This pre-solicitation notice seeks sealed bids for the City of Newport News Project VA FLAP NPNWS 105(1), solicitation number 693C73-20-B-000009. The project involves replacing the existing 658-foot, 16-span bridge over Lee Hall Reservoir with a 676-foot, 9-span bridge. Approach work includes reconstructing 0.56 miles of roadway, grading, drainage, subbase and paving. At least one lane in each direction must remain open during construction. The project cost is expected to exceed $10 million.
Bids are to be issued on or about February 5, 2020. Interested vendors must register at www.beta.sam.gov to receive email notifications or access bid documents, which will no longer be mailed. Required representations and certifications must be filled out online at www.beta.sam.gov. Subcontracting plans are required from businesses expecting over $700,000 in contracts or $1.5 million for construction, with legislated small business goals. Security screening is required for site access. Visitors must arrive at least one hour before scheduled bid openings.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 3 Pages
Form FHWA-201 (Rev. 11-67)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA- 121 for informal correspondence. MINUTE-MEMO
M:\PROJECTS\_ACCESS\VA\Projects\VA 23_VA FLAP NPNWS 105(1)\Techserv\Pavement\Correspondence\VA FLAP NPNWS 105(1) Prelim Pavement Memo Rev.doc
SUBJECT: Pavement Recommendation for VA FLAP NPNWS 105(1) VDOT No. 0105-121-R92 UPC No. 105624
TO MESSAGE/COMMENT FROM/DATE
V. Carreras- Calderon PS&E Project Manager
And:
C. Burnell Highway Design Manager
This memorandum discusses the findings and recommendations for VA FLAP NPNWS 105(1) – Fort Eustis Boulevard over Newport News Reservoir (Lee Hall Reservoir). The project site is in Newport News, Virginia. Virginia Department of Transportation No. 0105-121-R92, UPC No. 105624. The recommendations herein are based on a subsurface exploration performed in April and May 2017 and preliminary plans (30% submittal).
Executive Summary The replacement of Fort Eustis Bridge over Lee Hall Reservoir will require reconstruction of approximately 1425 linear feet of roadway. Three alternatives were considered for the reconstruction to include:
1. 10-inches Joint Reinforced Concrete Pavement (JRCP) over 6 inches of aggregate base.
2. 9-inches Continuously Reinforced Concrete Pavement (CRCP) over 6 inches of aggregate base
3. 10-inches Asphalt concrete over 12 inches of aggregate base The JRCP option is considered the best and lowest cost option to tie into the existing concrete pavement, and is therefore discussed and recommended herein.
Further details are outlined within the following sections.
Fort Eustis Boulevard (Route 105) Existing Conditions The focus of this project is the replacement of Fort Eustis Bridge over Lee Hall Reservoir, and reconstruction of the bridge approaches and associated ramps to and from Highway (Hwy) 60 to accommodate a grade raise of the bridge. The bridge will be raised to accommodate the planned raise of Lee Hall Reservoir pool elevation. The entire project consists of approximately 0.6 miles of roadway. The existing bridge is a 16-span structure, supported on reinforced concrete stub abutments and pre-stressed concrete piles. The existing bridge is approximately 79.5 feet wide and 657.5 feet long. Fort Eustis Boulevard is a divided, two-directional roadway with 8-foot wide shoulders and 12-foot wide travel lanes. West of the bridge, Route 105 consists of two eastbound (EB) lanes, two westbound (WB) lanes and Route 105 WB to Highway 60 NB ramp.
East of the bridge, Route 105 is comprised of two EB lanes and 2 WB lanes.
In support of design and construction efforts for the project, A/E contractor Johnson, Mirmiran and Thompson, Inc. (JMT) performed a detailed site investigation to include a subsurface exploration performed by subcontractor, Schnabel Engineering. The site exploration included ten structure borings (Borings 17BH-001 through -010) drilled on Fort Eustis Bridge to depths of 105 to 115 feet, and six pavement borings (17BH-P1 through -P6) drilled at the bridge approaches and associated ramps to a depth of 10 feet.
Based on the site investigation along Fort Eustis Boulevard, the existing
K. Ngozi- Bullock Pavement Engineer
Through:
S. O’Brien
Team Leader
11/30/2017
Page 2 of 3 Pages
M:\PROJECTS\_ACCESS\VA\Projects\VA 23_VA FLAP NPNWS 105(1)\Techserv\Pavement\Correspondence\VA FLAP NPNWS 105(1) Prelim
TO MESSAGE/COMMENT FROM/DATE
pavement structure is highly variable. Along the bridge deck, the pavement structure consists of 1.5 to 8.5 inches of asphalt over 4.75 to 8.5 inches of concrete for a total pavement section of 9 to 13.5 inches. The variable pavement sections are likely attributed to varying rehabilitation projects (asphalt overlay) and localized patching.
West of the bridge, approximately 758 linear feet of roadway will be reconstructed with a gradual grade raise of about 2.5 feet. The existing roadway surface consists of asphalt ranging from 1 to 3.6 inches over 4.8 to 8.25 inches of concrete. The composite pavement section is likely a product of past pavement rehabilitation projects in the form of asphalt overlays. Approximately 525 linear feet of the ramp to NB Hwy 60 will be reconstructed. The existing pavement section consists of 1 inch of asphalt over 8.5 inches of concrete. The 1-inch asphalt layer is likely an overlay performed as part of a pavement rehabilitation.
Approximately 500 feet of ramp from NB Hwy 60 to EB Route 105 will also be reconstructed. It’s current pavement structure consists of a 10-inch asphalt pavement section.
East of the bridge, approximately 667 linear feet of roadway will be reconstructed with a gradual grade raise of 3.5 feet. The existing roadway surface consists of 8.5 inches of concrete within the divided median and 2 inches of asphalt at the eastbound shoulder. Site photos and Google Earth indicate the existing roadway surface is concrete.
East and west of the bridge structure, the borings encountered fill materials immediately below the pavement section. The fill materials typically consisted of silty sand and sandy lean clay soils with varying amounts of gravel. Refer to the Subsurface Exploration Summary table and boring logs attached for further detail.
Site photographs show the existing asphalt pavement with reflective joint cracking, deterioration of crack filling/sealing, fatigue block cracking, longitudinal cracking between lanes, and rutting within the wheel paths.
Concrete pavement was observed with minor spalling, fatigue cracking. Site photographs obtained from the Schnabel investigation are attached.
Fort Eustis Boulevard (Route 105) Reconstruction Recommendations The reconstruction of Fort Eustis Boulevard will be performed in accordance with Virginia Department of Transportation (VDOT) guidelines and specifications and available traffic data. Pavement analysis was performed in accordance with VDOT’s Guidelines for 1993 AASHTO Pavement Design (published May 2000 and revised May 2003). Material specifications were obtained from VDOT 2007 Road and Bridge Specifications, the 2016 updated specifications and the 2017 supplement.
To support future traffic, we recommend a full depth concrete pavement section
Page 3 of 3 Pages
M:\PROJECTS\_ACCESS\VA\Projects\VA 23_VA FLAP NPNWS 105(1)\Techserv\Pavement\Correspondence\VA FLAP NPNWS 105(1) Prelim
TO MESSAGE/COMMENT FROM/DATE
to consist of joint reinforced concrete pavement (JRCP). Based on the planned traffic loading a 10-inch JRCP is recommended to support anticipated traffic in accordance with Table 1 below.
Table 1. Fort Eustis Blvd. – Rigid Pavement Options
Layer Minimum Thickness
(in) Comments
VDOT Road and Bridge
Specifications
Portland Cement Concrete Pavement
JRCP – max 30-foot joint spacing;
minimum percent of steel fabric reinforcement (Ps) of 0.034% concrete cross sectional area
Joint Material per Section 212;
Reinforcement per Section 223, VDOT Pavement Details 301.01-.05
Aggregate Base Course
Aggregate base (crushed stone)
Type I – 21B Section 208
JRCP pavement joints should be constructed at a maximum 30-foot spacing in accordance with VDOT Specifications Section 212. Steel reinforcement should be constructed in accordance with VDOT Pavement Details 301.01 through
301.05 attached, indicating longitudinal No. 2 gage wire spaced at 6 inches on centers and traverse No. 4 gage wire spaced at 12 inches on centers (6 x 12 – W5.5 x W4). The recommended JRCP pavement section will provide a design life of approximately 30 years.
Note that per VDOT specifications, aggregate base material, type I-21B shall be used in conjunction with longitudinal pavement drains (UD-4). Based on anticipated daily traffic greater than 20,000 ADT, a drainage layer should be considered and should consist of 6 inches or more of stabilized aggregate connected to a UD-4 edge drain as shown in the attached detail. The edge drain should daylight for positive drainage.
