Performance_Replacement_Amendment_A0005.pdf

PDF 286 KB Posted

Attached to
Tug to Replace Performance Federal contract opportunity
Solicitation number
6923G520RTUGREPLACEMENT
Issued by
Department of Transportation Saint Lawrence Seaway Development Corporation

About this file

Questions and answers 10/24/19

View the file

Other files for this federal contract opportunity

Other files attached to Tug to Replace Performance, newest first.
File Type Posted
SF30_Amendment_A0007_Tug_Replacement.pdf PDF
Performance_Replacement_Amendment_A0007.pdf PDF
19005-114_Ice_Scraper_Rev.pdf PDF
SF30_Amendment_A0006_Tug_Replacement.pdf PDF
RFP_New_Tug_Performance_Replacement_Amendment_Bid_Schedule.pdf PDF
SF30_Amendment_A0005_Tug_Replacement.pdf PDF
SF30_Amendment_A0004_Tug_Replacement.pdf PDF
Performance_Replacement_Amendment_A0004.pdf PDF
SF30_Amendment_A0003_Tug_Replacement.pdf PDF
Performance_Replacement_Amendment_A003.pdf PDF
Performance_Replacement_Amendment_A002.pdf PDF
SF30_Amendment_A0002_Tug_Replacement.pdf PDF
SF30_Amendment_A0001_Tug_Replacement.pdf PDF
RFP_New_Tug_Performance_Replacement.pdf PDF
19005-533-01_Potable_and_Sanitary_Rev_-signed.pdf PDF
19005-SPC-832-01_Technical_Specifications_Rev_A_signed.pdf PDF
19005-100-02_Foundation_Details_Rev_-_signed_(002).pdf PDF
Milestone_schedule_-_Performance_Replacement_Project.pdf PDF
19005-Rpt-300-01__Electrical_Load_Analysis_Rev-_signed.pdf PDF
19005-300-01_Electrical_One_Line_Rev-_signed.pdf PDF
19005-532-01_Firemain_Bilge_Cooling_Rev_A_signed.pdf PDF
19005-100-01_Structural_Arrangement_Rev_-signed_(002).pdf PDF
19005-166-01_Fender_Arrangement_and_Details_Rev_-signed_(002).pdf PDF
19005-240-01_Propulsion_Shafting_Rev_-_Signed_(002).pdf PDF
19005-070-02_Lines_Plan_Rev_-_signed_(002).pdf PDF
19005-259-01_Stack_Arrangement_Rev_-_signed.pdf PDF
19005-512-01_HVAC_Rev_-signed.pdf PDF
19005-330-01_Lighting_Rev-_signed.pdf PDF
19005-070-01_General_Arrangement_Rev_A_signed.pdf PDF
19005-541-01_Fuel_Rev_-_signed.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. 6923G520RTUGREPLACEMENT

AMENDMENT A0005

October 24, 2019

1. For clarity of the proposal submittal can you please advise on best course of action?

Per Section L we are only to submit 2 Volumes. However, other information is required to be submitted as part of the requirements outside of the 2 Volumes. For example, we must submit the Standard Form 33 as well as each additional amendments Standard Form 30 (Currently 0004 Amendments). We are also required to submit the Bid Bond/Bid Guarantee for this proposal. If we are to include these documents in Volume I, Pricing information, we will be well over the maximum page count of 5.

Volume I – (Max 20 Pages) – This is manageable to keep under the 20 page limit with requested narratives and table of contents/cover page, etc.

• Technical Proposal o Plan of Action

• Management/Shipyard Summary

• Past Performance

Volume II – (Max 5 Pages)

• Standard Form 33 (1 Page)

• Standard Form 30 – Amendment 001 (1 Page)

• Standard Form 30 – Amendment 002 (1 Page)

• Standard Form 30 – Amendment 003 (1 Page)

• Standard Form 30 – Amendment 004 (1 Page)

• Section B Pricing Form (1 Page)

• Proposed Milestone (1 Page)

• Section K Representations (5 Pages) – Section K is 5 pages directly out of the RFP. This alone, would reach the max number of pages required.

• Bid Bond / Bid Guarantee (3-4 Pages)

Standard Form 33, amendments, Section K, and the bid bond are excluded from the 5-page requirement for Volume II, Pricing Information.

2. Will proposals with alternative engines be considered? If an engine is similar in power with improved duty cycle, can it be offered in a proposal in lieu of or in addition to the C18 in the spec. i.e. a 690 hp engine at 1,800 rpm with a continuous rating (ICFN) equivalent to the Cat A Rating (unrestricted continuous).

The specifications take into consideration the requirements of the Buy American Act. Equivalents may be accepted if they meet our requirements; however, if the percentage of foreign parts exceeds the limitations of the Buy American Act, they will be rejected. Equipment submittals will be required after award for Owner review and consideration.