Appendix A.4- Preliminary Plans (Williamsburg Tunnel).pdf

PDF 34 MB Posted

Attached to
Rehabilitation of Colonial Parkway, Phase 1 - VA NP COLO 1A21 B42 C18 D51
Solicitation number
693C73-22-R-000013
Issued by

About this file

This solicitation is for a design-build contract to rehabilitate approximately 10.3 miles of the Colonial Parkway located within Colonial National Historical Park in Virginia. Major work includes exposed aggregate concrete pavement replacement, asphalt pavement rehabilitation, bridge and tunnel rehabilitation, new tunnel lighting system installation, culvert rehabilitation, storm drain system rehabilitation, historic brick wall rehabilitation, steel-backed timber guardrail replacement, signage and pavement marking replacement, and other miscellaneous work.

The solicitation is a two-phase qualifications-based selection process to shortlist up to three highly qualified offerors to receive the request for proposal in Phase Two. Phase One submissions are due by July 12, 2022 and should address key personnel experience, past performance, quality management approach, and project understanding. Evaluation criteria are provided. Award of a firm fixed-price design-build contract is expected in the second quarter of fiscal year 2023. The estimated design and construction cost range is $100-150 million.

View the file

Other files

File Type Posted
NP VA COLO 1A21 ETC - Shortlist.docx DOCX document
Amendment 0001 - VA NP-COLO 1A21 B42 C18 D51.pdf PDF
Appendix B.2b COLO_333_D192_Colonial Parkway Cultural Landscape Report_Part 1(Ch3-6).pdf PDF
Appendix C5. Papermill Creek Watershed Study (2005).pdf PDF
Appendix C.4 Colonial Parkway, Storm Culvert Cleaning Project (2017).pdf PDF
Appendix B.2a COLO_333_D192_Colonial Parkway Cultural Landscape Report_Part 1(Ch1-2).pdf PDF
Appendix C.2 Conceptual Stormwater Management Report (2020).pdf PDF
Appendix D Geotechnical and Pavement Reports.pdf PDF
Appendix F Bridge Inspection Reports.pdf PDF
Appendix B.1 Environmental Documents.pdf PDF
Appendix G.1 As-built Plans.pdf PDF
Appendix C.1 Hydraulic Reports.pdf PDF
Appendix C.3 Stormwater Report Addendum- Outfall, Stream Channel, and BMP Design (2021).pdf PDF
Appendix A.1 Preliminary Plans.pdf PDF
Appendix A.5- Penniman Rd Bridge and Paper Mill Creek.pdf PDF
Appendix I Miscellaneous Guidelines and Standards.pdf PDF
Appendix G.2 As-built Plans.pdf PDF
Appendix H Historical Construction Reports.pdf PDF
Appendix A.3 Preliminary Plans (Segment G).pdf PDF
Appendix A.2 Preliminary Plans (Segments A, D, E, F).pdf PDF
Appendix G.3 As-built Plans.pdf PDF
Draft RFP - NP-COLO 1A21 etc.pdf PDF
Appendix E Williamsburg Tunnel Lighting Reports.pdf PDF
Appendix B.3 COLO_333_8003_Cultural Landscape Report (1997).pdf PDF
RFQ - VA NP COLO 1A21 B42 C18 D51 FINAL.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

-A p r -2

:5

A M

M

P R

O J E

C T

S c o lo 1d

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

NO. DATE BY REVISIONS NO. DATE BY REVISIONS

GENERAL NOTES AND INDEX

No Scale

R01 th

SCOPE OF WORK

A

C T

U A

L F I L E R

N P C

O L

O

D

G N .D

G N

GENERAL NOTES:

Design:

AASHTO LRFD Bridge Design Specifications, 9 Edition, 2020.

SPECIFICATIONS:

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.