Appendix A:
Site Photographs Subsurface Exploration Plan Subsurface Exploration Summary Subsurface Exploration Logs
Appendix B:
VDOT Pavement and Edgedrain Details DARWin Pavement Design Results cc: Pavement (S. O’Brien), Highway Design (M. Toomer) w/ attachments
APPENDIX A
Site Photographs Subsurface Exploration Plan Subsurface Exploration Summary Subsurface Exploration Logs (select pages)
Appendix A1
Photograph 1 (above) – Fort Eustis Boulevard (Route 105), westbound showing deterioration of reflective joint cracks filling/seal, transverse cracks between lanes and rutting in wheel path.
Photograph 2 (below) –Route 105 eastbound showing reflective joint cracking, fatigue cracks, and rutting in wheel path.
Appendix A2
Photograph 3 (above) – Route 105 eastbound showing pavement conditions.
Photograph 4 (below) – Showing typical pavement core collected along Fort Eustis Boulevard.
VA
F
LA
P
NP
NW
S
5( 1)
VD
O T
-1
-R
UP
C
Le ge nd
Br id ge
B or in g
Lo ca tio n
Pa ve m en t B or in g
Lo ca tio ft N
N
G oo gle
G oo gle
G oo gle
Bo rin g N o.
La tit ud e N Lo ng itu de W
Su rf ac e
El ev at io n (f t)
Th ic kn es s o f As ph al t ( in ch es
Th ic kn es s o f Co nc re te
(in ch es
D ep th to
G ro un dw at er
(f t)
Lo ca tio n N ot es
BH
‐0
.1
.5
.5
.4
BH
‐0
.1
.5
.8
.5
.7
BH
‐0
.1
.5
.5
.4
.8
.3
BH
‐0
.1
.5
.2
.5
.5
BH
‐0
.1
.5
.8
.5
.5
.0
BH
‐0
.1
.5
.5
.5
.5
.8
BH
‐0
.1
.5
.2
.7
.2
.0
BH
‐0
.1
.5
.7
.0
.7
.0
BH
‐0
.1
.5
.2
.4
.8
.0
BH
‐0
.1
.5
.5
.5
.5
.0
BH
‐P
.1
.5
.6
.5 d ry
R te W
B t o H W Y
N B R am p
BH
‐P
.1
.5
.1
.2 d ry
R te W
B
BH
‐P
.1
.5
.6
.6
.8
.5
R te E B
BH
‐P
.1
.5
.6 n o n e d ry
H W Y N B R am p to R te E B
BH
‐P
.1
.5
.8 n o n e d ry
R te E B
BH
‐P
.1
.5
.8 n o n e
.5 d ry
M ed ia n E as t o f
B ri d ge
N ot es
B ri d ge D ec k
B o ri n gs p er fo rm ed b y Sc h n ab el E n gi n ee ri n g w it h a ‐7 /8 O .D . t ri ‐c o n e ro lle r b it a n d a u to m at ic h am m er B o ri gs p er fo rm ed A p ri l 2 t h ro u gh
M ay , 2
B o ri n g lo ca ti o n c o o rd in at es a re d eg re es la ti tu d e (N o rt h an d lo gi tu d e (W es t) b as ed o n N A D
VA
F
LA
P N
PN
W S
5( 1) S ub su rf ac e Ex pl or at io n Su m m ar y
Fo rt E us tis
B ou le va rd o ve r N ew po rt N ew s Re se rv oi r
0.0 / 22.0
2.5-INCHES ASPHALT
0.21 / 21.79
8.4-INCHES CONCRETE
0.88 / 21.12 Fill, orange-brown, fine to coarse, SILTY SAND FILL, trace gravel, medium dense, moist (SM) SAME, contains concrete fragments, very dense below 2.5 ft
4.0 / 18.0 Brown-gray, ELASTIC SILT FILL, few sand, soft, moist (SM)
7.5 / 14.5 Gray-brown, fine to medium, POORLY GRADED SAND WITH SILT FILL, loose, moist (SP-SM)
SAME, very loose, wet below 10 ft
SAME, gray-brown, contains root fragments below 12.5 ft
15.0 / 7.0 Brown-gray, SANDY ELASTIC SILT FILL, contains root fragments and silty sand layers, soft, wet (MH)
20.0 / 2.0 Shirley Formation, tan-gray, fine to medium, CLAYEY SAND, very loose, wet (SC)
SAME, dark brown, loose below 23 ft
26.5 / -4.5 Light gray, fine to coarse, POORLY GRADED SAND WITH SILT, medium dense, wet (SP-SM)
0.25
17BH-001
17BH-001
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.563520° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-550X (ATV).
