This solicitation is for a two-phase Design-Build contract to rehabilitate approximately 10.3 miles of the Colonial Parkway located within the Colonial National Historical Park in Virginia.
The scope of work includes exposed aggregate concrete pavement replacement, asphalt pavement rehabilitation, bridge and tunnel rehabilitation, culvert rehabilitation or replacement, storm drain system work, historic brick headwall rehabilitation, ditch grading, guardrail replacement, signage and pavement marking replacement, and other miscellaneous work. The estimated value of the base contract plus all options ranges from $100-150 million.
Phase One involves submitting Statements of Qualifications by July 12, 2022 to be evaluated based on key personnel experience, past performance, quality management approach, and project understanding. A maximum of three highly qualified offerors will be shortlisted to participate in Phase Two. Phase Two will involve responding to a Request for Proposal within 60 days for technical and price proposals, with award anticipated in the second quarter of fiscal year 2023. The owner and contracting agency is the Federal Highway Administration.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R01
-N o v -2
:3
A M
M
P R
O J E
C T
S c o lo 1A
B
C
D 1\
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
GENERAL NOTES AND INDEX
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
GENERAL NOTES:
X " = 1'-0"
A C
T U
A L F I L E R C
O L
O
A B
C
D
G
N .D
G N th
GENERAL NOTES:
Design:
AASHTO LRFD Bridge Design Specifications, 8 Edition, 2017.
SPECIFICATIONS:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
Construction:
Dead Load:
Concrete: 150 pcf
DESIGN LOADS:
SCOPE OF WORK:
Masonry:
Contact utility companies and locate all utilities before proceeding to work.
conditions.
of configuration of the surrounding area, adjust dimensions of the work to fit existing
Where dimensions of the proposed work in this Contract are dependent on the dimensions
Verify all controlling field dimensions before ordering or fabricating any materials.
CONSTRUCTION:
Submit brick samples to the CO for approval before use.
Furnish bricks that match existing according to Section 620.
reinforcement unless otherwise noted. Lap splice 30 bar diameters unless otherwise shown.
Provide 2-inch cover for reinforcing steel unless otherwise noted. Furnish uncoated
Furnish reinforcing steel conforming to AASHTO M 31, Grade 60 deformed.
Reinforcing Steel:
Concrete:
recommendations, and as approved by the CO.
Stain all concrete repairs to match existing concrete, according to manufacturer's
Furnish Class D(AE) exposed aggregate concrete for concrete deck replacement with f'c = 4.5 ksi at 28 days.
MATERIALS:
- Repoint brick mortar joints at wingwalls and headwalls as needed.
- Clean and seal joints in culvert barrels.
- Repair damaged concrete in culvert barrels as needed.
- Place riprap to repair bank erosion.
- Remove sediment and debris from culvert barrels.
4290-040P - Paper Mill Creek Culvert #1
INDEX OF BRIDGE PLAN SHEETS
Repair Details - 4290-040P
Repair Details - 4290-013P
General Notes and Index
SHEET NO. SHEET TITLE
For all other structures, see GFI.
Structure Number 4290-013P, 4290-040P damaged bricks as needed.
Remove and reset damaged brick masonry as directed by the CO. Replace
- Repoint brick mortar joints at abutments, wingwalls, and parapets as needed.
sealant.
- Clean and reseal curb and parapet expansion joints with elastomeric joint
- Seal deck expansion joints with precompressed hybrid joint seal.
- Perform partial-depth concrete deck replacement between curbs.
4290-013P - Penniman Road Bridge
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
000000
XXXXXX VA
B42 C18 D51
VA NP COLO 1A21
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CC CC
DRAWN BY
Christopher Negley of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-XXXX3
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
COLONIAL NATIONAL HISTORICAL PARK
REHABILITATION OF COLONIAL PARKWAY, PART I
November 2021
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
R02
M
P R
O J E
C T
S c o lo 1A
B
1\
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-N o v -2
Notes:
Not to Scale
A C
T U
A L F I L E R C
O L
O
A B
C
D
P .D
G N
REPAIR DETAILS - 4290-013P
Structure Number 4290-013P
"4 13'-717'-0"17'-0""4
13'-7
C Colonial ParkwayCL
Bottom reinforcement - #11 @ 9"
Top reinfrocement - #5 @ 19"
Bottom reinforcement - #10 @ 9"
"2 1Top reinforcement - #9 @ 4
CROSS SECTION
HALF SECTION - NEAR PIER HALF SECTION - NEAR MIDSPAN
ELEVATION
Seal deck expansion joints with precompressed hybrid joint seal (Typ.)
Seal parapet expansion joints with elastomeric joint sealant (Typ.)
Repoint brick mortar joints at abutments, wingwalls, and parapets as needed. Remove and reset brick masonry as directed by the CO.
Replace damaged bricks as needed. (Typ.)
Approximate existing ground
Perform partial-depth concrete deck replacement between curbs
(See Notes 1 and 2)
(Curb reinforcement not shown for clarity) dimensions before ordering material.
Reinforcement is shown based on as-built plans. Verify 3.
replace damaged reinforcing steel.
Furnish reinforcing steel matching existing reinforcement to
Clean reinforcing steel of rust and other foreign material. 2.
aggregate top finish.
of rebar. Restore deck to original profile with an exposed
Remove deck concrete to a minimum of 1 inch below top mat 1.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
000000
XXXXXX VA
B42 C18 D51
VA NP COLO 1A21
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CC CC
DRAWN BY
Christopher Negley of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-XXXX3
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
COLONIAL NATIONAL HISTORICAL PARK
REHABILITATION OF COLONIAL PARKWAY, PART I
November 2021
NOT
FOR
CO
NST
RUCTI
ON
PRE
R03
M
P R
O J E
C T
S c o lo 1A
B
1\
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-N o v -2
Not to Scale
A C
T U
A L F I L E R C
O L
O
A B
C
D
P .D
G N
Structure Number 4290-040P
REPAIR DETAILS - 4290-040P
PLAN
C Colonial ParkwayCL
CLC Paper Mill Creek Culvert #1
CROSS SECTION
1'-0" 12'-0" 1'-8" 4'-0" 1'-8" 12'-0" 1'-0"
To WilliamsburgTo Jamestown
Place riprap at southeast embankment to repair erosion
Approximate existing ground
Remove soil buildup in north and middle culverts
Clean and seal open joints in culvert (Typ.)
Repoint stone masonry in wingwalls and headwalls as needed (Typ.)
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
000000
XXXXXX VA
B42 C18 D51
VA NP COLO 1A21
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CC CC
DRAWN BY
Christopher Negley of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-XXXX3
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
COLONIAL NATIONAL HISTORICAL PARK
REHABILITATION OF COLONIAL PARKWAY, PART I
November 2021
NOT
FOR
CO
NST
RUCTI
ON
PRE
File details come from the government source that posted it. Updated .