Construction:

CONSTRUCTION:

measurements and dimensions shown on the plans.

identified as critical to the repair work and report to the CO any discrepancy between field Locations of repairs are approximate. Field verify all dimensions of the existing structure which are

INDEX OF BRIDGE PLAN SHEETS

Tunnel Repair Details

Retaining Wall Details

Tunnel Portal Repairs

Tunnel Cross Section

Concrete Lining Repair Plan - 3

Concrete Lining Repair Plan - 2

Concrete Lining Repair Plan - 1

General Notes and Index

SHEET NO. SHEET TITLE

Miscellaneous:

Reinforcing Steel:

Concrete:

Furnish grout and mortar according to Section 620.

Furnish a paint system according to Section 563. Match existing paint color.

Furnish tunnel waterproofing system according to Section 559.

Furnish helical stainless steel ties conforming to Section 709.01(m).

using mechanical splices or lap splice with remainng reinforcement.

Replace deteriorated reinforcement as directed by the CO with new reinforcement

Furnish epoxy coated reinforcing steel conforming to ASTM A615, Grade 60.

Furnish shotcrete with a design strength of 4.0 ksi at 28 days.

MATERIALS:

Excavate and install new drainage systems behind retaining walls.

Clean and reseal wingwall vertical joints on the portals.

Replace missing and broken bricks as directed by the CO.

cleaners. Submit methods of vegetation removal to the CO for approval.

Remove dirt or vegetation using non-invasive methods without chemical

Clean and repoint deteriorated mortar joints as directed by the CO.

Lap with existing waterproofing membrane.

Remove and replace deteroriated waterproofing membrane at portals.

the concrete tunnel lining.

After all tunnel lining repairs are complete, paint the exposed surface of lining as directed by the CO.

Remove and replace deteriorated concrete on the surface of the tunnel epoxy injection.

CO. Clean and seal other cracks and joints in the concrete lining by concrete lining by hydrophobic polyurethane sealant as directed by the

Clean and seal all cracks and joints with running or seeping water in the epoxy resin adhesive, as directed by the CO.

Clean exposed rebar along the surface of the tunnel and coat with

STATE PROJECT

NUMBER

SHEETNPS

NO.NO.

PMIS

175012

222485 VA NP-COLO 1D47

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

NN JEG Christopher Negley of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BRP NO.BRIDGE PLAN SHEET

BRP-12748

WILLIAMSBURG TUNNEL

COLONIAL NATIONAL HISTORICAL PARK

Structure Number 4290-033P

August 2020

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

N o r th P o r ta l

PLAN

C

(Typ.)

N

Legend

Spall

Brick masonry injected

Cracks to be

167+00

CONCRETE LINING REPAIR PLAN - 1

R02

Notes:

Total structure length: 1183'-0"

Jamestown

Yorktown

9'-0"±

Crown

Crown line Spring

(Typ.)

Constr. joint line

Match

Edge of pavement L Existing tunnel

(Typ.)

Panel

Edge of pavement line Spring

Sidewalk

Sidewalk

1183'-0"±

15'-0"±

3. For additional information, see "TUNNEL REPAIR DETAILS" sheet.

-inch in width.16

2. Do not repair cracks less than or equal to deep unless reinforcing steel is exposed.

1. Do not repair spalls less than 0.25 sq. ft. surface area and less than 1-inch

A C

T U

A L F I L E R

N P C

O L

O

D P

E .D

G N

30'-0"±27'-6"±3'-0"±

Sta. 166+98

Begin Tunnel

167+50 168+50168+00 169+50169+00 170+50170+00

-A p r -2

M

P R

O J E

C T

S c o lo 1d

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

PROJECT TEAM LEADER

of

DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY

U.S. DEPARTMENT OF TRANSPORTATION

BRP NO.

STATE PROJECT

NUMBER

SHEET

BRIDGE PLAN SHEET

NPS

NO.NO.

PMIS

175012

222485 VA

BRP-1274NN JEG 8

NP-COLO 1D47

WILLIAMSBURG TUNNEL

COLONIAL NATIONAL HISTORICAL PARK

Structure Number 4290-033P

August 2020Christopher Negley

-A p r -2

M

P R

O J E

C T

S c o lo 1d

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

NO. DATE BY REVISIONS NO. DATE BY

(Typ.)

