Appendix A.5- Penniman Rd Bridge and Paper Mill Creek.pdf

PDF 583 KB Posted

Attached to
Rehabilitation of Colonial Parkway, Phase 1 - VA NP COLO 1A21 B42 C18 D51
Solicitation number
693C73-22-R-000013
Issued by

About this file

This solicitation is for a two-phase Design-Build contract to rehabilitate approximately 10.3 miles of the Colonial Parkway located within the Colonial National Historical Park in Virginia.

The scope of work includes exposed aggregate concrete pavement replacement, asphalt pavement rehabilitation, bridge and tunnel rehabilitation, culvert rehabilitation or replacement, storm drain system work, historic brick headwall rehabilitation, ditch grading, guardrail replacement, signage and pavement marking replacement, and other miscellaneous work. The estimated value of the base contract plus all options ranges from $100-150 million.

Phase One involves submitting Statements of Qualifications by July 12, 2022 to be evaluated based on key personnel experience, past performance, quality management approach, and project understanding. A maximum of three highly qualified offerors will be shortlisted to participate in Phase Two. Phase Two will involve responding to a Request for Proposal within 60 days for technical and price proposals, with award anticipated in the second quarter of fiscal year 2023. The owner and contracting agency is the Federal Highway Administration.

View the file

Other files

File Type Posted
NP VA COLO 1A21 ETC - Shortlist.docx DOCX document
Amendment 0001 - VA NP-COLO 1A21 B42 C18 D51.pdf PDF
Appendix B.2b COLO_333_D192_Colonial Parkway Cultural Landscape Report_Part 1(Ch3-6).pdf PDF
Appendix C5. Papermill Creek Watershed Study (2005).pdf PDF
Appendix C.4 Colonial Parkway, Storm Culvert Cleaning Project (2017).pdf PDF
Appendix B.2a COLO_333_D192_Colonial Parkway Cultural Landscape Report_Part 1(Ch1-2).pdf PDF
Appendix C.2 Conceptual Stormwater Management Report (2020).pdf PDF
Appendix D Geotechnical and Pavement Reports.pdf PDF
Appendix F Bridge Inspection Reports.pdf PDF
Appendix B.1 Environmental Documents.pdf PDF
Appendix A.4- Preliminary Plans (Williamsburg Tunnel).pdf PDF
Appendix G.1 As-built Plans.pdf PDF
Appendix C.1 Hydraulic Reports.pdf PDF
Appendix C.3 Stormwater Report Addendum- Outfall, Stream Channel, and BMP Design (2021).pdf PDF
Appendix A.1 Preliminary Plans.pdf PDF
Appendix I Miscellaneous Guidelines and Standards.pdf PDF
Appendix G.2 As-built Plans.pdf PDF
Appendix H Historical Construction Reports.pdf PDF
Appendix A.3 Preliminary Plans (Segment G).pdf PDF
Appendix A.2 Preliminary Plans (Segments A, D, E, F).pdf PDF
Appendix G.3 As-built Plans.pdf PDF
Draft RFP - NP-COLO 1A21 etc.pdf PDF
Appendix E Williamsburg Tunnel Lighting Reports.pdf PDF
Appendix B.3 COLO_333_8003_Cultural Landscape Report (1997).pdf PDF
RFQ - VA NP COLO 1A21 B42 C18 D51 FINAL.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R01

-N o v -2

:3

A M

M

P R

O J E

C T

S c o lo 1A

B

C

D 1\

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

GENERAL NOTES AND INDEX

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

GENERAL NOTES:

X " = 1'-0"

A C

T U

A L F I L E R C

O L

O

A B

C

D

G

N .D

G N th

GENERAL NOTES:

Design:

AASHTO LRFD Bridge Design Specifications, 8 Edition, 2017.

SPECIFICATIONS:

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.

Construction:

Dead Load:

Concrete: 150 pcf

DESIGN LOADS:

SCOPE OF WORK:

Masonry:

Contact utility companies and locate all utilities before proceeding to work.

conditions.

of configuration of the surrounding area, adjust dimensions of the work to fit existing

Where dimensions of the proposed work in this Contract are dependent on the dimensions

Verify all controlling field dimensions before ordering or fabricating any materials.

CONSTRUCTION:

Submit brick samples to the CO for approval before use.

Furnish bricks that match existing according to Section 620.

reinforcement unless otherwise noted. Lap splice 30 bar diameters unless otherwise shown.

Provide 2-inch cover for reinforcing steel unless otherwise noted. Furnish uncoated

Furnish reinforcing steel conforming to AASHTO M 31, Grade 60 deformed.

Reinforcing Steel:

Concrete:

recommendations, and as approved by the CO.

Stain all concrete repairs to match existing concrete, according to manufacturer's

Furnish Class D(AE) exposed aggregate concrete for concrete deck replacement with f'c = 4.5 ksi at 28 days.

MATERIALS:

- Repoint brick mortar joints at wingwalls and headwalls as needed.

- Clean and seal joints in culvert barrels.

- Repair damaged concrete in culvert barrels as needed.

- Place riprap to repair bank erosion.

- Remove sediment and debris from culvert barrels.

4290-040P - Paper Mill Creek Culvert #1

INDEX OF BRIDGE PLAN SHEETS

Repair Details - 4290-040P

Repair Details - 4290-013P

General Notes and Index

SHEET NO. SHEET TITLE

For all other structures, see GFI.

Structure Number 4290-013P, 4290-040P damaged bricks as needed.

Remove and reset damaged brick masonry as directed by the CO. Replace

- Repoint brick mortar joints at abutments, wingwalls, and parapets as needed.

sealant.

- Clean and reseal curb and parapet expansion joints with elastomeric joint

- Seal deck expansion joints with precompressed hybrid joint seal.

- Perform partial-depth concrete deck replacement between curbs.

4290-013P - Penniman Road Bridge

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

000000

XXXXXX VA

B42 C18 D51

VA NP COLO 1A21

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-XXXX3

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

COLONIAL NATIONAL HISTORICAL PARK

REHABILITATION OF COLONIAL PARKWAY, PART I

November 2021

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

R02

M

P R

O J E

C T

S c o lo 1A

B

1\

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-N o v -2

Notes:

Not to Scale

A C

T U

A L F I L E R C

O L

O

A B

C

D

P .D

G N

REPAIR DETAILS - 4290-013P

Structure Number 4290-013P

"4 13'-717'-0"17'-0""4

13'-7

C Colonial ParkwayCL

Bottom reinforcement - #11 @ 9"

Top reinfrocement - #5 @ 19"

Bottom reinforcement - #10 @ 9"

"2 1Top reinforcement - #9 @ 4

CROSS SECTION

HALF SECTION - NEAR PIER HALF SECTION - NEAR MIDSPAN

ELEVATION

Seal deck expansion joints with precompressed hybrid joint seal (Typ.)

Seal parapet expansion joints with elastomeric joint sealant (Typ.)

Repoint brick mortar joints at abutments, wingwalls, and parapets as needed. Remove and reset brick masonry as directed by the CO.

Replace damaged bricks as needed. (Typ.)

Approximate existing ground

Perform partial-depth concrete deck replacement between curbs

(See Notes 1 and 2)

(Curb reinforcement not shown for clarity) dimensions before ordering material.

Reinforcement is shown based on as-built plans. Verify 3.

replace damaged reinforcing steel.

Furnish reinforcing steel matching existing reinforcement to

Clean reinforcing steel of rust and other foreign material. 2.

aggregate top finish.

of rebar. Restore deck to original profile with an exposed

Remove deck concrete to a minimum of 1 inch below top mat 1.

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

000000

XXXXXX VA

B42 C18 D51

VA NP COLO 1A21

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-XXXX3

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

COLONIAL NATIONAL HISTORICAL PARK

REHABILITATION OF COLONIAL PARKWAY, PART I

November 2021

NOT

FOR

CO

NST

RUCTI

ON

PRE

R03

M

P R

O J E

C T

S c o lo 1A

B

1\

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

-N o v -2

Not to Scale

A C

T U

A L F I L E R C

O L

O

A B

C

D

P .D

G N

Structure Number 4290-040P

REPAIR DETAILS - 4290-040P

PLAN

C Colonial ParkwayCL

CLC Paper Mill Creek Culvert #1

CROSS SECTION

1'-0" 12'-0" 1'-8" 4'-0" 1'-8" 12'-0" 1'-0"

To WilliamsburgTo Jamestown

Place riprap at southeast embankment to repair erosion

Approximate existing ground

Remove soil buildup in north and middle culverts

Clean and seal open joints in culvert (Typ.)

Repoint stone masonry in wingwalls and headwalls as needed (Typ.)

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

000000

XXXXXX VA

B42 C18 D51

VA NP COLO 1A21

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

CC CC

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

BRP-XXXX3

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

COLONIAL NATIONAL HISTORICAL PARK

REHABILITATION OF COLONIAL PARKWAY, PART I

November 2021

NOT

FOR

CO

NST

RUCTI

ON

PRE

File details come from the government source that posted it. Updated .