MINI SPLIT_drawings_2024-08-01.pdf

PDF 3 MB Posted

Attached to
Ductless Mini-Split Heating & Cooling System for DCR Room at Joint Base Cape Cod Bldg #2410
Solicitation number
6913G625Q300009
Issued by

About this file

This file contains architectural and engineering drawings for a mini-split HVAC system installation project at Building #2410 at Joint Base Cape Cod in Sandwich, MA. The drawings consist of 6 sheets showing detailed plans for Room #3, including a cover sheet, general notes and symbols, demolition/electrical/mechanical notes, HVAC floor plans, electrical floor plans, and panelboard schedules.

The plans specify the installation location and requirements for a ductless mini-split system, with detailed floor plans showing equipment placement, ductwork, electrical connections, and control systems. Key components include new HVAC thermostats, zones, and electrical panel modifications. The building layout includes storage, mechanical, electrical, shower, and office rooms. The drawings are dated April 30, 2024 and are marked as 100% working documents, prepared for the USDOT/Volpe Center located at 55 Broadway Center in Cambridge, MA. The project owner/lessor is listed as the Commonwealth of Massachusetts Executive Office of Public Safety & Security Military Division at Hanscom AFB.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MDP

Connected Loads By Phase (VA) Total Connected Loads By Type (VA) Demand Factors Total Demand Loads By Type (VA)

Total 55,597 Subtotal 50,773

Total Demand Load 63,466

Total Demand Amps 176

RP

Connected Loads By Phase (VA) Total Connected Loads By Type (VA) Demand Factors Total Demand Loads By Type (VA)

Total 27,813 Subtotal 24,539

Total Demand Load 30,674

Total Demand Amps 85

No. Description Date