Amendment 0001 - PR ST ER PRMNT RPR(5).pdf
PDF 31 MB Posted
- Attached to
- Signs and Safety Repairs in Puerto Rico
- Solicitation number
- 693C73-20-B-000024
About this file
This solicitation seeks sealed bids from certified Small Business Concerns for signs and safety repairs in multiple municipalities in Puerto Rico. The work includes repairing signs and guardrails damaged by Hurricanes Irma and Maria on PR-52 and PR-53, as well as other miscellaneous work. Services include traffic sign assemblies, new guardrails, bridge transition upgrades, traffic sign and guardrail demolition and removal, temporary traffic control, and other miscellaneous work. The project will be split into multiple schedules with a total cost expected to exceed $10,000,000. Bids are due on a date specified in the solicitation to be issued on or around July 10, 2020. The pre-bid meeting date and location will also be specified in the solicitation. Questions should be directed to the Department of Transportation Federal Highway Administration at the provided email. Bidders must be registered in the System for Award Management database to be eligible for payment if awarded.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7320B000024 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
693C73
STERLING VA 20166-6511
21400 Ridgetop Circle
FHWA EASTERN FED LANDS DIVISION
Federal Highway Administration
693C73
STERLING VA 20166-6511
21400 RIDGETOP CIRCLE
FHWA EASTERN FED LANDS DIVISION
Federal Highway Administration
See Block 1408/04/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/10/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project PR ST ER PRMNT RPR(5):
The purpose of this Amendment is to:
1) Revise the Solicitation Bid Schedule (B Pages) to:
a) Replace the Cost Proposal Bid Schedules and Cost Proposal Summary to update quantities and the unit of measurement for various bid items, and add/remove bid items.
b) See B Pages Changes Summary_Amendment 1.pdf for details.
2) Revise the Special Contract Requirements (J Pages) as follows:
a) Section 104 to modify Drawings requirements.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 191
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
693C7320B000024/0001
b) Section 613 to modify and add requirements for traffic sign structures.
c) See SCR Changes_Amendment 1.pdf for details.
3) Revise the Plans as follows:
a) Schedule A (PR-52): Replace Sheets TS-2 through TS-11, TS-15 through TS-19, TS-22, TS-23, TS-31, TS-32, TS-42, TS-77, TS-104, TS-112, TS-123, TS-144, TS-145 through TS-150, TS-153, TS-155, TS-160, TS-162, TS-163, TS-165, TS-169, and TS-170.
b) Schedule B (PR-53): Replace Sheets TS-11, TS-13 and TS-21.
c) See Amended Plan Sheets_Schedule
A_PR-52_Amendment 1.pdf, Amended Plan
Sheets_Schedule B_PR-53_Amendment 1.pdf, and Plan
Sheet Changes Summary_Amendment 1.pdf for details.
4) Revise Standard Drawings as follows:
a) Replace Sheets GMTS-04, GMTS-05 and GMTS-06.
b) See Amended Plan Sheets_Standard
Drawings_Amendment 1.pdf and Plan Sheet Changes
Summary_Amendment 1.pdf for details.
5) Provide updated Lead and Asbestos Report for
PR-52.
6) Provide Negative Lead Results Certification for PR-52.
7) Provide Negative Asbestos Results
Certification for PR-52.
8) Provide Pre-Bid Meeting Minutes.
9) Provide a summary of responses to questions/clarifications asked by potential bidders.
10) Reschedule the Bid Opening date to August 13, 2020 at 2:00 p.m. EST.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment No. 0001
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001 Project PR ST ER PRMNT RPR(5)
Signs and Safety Repairs in PR-52 and PR-53 Solicitation: 693C73-20-B-000024
The purpose of this Amendment is to:
1) Revise the Solicitation Bid Schedule (B Pages) to:
a) Replace the Cost Proposal Bid Schedules and Cost Proposal Summary to update quantities and the unit of measurement for various bid items, and add/remove bid items.
b) See B Pages Changes Summary_Amendment 1.pdf for details.
2) Revise the Special Contract Requirements (J Pages) as follows:
a) Section 104 to modify Drawings requirements.
b) Section 613 to modify and add requirements for traffic sign structures.
c) See SCR Changes_Amendment 1.pdf for details.
3) Revise the Plans as follows:
a) Schedule A (PR-52): Replace Sheets TS-2 through TS-11, TS-15 through TS-19, TS-22, TS-23, TS-31, TS-32, TS-42, TS-77, TS-104, TS-112, TS-123, TS-144, TS-145 through TS-150, TS-153, TS-155, TS-160, TS-162, TS-163, TS-165, TS-169, and TS-170.
b) Schedule B (PR-53): Replace Sheets TS-11, TS-13 and TS-21.
c) See Amended Plan Sheets_Schedule A_PR-52_Amendment 1.pdf, Amended Plan
Sheets_Schedule B_PR-53_Amendment 1.pdf, and Plan Sheet Changes Summary_Amendment 1.pdf for details.
4) Revise Standard Drawings as follows:
a) Replace Sheets GMTS-04, GMTS-05 and GMTS-06.
b) See Amended Plan Sheets_Standard Drawings_Amendment 1.pdf and Plan Sheet
Changes Summary_Amendment 1.pdf for details.
5) Provide updated Lead and Asbestos Report for PR-52.
6) Provide Negative Lead Results Certification for PR-52.
7) Provide Negative Asbestos Results Certification for PR-52.
8) Provide Pre-Bid Meeting Minutes.
9) Provide a summary of responses to questions/clarifications asked by potential bidders.
Info Page 1 of 1
10) Reschedule the Bid Opening date to August 13, 2020 at 2:00 p.m. EST.
B-1
B I D S C H E D U L E Schedule A
Project No: PR ST ER PRMNT RPR(5)
Name: Signs and Safety Repairs in PR-52
Item No.
Quantity Unit Unit Price Amount
15001-0000
Line A0020 ALL LPSM $
15100-1000
Line A0040 ALL LPSM $
15102-0000
Line A0060 1 CTSM $ 550,000.00$
15401-0000
Line A0080 ALL LPSM $
15501-0000
Line A0100 ALL LPSM $
60600-1000
Line A0120 10,300 M $ $
60600-2000
Line A0140 1,400 M $ $
60600-4000
Line A0160 11,700 M $ $
60604-3000
Line A0180 11 Each $ $
61101-0000
Line A0200 22 mo $ $
61310-1000
Line A0220 45 SQFT $ $
61310-2000
Line A0240 5,000 SQFT $ $
61310-9000
Line A0260 1,080 SQFT $ $
61311-0000
Line A0280 870 SQFT $ $
61311-1000
Line A0300 75 SQFT $ $
61311-2000
Line A0320 5,500 SQFT $ $
61311-4000
Line A0340 465 SQFT $ $
61311-7000
Line A0360 1,720 SQFT $ $
61311-8000
Line A0380 190 SQFT $ $
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Construction Schedule
W-Beam Guardrail, Single Face
Traffic Sign Assembly, Code Y
Traffic Sign Assembly, Code K
Traffic Sign Assembly, Code O
Traffic Sign Assembly, Code P
W-Beam Guardrail, Double Face
Removal, Storage and Delivery of Existing Guardrail
Thrie-Beam Transition, Type I
Field Office
Traffic Sign Assembly, Code A
Traffic Sign Assembly, Code B
Traffic Sign Assembly, Code R
Traffic Sign Assembly, Code U
Traffic Sign Assembly, Code X
Schedule Total: _________________________
Submitted by: __________________________
Amendment No. 1
B-2
Schedule A
Project No: PR ST ER PRMNT RPR(5)
Name: Signs and Safety Repairs in PR-52
Item No.