C

PLAN

Legend

Spall injected

Cracks to be

Exposed rebar

CONCRETE LINING REPAIR PLAN - 2

R03

Notes:

Jamestown

Match line Match line

Crown

Edge of pavement

Door Door Edge of pavement

CrownVent line

Spring

L Existing tunnel line Spring

Sidewalk

Sidewalk

1183'-0"±

12'-0"±

A C

T U

A L F I L E R

N P C

O L

O

D P

E .D

G N

30'-0"± 42'-0"±

3. For additional information, see "TUNNEL REPAIR DETAILS" sheet.

-inch in width.16

2. Do not repair cracks less than or equal to deep unless reinforcing steel is exposed.

1. Do not repair spalls less than 0.25 sq. ft. surface area and less than 1-inch

171+50171+00 172+50172+00 173+50173+00 174+00 174+50

-A p r -2

M

P R

O J E

C T

S c o lo 1d

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

PROJECT TEAM LEADER

NUMBER

SHEET

BRIDGE PLAN SHEET

NPS

NO.NO.

PMIS

175012

222485 VA

BRP-1274NN JEG 8

NP-COLO 1D47

WILLIAMSBURG TUNNEL

COLONIAL NATIONAL HISTORICAL PARK

-A p r -2

M

P R

O J E

C T

S c o lo 1d

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

C

PLAN

S o u th P o r ta l

End tunnel

Legend

Spall

Brick masonry injected

Cracks to be

Structure Number

CONCRETE LINING REPAIR PLAN - 3

R04

Notes:

Jamestown

Crown

L Existing tunnel line

Match

Sidewalk

Sidewalk line

Spring

Edge of pavement

Edge of pavement

Crown line

Spring

1183'-0"±

A C

T U

A L F I L E R

N P C

O L

O

D P

E .D

G N

3'-0"±27'-6"±

3. For additional information, see "TUNNEL REPAIR DETAILS" sheet.

-inch in width.16

2. Do not repair cracks less than or equal to deep unless reinforcing steel is exposed.

1. Do not repair spalls less than 0.25 sq. ft. surface area and less than 1-inch

Sta. 178+80

175+00 175+50 176+50176+00 177+50177+00 178+50178+00

-A p r -2

M

P R

O J E

C T

S c o lo 1d

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

PROJECT TEAM LEADER

NUMBER

SHEET

BRIDGE PLAN SHEET

NPS

NO.NO.

PMIS

175012

222485 VA

BRP-1274NN JEG 8

NP-COLO 1D47

WILLIAMSBURG TUNNEL

COLONIAL NATIONAL HISTORICAL PARK

-A p r -2

M

P R

O J E

C T

S c o lo 1d

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

R : 1

'-0

"±R : 1

'-7

PC PC

TYPICAL SECTION

(Typ.)

L Existing tunnelC

Sidewalk Roadway Sidewalk

Structure Number

R05

A C

T U

A L F I L E R

N P C

O L

O

D

T Y P S

E C

T .D

G N

M in c le a r a n c e

M in c le a r a n c e

" = 1'-0"2

2'-6"±

2'-6"±

Spring line pavement Top of

4'-9"± 2'-3"±3'-0"±

2'-6"±

10'-0"±

25'-0"±

(Typ.)

8" Pipe sheathing

Stone gravel plank protection membrane with

Waterproofing

Concrete lining

-A p r -2

M

P R

O J E

C T

S c o lo 1d

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

PROJECT TEAM LEADER

NUMBER

SHEET

BRIDGE PLAN SHEET

NPS

NO.NO.

PMIS

175012

222485 VA

BRP-1274NN JEG 8

NP-COLO 1D47

WILLIAMSBURG TUNNEL

COLONIAL NATIONAL HISTORICAL PARK

-A p r -2

M

P R

O J E

C T

S c o lo 1d

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

TUNNEL PORTAL REPAIRS

R06

S e e N o te

A A

A C

T U

A L F I L E R

N P C

O L

O

D P

O R

T A

L R

E P

A I R

S .D

G N

CL

wall

Face of parapet

Sta. 00+00

00+50

Sta. 00+78 wingwall

Face of wingwall

Face of

10'-0"

(See Note 4)

Remove tree root

S e e N o te

Sta. 12+61 Sta. 13+08 wingwall

Face of wingwall

Face of retaining wall

Face of NE retaining wall

Face of NW retaining wall

Face of SE retaining wall

Face of SW

" = 1'-0"8

(Typ.)

