Appendix A.2 Preliminary Plans (Segments A, D, E, F).pdf

PDF 54 MB Posted

Attached to
Rehabilitation of Colonial Parkway, Phase 1 - VA NP COLO 1A21 B42 C18 D51
Solicitation number
693C73-22-R-000013
Issued by

About this file

This solicitation is for a two-phase Design-Build contract to rehabilitate approximately 10.3 miles of the Colonial Parkway located in Virginia. Work includes concrete and asphalt pavement replacement, bridge rehabilitation, drainage improvements, historic preservation, and other miscellaneous construction. The estimated value is between $100-150 million.

Interested offerors must submit statements of qualifications by July 12th addressing key personnel experience, past performance, quality management approach, and project understanding. A selection committee will shortlist up to three highly qualified teams to participate in Phase Two. The shortlisted teams will receive a request for proposal in Phase Two to submit technical and price proposals, with an anticipated award by the second quarter of 2023. Evaluation criteria emphasize experience with similar historic roadway and bridge projects, cultural landscape preservation, and successful design-build project delivery.

View the file

Other files

File Type Posted
NP VA COLO 1A21 ETC - Shortlist.docx DOCX document
Amendment 0001 - VA NP-COLO 1A21 B42 C18 D51.pdf PDF
Appendix B.2b COLO_333_D192_Colonial Parkway Cultural Landscape Report_Part 1(Ch3-6).pdf PDF
Appendix C5. Papermill Creek Watershed Study (2005).pdf PDF
Appendix C.4 Colonial Parkway, Storm Culvert Cleaning Project (2017).pdf PDF
Appendix B.2a COLO_333_D192_Colonial Parkway Cultural Landscape Report_Part 1(Ch1-2).pdf PDF
Appendix C.2 Conceptual Stormwater Management Report (2020).pdf PDF
Appendix D Geotechnical and Pavement Reports.pdf PDF
Appendix F Bridge Inspection Reports.pdf PDF
Appendix B.1 Environmental Documents.pdf PDF
Appendix A.4- Preliminary Plans (Williamsburg Tunnel).pdf PDF
Appendix G.1 As-built Plans.pdf PDF
Appendix C.1 Hydraulic Reports.pdf PDF
Appendix C.3 Stormwater Report Addendum- Outfall, Stream Channel, and BMP Design (2021).pdf PDF
Appendix A.1 Preliminary Plans.pdf PDF
Appendix A.5- Penniman Rd Bridge and Paper Mill Creek.pdf PDF
Appendix I Miscellaneous Guidelines and Standards.pdf PDF
Appendix G.2 As-built Plans.pdf PDF
Appendix H Historical Construction Reports.pdf PDF
Appendix A.3 Preliminary Plans (Segment G).pdf PDF
Appendix G.3 As-built Plans.pdf PDF
Draft RFP - NP-COLO 1A21 etc.pdf PDF
Appendix E Williamsburg Tunnel Lighting Reports.pdf PDF
Appendix B.3 COLO_333_8003_Cultural Landscape Report (1997).pdf PDF
RFQ - VA NP COLO 1A21 B42 C18 D51 FINAL.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .