This solicitation is for a pavement preservation project on the Blue Ridge Parkway in Buncombe County, North Carolina. The project consists of pavement preservation treatment on approximately 25.67 miles of roadway between mileposts 365.50 to 389.70 and 393.23 to 394.70. Eligible contractors may submit a proposal to perform either a stress-absorbing membrane interlayer or ultra-thin bonded wearing course treatment method. The project includes asphalt concrete patching, pavement markings, and other miscellaneous work split into multiple schedules. The estimated cost range for the entire project is $1,000,000 to $5,000,000 and must be completed by December 11, 2020. Proposals from certified small businesses will be accepted under solicitation number 693C73-20-R-000003. Bid documents will be issued on November 18, 2019 with the bid due date and location specified in block 13a of the solicitation. Offerors must submit qualifications related to their experience in pavement preservation using one of the treatment methods. The selected contractor will perform the alternative treatment method proposed. The Department of Transportation Federal Highway Administration is the agency and work will take place on the Blue Ridge Parkway in Buncombe County, North Carolina.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5140-122P
U.S. ROUTE 25 BRIDGE INSPECTION DATE: 7/14/17
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... BOX GIRDER - SINGLE or SPREAD NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 200.7 FT (61.2 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 90.0 FT (27.4 M)
WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 36.3 FT (11.1 M)
ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 28.5 FT (8.7 M)
PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 2R12 / 41903 SKEW ANGLE: ..................... 33 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1985, 2008-JOINT REPAIR. 2005-RAIL POSTS REPLACED. 2008-DECK PATCHED. 2009-DECK
SEALED
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 388.74 (KM PT 625.44)
STATE: ................................. NORTH CAROLINA LOCATION: 2.9 MILES TO INTERSTATE 26
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. U.S. ROUTE 25
STRUCTURE EVALUATION SUMMARY
This continuous concrete box girder bridge is in good condition overall and has only minor problems at this time.
These include a 2" gap between the slope paving and breastwall at each abutment, loose joint armor angle on the east end of the south expansion joint, exposed rebar on the northwest cheekwall and west column of the north pier, vegetation growth along the wingwalls and concrete slope protection, and debris accumulation in the deck drains and along the east and west curblines. Due to traffic volume on this section of the Parkway, consideration should be given to installing Type 3 reflective object markers at the north parapet ends.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: J. TRIPLETT (SEH), B. ROBIN (GEOCAL)
CONDITION ASSESSMENT:
JASON D. TRIPLETT, P.E., FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/6/17
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-122P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
60.11 SEAL GAP BETWEEN TOP OF SLOPE PROTECTION AND EACH ABUTMENT
BREASTWALL.
80 LF
58.2 SECURE JOINT ARMOR ANGLE ON EAST SIDE OF SOUTH EXPANSION JOINT AND
REMOVE SOIL ACCUMULATION FROM DECK JOINTS.
1 LS
60.6,13 CLEAN AND SEAL EXPOSED REBAR AT NORTHWEST CHEEKWALL AND WEST
COLUMN OF NORTH PIER WITH APPROVED PROTECTIVE COATING.
5 SF
60.6,11 REMOVE VEGETATION ENCROACHING INTO ROADWAY AS NECESSARY. 1 LS
58.7 REMOVE DEBRIS FROM DECK DRAINS AND CURBLINES. 1 LS
222.7 INSTALL TYPE 3 REFLECTIVE OBJECT MARKERS AT NORTH PARAPET ENDS. 4 EA
222.4 FEATHER ASPHALT FOR 10' AT BOTH APPROACHES TO ELIMINATE BUMPS ONTO
BRIDGE.
1 EA
PRELIM. MAINTENANCE TOTAL : 0
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
| FIELD INSPECTION REPORT | STRUCTURE NO. 5140-122P |
| U.S. ROUTE 25 BRIDGE | INSPECTION DATE: 7/14/17 |
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION - no problems noted.