Quantity Unit Unit Price Amount
61312-1000
Line A0400 600 SQFT $ $
61312-2000
Line A0420 4,000 SQFT $ $
62100-1000
Line A0440 117 Each $ $
62100-2000
Line A0460 635 Each $ $
62101-1000
Line A0480 210 Each $ $
63800-1000
Line A0500 ALL LPSM $
66100-1000
Line A0520 2 Each $ $
91001-3000
Line A0540 11 Each $ $
91300-5000
Line A0560 1,300 Each $ $
91300-6000
Line A0580 165 Each $ $
91300-7000
Line A0600 10 Each $ $
93101-1000
Line A0620 440 LNFT $ $
93101-2000
Line A0640 500 SQFT $ $
93501-0000
Line A0660 20 Each $ $
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Removal and Disposal of Lead Based Paint (Painted Concrete Barrier)
Locate Utility, Test Pit
Traffic Sign Assembly, Code GG
Traffic Sign Assembly, Code HH
Maintenance of Traffic
Project Funding Sign
Bridge Transition Upgrade
Removal of Existing Traffic Signs (Ground Mounted)
Removal of Existing Traffic Signs (Breakaway)
Removal of Existing Traffic Signs (Overhead)
Kilometer Marker
Hectometer Marker
Object Markers
Schedule B
Project No: PR ST ER PRMNT RPR(5)
Name: Signs and Safety Repairs in PR-53
Item No.
Quantity Unit Unit Price Amount
15001-0000
Line B0020 ALL LPSM $
15100-1000
Line B0040 ALL LPSM $
15102-0000
Line B0060 1 CTSM $ 250,000.00$
15401-0000
Line B0080 ALL LPSM $
15501-0000
Line B0100 ALL LPSM $
60600-1000
Line B0120 1,500 M $ $
60600-4000
Line B0140 1,350 M $ $
60604-3000
Line B0160 4 Each $ $
61310-1000
Line B0180 12 SQFT $ $
61310-2000
Line B0200 2,427 SQFT $ $
61310-3000
Line B0220 6 SQFT $ $
61310-4000
Line B0240 16 SQFT $ $
61310-9000
Line B0260 528 SQFT $ $
61311-0000
Line B0280 540 SQFT $ $
61311-1000
Line B0300 114 SQFT $ $
61311-2000
Line B0320 1,359 SQFT $ $
Schedule Total: _________________________
Submitted by: __________________________
Traffic Sign Assembly, Code R
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Construction Schedule
W-Beam Guardrail, Single Face
Traffic Sign Assembly, Code K
Traffic Sign Assembly, Code O
Traffic Sign Assembly, Code P
Removal, Storage and Delivery of Existing Guardrail
Thrie-Beam Transition, Type I
Traffic Sign Assembly, Code A
Traffic Sign Assembly, Code B
Traffic Sign Assembly, Code C
Traffic Sign Assembly, Code D
Amendment No. 1B-3
Schedule B
Project No: PR ST ER PRMNT RPR(5)
Name: Signs and Safety Repairs in PR-53
Item No.
Quantity Unit Unit Price Amount
61311-3000
Line B0340 276 SQFT $ $
61311-8000
Line B0360 9,969 SQFT $ $
62100-1000
Line B0380 75 Each $ $
62100-2000
Line B0400 340 Each $ $
62101-1000
Line B0420 135 Each $ $
63800-1000
Line B0440 ALL LPSM $
66100-1000
Line B0460 2 Each $ $
91001-3000
Line B0480 3 Each $ $
91001-4000
Line B0500 1 Each $ $
91300-5000
Line B0520 $
91300-6000
Line B0540 60 Each $ $
91300-7000
Line B0560 6 Each $ $
93501-0000
Line B0580 20 Each $ $
Removal of Existing Traffic Signs (Overhead)
Locate Utility, Test Pit
Maintenance of Traffic
Project Funding Sign
Bridge Transition Upgrade
Traffic Sign Assembly, Code S
Traffic Sign Assembly, Code Y
Kilometer Marker
Hectometer Marker
Object Markers
New Transition Module (More than 45mph)
Removal of Existing Traffic Signs (Ground Mounted)
535 Each $
Removal of Existing Traffic Signs (Breakaway)
Amendment No. 1B-4
B - 5
BID SUMMARY
Project PR ST ER PRMNT RPR(5)
(1) Schedule A (Base Contract) Bid Total (from Page B-1) = (1) $____________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-3) = (2) $____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) $____________________
Maximum Time Allowed for the Contract if Schedules A and B are Awarded at the Same Time
If the Government awards the contract as Schedules A + B, the performance period to complete all contract work will be 610 calendar days.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 530 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 460 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
B Pages Changes Summary Page 1 of 2
B Pages changes
1. Delete the Cost Proposal Bid Schedules and Cost Proposal Summary, pages B-1 through B- 5, and substitute the amended Cost Proposal Bid Schedules and Cost Proposal Summary, pages B-1 through B-5.
a) Revised the unit of measurement and bid quantities for the following Schedule A pay items:
1. Pay item 61310-1000 Traffic Sign Assembly, Code A
2. Pay item 61310-2000 Traffic Sign Assembly, Code B
3. Pay item 61310-9000 Traffic Sign Assembly, Code K
4. Pay item 61311-0000 Traffic Sign Assembly, Code O
5. Pay item 61311-1000 Traffic Sign Assembly, Code P
6. Pay item 61311-2000 Traffic Sign Assembly, Code R
7. Pay item 61311-4000 Traffic Sign Assembly, Code U
8. Pay item 61311-7000 Traffic Sign Assembly, Code X
9. Pay item 61311-8000 Traffic Sign Assembly, Code Y
10. Pay item 61311-9000 Traffic Sign Assembly, Code AA
11. Pay item 61312-1000 Traffic Sign Assembly, Code GG
12. Pay item 61312-2000 Traffic Sign Assembly, Code HH
b) Revised bid quantities for the following Schedule B pay items:
1. Pay item 61310-1000 Traffic Sign Assembly, Code A
2. Pay item 61310-2000 Traffic Sign Assembly, Code B
3. Pay item 61310-3000 Traffic Sign Assembly, Code C
4. Pay item 61310-4000 Traffic Sign Assembly, Code D
5. Pay item 61310-9000 Traffic Sign Assembly, Code K
B Pages Changes Summary Page 2 of 2
6. Pay item 61311-0000 Traffic Sign Assembly, Code O
7. Pay item 61311-1000 Traffic Sign Assembly, Code P
8. Pay item 61311-2000 Traffic Sign Assembly, Code R
9. Pay item 61311-3000 Traffic Sign Assembly, Code S
10. Pay item 61311-8000 Traffic Sign Assembly, Code Y
c) Added the following pay item for Schedule A:
1. Pay item 62101-1000 Object Markers
2. Pay item 91300-5000 Removal of Existing Traffic Signs (Ground Mounted)
3. Pay item 91300-6000 Removal of Existing Traffic Signs (Breakaway)
4. Pay item 91300-6000 Removal of Existing Traffic Signs (Overhead)
d) Added the following pay item for Schedule B:
1. Pay item 91300-5000 Removal of Existing Traffic Signs (Ground Mounted)
2. Pay item 91300-6000 Removal of Existing Traffic Signs (Breakaway)
3. Pay item 91300-6000 Removal of Existing Traffic Signs (Overhead)
e) Deleted the following pay items for Schedule A:
1. Pay item 61312-3000 Other Signs
2. Pay item 91300-4000 Removal of Existing Traffic Signs
f) Deleted the following pay items for Schedule B:
1. Pay item 91300-4000 Removal of Existing Traffic Signs
SCR changes 1 of 3
Special Contract Requirement (J Pages) changes
1. Delete the first sentence of Subsection 104.03(b)(2) of the SCR, page J-23, and substitute with the following:
Submit drawings that bear the seal and signature of a professional engineer proficient in the pertinent design field and licensed in the state where the project will be constructed for the following:
2. Add the following to Subsection 104.03(b)(2) of the SCR, page J-24:
(o) Alternate ground mounted traffic signs details;
(p) Alternate Sign Bridge Connection details; and
(q) Overhead traffic signs structures.
3. Delete Subsection 613-1.01(a) of the SCR, page J-141, and substitute with the following:
(a) This work consists of furnishing and erecting traffic signs, including overhead sign structures, in accordance with these specifications and the Standard Drawings for Small Traffic Signs (STS), Ground Mounted Traffic Signs (GMTS), Sign Bridge Connections (SBC), and Overhead Traffic Signs (OHTS), and in conformity with the locations and details shown on the plans or as directed by the Engineer.