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
FIRST ENCOUNTERED AT 10.0 ft DEPTH
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
-5
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172515° N
SURFACE ELEVATION: 22.0 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
BRIDGE
Date(s) Drilled: 5/1/2017 - 5/1/2017 Drilling Method(s): 2-15/16" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: R. Rountree (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
WOH
WOH
WOH
2.5
4.5
7.5
9.5
12.5
14.5
17.5
19.5
0.0 / 22.8
8.5-INCHES ASPHALT
0.71 / 22.09
5-INCHES CONCRETE
1.13 / 21.67
AIR
8.7 / 14.1
WATER
12.6 / 10.2 Alluvium, gray-brown, fine to medium, SILTY SAND, contains brick fragments, contains organics, medium dense, wet (SM)
15.0 / 7.8 Gray, SANDY LEAN CLAY, very soft, wet (CL)
SAME, gray-brown, contains root fragments below 17.5 ft
20.0 / 2.8 Blue-gray, fine to medium, CLAYEY SAND, very loose, wet
(SC)
22.5 / 0.3 Shirley Formation, gray, LEAN CLAY WITH SAND, medium stiff, moist (CL)
25.0 / -2.2 Brown, fine to medium, POORLY GRADED SAND WITH SILT, trace gravel, loose, wet (SP-SM)
SAME, few gravel, medium dense below 27.5 ft
1.25
17BH-002
17BH-002
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.563297° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-550X (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
FIRST ENCOUNTERED AT 8.7 ft DEPTH
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
-5
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172530° N
SURFACE ELEVATION: 22.8 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
BRIDGE
Date(s) Drilled: 4/27/2017 - 4/27/2017 Drilling Method(s): 2-15/16" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: R. Rountree (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
WOH
WOH
WOH
WOH
WOH
WOH
WOH
WOH
12.6
14.6
17.5
19.5
22.5
24.5
27.5
29.5
0.0 / 23.5
8.4-INCHES ASPHALT
0.67 / 22.83
4.8-INCHES CONCRETE
1.09 / 22.41
AIR
9.3 / 14.2
WATER
21.0 / 2.5 Alluvium, gray, fine to medium, CLAYEY SAND, contains organics, very loose, wet (SC)
23.5 / 0.0 Blue-brown, SANDY LEAN CLAY, very soft, wet (CL)
26.0 / -2.5 Yorktown Formation, blue-brown, SANDY ELASTIC SILT, soft, moist (MH)
28.5 / -5.0 Blue-brown, fine to medium, SILTY SAND, soft, moist (SM)
0.5
17BH-003
17BH-003
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.563010° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-55 (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
FIRST ENCOUNTERED AT 9.3 ft DEPTH
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
-5
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172549° N
SURFACE ELEVATION: 23.5 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
BRIDGE
Date(s) Drilled: 4/28/2017 - 4/28/2017 Drilling Method(s): 3-7/8" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: R. Rountree (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
WOR
WOH
WOH
WOR
WOH
WOH
23.5
25.5
28.5
0.0 / 24.0
7.2-INCHES ASPHALT
0.61 / 23.39
5.5-INCHES CONCRETE
1.0 / 23.0
AIR
10.5 / 13.5
WATER
22.5 / 1.5 Alluvium, dark gray, ORGANIC SILT WITH SAND, very soft, wet (OL)
26.0 / -2.0 Light gray, fine to coarse, POORLY GRADED SAND WITH SILT, trace gravel, loose, wet (SP-SM)
27.5 / -3.5 Yorktown Formation, green-gray, SANDY FAT CLAY, contains trace shell fragments, firm, moist (CL)
1000.5
17BH-004
17BH-004
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.562723° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-55 (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
FIRST ENCOUNTERED AT 10.5 ft DEPTH
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
-5
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172569° N
SURFACE ELEVATION: 24.0 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
BRIDGE
Date(s) Drilled: 5/2/2017 - 5/2/2017 Drilling Method(s): 3-7/8" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: R. Rountree (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
WOR
WOH
WOR
WOH
WOR
22.5
24.5
0.0 / 24.8
6.5-INCHES ASPHALT
0.52 / 24.28
5.5-INCHES CONCRETE
1.0 / 23.8
AIR
11.0 / 13.8
WATER
23.0 / 1.8 Alluvium, Mottled brown and gray, SANDY FAT CLAY, contains organics, very soft, moist (CH)
28.0 / -3.2 Yorktown Formation, olive-gray, fine to medium, SILTY SAND, very loose, wet (SM)
1000.5
17BH-005
17BH-005