7 GOOD CONDITION - some minor problems.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration.
5 FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
1 “IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 6
1. DECK SLAB F
2. EXPANSION JOINTS F
3. WEARING SURFACE N
4. RIDEABILITY G
5. CURBS, SIDEWALKS, AND MEDIAN G
6. PARAPETS AND/OR RAILINGS G
7. DRAINS AND DRAINAGE F
8. UTILITIES N
9. DEFLECTION AND/OR VIBRATION G
10. OTHER (VEGETATION/STRIPING) F
59. SUPERSTRUCTURE 7
1. BEARING DEVICES
2. GIRDERS OR BEAMS
3. ARCH(ES) OR SLAB(S)
4. FLOOR BEAMS AND STRINGERS
5. TRUSSES
6. DIAPHRAGMS AND BRACING
7. PAINT
8. FASCIA(E)
9. DEFLECTION AND/OR VIBRATION
10. ALIGNMENT
11. OTHER
60. SUBSTRUCTURE
ABUTMENTS
1. BREASTWALLS OR COLUMNS
2. PILE BENTS
3. CAPS AND/OR BEARING SEATS
4. BACKWALLS AND/OR BULKHEADS
5. FOUNDATIONS (CONCRETE FTG)
6. WINGWALLS
7. WEEP HOLES
8. EXPANSION JOINTS
9. EROSION AND/OR SCOUR
10. SETTLEMENT OR DEFLECTION
11. SLOPE PROTECTION
12. OTHER
PIER(S)
13. WALLS AND/OR COLUMNS
14. PILE BENTS
15. CAPS AND/OR BEARING SEATS
16. FOUNDATIONS
17. EROSION AND/OR SCOUR
18. SETTLEMENT OR DEFLECTION
19. OTHER
G G N N N N N N G G N
G N G G N F F N G G F N
G N N N G G N
58.1
58.2
58.5
58.7
58.10
59.2
60.3
60.4
ITEM REFERENCE AND REMARKS
WIDESPREAD MODERATE TRANSVERSE CRACKING UP TO 0.060"
WIDE IN DECK SURFACE CONCENTRATED OVER PIERS. MINOR TO
MODERATE SCALING IN ISOLATED AREAS OF TOP OF DECK. MINOR
HONEYCOMBING ON UNDERSIDE OF SLAB AT RANDOM LOCATIONS.
MINOR AREA OF DELAMINATION AT SOUTH END OF DECK
OVERHANG, WEST SIDE. 2'-6" X 2'-6" AND 9"X9" PATCHES IN
SOUTHBOUND LANE OVER PIER #1.
SEVERE DETERIORATION OF SIDEWALK JOINT FILLER IN A FEW
LOCATIONS WITH VEGETATION GROWTH PRESENT. LOOSE
SECTION OF JOINT ARMOR ANGLE ON EAST SIDE OF SOUTH DECK
JOINT, POUNDING AS VEHICLES CROSS. MINOR TO MODERATE
SOIL ACCUMULATION IN DECK JOINTS NEAR CURBS.
SPALL ON END OF SIDEWALK AT SOUTHWEST CORNER OF BRIDGE.
MINOR CRACKING WITH EFFLORESCENCE ON UNDERSIDE OF
CURBS.
MODERATE DEBRIS ACCUMULATION ALONG EAST CURBLINE AND
DECK DRAINS. DECK DRAIN OVER PIER #2 IS CLOGGED.
VEGETATION IS GROWING OVER END PARAPETS AND BRIDGE RAIL
ON BOTH SIDES. MINOR FADING AND PEELING OF CENTERLINE
STRIPING.
MINOR WATER STAINING ON WEST SIDE OF BOX GIRDER NEAR
PIERS. ACCESS HATCHES ARE BOLTED SHUT. SCRAPES ON BOX
GIRDER UNDERSIDE OVER NORTHBOUND UNDERPASS LANES DUE
TO VEHICULAR COLLISION. MINOR CRACKING WITH
EFFLORESCENCE AND LEAKAGE ON UNDERSIDE OF BOX GIRDER,
WEST SIDE NEAR NORTH PIER.
MINOR DEBRIS ACCUMULATION ON BEARING SEATS.
MINOR CRACKING WITH EFFLORESCENCE ON BOTH ABUTMENT
BACKWALLS. TOP SURFACE OF BACKWALL AT EAST SIDE OF
SOUTH ABUTMENT HAS BEEN MILLED AWAY FOR APPROXIMATELY 4'
(WIDE). MINOR STAINING ON EAST CORNER OF NORTH ABUTMENT.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-122P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL N
222. APPROACHES 7
OTHER 9.
ALIGNMENT 8.
SIGNS 7.
SETTLEMENT 6.
EROSION 5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS 2.