N

(owned by others)

Municipal wall

13+00

Parkway

C Colonial wall

Face of parapet

T y p

R e p a ir W a te r p r o o fi n g L im it

R e p a ir W a te r p r o o fi n g L im it

T y p

T y p

Parkway

C Colonial CL

NORTH PORTAL PLAN SOUTH PORTAL PLAN

pipe (Typ.)

Existing drainage joints (Typ.)

wingwall vertical

Clean and reseal pipe (Typ.)

Existing drainage

(See Note 1) system behind retaining wall

Excavate and install drainage

(See Note 1) system behind retaining wall

Excavate and install drainage

(See Note 1) system behind retaining wall

Excavate and install drainage

(See Note 1) system behind retaining wall

Excavate and install drainage recommendations.

b. Install new expansion joint material according to manufacturer and remove laitance with oil-free compressed air.

a. Remove existing joint material, clean joint opening of debris

6. Pourable joint sequence of work:

712.01(f).

cleaning to select size of backer rod conforming to Subsection for wingwall veritcal joints (4 total). Measure joint opening after

5. Furnish silicone joint sealant conforming to Subsection 712.01(d)

4. Remove tree root according to Section 201.

3. For waterproofing repair, see "TUNNEL REPAIR DETAILS" sheet.

by the CO.

finishing. Clean mortar excess as a result of repointing as directed

Provide mortar matching existing mortar color, dimension, and

2. Repoint masonry according to Section 620 as directed by the CO.

sheet.

1. For retaining wall and drainage details, see "RETAINING WALL DETAILS"

Notes:

T y p

T y p

T y p

(Typ.)

Weep holes

Drainage pipe (Typ.)

(Typ.)

Weep holes

(Typ.)

Drainage pipe

STATE PROJECT

NUMBER

SHEETNPS

NO.NO.

PMIS

175012

U.S. DEPARTMENT OF TRANSPORTATION

WILLIAMSBURG TUNNEL

COLONIAL NATIONAL HISTORICAL PARK

Structure Number 4290-033P

August 2020

NOT

FOR

CO

NST

RUCTI

ON

PRE

-A p r -2

M

P R

O J E

C T

S c o lo 1d

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

R07

A C

T U

A L F I L E R

N P C

O L

O

D

R W D

E T

A I L S .D

G N

El. 64.30'

El. 56.00'

El. 60.00'

RETAINING WALL DETAILS

SW RETAINING WALL SE RETAINING WALL

NE RETAINING WALL

(NW Retaining wall similar) lap

Existing ground portal

Face of north walkway (Typ.)

Top of brick ground

Existing

El. 58.30' portal

Face of south portal

Face of south walkway (Typ.)

Top of brick ground

Existing

El. 66.30'

89'-0"±

47'-0"± 47'-0"±

1'-0"

Existing ground type C

Geotextile class 2, sheet drain

1" Geocomposite retaining wall

Face of existing sheet drain

1" Geocomposite

DETAIL A

" = 1'-0"2 1Scale: 1

" = 1'-0"4 1Scale:

" = 1'-0"4 1Scale:

" = 1'-0"4 1Scale:

Not to scale

1'-0"

(collector pipe) plastic pipe

Elevation A

Elevation B

As shown

RETAINING WALL DRAINAGE DETAIL

Elevation A Location

Retaining Wall Elevation B

Southwest

Southeast

Northwest

Northeast

58.30

66.30

66.30

54.30

60.26

60.52 plastic pipe

Non-perforated

62.30

Detail A

62'-0"±27'-0"±

20'-0"±27'-0"± 20'-0"± 27'-0"±

(collector pipe) plastic pipe

3" Ø Perforated

El. 62.30'

2'-6"±

ELEVATION TABLE

based on as-built plans.