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.562435° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-55 (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
FIRST ENCOUNTERED AT 11.0 ft DEPTH
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
-5
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172588° N
SURFACE ELEVATION: 24.8 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
BRIDGE
Date(s) Drilled: 4/27/2017 - 4/27/2017 Drilling Method(s): 3-7/8" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: D. Kniech (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
WOH
WOH
WOH
WOH
WOH
WOH
WOH
WOH
25.5
28.5
0.0 / 25.5
7.5-INCHES ASPHALT
0.63 / 24.88
5.5-INCHES CONCRETE
1.08 / 24.42
AIR
12.75 / 12.75
WATER
24.5 / 1.0 Alluvium, assumed (no recovery)0
17BH-006
17BH-006
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.562148° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-55 (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
FIRST ENCOUNTERED AT 12.8 ft DEPTH
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172608° N
SURFACE ELEVATION: 25.5 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
BRIDGE
Date(s) Drilled: 4/28/2017 - 4/28/2017 Drilling Method(s): 3-7/8" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: D. Kniech (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
WOH
WOH
WOH
WOH
WOH
WOH
WOH
WOH
WOH
24.5
26.5
0.0 / 26.2
7.75-INCHES ASPHALT
0.65 / 25.55
5.25-INCHES CONCRETE
1.08 / 25.12
AIR
13.0 / 13.2
WATER
24.3 / 1.9 Alluvium, dark brown, ELASTIC SILT WITH SAND, contains organics, very soft, wet (MH)
28.0 / -1.8 Yorktown Formation, green-gray, fine to medium, CLAYEY SAND, loose, wet (SC)
17BH-007
17BH-007
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.561861° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-55 (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
FIRST ENCOUNTERED AT 13.0 ft DEPTH
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172627° N
SURFACE ELEVATION: 26.2 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
BRIDGE
Date(s) Drilled: 5/1/2017 - 05/01/2017 Drilling Method(s): 3-7/8" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: D. Kniech (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
WOH
WOH
WOH
WOH
24.3
26.3
0.0 / 26.7
8-INCHES ASPHALT
0.67 / 26.03
4.75-INCHES CONCRETE
1.1 / 25.6
AIR
13.0 / 13.7
WATER
18.0 / 8.7 Alluvium, Dark gray, ORGANIC SILT, very soft, wet (OL)
20.0 / 6.7 Gray and brown, SANDY LEAN CLAY, firm, wet (CL)
23.0 / 3.7 Yorktown Formation, light gray and orange-brown, SANDY FAT CLAY, soft, wet (CH)
25.0 / 1.7 Blue-gray, SANDY SILT, wet (ML)
1.25
0.5
0.75
0.75
17BH-008
17BH-008
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.561615° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-55 (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
FIRST ENCOUNTERED AT 13.0 ft DEPTH
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172644° N
SURFACE ELEVATION: 26.7 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
BRIDGE
Date(s) Drilled: 5/2/2017 - 5/2/2017 Drilling Method(s): 3-7/8" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: D. Kniech (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
WOR
WOH
WOR
WOR
WOR
20.5
22.5
25.5
0.0 / 27.2
8.4-INCHES ASPHALT
0.65 / 26.55
4.8-INCHES CONCRETE
1.06 / 26.14
AIR
14.0 / 13.2
WATER
15.0 / 12.2 Alluvium, black and gray, ORGANIC SILT WITH SAND, contains organic matter, very soft, wet (OL)
18.5 / 8.7 Dark brown, fine to medium, SILTY SAND, medium dense, wet (SM) SAME, loose below 20 ft
22.5 / 4.7 Light brown, fine to coarse, POORLY GRADED SAND WITH SILT, few gravel, loose, wet (SP-SM)
25.0 / 2.2 Yorktown Formation, green-gray, ELASTIC SILT WITH SAND, soft, moist (MH)
SAME, firm below 27.5 ft
0.5
0.5
17BH-009
17BH-009
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.561399° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-550X (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
FIRST ENCOUNTERED AT 14.0 ft DEPTH
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172658° N
SURFACE ELEVATION: 27.2 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
BRIDGE
Date(s) Drilled: 5/3/2017 - 5/3/2017 Drilling Method(s): 2-15/16" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: R. Rountree (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
WOH
WOH
WOH
WOH
WOH
17.5
19.5
22.5
24.5
0.0 / 28.5
1.5-INCHES ASPHALT
0.13 / 28.38
7.5-INCHES CONCRETE
