This document provides details of a bid opening for the City of Newport News Fort Eustis Blvd. Bridge project. Seven contractors submitted bids for the bridge replacement project, which includes replacing an existing 658-foot, 16-span prestressed concrete girder bridge with a 676-foot bridge containing 9 prestressed concrete bulb-T spans. The proposed bridge will be 86 feet wide and include five 12-foot travel lanes, two 10-foot shoulders, and a 4-foot median. The project also involves approach work such as roadway reconstruction, grading, drainage, paving, and other miscellaneous tasks along 0.56 miles. The low bid was submitted by Infrastructure & Industrial Constructors Southeast, Inc. at $17,777,777.77 to complete the work within 893 calendar days. The engineer's estimate for the project was $16,300,000 to be completed in 893 calendar days.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Highway Administration Eastern Federal Lands Highway Division

Bid Opening for

City of Newport News Fort Eustis Blvd. Bridge

PROJECT: VA FLAP NPNWS 105(1)

SOLICITATION NO. 693C73-20-B-000009

March 24, 2020 at 2:00 p.m.

Sterling, VA

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-20-B-000009

PROJECT NUMBER: VA FLAP NPNWS 105(1)

March 24, 2020, 2:00 p.m. local time

BIDDER BID TOTAL DAYS TOTAL PRICE

Cianbro Corporation Schedule A $24,484,600.00

Calendar Days Schedule A $24,484,600.00

Corman Kokosing Construction Company

Schedule A $21,239,970.00

Calendar Days Schedule A $21,239,970.00

Infrastructure & Industrial Constructors Southeast, Inc.

Schedule A $17,777,777.77

Calendar Days Schedule A $17,777,777.77

Kiewit Infrastructure South Co. Schedule A $29,267,756.50

Calendar Days Schedule A $29,267,756.50

The performance period for the completion of Schedule A is 893 calendar days.

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-20-B-000009

PROJECT NUMBER: VA FLAP NPNWS 105(1)

March 24, 2020, 2:00 p.m. local time

BIDDER BID TOTAL DAYS TOTAL PRICE

Mclean Contracting Company Schedule A $41,248,413.00

Calendar Days Schedule A $41,248,413.00

Traylor Bros.,Inc. Schedule A $34,851,944.00

Calendar Days Schedule A $34,851,944.00

Engineer’s Estimate Schedule A $16,300,000.00

Calendar Days

Schedule A $16,300,000.00

The performance period for the completion of Schedule A is 893 calendar days.

Slide Number 1
FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000009 � PROJECT NUMBER: VA FLAP NPNWS 105(1)�March 24, 2020, 2:00 p.m. local time
FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000009 � PROJECT NUMBER: VA FLAP NPNWS 105(1)�March 24, 2020, 2:00 p.m. local time

File details come from the government source that posted it. Updated .