1. APPROACH SLABS N
N G G G G N G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION 5.
EROSION AND/OR SCOUR 4.
FOUNDATION 3.
WEEP HOLES 2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 1
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
60.6 MINOR POPOUTS WITH EXPOSED REBAR ON BASE OF NORTHWEST
CHEEKWALL.
60.6,11 MODERATE TO HEAVY VEGETATION ALONG WINGWALLS AND ON
CONCRETE SLOPE PROTECTION. BLOCK WALL AND SIDEWALK
BUILT AT BASE OF NORTH SLOPE PAVING BETWEEN 2015 AND 2017
INSPECTIONS.
60.7 EMBANKMENT IS LEACHING THROUGH WEEP HOLES.
60.11 UP TO 2" GAP BETWEEN BREASTWALLS AND TOPS OF SLOPE
PROTECTION AT BOTH ABUTMENTS. MINOR CRACKING OF SLOPE
PROTECTION BY NORTH PIER.
60.13 MINOR SPALLING AND EXPOSED WIRE ON SOUTH FACE OF WEST
COLUMN, NORTH PIER. 6"X12" AREA OF DELAMINATION ON SOUTH
FACE OF WEST COLUMN IN SOUTH PIER.
222.3 APPROACH GUARDRAIL AT SOUTH APPROACH ONLY.
222.4 ASPHALT PAVEMENT IS UP TO 1" LOW AT BOTH APPROACHES,
CAUSING ROUGH TRANSITION ON AND OFF BRIDGE.
222.7 TYPE 3 REFLECTIVE OBJECT MARKERS MISSING FROM PARAPET
ENDS.
36.B,C APPROACH GUARDRAIL IS NOT ATTACHED TO BRIDGE PARAPET AT
SOUTH APPROACH.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-122P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 21 19 35 32
TYPE 3 20 18 34 31
TYPE 3S2 25 23 41 37
TYPE 3-3 28 25 46 42
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-122P
U.S. ROUTE 25 BRIDGE INSPECTION DATE: 7/14/17
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... U.S. ROUTE 25 BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 021 - BUNCOMBE
(204) STRUCTURE NUMBER: ..... 5140-122P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... U.S. ROUTE 25
(207) ROAD SECTION NO: .......... 122P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140122P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 2.9 MILES TO INTERSTATE 2
(210) OPERATING UNIT: ............. GILLESPE (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 2R12 (11) MILE POINT: ............................. 388.74 (KM PT 625.44)
(212) DRAWING NUMBERS: ....... 41903 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
2 - CONCRETE CONTINUOUS
06 - BOX GIRDER - SINGLE or SPREAD
90.0 FT (27.4 M)
200.7 FT (61.2 M)
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 21.0 TONS (19.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 35.0 TONS (31.8 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 7/17 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-122P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 28.5 FT (8.7 M)
(16) LATITUDE: ............................. 35°31'10.90"
(17) LONGITUDE: ......................... 82°31'42.10"
(19) DETOUR LENGTH: ............... 5 MI (8 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 05
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 4.0 FT (1.2 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
36.3 FT (11.1 M)
38.0 FT (11.6 M)
22.0 FT (6.7 M)
8.0 FT (2.4 M)
8.0 FT (2.4 M)
0 - NO MEDIAN
33 °
NO
28.5 FT (8.7 M)
2.7 FT (0.8 M)
2.7 FT (0.8 M)
2 - MOUNTED ON PARAPET
3 - CONCRETE/STEEL
1 - CONTINUOUS RAIL
2.83 FT (0.86 M)
99.99 FT (99.99 M)
18.00 FT (5.50 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL: .......................... N
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1001
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N - Not over waterway.
1 - MAINTENANCE
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1985, 2008-JOINT REPAIR. 2005-RAIL POSTS REPLACED. 2008-DECK PATCHED. 2009-DECK SEALED
(231) ADDITIONAL CONSIDERATIONS:
SNOOPER REQUIRED FOR HATCH ACCESS.