Elevations shown are approximated

54.30

8" Ø Drainage pipe

4" Ø Weep hole

4" Ø Weep hole

Granular backfill

STATE PROJECT

NUMBER

SHEETNPS

NO.NO.

PMIS

175012

U.S. DEPARTMENT OF TRANSPORTATION

WILLIAMSBURG TUNNEL

COLONIAL NATIONAL HISTORICAL PARK

Structure Number 4290-033P

August 2020

NOT

FOR

CO

NST

RUCTI

ON

PRE

-A p r -2

M

P R

O J E

C T

S c o lo 1d

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

4" Min.

(Typ.)

REPAIR DETAIL

PARTIAL DEPTH CONCRETE-LINING

steel (See Note 2)

Existing reinforcing

CONCRETE CRACK REPAIR

concretearea into sound perimeter of the repair

" Saw cut around the 4

TYPICAL TUNNEL WATERPROOFING DETAIL

TUNNEL REPAIR DETAILS

R08

SECTION A-A

Concrete

(NE and SW joints opposite hand)

(See Note 2)

SECTION B-B

B B

R e p a ir A r e a tunnel

Face of

Varies lining

Existing concrete wall masonry

Existing b r ic k c o u r s e s

S p a c e d e v e r y

1'-8" min (Typ.) 1'-8" min (Typ.)

steel tie stainless Helical wall masonry Existing

"2

"4

Mortar

Grout

(See Note 4) steel tie stainless Helical arch ring Face of with asphalt plank protection Existing waterproofing membrane

End of waterproofing concrete block Remove existing footer concrete Existing wingwall Existing Existing joint wall parapet Existing

(See Note 7) Termination m in m in

1'-2"±

3'-0"±

2'-0" min.

m in

"±4

(Typ.)

Injection port crack Existing surface Existing concrete

(See Note 9) material Crack injection

A C

T U

A L F I L E R

N P C

O L

O

D

R E P

A I R D

E T

A I L S .D

G N grout

Nonshrink

Termination covering Protective

Termination

Not to Scale

Protective covering membrane sheet Preformed

Slot

Existing grade membrane with existing

6" min. lap

" wide)2 1(for cracks ≥

MASONRY WALL CRACK REPAIR DETAIL

(See Note 1)

Section 552 according to or shotcrete

Repair concrete by the CO, according to Section 561.

the concrete lining by hydrophobic polyurethane sealant as directed

Clean and seal all cracks and joints with running or seeping water in 9.

over joints. Extend waterproofing 2'-0" beyond joints.

preformed membrane manufacturer. Do not terminate membrane

Install waterproofing terminations as recommended by the 8.

minimum of 6 inches. Butt existing covering.

Section 559.05(a). Lap existing waterproofing membrane by a masonry wall to 6 inches below the existing grade line, according to

Install tunnel waterproofing from a minimum of 6 inches up the 7.

and 702.

terminations from the same manufacturer, according to Sections 559

Furnish primer, preformed membrane, protective covering, and 6.

tie.

Measure joint opening width to select size of stainless steel helical 5.

Repair masonry cracks according to Section 620. 4.

directed by the CO.

Clean exposed rebar and coat with an epoxy resin adhesive, as 3.

mechanical coupler.

bar cross section and connect it to the new epoxy bar using a cracked. Chip concrete to expose a minimum of 5-inch of adequate more of the original cross section area or if existing bar is broken or

Place new epoxy coated rebar when existing bar has lost 25% or 2.

and texture, as approved by the CO.

CO. Provide concrete matching the existing concrete lining in color structurally sound concrete is encountered and as approved by the

Remove and replace unsound concrete to a depth at which 1.

Notes:

STATE PROJECT

NUMBER

SHEETNPS

NO.NO.

PMIS

175012

U.S. DEPARTMENT OF TRANSPORTATION

WILLIAMSBURG TUNNEL

COLONIAL NATIONAL HISTORICAL PARK

Structure Number 4290-033P

August 2020

NOT

FOR

CO

NST

RUCTI

ON

PRE

File details come from the government source that posted it. Updated .