0.75 / 27.75 Fill, orange-brown and gray, SANDY LEAN CLAY WITH GRAVEL FILL, contains organic matter, soft, moist (CL)
2.0 / 26.5 Light brown-gray and gray, SANDY FAT CLAY FILL, soft, moist (CH)
5.0 / 23.5 Shirley Formation, light gray and tan, FAT CLAY, few sand, contains organics, and roots, soft, moist (CH)
10.0 / 18.5 Orange-brown and gray, LEAN CLAY WITH SAND, firm, moist (CL)
SAME, light gray below 12.5 ft
SAME, stiff, wet below 15 ft
22.0 / 6.5 Yorktown Formation, gray, fine to coarse, SILTY SAND, loose, wet (SM)
25.0 / 3.5 Blue-gray, SANDY SILT, soft, wet (ML)
28.0 / 0.5 Green-gray, fine to medium, SILTY SAND, loose, wet (SM)
1.5
1.75
1.5
2.5
2.25
1.5
17BH-010
17BH-010
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.561184° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-55 (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
FIRST ENCOUNTERED AT 15.0 ft DEPTH
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172673° N
SURFACE ELEVATION: 28.5 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
BRIDGE
Date(s) Drilled: 4/26/2017 - 4/26/2017 Drilling Method(s): 3-7/8" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: D. Kniech (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
WOH
2.5
4.5
7.5
9.5
12.5
14.5
17.5
19.5
0.0 / 17.6
1-INCH ASPHALT
0.1 / 17.5
8.5-INCHES CONCRETE
0.79 / 16.81 Fill, orange-brown, fine to coarse, SILTY SAND FILL, few gravel, loose, moist (GP-GM)
2.0 / 15.6 Light tan-brown with streaks of gray, SANDY FAT CLAY FILL, trace gravel, moist (CH) SAME, moist below 4 ft
SAME, contains concrete fragments below 7 ft
Bottom of Boring at 10 ft.
1.5
1.25
1.25
17BH-P1
17BH-P1
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.564717° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-55 (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
NOT ENCOUNTERED DURING DRILLING
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172612° N
SURFACE ELEVATION: 17.6 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
PAVEMENT
Date(s) Drilled: 5/3/2017 - 5/3/2017 Drilling Method(s): 3-7/8" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: D. Kniech (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
0.5
0.0 / 20.1
1-INCH ASPHALT
0.1 / 20.0
8.25-INCHES CONCRETE
0.77 / 19.33 Fill, dark orange-brown with streaks of gray, fine, SANDY LEAN CLAY FILL, firm, wet (SC) SAME, stiff below 2 ft
6.0 / 14.1 Tan-brown, fine to medium, SILTY SAND FILL, loose, moist
(SC)
8.0 / 12.1 Orange-brown and gray, SANDY LEAN CLAY FILL, contains glass fragments, stiff, moist (CL)
Bottom of Boring at 10 ft.
2.75
2.25
3.75
17BH-P2
17BH-P2
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.564314° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-55 (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
NOT ENCOUNTERED DURING DRILLING
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172539° N
SURFACE ELEVATION: 20.1 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
PAVEMENT
Date(s) Drilled: 5/3/2017 - 5/3/2017 Drilling Method(s): 3-7/8" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: D. Kniech (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
0.5
0.0 / 21.6
3.6-INCHES ASPHALT
0.31 / 21.29
4.8-INCHES CONCRETE
0.65 / 20.95 Fill, orange-brown, fine to coarse, CLAYEY SAND FILL, trace gravel, medium dense, moist (SC)
2.5 / 19.1 Orange-brown, SANDY LEAN CLAY FILL, trace gravel, stiff, moist (CL)
8.0 / 13.6 Light gray-brown, fine to medium, SILTY SAND FILL, contains organic matter, loose, wet (SM)
Bottom of Boring at 10 ft.
0.5
0.5
0.25
17BH-P3
17BH-P3
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.563609° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-550X (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
FIRST ENCOUNTERED AT 6.5 ft DEPTH
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172467° N
SURFACE ELEVATION: 21.6 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
PAVEMENT
Date(s) Drilled: 5/2/2017 - 5/2/2017 Drilling Method(s): 2-15/16" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: R. Rountree (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
2.5
0.0 / 20.6
10-INCHES ASPHALT
0.83 / 19.77 Fill, orange-brown, fine to coarse, SILTY SAND FILL, few gravel, medium dense, moist (SM)
4.0 / 16.6 Orange-brown and gray, SANDY LEAN CLAY FILL, trace gravel, stiff, moist (CL)
Bottom of Boring at 10 ft.
2.75
2.75
17BH-P4
17BH-P4
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.564149° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-55 (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
NOT ENCOUNTERED DURING DRILLING
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172095° N
SURFACE ELEVATION: 20.6 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
PAVEMENT
Date(s) Drilled: 5/2/2017 - 5/2/2017 Drilling Method(s): 3-7/8" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: D. Kniech (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
0.5
0.0 / 28.8
2-INCHES ASPHALT
0.17 / 28.63 Fill, orange-brown, SANDY LEAN CLAY FILL, contains organic matter, few gravel, stiff, moist (CL)
2.0 / 26.8 Shirley Formation, light orange-brown and gray, LEAN CLAY WITH SAND, contains roots, stiff, moist (CL) SAME, gray below 4 ft
SAME, firm below 6 ft
SAME, stiff below 8 ft
Bottom of Boring at 10 ft.
1.25
3.5
3.75
3.25
17BH-P5
17BH-P5
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.560891° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-55 (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
NOT ENCOUNTERED DURING DRILLING
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172624° N
SURFACE ELEVATION: 28.8 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
PAVEMENT
Date(s) Drilled: 4/26/2017 - 4/26/2017 Drilling Method(s): 3-7/8" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: D. Kniech (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
0.0 / 34.8
8.5-INCHES CONCRETE
0.71 / 34.09 Fill, orange-brown, fine to coarse, SILTY SAND FILL, trace gravel, medium dense, moist
2.0 / 32.8 Tan-brown, SANDY LEAN CLAY FILL, contains root fragments, stiff, moist (CL)
4.0 / 30.8 Mottled brown, fine, SILTY SAND FILL, contains organics, loose, moist (SM)
7.0 / 27.8 Shirley Formation, gray, fine to medium, ELASTIC SILT WITH SAND, stiff, moist (SM)
Bottom of Boring at 10 ft.
0.75
17BH-P6
17BH-P6
FIELD DESCRIPTION OF STRATA
GROUND WATER
OFFSET:
LONGITUDE: 76.560013° W
COORD. DATUM: NAD 83
REMARKS: Rig Type: CME-55 (ATV).
DTFH7112D00012/5011
S P
T _L
O G
A :1
7C
V D
O T
L O
G S
.G P
J:
S
P T
7.
G
D T
:g
IN
T _v er si on
.0
.0
0:
5/
9/
:S ch na be l E ng in ee rin g
Copyright 2017, Commonwealth of Virginia
S O
IL
R
E C
O V
E R
Y
C O
R E
R E
C O
V E
R Y
NOT ENCOUNTERED DURING DRILLING
NO LONG TERM MEASUREMENTS TAKEN
DIP °
S T
R A
T A
R O C K
S A
M P
LE
L
E G
E N
D
S O I L
PROJECT #:
LOCATION:
STRUCTURE:
E
LE
V A
T
IO
N ft)
D E
P T
H ft)
S A
M P
LE
IN
T E
R V
A L
R O
C K
Q U
A
LI
T Y
D E
S
IG
N A
T
IO
N
S T
A N
D A
R D
P E
N E
T R
A T
IO
N
T E
S T
H A
M M
E R
B
LO
W S
FIELD DATA
S T
R A
T A
L E
G E
N D
JO
IN
T S
STATION:
LATITUDE: 37.172798° N
SURFACE ELEVATION: 34.8 ft
VA FLAP NPNWS 105(1)
Route 105 over NN Reservoir
PAVEMENT
Date(s) Drilled: 5/3/2017 - 5/3/2017 Drilling Method(s): 3-7/8" O.D. Tri-cone Roller Bit SPT Method: Auto Hammer (140 lb) Other Test(s): Not Applicable Driller: Fishburne - Chesapeake Logger: D. Kniech (Schnabel Engineering)
P K
T . P
E N
E T
R O
M E
T E
R ts f)
LAB DATA
LL
LI
Q
U
ID
L
IM
IT
M O
IS
T
U R
E C
O N
T E
N T
P
LA
S T
IC
IT
Y
IN
D E
X
PI
0.5
APPENDIX B
VDOT Pavement and Edgedrain Details DARWin Pavement Design Results
1993 AASHTO Pavement Design
DARWin Pavement Design and Analysis System
A Proprietary AASHTOWare Computer Software Product
FHWA.EFLHD
21400 Ridgetop Circle
Sterling, VA
Rigid Structural Design Module
Fort Eustis Blvd Bridge and approaches. PCCP thickness design - Joint Reinforced Concrete Pavement