(330) ADDITIONAL CONFIG. INFO.:
http:82�31'42.10 http:35�31'10.90
APPENDIX STRUCTURE NO. 5140-122P
PHOTOGRAPHS STRUCTURE NO. 5140-122P
PHOTO #1 - LOOKING SOUTH TOWARD CHEROKEE STREET; NOTE
MISSING OBJECT MARKERS AT ENDS OF PARAPETS
PHOTO #2 - EAST SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING SOUTH
PHOTO #4 - TRANSVERSE CRACKING IN SOUTH APPROACH,
SOUTHBOUND LANE SHOWN
PHOTO #5 - TRANSVERSE CRACKING OF WEARING SURFACE,
SOUTHBOUND LANE OVER NORTH PIER SHOWN
PHOTO #6 - TRANSVERSE CRACKING OF WEARING SURFACE IN
SOUTH SPAN OF NORTHBOUND LANE
PHOTO #7 - GENERAL VIEW OF NORTH EXPANSION JOINT
PHOTO #8 - DEBRIS ACCUMULATION AND SPALLING IN WEST END OF
NORTH EXPANSION JOINT
PHOTO #9 - EXPANSION JOINT AT SOUTH END; NOTE DEBRIS
ACCUMULATION ALONG CURB
PHOTO #10 - TYPICAL LIGHT CORROSION OF NUTS FOR CONNECTION
HARDWARE, WEST BRIDGE RAIL IN CENTER SPAN SHOWN
PHOTO #11 - TYPICAL DEBRIS ACCUMULATION AT SCUPPER GRATES,
EAST CURBLINE IN NORTH SPAN SHOWN
PHOTO #12 - DEBRIS ACCUMULATION ALONG WEST CURBLINE
PHOTO #13 - LOW APPROACH AT NORTH END OF NORTHBOUND LANE
PHOTO #14 - GAP UNDER JOINT ARMOR, EAST END OF SOUTH
EXPANSION JOINT SHOWN; NOTE JOINT SEAL DAMAGE
PHOTO #15 - TREE BRANCHES ENCROACHING ONTO BRIDGE RAIL AT
SOUTH END OF WEST RAIL
PHOTO #16 - GENERAL UNDERSIDE VIEW LOOKING NORTH
PHOTO #17 - WATER STAINING ON WEST SIDE OF BOX GIRDER NEAR
NORTH PIER
PHOTO #18 - VEHICULAR SCRAPES ON UNDERSIDE OF EAST BOX
GIRDER IN CENTER SPAN OVER WESTBOUND LANE OF UNDERPASS
ROADWAY
PHOTO #19 - CRACKING WITH EFFLORESCENCE AND LEAKAGE ON
BOX GIRDER UNDERSIDE, WEST SIDE NEAR NORTH PIER SHOWN
PHOTO #20 - SPALLING WITH EFFLORESCENCE AROUND INSPECTION
HATCH IN NORTH SPAN NEAR NORTH PIER
PHOTO #21 - HONEYCOMBING OF BOX GIRDER UNDERSIDE IN CENTER
SPAN
PHOTO #22 - DELAMINATION OF DECK OVERHANG AT SOUTH
ABUTMENT ON WEST SIDE; NOTE CRACK WITH EFFLORESCENCE
PHOTO #23 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #24 - POP OUTS AND EXPOSED REBAR AT WEST END OF
NORTH ABUTMENT; NOTE CRACKING AND EXPOSED REBAR AT BASE
OF CHEEKWALL
PHOTO #25 - BACKFILL LEAKAGE THROUGH WEEPHOLES AT WEST
END OF NORTH ABUTMENT
PHOTO #26 - EROSION HOLE AT NORTHEAST WINGWALL
PHOTO #27 - GENERAL VIEW OF SOUTH PIER; NOTE VEGETATION
GROWTH ON ABUTMENT SLOPE PROTECTION
PHOTO #28 - ACTIVE WATER LEAKAGE AT EAST BEARING OF SOUTH
ABUTMENT; NOTE SOIL ACCUMULATION ON BEARING SEAT
PHOTO #29 - GAP BETWEEN SOUTH ABUTMENT BREASTWALL AND
SLOPE PROTECTION
PHOTO #30 - SPALLING AND EXPOSED WIRE AT SOUTH FACE OF WEST
COLUMN IN NORTH PIER
PHOTO #31 - SPALL WITH CRACK, BASE OF WEST COLUMN IN SOUTH
PIER
PHOTO #32 - SPALLING AND WATER STAINING ON UNDERSIDE OF BOX
GIRDER IN CENTER SPAN NEAR WEST COLUMN OF SOUTH PIER
File details come from the government source that posted it. Updated .