4. Add the following to Subsection 613-1.01(b) of the SCR, page J-141:
For signs and structures that exceed the span and dimension limits indicated in the standard drawings for GMTS, OHTS and SBC, the contractor shall provide an alternate design and shop drawings that meet the requirements of these specifications and the plans.
5. Add the following to Subsection 613-2.01 of the SCR, page J-142:
For signs that exceed the span and dimension limits indicated in the standard drawings for GMTS, OHTS, and SBC, the contractor shall provide an alternate design for approval at least 90 days before starting construction. The submittal shall include design calculations and a list of proposed materials, including anchor bolts, before submitting shop drawings. Computer-generated design parameters and calculations are acceptable only when accompanied by the appropriate supporting documentation. Once the alternate design is approved, the contractor shall submit shop drawings in accordance with Subsection 104.03.
6. Delete the first sentence of Subsection 613-2.02 of the SCR, page J-142, and substitute with the following:
Conform to Standard Drawing GMTS-02 for sign panel materials specifications for all sign panels except for Kilometer and Hectometer Marker signs and Small Traffic Signs (STS).
SCR changes 2 of 3
7. Add the following to Subsection 613-2.02 of the SCR, page J-142:
For Small Traffic Signs, the following replaces the Sign Plate Thickness Table of Standard Drawings (STS–7). The panels shall be 0.080 inches thick for signs with area less or equal than 10.8 square feet. For signs with area greater than 10.8 square feet, panels shall be 0.125 inches thick. The use of panels of 0.0625 inches thick will not be permitted.
8. Delete the first sentence of Subsection 613-2.06 of the SCR, page J-144, and substitute with the following:
Furnish sign supports meeting Standard Drawing GMTS-02 criteria, except for signs considered part of Small Traffic Sign covered by STS Standard Drawings. Refer to Subsection 613-2.06(a) for information regarding the sign posts to use for Small Traffic Signs.
9. Add the following after Subsection 613-2.02 of the SCR, page J-144:
613-2.06(a) Small Traffic Signs Posts. All Small Traffic Signs are to be mounted on steel u-channel or square posts with a minimum weight of 3 lbs/foot that conforms to the material requirements of Standard Drawing STS-1.
10. Add the following to the first paragraph of Subsection 613-2.08 of the SCR, page J-144:
On Standard Structures Types, the Contractor shall shorten the arm or span to fit the site condition.
11. Delete the first sentence of Subsection 613-2.08(a) of the SCR, page J-144, and substitute with the following:
At least 90 days before any construction or foundation work begins, submit all required information for evaluation in conformance to Section 104.03 and the following
12. Add the following to Subsection 613-3.04 of the SCR, page J-148:
(g) Small Traffic Signs Construction. Construct Small Traffic Signs according to STS Standard drawings except for the following:
(1) Small Signs with 30” of width or smaller shall be mounted on one (1) post that conforms to 613-2.06(a). Small signs wider than 30” but less than twenty-one (21) square feet in area shall be mounted on two posts that conform to 613-2.06(a). All other signs with area equal or larger than twenty (21) square feet shall be mounted on break-away posts according to GMTS Standard Drawings.
(2) The “Route Marker" signs with a size of 48” x 48” shall be installed only on expressways.
SCR changes 3 of 3
(3) Small traffic signs code R1-1, R1-2 and R6-1 (left or right) shall be mounted on a single post that conforms to 613-2.06(a)
(4) Details for “Typical Route Marker Assembly for one 24” X 24” Route Marker With or Without Auxiliary Plates” on Standard Drawing STS 22A shall also apply for 36” X 24” route markers. For this detail one post that conforms to 613-2.06(a) shall be used.
(5) Details for “Typical Route Marker Assembly for two 24” X 24” Route Markers With or Without Auxiliary Plates” on Standard Drawing STS 22A shall also apply for 36” X 24” route markers. For this detail two posts that conform to 613-2.06(a) shall be used.
(6) Details for “Typical Toll Ways Route Marker Assembly for one 24” X 24” Route Marker With or Without Auxiliary Plates” on Standard Drawing STS 22A shall also apply for 36” X 24” route markers. For this detail two posts that conform to 613- 2.06(a)shall be used.
R
G a a n s
G a n s
YABUCOA
BR-2525
40.5
40.6
40.7
40.8
40.9
41.0
41.1
41.2
41.3
41.4
41.5
41.6
41.7
41.8
41.9
42.0
42.1
40.5
40.6
40.7
40.8
40.9
41.0
41.1
41.2
41.3
41.4
41.5
41.6
41.7
41.8
41.9
42.0
42.1
Q u e b r a d a
L a j a
PR-53 PROJECT PARTIAL ENDS
PR-53 KM. 43.76
CONTINUED ON PR-53 KM 49.50
AC-804541
C d e
S n t i a g
C d e n t i a g
Z a n j a
B a r r a
Z a n j a
B a r r a
YABUCOA
B R
-2
42.2
42.3
42.4
42.5
42.6
42.7
42.8
42.9
43.0
43.1
43.2
43.3
43.4
43.5
43.6
42.2
42.3
42.4
42.5
42.6
42.7
42.8
42.9
43.0
43.1
43.2
43.3
43.4
43.5
43.6
1509 F.D. Roosevelt Ave.
Guaynabo, Puerto Rico 00968-2612
Tel: 787-792-1509 E-mail: cma@cmapr.com www.cmapr.com
A R C H I T E C T S &
E N G I N E E R S LLC
MATCHLINE B-B
SEE THIS DWG
M A
T C
H L I N
E
B
B
S E
E
T
H I
D
W G
LEGEND:
M
A
T
C
H
L
I N
E
A
A
K
M
M A
T C
H L I N
E
T
S
M
A
T
C
H
L I N
E
1509 F.D. Roosevelt Ave.
Guaynabo, Puerto Rico 00968-2612
Tel: 787-792-1509 E-mail: cma@cmapr.com www.cmapr.com
A R C H I T E C T S &
E N G I N E E R S LLC
NEW SIGN DATA (SPEC 613)
CODE
NUMBER
LOCATION
NUMBER
LEGEND
TOTAL
ITEM
SIGN
CODE
REFERENCE
MANUAL
OVERHEAD
STRUCTURE
TYPE
SIZE OF
SIGN
PANEL
SEE
GUIDE
SIGN
18N/A
48"x48"
36"x36"
CODE
NUMBER
LOCATION
NUMBER
LEGEND
TOTAL
ITEM
REFERENCE
MANUAL
OVERHEAD
STRUCTURE
TYPE
SIZE OF
SIGN
PANEL
260"x72"
SEE STD.
DWG. GMTS
E5-1A
260"x72"
SEE STD.
DWG. GMTS
E5-1A
160"x72"
SEE STD.
DWG. GMTS
E5-1A
260"x72"
SEE STD.
DWG. GMTS
E5-1A
260"x72"
SEE STD.
DWG. GMTS
E5-1A
W17-1 N/A
SEE STD.
DWG. WS
48"x48" 2
5,30,41,74,97,134, 143,172,225,250, 272,315,319,383, 396,434,465,489
13,22
57,60
113,(121*)
151,160
39,76
10,109,149,174, 230,281,336,356, 410,434,481
OM-3(R)
12"x36" N/A
SEE D.T.P.W.
MANUAL
R2-1
R2-2
20N/A
SEE D.T.P.W.
MANUAL
48"x60"
48"X48"
W4-1 19N/A48"x48"
48" X 60"
N/AR16-1
42" X 24"
2248"x60" N/AR8-4
SEE D.T.P.W.
MANUAL
11N/A
48"x48"
48"x24"
SUR
M3-3
M1-6A
20W13-2 N/A
SEE D.T.P.W.
MANUAL
36"x48"12R3-4 36"x36" N/A
SEE D.T.P.W.
MANUAL
R4-3 22N/A
SEE D.T.P.W.
MANUAL
48"x60"
11N/A
48"x48"
48"x24"
NORTE
M3-1
M1-6A
9,26,48,67,108,126, 147,164,173,229, 246,277,296,310, 333,342,348,373, 400,432
6,29,42,73,105, 133,144,166,168, 226,249,274,314, 320,347,350,382, 397,425,429,453, 25,49,61,125,161, 245,301,339,368, 421,442
7,28,45,72,106, 132,145,167,169, 227,248,275,313, 328,346,351,378, 398,424,430,447, 85,86,182,184, 278,279,316,317, 384,385,463,466
8,27,47,71,107, 131,146,165,171, 228,247,276,312, 331,344,352,374, 399,423,431,446, 16,18,33,35,53,66,68,36, 51,79,81,89,90,91,100, 103,115,117,129,137, 139,151,192,193,194, 196,198,200,202,204, 206,208,210,212,221, 223,237,238,253,256, 260,263,268,269,286, 282,293,294,305,307, 323,327,360,363,377, 380,389,390,402,406, 413,414,437,438,439, 449,452,455,459,472, 474, 14,21,58,59,112, 120,152,158,177, 234,241,287,300, 337,338,357,367, 411,416
12,23,62,95,111, 123,150,162,176, 232,243,289,298, 325,343,354,362, 371,405,418
36"x36"x36"R1-2 1N/A
SEE D.T.P.W.
MANUAL
1R1-1 N/A
SEE D.T.P.W.
MANUAL
30"x30"20
SEE GUIDE SIGN
DETAILS
SEE GUIDE SIGN
DETAILS
W4-2 N/A
SEE
M.U.T.C.D.
36"x36" 16
NOTE:
(*) SIGNS NOT INCLUDED AS PART OF DDIR.
PAY
ITEM
CODE
B
B
B
B
B
B
R
K
K
SIGN
CODE
PAY
ITEM
CODE
B
A
B
B
R
O
O
O
O
O
PAY ITEM CODE TABLE
PAY
ITEM
CODE
DESCRIPTION:
A GROUND MOUNTED SIGNS WITH AREA(A) LESS THAN TWENTY-ONE SQUARE FEET (A< 21SQFT) AND WIDTH(W) EQUAL OR LESS THAN THIRTY INCHES (W<30"). THE TOTAL AREA INCLUDES AUXILIARY PLATES.
B GROUND MOUNTED SIGNS WITH AREA LESS THAN TWENTY-ONE SQUARE FEET (A< 21SQFT) AND WIDTH GREATER
THAN THIRTY INCHES (W>30"). THE TOTAL AREA INCLUDES AUXILIARY PLATES.
C GROUND MOUNTED ROUTE MARKERS WITH OR WITHOUT AUXILIARY PLATES - 1 MARKER - 24"X24" OR 36"X24"
D GROUND MOUNTED ROUTE MARKERS WITH OR WITHOUT AUXILIARY PLATES - 2 MARKERS - 24"X24" OR 36"X24"
E GROUND MOUNTED ROUTE MARKERS WITH OR WITHOUT AUXILIARY PLATES - 3 MARKERS - 24"X24" OR 36"X24"
F GROUND MOUNTED ROUTE MARKERS WITH OR WITHOUT AUXILIARY PLATES - 4 MARKERS - 24"X24" OR 36"X24"
G GROUND MOUNTED ROUTE MARKERS WITH OR WITHOUT AUXILIARY PLATES - 1 MARKER - 36"X36" OR 48"X36"
H GROUND MOUNTED ROUTE MARKERS WITH OR WITHOUT AUXILIARY PLATES - 2 MARKERS - 36"X36" OR 48"X36"
I GROUND MOUNTED ROUTE MARKERS WITH OR WITHOUT AUXILIARY PLATES - 3 MARKERS - 36"X36" OR 48"X36"
J GROUND MOUNTED ROUTE MARKERS WITH OR WITHOUT AUXILIARY PLATES - 4 MARKERS - 36"X36" OR 48"X36"
K GROUND MOUNTED ROUTE MARKERS WITH OR WITHOUT AUXILIARY PLATES - 1 MARKER - 48"X48"
L GROUND MOUNTED ROUTE MARKERS WITH OR WITHOUT AUXILIARY PLATES - 2 MARKERS - 48"X48"
M GROUND MOUNTED ROUTE MARKERS WITH OR WITHOUT AUXILIARY PLATES - 3 MARKERS - 48"X48"
N GROUND MOUNTED ROUTE MARKERS WITH OR WITHOUT AUXILIARY PLATES - 4 MARKERS - 48"X48"
O GROUND MOUNTED EXIT GORE SIGNS - NONE, ONE AND TWO DIGITS-0, 1 AND 2 DIGITS
P GROUND MOUNTED EXIT GORE SIGNS-THREE DIGITS-3 DIGITS
Q GROUND MOUNTED EXIT GORE SIGNS-FOUR DIGITS-4 DIGITS
R GROUND MOUNTED SIGNS WITH AREA(A) EQUAL OR MORE THAN TWENTY-ONE SQUARE FEET (A > 21 SQFT).
THE TOTAL AREA INCLUDES AUXILIARY PLATES.
S BRIDGE MOUNTED
T INSTALLATION IN EXISTING GROUND MOUNTED STRUCTURE A<21 SQFT.THE TOTAL AREA INCLUDE AUXILIARY PLATES.
U INSTALLATION IN EXISTING GROUND MOUNTED STRUCTURE A>21 SQFT.THE TOTAL AREA INCLUDE AUXILIARY PLATES.
V OVERHEAD SIGNS - NEW STRUCTURE TYPE I-A
W OVERHEAD SIGNS - NEW STRUCTURE TYPE I-B
X OVERHEAD SIGNS - NEW STRUCTURE TYPE I-C
Y OVERHEAD SIGNS - NEW STRUCTURE TYPE I-D
Z OVERHEAD SIGNS - NEW STRUCTURE TYPE II-A
AA OVERHEAD SIGNS - NEW STRUCTURE TYPE II-B
BB OVERHEAD SIGNS - NEW STRUCTURE TYPE III-A
CC OVERHEAD SIGNS - NEW STRUCTURE TYPE III-B
DD OVERHEAD SIGNS - NEW STRUCTURE TYPE III-C
EE OVERHEAD SIGNS - NEW STRUCTURE TYPE III-D
FF OVERHEAD SIGNS - NEW STRUCTURE TYPE III-E
GG OVERHEAD SIGN - INSTALLATION IN EXISTING OVERHEAD STRUCTURE - SIGN AREA A < 144 SQFT
HH OVERHEAD SIGN - INSTALLATION IN EXISTING OVERHEAD STRUCTURE - SIGN AREA A > 144 SQFT
SEE STD.
DWG. STS
DWG. TS-22
SEE STD.
DWG. STS
DWG. TS-22
N/A
N/A
N/A
N/A
N/A
SEE
M.U.T.C.D.
1509 F.D. Roosevelt Ave.
Guaynabo, Puerto Rico 00968-2612
Tel: 787-792-1509 E-mail: cma@cmapr.com www.cmapr.com
A R C H I T E C T S &
E N G I N E E R S LLC
P U E R T O R I C O
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY
STANDARD DRAWING APPROVAL
RECOMMENDED BY:
HIGHWAY & TRANSPORTATION
AUTHORITY
APPROVED BY:DATE: DATE:
INTERIM STANDARD DRAWING
GMTS-04
POST SECTION SELECTION
TWO POST
FEBRUARY 2019
SIGN WIDTH (W)
S I G
N
H
E I G
H T
TYPICAL ELEVATION
N.T.S.
SIGN WIDTH (W)
S I G
N
H
E I G
GROUND MOUNTED TRAFFIC SIGNS
V E
R T
I C
A L
C
L E
A R
A N
C E
C L E
I G
H T
C L E
I G
H T
V E
R T
I C
A L
C
L E
A R
A N
C E
A/2
C
L
A/2 A/2
C
L
A/2
NOTES:
1. VERTICAL CLEARANCE TO BOTTOM OF LOWEST SIGN PANEL SHALL BE 2.13 (7'-0")
TO 2.30 (7'-6") FROM THE FINISHED GRADE OF THE NEAREST LANE EDGE.
2. CLEAR HEIGHT SHALL BE THE DISTANCE FROM THE BASE OF THE SIGN POST TO
THE BOTTOM OF LOWEST SIGN PANEL. IF CLEAR HEIGHT IS MORE THAN 12 FT.,
THE SIGN SHALL BE INSTALLED BEHIND W-BEAM GUARDRAIL OR ANY OTHER
SAFETY MEASURE SHOWN ON THE PLANS OR AS NOTED BY THE ENGINEER.
3. W-BEAM GUARDRAIL OR ANY OTHER SAFETY MEASURES SHALL BE ACCORDING
TO PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS.
4. THE CONTRACTOR SHALL USE THE NUMBER OF POSTS AND POST SIZE
TABULATED FOR A SIGN PANEL WIDTH AND FOR A SIGN PANEL HEIGHT (H)
EQUAL TO OR GREATER THAN THE ACTUAL SIGN PANEL LENGTH (L) AND SIGN
PANEL HEIGHT (H).
S
O T
E
S
T
E
S
T
E
S
T
E
TYPICAL ELEVATION
N.T.S.
TOP POST
TOP POST
STUB POST
STUB POST
INTERIOR SPACING (A) INTERIOR SPACING (A)
1 mts.
1 mts.
CLEAR HEIGHT = 8 FT
SIGN
HEIGHT (H)
(FT)
8 10
SIGN WIDTH (W)
(FT)
W6 x 12
W6 x 12
W8 x 18
12 14 16
W6 x 12
W8 x 18
W8 x 18
W8 x 24
W6 x 12 W6 x 12 W6 x 12 W6 x 12
W6 x 12
W8 x 24
W8 x 24
W8 x 18
W8 x 18
W8 x 18
W6 x 12
W8 x 18
W8 x 18
W8 x 24
W8 x 24
W10 x 33 W10 x 33
W10 x 33 W10 x 33
W10 x 33
W8 x 18
W8 x 18
W8 x 18
W8 x 24 W8 x 24
W8 x 24
W8 x 18
W8 x 18
CLEAR HEIGHT = 10 FT
SIGN
HEIGHT (H)
(FT)
8 10
SIGN WIDTH (W)
(FT)
W6 x 12
W8 x 18
12 14 16
W6 x 12
W8 x 18
W8 x 24
W6 x 12 W6 x 12 W6 x 12 W6 x 12
W6 x 12
W8 x 24
W8 x 18
W8 x 18 W8 x 18
W8 x 18
W8 x 24
W8 x 24
W10 x 33 W10 x 33
W10 x 33 W10 x 33
W10 x 33
W8 x 18
W8 x 18
W8 x 24
W8 x 24
W8 x 18
W8 x 18
W8 x 18
W8 x 24
W8 x 24
W10 x 33
W8 x 18
W8 x 24
W10 x 33
CLEAR HEIGHT = 12 FT
SIGN
HEIGHT (H)
(FT)
8 10
SIGN WIDTH (W)
(FT)
W6 x 12
W8 x 18
12 14 16
W6 x 12
W8 x 18
W8 x 24
W6 x 12 W6 x 12
W8 x 24
W8 x 18
W8 x 18 W8 x 18
W8 x 24
W10 x 33 W10 x 33
W10 x 33 W10 x 33
W8 x 18
W8 x 24
W8 x 18
W8 x 18
W8 x 24
W8 x 24
W10 x 33
W8 x 18
W8 x 24
W10 x 33
W8 x 18
W8 x 24
W8 x 18
W8 x 18
W8 x 24
W10 x 33
W8 x 24
W10 x 33
CLEAR HEIGHT = 14 FT
SIGN
HEIGHT (H)
(FT)
8 10
SIGN WIDTH (W)
(FT)
W8 x 18
12 14 16
W6 x 12
W8 x 24
W6 x 12
W8 x 18
W8 x 18
W8 x 18
W10 x 33
W10 x 33
W10 x 33 W10 x 33
W10 x 33
W8 x 18
W8 x 18
W8 x 24 W8 x 24
W8 x 24
W8 x 18
W8 x 18
W8 x 18
W8 x 24
W10 x 33
W8 x 18
W8 x 24
W8 x 24
W10 x 33
W10 x 33
W10 x 33
W10 x 33
W8 x 24
W8 x 24
W10 x 33
SIGN
WIDTH (W)
(FT)
8.00
9.00
10.00
11.00
12.00
13.00
14.00
INTERIOR
SPACING "A"
(FT)
POST SPACING
15.00
16.00
7.00
7.00
7.00
7.00
7.00
7.54
8.12
8.70
9.28
Victor.Carreras Text Box Amendment No. 1
Victor.Carreras Text Box Amendment 1 changes:
- The first column's header in the Post Spacing table was adjusted to reflect that these measurements are for the Width of the sign.
75 COVER
D E
P T
H
S
B
L
D E
P T
H
S
B
ELEVATION VIEW PRECAST
(STUB POST SHALL BE CAST
WITH PRECAST FOUNDATION)
N.TS
TOP VIEW
CAST IN PLACE AND PRECAST
N.TS.
L A
P
S
P L I C
E
M
I N
NOTES:
1. DRILLED SHAFTS SHALL BE CAST IN PLACE. THE CONCRETE SHALL BE POURED
AGAINST UNDISTURBED SOIL.
2. THE CONTRACTOR MAY ELECT TO CONSTRUCT A SPREAD FOOTING OR DRILLED
SHAFT FOOTING PROVIDED THEY DO NOT CONFLICT WITH UNDERGROUND
OBSTRUCTIONS, MAINTENANCE OF TRAFFIC CONSIDERATIONS, ROCK LAYER OR
ANY OTHER SITE CONSTRAINTS. IF SITE CONSTRAINTS PREVENT THE USE OF A
TYPE OF FOOTING, THE CONTRACTOR SHALL DESIGN AND CONSTRUCT A
MODIFIED FOOTING SUITABLE TO THE SITE SUBJECT TO THE APPROVAL OF THE
AUTHORITY.
DESIGN REFERENCES:
1. AASHTO - LRFD SPECIFICATIONS FOR STRUCTURAL SUPPORTS FOR HIGHWAY
SIGNS, LUMINAIRES, AND TRAFFIC SIGNALS - FIRST EDITION 2015, INTERIMS 2017
AND 2018, OR LATER DRAFTS OF SAID SPECIFICATION.
2. LRFD BRIDGE DESIGN SPECIFICATIONS - SEVENTH EDITION, 2014.
DESIGN PARAMETERS:
1. WIND SPEED - 125 M.P.H.
2. ALLOWABLE BEARING PRESSURE 2000 P.S.F.
3. INTERNAL FRICTION ANGLE Ø - 25°
4. SPT N
VALUE = 10
MATERIALS:
1. CONCRETE TYPE I CLASS A-4, PRHTA STANDARD SPECIFICATION 601.
2. STEEL: REINFORCING STEEL AASHTO M31 (ASTM A615) GRADE 60,
PRHTA STANDARD SPECIFICATION 601
CONCRETE COVER:
1. FOOTING BOTTOM 0.075
2. DRILLED SHAFT TOP 0.075
BOTTOM & SIDES 0.075
3. PEDESTAL TOP 0.05
SIDES 0.075
MISCELLANEOUS:
1. ALL EXPOSED CONCRETE CORNERS SHALL BE CHAMFERED 0.025 WHETHER OR
NOT SUCH CHAMFERS ARE SHOWN ON THE PLAN DETAILS.
2. SPLICES ON LONGITUDINAL DRILLED SHAFT REINFORCEMENT IS NOT
PERMITTED.
3. FOR DRILLED SHAFTS WITH 0.9M DIAMETER, THE MAXIMUM ALLOWED DIAMETER
OF COLUMN POST IS 0.45M (18 INCHES).
STUB POST
FINISHED GRADE
CONCRETE CAST AGAINST
UNDISTURBED SOIL
VERTICAL
REINFORCEMENT
(SEE TABLE 4)
S T
U B
P
S
T
L E
N G
B
FINISHED GRADE
VERTICAL
REINFORCEMENT
(SEE TABLE 4)
SATURATED CLEAN SAND
WITH LESS THAN 5%
PASSING THE #200 SIEVE
BACKFILL AGAINST
UNDISTURBED SOIL.
BARS #4 @ 100 PITCH
(SPIRAL)
CLASS A-4
CONCRETE
S T
U
N G
B
VERTICAL REINFORCEMENT
(SEE TABLE 1)
STUB POST
BARS #4 @ 100 PITCH. THREE
FLAT TURNS TOP AND ONE FLAT
TURN BOTTOM.
D I A
M E
T E
R
S
B
DRILLED SHAFTS
POST
SECTION
DIAMETER DEPTH
VERTICAL REINFORCEMENT STUB LENGTH
M M
AMOUNT SIZE
W 6X12
W 8X18 0.60 2.60 10 #6 1.30
W 8X24 0.60 2.90 10 #6 1.30
W 10X33 0.75 3.25 12 #8 1.30
W 12X45 0.75 4.00 12 #8 1.60
M
STUB POST
ELEVATION VIEW CAST IN PLACE
N.TS
BARS #4 @ 100 PITCH
(SPIRAL)
CLASS A-4
CONCRETE
0.45 2.30 8 #5 1.05
TABLE 1
P U E R T O R I C O
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY
STANDARD DRAWING APPROVAL
RECOMMENDED BY:
HIGHWAY & TRANSPORTATION
AUTHORITY
APPROVED BY:DATE: DATE:
INTERIM STANDARD DRAWING
GMTS-05
FOUNDATIONS
DRILLED SHAFTS
FEBRUARY 2019
GROUND MOUNTED TRAFFIC SIGNS
Victor.Carreras Text Box Amendment No. 1
Victor.Carreras Text Box Amendment 1 changes:
- The Wind Speed Design Parameter was adjusted to 125 M.P.H.
(TYP.)
C POST & SIGN
L
B
W
#3 @ 0.10 (TYP.)
W
T
#3 @ 0.10
T
PEDESTAL
A
PEDESTAL VERTICAL REINFORCEMENT 16 # 5
NOTE:
FOOTING TO BE PLACED
WITH LONGEST SIDE
PARALLEL TO ROADWAY.
PLAN
N.T.S.
TYPICAL PEDESTAL SECTION
N.T.S.
PEDESTAL VERTICAL REINF.
TRANSVERSAL REINFORCEMENT, TOP
(SEE TABLE 2)
LONGITUDINAL REINFORCEMENT, TOP
(SEE TABLE 2)
LONGITUDINAL
REINFORCEMENT, TOP
(SEE TABLE 5)
SECTION 1-1
N.T.S.
C
A
L
C POST & SIGN
STUB POST
FINSHED GRADE
LONGITUDINAL
REINFORCEMENT, TOP
(SEE TABLE 2)
LONGITUDINAL
REINFORCEMENT,
BOTTOM (SEE TABLE 2)
SECTION 2-2
N.T.S.
H
SPREAD FOOTINGS
POST
SECTION
PEDESTAL
DIMENSIONS
VERTICAL
REINFORCEMENT
FOOTING
DIMENSIONS
LONGITUDINAL
REINFORCEMENT
TRANSVERSAL
REINFORCEMENT
T W
QTY.
SIZE
A B C TOP BOTTOM TOP BOTTOM
M
M
M M M
QTY. SIZE QTY. SIZE
SPACING SIZE SPACING SIZE
W 6X12
W 8X18 0.60 0.60 16 #5 1.20 2.65 0.60 5 #4 7 #6 0.3 M #5 0.3 M #5
W 8X24 0.60 0.60 16 #5 1.20 3.10 0.60 5 #4 7 #6 0.3 M #5 0.3 M #5
DESIGN REFERENCES:
1. AASHTO - LRFD SPECIFICATIONS FOR STRUCTURAL SUPPORTS FOR HIGHWAY
SIGNS, LUMINAIRES, AND TRAFFIC SIGNALS - FIRST EDITION 2015, INTERIMS 2017
AND 2018, OR LATER DRAFTS OF SAID SPECIFICATION.
2. LRFD BRIDGE DESIGN SPECIFICATIONS - SEVENTH EDITION, 2014.
DESIGN PARAMETERS:
1. WIND SPEED - 125 M.P.H.
2. ALLOWABLE BEARING PRESSURE 2000 P.S.F.
3. INTERNAL FRICTION ANGLE Ø - 25°
4. SPT N
VALUE = 10
MATERIALS:
1. CONCRETE TYPE I CLASS A-4, PRHTA STANDARD SPECIFICATION 601.
2. STEEL: REINFORCING STEEL AASHTO M31 (ASTM A615) GRADE 60,
PRHTA STANDARD SPECIFICATION 601
CONCRETE COVER:
1. FOOTING: BOTT. 0.075
TOP & SIDES 0.075
2. PEDESTAL: TOP & SIDES 0.075
MISCELLANEOUS:
1. ALL EXPOSED CONCRETE CORNERS SHALL BE CHAMFERED 0.025 WHETHER OR NOT
SUCH CHAMFERS ARE SHOWN ON THE PLAN DETAILS.
2. PRIOR TO ERECTION OF THE POST, THE BACKFILL MATERIAL SHALL BE IN PLACE.
NOTES:
1. THE CONTRACTOR MAY ELECT TO CONSTRUCT A SPREAD FOOTING OR DRILLED
SHAFT FOOTING PROVIDED THEY DO NOT CONFLICT WITH UNDERGROUND
OBSTRUCTIONS, MAINTENANCE OF TRAFFIC CONSIDERATIONS, ROCK LAYER OR ANY
OTHER SITE CONSTRAINTS. IF SITE CONSTRAINTS PREVENT THE USE OF A TYPE OF
FOOTING, THE CONTRACTOR SHALL DESIGN AND CONSTRUCT A MODIFIED FOOTING
SUITABLE TO THE SITE SUBJECT TO THE APPROVAL OF THE AUTHORITY.
W 10X33 0.60 0.60 16 #5 1.20 3.75 0.75 n/a
W 12X45 0.60 0.60 16 #5 1.50 4.25 0.75
H
M
0.60
0.60
0.75
0.75 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
TRANSVERSAL REINFORCEMENT,
BOTTOM (SEE TABLE 2)
C
0.60 0.60 16 #5 0.90 2.10 0.60 4 #4 6 #6 0.3 M #4 0.3 M #40.60
TABLE 2
P U E R T O R I C O
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY
STANDARD DRAWING APPROVAL
RECOMMENDED BY:
HIGHWAY & TRANSPORTATION
AUTHORITY
APPROVED BY:DATE: DATE:
INTERIM STANDARD DRAWING
GMTS-06
FOUNDATIONS
SPREAD FOOTINGS
FEBRUARY 2019
GROUND MOUNTED TRAFFIC SIGNS
Victor.Carreras Text Box Amendment No. 1
Victor.Carreras Text Box Amendment 1 changes:
- The Wind Speed Design Parameter was adjusted to 125 M.P.H.
- Removed Spread Footing information for W10 and W12 in Table 2. Only drilled shafts can be used for the foundations of W10 and W12 posts. Refer to GMTS-05 Standard Drawing.
Victor.Carreras Line
Victor.Carreras Line
Plan Sheet changes 1 of 4
Plan Sheet changes
Standard Drawings
1. Delete Standard Drawing Sheets GMTS-04, GMTS-05 and GMTS-06, and substitute the amended Standard Drawing Sheets GMTS-04, GMTS-05 and GMTS-06.
a) Sheet GMTS-04 updated to revise the first column header of the Post Spacing Table.
b) Sheet GMTS-04 updated to revise the Wind Speed Design Parameter.
c) Sheet GMTS-06 updated to revise the Wind Speed Design Parameter and remove the spread footing dimensions for W10 and W12 posts.
Schedule A (PR-52)
2. Delete Plan Sheets TS-2 through TS-11, TS-15 through TS-19, TS-22, TS-23, TS-31, TS-32, TS-42, TS-77, TS-104, TS-112, TS-123, TS-144, TS-145 through TS-150, TS-153, TS-155, TS-160, TS-162, TS-163, TS-165, and TS-169, and substitute the amended Plan Sheets TS-2 through TS-11, TS-15 through TS-19, TS-22, TS-23, TS-31, TS-32, TS-42, TS-77, TS-104, TS-112, TS-123, TS-144, TS-145 through TS-150, TS-153, TS-155, TS-160, TS-162, TS- 163, TS-165, and TS-169.
a) Sheet TS-2 updated to revise the location number of Sign Code Number 27 at Location Number 71. Sheet TS-2 was also updated to include Area Not Included in Contract.
b) Sheet TS-3 updated to remove Guardrail Damage Location Number 178. Sheet TS-
3 was also updated to include Area Not Included in Contract.
c) Sheet TS-4 updated to revise the location number of Sign Code Number 27 at Location Number 16. Sheet TS-4 was also updated to include Area Not Included in
d) Sheet TS-5 updated to remove Sign Code Number 27 at Location Numbers 103 and
109. Sheet TS-5 was also updated to remove Sign Code Number 15 at Location Numbers 105 and 106. Sheet TS-5 was also updated to include Area Not Included in Contract.
e) Sheet TS-6 updated to remove Sign Code Number 27 at Location Numbers 117 and
127. Sheet TS-6 was also updated to include Area Not Included in Contract.
f) Sheet TS-7 updated to remove Sign Code Number 27 at Location Numbers 139 and
141. Sheet TS-7 was also updated to include Area Not Included in Contract.
Plan Sheet changes 2 of 4
g) Sheet TS-8 updated to remove Guardrail Damage Location Numbers 204, 205, and
206. Sheet TS-8 was also updated to include Area Not Included in Contract.
h) Sheet TS-9 updated to remove Sign Code Number 27 at Location Numbers 144 and 1143. Sheet TS-9 was also updated to include Area Not Included in Contract.
i) Sheet TS-10 updated to remove Sign Code Number 27 at Location Numbers 151 and 1134. Sheet TS-10 was also updated to remove Sign Code Number 15 at Location Numbers 146 and 152. Sheet TS-10 was also updated to remove Guardrail Damage Location Number 167. Sheet TS-10 was also updated to include Area Not Included in Contract.
j) Sheet TS-11 updated to revise Sign Code Number 7 at Location Numbers 167 has been included in the Sign Data Table.
k) Sheet TS-15 updated to remove Guardrail Damage Location Number 210. Sheet TS-15 was also updated to remove Sign Code Number 27 at Location Numbers 187 and 1102. Sheet TS-15 was also updated to remove Sign Code Number 15 at Location Number 186. Sheet TS-15 was also updated to include Area Not Included
l) Sheet TS-16 updated to remove Sign Code Number 15 at Location Number 191.
Sheet TS-16 was also updated to include Area Not Included in Contract.
m) Sheet TS-17 updated to remove Sign Code Number 27 at Location Number 242 and
820. Sheet TS-17 was also updated to remove Sign Code Number 15 at Location Number 192. Sheet TS-17 was also updated to include Area Not Included in
n) Sheet TS-18 updated to remove Sign Code Number 27 at Location Numbers 255 and 810. Sheet TS-18 was also updated to remove Sign Code Number 15 at Location Number 182. Sheet TS-18 was also updated to remove Sign to be Removed Code Number R11 at Location Number 10. Sheet TS-18 was also updated to include Area Not Included in Contract.
o) Sheet TS-19 updated to remove Sign Code Number 27 at Location Numbers 267 and 210. Sheet TS-19 was also updated to remove Sign Code Numbers 19 at Location Number 918. Sheet TS-19 was also updated to include Area Not Included
p) Sheet TS-22 updated to remain Sign Code Number 26 at Location Number 279.
q) Sheet TS-23 updated to remove Sign Code Number 26 at Location Number 279.
Plan Sheet changes 3 of 4
r) Sheet TS-31 updated to remove duplicate Sign Code Number 11 at Location Number 1165.
s) Sheet TS-32 updated to remove Sign to be Removed Code Number R28 at Location
Number 20.
t) Sheet TS-42 updated to include Sign Code Number 22 at Location Number 1418.
u) Sheet TS-77 updated to revise Sign Code Number 11 at Location Number 988 has
v) Sheet TS-104 updated to revise Sign Code Number 1 at Location Number 516 has
w) Sheet TS-112 updated to revise Sign Code Number 4 at Location Number 1066 has
x) Sheet TS-123 updated to revise to Sign Code Number 1 at Location Number 1003 has been included in the Sign Data Table. Sheet TS-123 updated to also remove Sign Code Number 27 at Location Number 211. Sheet TS-123 updated to also include Sign Code Number 26 at Location Number 210.
y) Sheet TS-144 updated to revise to Sign Code Number 49 at Location Number 955 has been included in the Sign Data Table. Sheet TS-144 updated to revise to also Sign Code Number 49 at Location Number 955 has been included in the Sign Data Table. Sheet TS-144 updated to also revise location number for Sign Code Number 8 to Location Number 1624.
z) Sheet TS-145 updated to revise location number for Sign Code Number 13 to
Location Number 1638.
aa) Sheet TS-146 through TS-150 updated to revise the Sign Data Table information and sign details.
bb) Sheet TS-153 updated to revise Sign Detail for Sign Code Number 43 at Location
115 to show as a ground mounted sign.
cc) Sheet TS-155 updated to revise the Sign Detail for Sign Code Number 53.
dd) Sheet TS-160 updated to revise the Sign Detail for Sign Code Numbers 87 and 84.
ee) Sheet TS-162 updated to revise the Sign Detail for Sign Code Numbers 97.
ff) Sheet TS-163 updated to revise the Sign Detail for Sign Code Numbers 101.
gg) Sheet TS-165 updated to revise the Sign Detail for Sign Code Number 91.
Plan Sheet changes 4 of 4
hh) Sheet TS-169 updated to revise the Sign Detail for Sign Code Number 20.
ii) Sheet TS-170 updated to revise the Sign Details for Sign Code Numbers 10, 11and
109.
Schedule B (PR-53)
3. Delete Plan Sheets TS-11, TS-13 and TS-21, and substitute the amended Plan TS-11, TS-13 and TS-21.
a) Sheet TS-11 updated to correct the location and mounting type of Sign Code Number 71 at Location Number 426.
b) Sheet TS-13 updated to correct the Pay Item Code for Sign Code Number 2.
c) Sheet TS-21 updated to correct the Pay Item Code for Sign Code Number 2.
ENVIRONMENTAL SURVEY
FOR
LEAD BASED PAINT (LBP)
AND
ASBESTOS CONTAINING MATERIALS (ACM)
FOR
Prepared For:
Puerto Rico Highway & Transportation Authority
May 2020
Prepared By:
Analytical Environmental
Services International, Inc.
611 Monserrate Street
2nd Floor, Santurce, P.R. 00907
(787) 722-0220 / Fax (787) 724-5788
AC-830578- HURRICANE MARIA RECOVERY
EFFORTS- SIGNING AND GUARDRAILS
IMPROVEMENTS PROJECT AT PR-52 FROM SAN JUAN
TO PONCE AND PONCE TO SAN JUAN
Project Location: PR52 from San Juan to Ponce and Ponce to San Juan
LEAD
ADY PADAN, PH.D
TABLE OF CONTENTS
I. SUMMARY
1.0 INTRODUCTION
2.0 TESTING PROCEDURES
3.0 LEAD BASED PAINT TESTING METHODOLOGY
4.0 RESULTS
5.0 CONCLUSIONS
APPENDIX I - AESI Credentials
APPENDIX II - XRF Data
APPENDIX III - Selective Photos of LBP Components
ADY PADAN, PH.D 1
I. SUMMARY
A survey for Lead Based Painted (LBP) components was conducted by Analytical
Environmental Services International (AES International), Inc. on Road PR-52 for kilometers
7 to 38, 61 to 66, 77 to 95 and 106 to 112, San Juan to Ponce and Ponce to San Juan, Puerto
Rico.
The results of the areas investigated are presented herein. The investigation was conducted on 3/12, 3/14 & 5/12/2020 by Elme Rivera, an EQB/EPA certified lead risk assessor. The following components were found to be painted with LBP:
PR-52
Km 18.8 San Juan to Ponce
Guardrail, Right Metal Yellow 20 sq.ft
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow
Barrier Corner, Left Concrete Yellow 130 sq.ft
Barrier Corner, Left Concrete Yellow
Km 19.5 San Juan to Ponce
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow
Barrier Corner, Left Concrete Yellow 130 sq.ft
Barrier Corner, Left Concrete Yellow
Curb Concrete Yellow 18 sq.ft
Km 20.2 San Juan to Ponce
Guardrail, Right Metal Yellow 20 sq.ft
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow
Barrier Corner, Left Concrete Yellow 130 sq.ft
Barrier Corner, Left Concrete Yellow
Km 20.6 San Juan to Ponce
Barrier, Right Concrete Yellow 32 sq.ft
Km 21.2 San Juan to Ponce
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow
Barrier Corner, Left Concrete Yellow 130 sq.ft
Barrier Corner, Left Concrete Yellow
Barrier Corner, Left Concrete Yellow
Km 21.4 San Juan to Ponce
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow
Barrier Corner, Left Concrete Yellow 130 sq.ft
Barrier Corner, Left Concrete Yellow
Km 21.6 San Juan to Ponce
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow
Barrier Corner, Left Concrete Yellow 130 sq.ft
Barrier Corner, Left Concrete Yellow
Km 22.1 San Juan to Ponce
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow
Barrier Corner, Left Concrete Yellow 130 sq.ft
Barrier Corner, Left Concrete Yellow
Km 23.9 to 24.0 San Juan to Ponce
Guardrail, Right Metal Yellow 20 sq.ft
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow 60 sq.ft
**25.2 and 25.9 to 26.3 San Juan to Ponce, not painted
Km 27.3 to 27.8 San Juan to Ponce
Barrier Corner, Right Concrete Yellow
Barrier Corner, Left Concrete Yellow 130 sq.ft
Barrier Corner, Left Concrete Yellow
Km 28.5 to 28.7 San Juan to Ponce
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow 130 sq.ft
Barrier Corner, Left Concrete Yellow
Barrier Corner, Left Concrete Yellow
Km 31.4 to 31.5 San Juan to Ponce
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow
Barrier Corner, Left Concrete Yellow 160 sq.ft
Barrier Corner, Left Concrete Yellow
Guardrail, Right Metal Yellow 20 sq.ft
Guardrail, Right Metal Yellow 20 sq.ft
Guardrail, Left Metal Yellow 20 sq.ft
Guardrail, Left Metal Yellow 20 sq.ft
Km 33.2 to 33.4 San Juan to Ponce
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow
Barrier Corner, Left Concrete Yellow 160 sq.ft
Barrier Corner, Left Concrete Yellow
Guardrail, Right Metal Yellow 20 sq.ft
Guardrail, Left Metal Yellow 20 sq.ft
Km 34.7 San Juan to Ponce
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow
Barrier Corner, Left Concrete Yellow 130 sq.ft
Barrier Corner, Left Concrete Yellow
Km 35.2 San Juan to Ponce
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow 140 sq.ft
Km 35.4 San Juan to Ponce
Barrier Corner, Right Concrete Yellow 128 sq.ft
Barrier Corner, Left Concrete Yellow
Barrier Corner, Left Concrete Yellow
Guardrail, Right Metal Yellow 20 sq.ft
Guardrail, Left Metal Yellow 20 sq.ft
Km 36.1 to 36.2 San Juan to Ponce
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow 128 sq.ft
Barrier Corner, Left Concrete Yellow
Barrier Corner, Left Concrete Yellow
Guardrail, Right Metal Yellow 20 sq.ft
Guardrail, Left Metal Yellow 20 sq.ft
Km 36.5 to 36.6 San Juan to Ponce
Barrier Corner, Right Concrete Yellow
Barrier Corner, Right Concrete Yellow 128 sq.ft
Barrier Corner, Left Concrete Yellow
Barrier Corner, Left Concrete Yellow
Guardrail, Left Metal Yellow 20 sq.ft
Bridge Km 106.3 San Juan to Ponce
Barrier Corner, Right Concrete Yellow 32 sq.ft
Barrier Corner, Left Concrete Yellow 32 sq.ft
Bridge Km 106.6 San Juan to Ponce
Bridge Km 107 San Juan to Ponce, East
Barrier Corner, Right Concrete Yellow 96 sq.ft
Curb Concrete Yellow 10 sq.ft
Barrier Corner, Left Concrete Yellow 96 sq.ft
Bridge Km 107 San Juan to Ponce, West
Curb, Right West Concrete Yellow 10 sq.ft
Bridge Km 107.7 San Juan to Ponce, East
Curb, Right Concrete Yellow 6 sq.ft
Floor Line, Left Concrete Yellow
Bridge Km 107.9 to 108 San Juan to Ponce
Barrier Corner, Right Concrete Yellow 40 sq.ft
Bridge Km 108.2 San Juan to Ponce
Floor Line, Left Concrete Yellow 32 sq.ft
Km 108.2 Ponce to San Juan
Km 107.7 Ponce to San Juan
Curb, Right Concrete Yellow 8 sq.ft
Floor Line, Left Concrete Yellow
Barrier Corner, Left Concrete Yellow 40 sq.ft
Km 107 Ponce to San Juan, West
Barrier Corner, Right Concrete Yellow 96 sq.ft
Barrier Corner, Left Concrete Yellow 96 sq.ft
Km 107 Ponce to San Juan, East
Barrier Corner, Right Concrete Yellow 96 sq.ft
Curb, Right Concrete Yellow 8 sq.ft
Barrier Corner, Left Concrete Yellow 96 sq.ft
Km 106.6 Ponce to San Juan, West
Barrier Corner, Right Concrete Yellow 32 sq.ft
Curb, Right Concrete Yellow 4 sq.ft
Barrier Corner, Left Concrete Yellow 32 sq.ft
Km 106.3 Ponce to San Juan, East
**88.2, 87.8, 81.3, Ponce to San Juan, not painted
Bridge Km 36.6 Ponce to San Juan
Barrier Corner, Right (2) Concrete Yellow 60 sq.ft
Barrier Corner, Left (2) Concrete Yellow 60 sq.ft
Bridge Km 36.2 to 36.1 Ponce to San Juan
Floor Line, Left Concrete Yellow 120 ln.ft approx..
Bridge Km 35.5 to 35.4 Ponce to San Juan
Bridge Km 35.2 to 35.1 Ponce to San Juan
Bridge Km 34.7 Ponce to San Juan
Floor Line, Left Concrete Yellow 90 ln.ft approx..
Bridge Km 33.1 Ponce to San Juan
Km 31.4 to 31.1 Ponce to San Juan
Floor Line, Left Concrete Yellow 80 ln.ft
Guardrail, Right (2) Metal Yellow 16 sq.ft
Barrier Corner, Left (2) Concrete Yellow 60 sq.ft
Km 21.4 Exit Ponce to San Juan
Barrier Corner, Right Concrete Yellow
Curb, Right Concrete Yellow 140 sq.ft
Km 21.1 Ponce to San Juan
Barrier Corner, Right Concrete Yellow
Curb, Right Concrete Yellow 140 sq.ft
Km 20.9 Ponce to San Juan
Barrier Corner, Right Concrete Yellow
Curb, Right Concrete Yellow 140 sq.ft
Km 20.2 Exit Ponce to San Juan
Barrier Corner, Right Concrete Yellow
Curb, Right Concrete Yellow 140 sq.ft
Km 19.6 Exit Ponce to San Juan
Curb, Right Concrete Yellow 140 sq.ft
If remodeling/demolition activities will be conducted in the nearest future, it is mandatory to remove all LBP from the components to be affected by such activities.
1.0 INTRODUCTION
AES International performed an LBP survey on Road PR-52 for kilometers 7 to 38, 61 to 66, 77 to
95 and 106 to 112, San Juan to Ponce and Ponce to San Juan, Puerto Rico. The results of the areas investigated are presented herein.
The investigation was conducted on 3/12, 3/14 & 5/12/2020 by Elme Rivera, an EQB/EPA certified lead risk assessor. The credentials of AESI are attached in Appendix I. The survey, performed with an XRF instrument manufactured by Heuresis, Model Pb200i, was conducted using HUD protocol of 1997, revised in 2012.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .