VDOT_2016_RB_Specs.pdf

PDF 18 MB Posted

Attached to
City of Newport News Fort Eustis Blvd. Bridge - VA FLAP NPNWS 105(1)
Solicitation number
693C73-20-B-000009
Issued by

About this file

This document provides details for a federal contract opportunity to replace an existing bridge over the Lee Hall Reservoir in the City of Newport News, Virginia. The project involves replacing the 658-foot, 16-span prestressed concrete girder bridge with a 676-foot bridge containing nine prestressed concrete bulb-T spans on concrete pile bents. The proposed section will be 86 feet wide and contain five 12-foot travel lanes, two 10-foot shoulders, and a 4-foot median. Approach work includes roadway reconstruction, grading, drainage, paving and other miscellaneous work. The total project length is 0.56 miles and at least one lane of traffic in each direction must be maintained. The cost is expected to exceed $10 million. Sealed bids are due in February 2020 with the exact date and location to be specified upon bid document issuance around February 5, 2020. The Department of Transportation Federal Highway Administration is the agency overseeing this project.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .