Appendix G.3 As-built Plans.pdf

PDF 94 MB Posted

Attached to
Rehabilitation of Colonial Parkway, Phase 1 - VA NP COLO 1A21 B42 C18 D51
Solicitation number
693C73-22-R-000013
Issued by

About this file

This document provides details for a solicitation notice seeking proposals for a design-build contract to rehabilitate approximately 10.3 miles of the Colonial Parkway located within the Colonial National Historical Park in Virginia. The work includes exposed aggregate concrete pavement replacement, asphalt pavement rehabilitation, bridge and tunnel rehabilitation, drainage improvements, historic preservation work, and other miscellaneous construction activities.

The solicitation is a two-phase qualifications-based selection process. Phase one involves evaluating statements of qualifications from interested offerors based on key personnel experience, past performance, quality management approach, and project understanding. A maximum of three highly qualified offerors will be shortlisted to participate in phase two. The selected offerors will then submit technical and price proposals in response to a request for proposal. Award of a firm fixed-price contract is anticipated in the second quarter of fiscal year 2023. The estimated value of the design and construction work is between $100-150 million. Statements of qualifications are due no later than July 12, 2022.

View the file

Other files

File Type Posted
NP VA COLO 1A21 ETC - Shortlist.docx DOCX document
Amendment 0001 - VA NP-COLO 1A21 B42 C18 D51.pdf PDF
Appendix B.2b COLO_333_D192_Colonial Parkway Cultural Landscape Report_Part 1(Ch3-6).pdf PDF
Appendix C5. Papermill Creek Watershed Study (2005).pdf PDF
Appendix C.4 Colonial Parkway, Storm Culvert Cleaning Project (2017).pdf PDF
Appendix B.2a COLO_333_D192_Colonial Parkway Cultural Landscape Report_Part 1(Ch1-2).pdf PDF
Appendix C.2 Conceptual Stormwater Management Report (2020).pdf PDF
Appendix D Geotechnical and Pavement Reports.pdf PDF
Appendix F Bridge Inspection Reports.pdf PDF
Appendix B.1 Environmental Documents.pdf PDF
Appendix A.4- Preliminary Plans (Williamsburg Tunnel).pdf PDF
Appendix G.1 As-built Plans.pdf PDF
Appendix C.1 Hydraulic Reports.pdf PDF
Appendix C.3 Stormwater Report Addendum- Outfall, Stream Channel, and BMP Design (2021).pdf PDF
Appendix A.1 Preliminary Plans.pdf PDF
Appendix A.5- Penniman Rd Bridge and Paper Mill Creek.pdf PDF
Appendix I Miscellaneous Guidelines and Standards.pdf PDF
Appendix G.2 As-built Plans.pdf PDF
Appendix H Historical Construction Reports.pdf PDF
Appendix A.3 Preliminary Plans (Segment G).pdf PDF
Appendix A.2 Preliminary Plans (Segments A, D, E, F).pdf PDF
Draft RFP - NP-COLO 1A21 etc.pdf PDF
Appendix E Williamsburg Tunnel Lighting Reports.pdf PDF
Appendix B.3 COLO_333_8003_Cultural Landscape Report (1997).pdf PDF
RFQ - VA NP COLO 1A21 B42 C18 D51 FINAL.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .