This document contains an amendment to a solicitation and related federal contract opportunity. The amendment provides clarification on a pavement preservation project for approximately 25.67 miles of the Blue Ridge Parkway in Buncombe County, North Carolina. The project consists of one of two pavement preservation treatment methods: stress-absorbing membrane interlayer or ultra-thin bonded wearing course. Additional work includes asphalt concrete patching, pavement markings, and miscellaneous work. The solicitation number is 693C73-20-R-000003 and proposals are due by January 14, 2020. The estimated cost range for the project is $1,000,000 to $5,000,000. The amendment summarizes responses to contractor questions, clarifies shoulder reconditioning work, and confirms the proposal due date.

View the file

Other files

File Type Posted
RFP Solicitation NP-BLRI PVT PRES Asheville.pdf PDF
5140-119P1417_Redacted.pdf PDF
Plans - NP-BLRI PVT PRES Asheville.pdf PDF
NEPA_CE.pdf PDF
5140-122P6375_Redacted.pdf PDF
5140-117P1821_Redacted.pdf PDF
5140-203P4250_Redacted.pdf PDF
BLRI_C5_RipReport.pdf PDF
5140-173P4250_Redacted.pdf PDF
VETS-4212 Form.pdf PDF
5140-118P1594_Redacted.pdf PDF
5140-116P2125_Redacted.pdf PDF
5140-186P2125_Redacted.pdf PDF
5140-141P12750_Redacted.pdf PDF
5140-120P638_Redacted.pdf PDF
ADV_Offeror's Qualifications Form.doc DOC document
5140-121P12750_Redacted.pdf PDF
5140-125P2550_Redacted.pdf PDF
FP14_Eng.pdf PDF
Synopsis_-_NP-BLRI_PVT_PRES_Asheville.doc DOC document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7320R000003 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

See Block 1401/06/20200001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

12/12/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

NP-BLRI PVT PRES Asheville - Blue Ridge Parkway

The purpose of this Amendment is to:

1) Provide a summary of responses to questions/clarifications asked by potential bidders.

2) Revise the Special Contract Requirements (J Pages) Section 303 to clarify shoulder reconditioning work.

The Proposal due date of January 14, 2020, at 2:00 p.m. EST will remain the same.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0001

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0001 Project NP BLRI PVT PRES ASHEVILLE

Blue Ridge Parkway Solicitation: 693C73-20-R-000003

The purpose of this Amendment is to:

1) Provide a summary of responses to questions/clarifications asked by potential bidders.

2) Revise the Special Contract Requirements (J Pages) Section 303 to clarify shoulder reconditioning work.

The Proposal due date of January 14, 2020, at 2:00 p.m. EST will remain the same.

Special Contract Requirement changes

1. Add the following to Subsection 303.04 of the Special Contract Requirements, page J-11:

Match existing shoulder widths of 3 to 5 feet when performing reconditioning. Within the shoulder reconditioning limits, maintain the final shoulder elevation of no more than ½” lower than the adjacent top of pavement.

Questions / Clarifications

Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.

Questions can be submitted at any time, but questions submitted within 7 days of the proposal due date may not be answered in time for the bidder to properly incorporate the responses into their bids.

The following questions and issues were submitted via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.

The Government’s direct response to the sender may also have been updated below for better clarity.

1. Question: Are pull offs, ramps, turn lanes included in the pavement preservation quantities? If so, will milling be required at curbs? How far do we go back on intersections?

Response: Pull offs, ramps, and turn lanes are not part of the project and the quantities for these were not calculated along with the pavement preservation quantities. Please see Sheet S02 (Detail E401-01) for milling lengths when transitioning to outside the project limits.

2. Question: There are no shoulder typical sections in the plans. What will the shoulder typical be for the incidental shoulder reconstruction item?

Response: Per Sections 303 and 313, pages J-10 to J-11 of the Special Contract Requirements (SCRs), the CO will direct which shoulder areas are to be reconditioned with mailto:eflhd.contracts@dot.gov aggregate-topsoil and turf establishment. The existing shoulder widths of 3 to 5 feet will need to be matched. The contractor will be required to recondition only those shoulders where the depths of drop-offs exceeded 1.5” only after the pavement preservation overlay.

The final shoulder elevation should not be any more than ½” lower than the adjacent top of pavement. The shoulders where the depths of drop off exceeded 1.5” prior to the pavement preservation overlay will not require reconditioning. The work for the shoulder reconditioning will be incidental to Pay Item 42001-0000.

3. Question: Traffic control items/field office pay items are included in both schedules. What is the intent? Will two office locations be required?

Response: The traffic control items will be used for the work on both schedules. The intent for including the traffic control items in schedule B is to compensate the contractor for the traffic control items additional use.

It is anticipated that the contractor will only require one office for both schedules. The primary field office will be paid under schedule A. The intent for including the field office in schedule B is to compensate the contractor for the field office additional use and duration.

4. Question: On page J-9, Section 156.05(f), please explain “fully functional”. Does this mean clean every drainage system throughout the project? If so, how many are there? 200+? This will be a major cost factor due to the fact that many of these outlets are inaccessible by equipment (i.e. off the slope and/or outside construction limits).

Response: Section 156.05(f) of the SCRs intent is to say that the contractor should not block with their equipment and materials any inlets and drainage structures located within project limits. The contractor will be required to clean these structures only if the CO determines they became plugged due to contractor’s actions.

5. Question: Will construction staking be required? If so, there is not a pay item for it.

Response: Construction staking will not be required for this project since the scope is only to overlay. If the contractor needs to stake the depths for the overlay, this work will be subsidiary to the pavement preservation treatment.

6. Question: Could you clarify J-9, Section 156.07 pertaining to chip seal operations and sweeping operations, including explaining lane closure/nighttime restrictions and the 24 hour vacuuming restriction.

Response: Section 156.07(n) states that the contractor will need to use single lane closures with pilot car to perform chip seal vacuuming operation during the day time for the full length of the project. Section 108.01(c) (J-4) states that sweeping will be allowed Saturdays, before 10 am (this falls within daytime as well, so single lane closures with pilot car will need to be used). Per Section 156.08, page J-10 of the SCRs, chip seal cannot be placed at night, however, within MP 383.6 (Parkway MP 382.6) to MP 394.70 (Parkway MP 393.70), nighttime work under full Parkway closure will be allowed, where work can include sweeping/vacuuming chip seal loose aggregate.

7. Question: In the SCR's section 429-05, it states that a "spray paver" is required for the ultra thin lift paving operation. On past projects such as GRSM 1B22 and GRSM 13(1), 14(2), 18(1) it stated in the SCR's that there was an option to either use 1. a spray paver or 2. a non-tracking hot applied polymer asphalt tack coat application. Will they contractor have the option between the two on this project as well? Or will a spray paver be required?

Response: On this project, only a “spray paver” is allowed.

Amendment 1 Info Asheville.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001
Project NP BLRI PVT PRES ASHEVILLE
Blue Ridge Parkway
Solicitation: 693C73-20-R-000003