7 | YEAR 8 | YEAR 9 | YEAR 10 | |||
| TACAN Antenna System | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Cable, Antenna-ACU (signal) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Cable, Antenna-ACU (power) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Cable, ACU-Beacon | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Cable, Beacon-Antenna (RF) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Technical Manual (Electronic copy) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Technical Manual (Hard copy) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Leveling Rings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Lightning Arrester | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Pattern Generator | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Antenna Power Supply, CCA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Distribution CCA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Antenna Backplane, CCA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Trigger Generator CCA, ACU | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Backplane CCA, ACU | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Antenna Control CCA, ACU | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Display CCA, ACU | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Power Supply, ACU | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 36-48 VDC Module, ACU | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&"Times New Roman,Bold"&12 J-13. Price Proposal Bid Model
1. Price List - Materials
2. Rate Build-Up Government Site and Contractor Site Base Year Buildup
| Indirect Rates - Year 1: | ||||||||||||
| Labor Category | Base Rate | Fringe | Overhead | G&A | Profit | T&M Rate | Base Rate | Fringe | Overhead | G&A | Profit | T&M Rate |
| Government Site | Contractor Site | |||||||||||
| Administrative Clerical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Configuration Management Specialist I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Configuration Management Specialist II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Configuration Management Specialist III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Configuration Management Specialist IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Contract Administrator I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Contract Administrator II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Contract Administrator III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Deputy Program Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Digital Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Digital Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Digital Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Digital Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Documentation Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Electrical Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Electrical Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Electrical Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Electrical Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Engineer (Implementation) I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Engineer (Implementation) II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Engineer (Implementation) III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Engineering Subject Matter Expert | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Planning/Control Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Program Cost Scheduling/Control Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Program Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Quality Assurance Specialist (Engineer) I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Quality Assurance Specialist (Engineer) II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Quality Assurance Specialist (Engineer) III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Radio Frequency Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Radio Frequency Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Radio Frequency Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Radio Frequency Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Safety Specialist (Engineering) I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Safety Specialist (Engineering) II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Safety Specialist (Engineering) III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Safety Specialist (Engineering) IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Scheduler I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Scheduler II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Scheduler III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Software Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer (Logistician) I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer (Logistician) II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer (Logistician) III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer (Logistician) IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Systems Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Team Leader | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Technical Writer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Technical Writer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Technician I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Technician II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Technician III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Training Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Training Specialist I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Training Specialist II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Training Specialist III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
2. Rate Build-Up
3. Task Order 001
| Base Period - Year 1 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Deputy Program Manager | $ - 0 | |||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| 0 | $ - 0 |
| Base Period - Year 2 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Deputy Program Manager | $ - 0 | |||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| 0 | $ - 0 |
| Base Period - Year 3 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Deputy Program Manager | $ - 0 | |||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| 0 | $ - 0 |
| Option Period 1 - Year 4 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Deputy Program Manager | $ - 0 | |||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| 0 | $ - 0 |
| Option Period 2 - Year 5 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Deputy Program Manager | $ - 0 | |||
| Contract Administrator II | $ - 0 | |||
| Scheduler II | $ - 0 | |||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| 0 | $ - 0 |
| Option Period 3 - Year 6 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Deputy Program Manager | $ - 0 | |||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| 0 | $ - 0 |
| Option Period 4 - Year 7 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Deputy Program Manager | $ - 0 | |||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| 0 | $ - 0 |
| Option Period 5 - Year 8 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Deputy Program Manager | $ - 0 | |||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| 0 | $ - 0 |
| Option Period 6 - Year 9 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Deputy Program Manager | $ - 0 | |||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| 0 | $ - 0 |
| Option Period 7 - Year 10 | ||||
| Labor Category | FBLR | Discounted FBLR | LOE Hours | Total |
| Program Manager | $ - 0 | |||
| Deputy Program Manager | $ - 0 | |||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| $ - 0 | ||||
| 0 | $ - 0 |
| Task Order 001 - Total LOE Hours | ||||||||||
| Base | OY1 | OY2 | OY3 | OY4 | OY5 | OY6 | OY7 | Total | ||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Task Order 001 - Total Costs | |||||||||||
| Cost Elements | Base | OY1 | OY2 | OY3 | OY4 | OY5 | OY6 | OY7 | Total | ||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | ||
| Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Travel | $ 33,000.00 | $ 33,000.00 | $ 34,000.00 | $ 34,000.00 | $ 35,000.00 | $ 36,000.00 | $ 37,000.00 | $ 38,000.00 | $ 39,000.00 | $ 39,000.00 | $ 358,000.00 |
| Total | $ 33,000.00 | $ 33,000.00 | $ 34,000.00 | $ 34,000.00 | $ 35,000.00 | $ 36,000.00 | $ 37,000.00 | $ 38,000.00 | $ 39,000.00 | $ 39,000.00 | $ 358,000.00 |
3. Task Order 001
4. Task Order 002
| Base Period - Year 1 | |||||||
| 0.00% | 0.00% | 0.00% | |||||
| Labor Category | Base Labor Rate | Fringe | Overhead | G&A | Hourly Rate | Hours | Labor Cost |
| Implementation Engineer, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineer Subject Matter Expert, Level IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Safety Specialist, Level III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Configuration Management Specialist, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Software Engineer, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Assurance Specialist, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Technician (Test Manager), Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Labor Costs | 0 | $ - 0 |
| Materials | |||||||
| 0.00% | |||||||
| Part Name | Part Number | Manufacturer | Unit Price | Quantity | Subtotal | G&A | Total Part Cost |
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| Total Materials | $ - 0 |
| Travel - NTE | $ 10,000.00 |
| ODC - NTE | $ - 0 |
Proposed Fee 0.00% $ - 0
Total Price - Year 1 $ 10,000.00
| Base Period - Year 2 | |||||||
| 0.00% | 0.00% | 0.00% | 0.00% | ||||
| Labor Category | Base Labor Rate | Fringe | Overhead | G&A | Hourly Rate | Hours | Labor Cost |
| Implementation Engineer, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineer Subject Matter Expert, Level IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Safety Specialist, Level III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Configuration Management Specialist, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Software Engineer, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Assurance Specialist, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Technician (Test Manager), Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Labor Costs | 0 | $ - 0 |
| Materials | |||||||
| 0.00% | |||||||
| Part Name | Part Number | Manufacturer | Unit Price | Quantity | Subtotal | G&A | Total Part Cost |
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| Total Materials | $ - 0 |
| Travel - NTE | $ 15,000.00 |
| ODC - NTE | $ 37,500.00 |
Proposed Fee 0.00% $ - 0
Total Price - Year 2 $ 52,500.00
| Base Period - Year 3 | |||||||
| 0.00% | 0.00% | 0.00% | 0.00% | ||||
| Labor Category | Base Labor Rate | Fringe | Overhead | G&A | Hourly Rate | Hours | Labor Cost |
| Implementation Engineer, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineer Subject Matter Expert, Level IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Safety Specialist, Level III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Configuration Management Specialist, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Software Engineer, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Assurance Specialist, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Technician (Test Manager), Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Labor Costs | 0 | $ - 0 |
| Materials | |||||||
| 0.00% | |||||||
| Part Name | Part Number | Manufacturer | Unit Price | Quantity | Subtotal | G&A | Total Part Cost |
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| Total Materials | $ - 0 |
| Travel - NTE | $ 15,000.00 |
| ODC - NTE | $ 37,500.00 |
Proposed Fee 0.00% $ - 0
Total Price - Year 3 $ 52,500.00
| Option Period 1 - Year 4 | |||||||
| 0.00% | 0.00% | 0.00% | 0.00% | ||||
| Labor Category | Base Labor Rate | Fringe | Overhead | G&A | Hourly Rate | Hours | Labor Cost |
| Implementation Engineer, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineer Subject Matter Expert, Level IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Safety Specialist, Level III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Configuration Management Specialist, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Software Engineer, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Assurance Specialist, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Technician (Test Manager), Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Labor Costs | 0 | $ - 0 |
| Materials | |||||||
| 0.00% | |||||||
| Part Name | Part Number | Manufacturer | Unit Price | Quantity | Subtotal | G&A | Total Part Cost |
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| Total Materials | $ - 0 |
| Travel - NTE | $ 15,000.00 |
| ODC - NTE | $ - 0 |
Proposed Fee 0.00% $ - 0
Total Price - Year 2 $ 15,000.00
| Option Period 2 - Year 5 | |||||||
| 0.00% | 0.00% | 0.00% | 0.00% | ||||
| Labor Category | Base Labor Rate | Fringe | Overhead | G&A | Hourly Rate | Hours | Labor Cost |
| Implementation Engineer, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineer Subject Matter Expert, Level IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Safety Specialist, Level III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Configuration Management Specialist, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Software Engineer, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Assurance Specialist, Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Technician (Test Manager), Level II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Total Labor Costs | 0 | $ - 0 |
| Materials | |||||||
| 0.00% | |||||||
| Part Name | Part Number | Manufacturer | Unit Price | Quantity | Subtotal | G&A | Total Part Cost |
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | |||||
| Total Materials | $ - 0 |
| Travel - NTE | $ 15,000.00 |
| ODC - NTE | $ - 0 |
Proposed Fee 0.00% $ - 0
Total Price - Year 3 $ 15,000.00
| Task Order 002 - Total LOE Hours | |||||
| Base | Option | Total | |||
| 1 | 2 | 3 | 1 | 2 | |
| 0 | 0 | 0 | 0 | 0 | 0 |
| Task Order 002 - Total Costs | ||||||
| Cost Elements | Base | Option | Total | |||
| 1 | 2 | 3 | 1 | 2 | ||
| Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Materials | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Travel | $ 10,000.00 | $ 15,000.00 | $ 15,000.00 | $ 15,000.00 | $ 15,000.00 | $ 70,000.00 |
| ODCs | $ - 0 | $ 37,500.00 | $ 37,500.00 | $ - 0 | $ - 0 | $ 75,000.00 |
| Fee | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total | $ 10,000.00 | $ 52,500.00 | $ 52,500.00 | $ 15,000.00 | $ 15,000.00 | $ 145,000.00 |
4. Task Order 0002
5. Labor - GS Government Site Rates
| Yearly Labor Rate Escalation | ||||||||||
| CONTRACT YEARS | ||||||||||
| Fully Loaded Rates | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | YEAR 6 | YEAR 7 | YEAR 8 | YEAR 9 | YEAR 10 |
| Administrative Clerical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Configuration Management Specialist I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Configuration Management Specialist II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Configuration Management Specialist III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Configuration Management Specialist IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contract Administrator I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contract Administrator II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contract Administrator III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Deputy Program Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Digital Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Digital Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Digital Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Digital Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Documentation Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Electrical Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Electrical Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Electrical Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Electrical Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Engineer (Implementation) I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Engineer (Implementation) II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Engineer (Implementation) III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Engineering Subject Matter Expert | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Planning/Control Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Program Cost Scheduling/Control Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Program Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Quality Assurance Specialist (Engineer) I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Quality Assurance Specialist (Engineer) II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Quality Assurance Specialist (Engineer) III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Radio Frequency Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Radio Frequency Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Radio Frequency Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Radio Frequency Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Safety Specialist (Engineering) I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Safety Specialist (Engineering) II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Safety Specialist (Engineering) III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Safety Specialist (Engineering) IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Scheduler I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Scheduler II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Scheduler III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Software Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Software Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Software Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Software Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer (Logistician) I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer (Logistician) II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer (Logistician) III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer (Logistician) IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Team Leader | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technical Writer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technical Writer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technician I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technician II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technician III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Training Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Training Specialist I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Training Specialist II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Training Specialist III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
5. Labor - GS
6. Labor - CS Contractor Site Rates Site Rates
| Yearly Labor Rate Escalation | ||||||||||
| CONTRACT YEARS | ||||||||||
| Fully Loaded Rates | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | YEAR 6 | YEAR 7 | YEAR 8 | YEAR 9 | YEAR 10 |
| Administrative Clerical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Configuration Management Specialist I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Configuration Management Specialist II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Configuration Management Specialist III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Configuration Management Specialist IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contract Administrator I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contract Administrator II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Contract Administrator III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Deputy Program Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Digital Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Digital Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Digital Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Digital Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Documentation Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Electrical Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Electrical Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Electrical Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Electrical Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Engineer (Implementation) I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Engineer (Implementation) II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Engineer (Implementation) III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Engineering Subject Matter Expert | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Planning/Control Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Program Cost Scheduling/Control Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Program Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Quality Assurance Specialist (Engineer) I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Quality Assurance Specialist (Engineer) II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Quality Assurance Specialist (Engineer) III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Radio Frequency Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Radio Frequency Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Radio Frequency Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Radio Frequency Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Safety Specialist (Engineering) I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Safety Specialist (Engineering) II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Safety Specialist (Engineering) III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Safety Specialist (Engineering) IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Scheduler I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Scheduler II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Scheduler III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Software Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Software Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Software Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Software Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer (Logistician) I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer (Logistician) II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer (Logistician) III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer (Logistician) IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Systems Engineer IV | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Team Leader | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technical Writer I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technical Writer II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technician I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technician II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Technician III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Training Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Training Specialist I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Training Specialist II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Training Specialist III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
6. Labor - CS
File details come from the government source that posted it. Updated .