Rigid Structural Design
Pavement Type JRCP 18-kip ESALs Over Initial Performance Period 14,184,668 Initial Serviceability 4.5 Terminal Serviceability 2.9 28-day Mean PCC Modulus of Rupture 650 psi 28-day Mean Elastic Modulus of Slab 5,000,000 psi Mean Effective k-value 250 psi/in Reliability Level 90 % Overall Standard Deviation 0.39 Load Transfer Coefficient, J 2.7 Overall Drainage Coefficient, Cd 1
Calculated Design Thickness 10.10 in
Rigorous ESAL Calculation
Performance Period (years) 30 Two-Way Traffic (ADT) 38,000 Number of Lanes in Design Direction 2 Percent of All Trucks in Design Lane 100 % Percent Trucks in Design Direction 90 %
Vehicle Class
Percent of
ADT
Annual
Growth
Average Initial Truck Factor
(ESALs/ Truck)
Annual % Growth in
Truck Factor
Accumulated 18-kip ESALs over Performance Period
1 97 2 0.0003 0 147,467 2 2 2 0.59 0 5,979,747 3 1 2 1.59 0 8,057,455
Total 100 - - - 14,184,668
Growth Compound
Total Calculated Cumulative ESALs 14,184,668
Page 1 of 1 Pages
M:\PROJECTS\_ACCESS\VA\Projects\VA 23_VA FLAP NPNWS 105(1)\Techserv\Pavement\Correspondence\VA FLAP NPNWS 105(1) Pavement Memo Addendum.doc
SUBJECT: Pavement Recommendation for VA FLAP NPNWS 105(1) VDOT No. 0105-121-R92 UPC No. 105624
TO MESSAGE/COMMENT FROM/DATE
V. Carreras- Calderon PS&E Project Manager
And:
C. Burnell Highway Design Manager
This Addendum to the Pavement Recommendations Memorandum dated December 5, 2017 discusses the revised pavement section for VA FLAP NPNWS 105(1). The recommendations herein are based on a value engineering study performed by the City of Newport News.
Value Engineering Comment Response P-1 addresses the use of Asphalt Concrete pavements in lieu of the previously recommended Joint Reinforced Concrete Pavement (JRCP), for an anticipated cost savings of $1 Million. The following table outlines the recommended flexible pavement section based on future traffic loads.
Table 1. Fort Eustis Blvd. – Flexible Pavement Option
Layer Minimum Thickness
(in) Comments
VDOT Road and Bridge
Specifications
AC Surface Course
Asphalt Concrete
>10 x 106 ESAL’s, ½” NMSA
SM 12.5E -
Section 211
Asphalt Tack Coat
AC Tack Coat per
VDOT
Specification
Section 310 (2007 or revised)
AC Intermediate Course
Asphalt Concrete
>10 x 106 ESAL’s, ¾” NMSA
IM-19.0D -
Section 211
Asphalt Tack Coat
AC Tack Coat per
VDOT
Specification
Section 310
AC Base Course 4 Asphalt Concrete
>10 x 106 ESAL’s, 1” NMSA
BM-25.0D -
Section 211
Aggregate Base Course
Aggregate base (crushed stone)
Type I – 21B Section 208
This alternative will provide a pavement section with a design life of approximately 25 years.
Note that per VDOT specifications, based on anticipated daily traffic greater than 20,000, an aggregate base material (such as the recommended type I-21B) shall be used in conjunction with longitudinal pavement drains per VDOT specifications for underdrain UD-4 as shown in the attached detail. The edge drain should daylight for positive drainage.
K. Ngozi- Bullock
Engineer
Through:
M. Elias (Acting)
Team Leader
04/20/2018 cc: Highway Design (M. Toomer) w/ attachments
| REVISED APPENDIces.pdf |
| va flap npnws 105-vdotlogs select.pdf |
| 17BH-001 |
| 17BH-002 |
| 17BH-003 |
| 17BH-004 |
| 17BH-005 |
| 17BH-006 |
| 17BH-007 |
| 17BH-008 |
| 17BH-009 |
| 17BH-010 |
| 17BH-P1 |
| 17BH-P2 |
| 17BH-P3 |
| 17BH-P4 |
| 17BH-P5 |
| 17BH-P6 |
File details come from the government source that posted it. Updated .