About this file

This is Amendment No. A002 to Solicitation 69056726R000005, issued by the Federal Highway Administration on January 29, 2026, for construction work on WY NPS GRTE 2020(1) Moose Wilson Road Phase 2 and WY NP GRTE 11(1) Teton Park Road—Moose to Taggart Lake Trailhead in Wyoming. The amendment extends the offer due date from February 3, 2026, to February 5, 2026, at 1400 hours local time. Offerors must acknowledge receipt of this amendment prior to the extended deadline through one of three specified methods: completing and returning items 8 and 15, acknowledging receipt on each copy of the offer submitted, or submitting a separate letter or telegram referencing the solicitation and amendment numbers.

Amendment A002 revises multiple sections of the solicitation, including the SF 1442 form, bid schedule (pages A-7 through A-18), and special contract requirements. Key revisions include: (1) adding two new bid schedule items A2065 (System Installation, Speed Feedback Sign—LPSM) and A2075 (System Installation, Traffic Signal Pedestrian—2 EACH); (2) revising Section 105.04 regarding handling and storing material; (3) substantially revising Section 107.10 Environmental Protection, including modified requirements for vegetation removal timing, nesting bird surveys, migratory bird treaty compliance, stream diversion, and environmental permitting; (4) editing Section 109.06 profit limitations and cost or pricing data requirements; (5) adding new Subsection 107.12 Contractor's Camp with detailed specifications for camping at Gros Ventre Campground and Barker-Davis site; and (6) revising Section 637.03 Facilities with new Tables 637-1 and 637-2 specifying minimum requirements for residential housing units and facility furnishings. The enclosed pages include bid schedule details, plan sheets (B.1-B.4, E.22, L.5, L.11, L.14, N.2, N.5), and special contract requirement sections.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 01/29/2026 N/A WY NPS GRTE 2020(1), Moose Wilson Road Phase 2 and WY NP GRTE 11(1), Teton Park Road – Moose to Taggart Lake Trailhead

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056726R000005

9B. DATED (SEE ITEM 11)

01/02/2026

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(_X_ ) is extended, ( ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WY NPS GRTE 2020(1), Moose Wilson Road Phase 2 and

WY NP GRTE 11(1), Teton Park Road - Moose to Taggart Lake Trailhead

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A002, dated 01-29-2026

Solicitation No. 69056726R000005 WY NPS GRTE 2020(1), Moose Wilson Road Phase 2

Page 2 and WY NP GRTE 11(1), Teton Park Road – Moose to Taggart Lake Trailhead

REVISIONS ARE AS FOLLOWS:

SF 1442, SOLICITATION, OFFER, AND AWARD

Page A-3, Block 13A. Revises offer due date from 02/03/2026 to 02/05/2026.

BID SCHEDULE

Page A-7 through A-18. Adds items A2065 and A2075.

SPECIAL CONTRACT REQUIREMENTS

Page E-20, Subsection 105.04 Handling and Storing Material. Revises (f)(3).

Pages E-28 through E-33a, Subsection 107.10 Environmental Protection. Revises section (e)

Other Requirements.

Page E-37, Subsection 109.06 Pricing of Adjustments. Edits (3) Profit.

Page E-46 through E-46b, Adds and Revises Subsection 637.03 Facilities. Adds and Revises

Table 637-1 Minimum Requirements for Field Facilities and Associated Services and Table 637-2

Minimum Facility Furnishings.

PLANS

Plan sheet B.1 through B.4 Revises Summary of Quantities- Base Schedule.

Plan sheet E.22 Revises Sidewalk Details.

Plan sheet L.5 Removes counter type.

Plan sheet L.11 Removes counter type.

Plan sheet L.14 Removes counter type.

Plan sheet N.2 Revises LCC1 Branch Feed Schedule.

Plan sheet N.5 Removes counter type.

New offer due date: 02/05/2026

Notice to Offeror: Please submit revised pages A-7 through A-18 with your proposal.

Amendment No. A002, dated 01-29-2026

Solicitation No. 69056726R000005 WY NPS GRTE 2020(1), Moose Wilson Road Phase 2

Page 3 and WY NP GRTE 11(1), Teton Park Road – Moose to Taggart Lake Trailhead

ENCLOSURES

Pages:

A-3

A-7 through A-18

E-20

E-28 through E-33a

E-37

E-46 through E-46b

Plan Sheets:

B.1 through B.4

E.22

L.5

L.11

L.14

N.2

N.5

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

690567 8. ADDRESS OFFER TO

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

ACQUISTIONS

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

360-619-7520

See Block 10 x 01/02/2026

69056726R000005

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

THIS TASK ORDER REQUEST FOR PROPOSAL IS BEING SOLICITATED TO THE YELLOWSTONE, GRAND

TETON, & SURROUNDING AREA MATIOC IDIQ HOLDERS. ONLY CONTRACTORS AWARDED AN IDIQ

CONTRACT WILL BE CONSIDERED.

This solicitation is designated WY NPS GRTE 2020(1), Moose Wilson Road Phase 2 and

WY NP GRTE 11(1), Teton Park Road - Moose to Taggart Lake Trailhead

IN STRICT ACCORDANCE WITH:

Federal Acquisition Regulations (FAR) and Transportation Acquisition Regulations

(TAR)

General Wage Decision

Special Contract Requirements

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 calendar days and complete it within ________________ ________________ calendar days after receiving

*Page A-5

________________________ 02/03/2026

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 8/2014)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

A-3

02/05/2026

Revised by Amendment A002

Rebekah Webb Cross-Out

BID SCHEDULE

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.

Revised by Amendment A002 Page A-7

Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Schedule : A

Schedule Type : Base

AMD# Line Item

Number

Pay Item

Number

Supplemental

Description

Quantity Unit Unit Price Amount

A0020 15101-0000 ALL LPSM

A0040 15201-0000 ALL LPSM

A0060 15301-0000 ALL LPSM

A0080 15401-0000 ALL LPSM

A0100 15501-0000 ALL LPSM

A0120 15705-0100 310.000 LNFT

A0140 15705-0500

(12-INCH)

30.000 LNFT

A0160 15705-1400

(EXCELSIOR FIBER)

3,945.000 LNFT

A0180 15706-1600

(TEMPORARY

CONSTRUCTION

TURNAROUND)

1.000 EACH

A0200 15706-1600

(TEMPORARY)

1.000 EACH

A0220 15802-0000 ALL LPSM

A0240 20101-0000 9.300 ACRE

A0260 20301-0700 100.000 EACH

A0280 20301-1100 2.000 EACH

A0300 20301-2400 24.000 EACH

REMOVAL OF GATE

REMOVAL OF SIGN

SOIL EROSION

CONTROL, STABILIZED

CONSTRUCTION EXIT

SOIL EROSION

CONTROL, STABILIZED

CONSTRUCTION EXIT

WATERING FOR DUST

CONTROL

CLEARING AND

GRUBBING

REMOVAL OF

DELINEATOR

CONTRACTOR TESTING

CONSTRUCTION

SCHEDULE

SOIL EROSION

CONTROL, SILT FENCE

SOIL EROSION

CONTROL,

TEMPORARY CULVERT

SOIL EROSION

CONTROL, FIBER ROLL

Description

MOBILIZATION

CONSTRUCTION

SURVEY AND STAKING

CONTRACTOR

QUALITY CONTROL

21101-2000 ROADWAY OBLITERATION, METHOD 2

62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

Contract Quantity Pay Items

20101-0000 CLEARING AND GRUBBING

20403-0000 UNCLASSIFIED BORROW

BID SCHEDULE

Project No : WY NPS GRTE 2020(1) & WY NP

GRTE 11(1)

Project Name : Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Revised by Amendment A002 Page A-8

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

AMD# Line Item

Number

Pay Item

Number

Supplemental

Description

Quantity Unit Unit Price AmountDescription

A0320 20302-0625 290.000 LNFT

A0340 20302-0700 1,000.000 LNFT

A0360 20302-0800 126.000 LNFT

A0380 20302-0900 1,400.000 LNFT

A0400 20303-1600 540.000 SQYD

A0420 20304-1000

(BARKER-DAVIS

RESIDENCE) ALL LPSM

A0440 20304-1000

(SOIL EROSION

CONTROL, FIBER

ROLL (EXCELSIOR

ALL LPSM

A0460 20304-1000

(WILLIAMS

RESIDENCE) ALL LPSM

A0480 20304-1000

(WITTMER RESIDENCE)

ALL LPSM

A0500 20401-0000 10,484.000 CUYD

A0520 20402-0000 700.000 CUYD

A0540 20403-0000 9,257.000 CUYD

A0560 20410-0000 700.000 CUYD

A0580 20435-2000 40.000 CUYD

A0600 20470-0000 10.000 EACH

A0620 20470-0000

(LANDSCAPING)

109.000 EACH

A0640 20701-1000 530.000 SQYD

A0660 20701-2000 40.000 SQYD

A0680 20703-1200 280.000 SQYD

A0700 20820-0000

(LOWER STEWART

DRAW) ALL LPSM

A0720 20820-0000

(UPPER STEWART

DRAW) ALL LPSM

A0740 21101-1000 31,900.000 SQYD

GEOTEXTILE FILTER,

CLASS 1, NON-WOVEN

DEWATERING

DEWATERING

ROADWAY

OBLITERATION,

METHOD 1

BACKFILL, GRANULAR

BOULDER

BOULDER

SEPARATION

GEOTEXTILE, WOVEN

SEPARATION

GEOTEXTILE, NON-

WOVEN

REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

ROADWAY

EXCAVATION

SUBEXCAVATION

UNCLASSIFIED

BORROW

SELECT BORROW

REMOVAL OF FENCE,

CHAIN LINK

REMOVAL OF

PAVEMENT, ASPHALT

REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

REMOVAL OF CURB,

LOG

REMOVAL OF FENCE

REMOVAL OF FENCE,

BARBED WIRE

Revised by Amendment A002 Page A-9Bid Schedule

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Pay Item

Number

Supplemental

Description

Quantity Unit Unit Price AmountDescription

A0760 21101-2000 16,680.000 SQYD

A0780 25101-0200 50.000 CUYD

A0800 25101-0300 275.000 CUYD

A0820 30201-2000 4,550.000 CUYD

A0840 30402-5200 6,100.000 SQYD

A0860 31303-0000 180.000 CUYD

A0880 40301-0100 5,660.000 TON

A0900 41201-0000 9.500 TON

A0920 55601-1300

(BOX CULVERT)

58.000 LNFT

A0940 60201-0600

(RCP WITH CRITTER

CONTROL) 480.000 LNFT

A0960 60201-0800 50.000 LNFT

A0980 60210-0800 2.000 EACH

A1000 60220-0000

(LOWER STEWART

DRAW AOP) 32.000 LNFT

A1020 60220-0000

(UPPER STEWART

DRAW AOP) 32.000 LNFT

A1040 60404-1000

(TYPE B GRATE)

4.000 EACH

A1060 60901-7000 210.000 LNFT

A1080 60902-2500 1,400.000 LNFT

A1100 61001-0500

(4-INCH DEPTH)

1,020.000 SQYD

A1120 61001-0500

(6-INCH DEPTH)

10.000 SQYD

A1140 61003-2000

(RIVER ROCK INLAY)

150.000 SQYD

A1160 61009-0000 8.000 SQYD

A1180 61901-2250

(WOOD)

2,530.000 LNFT

FENCE, RAIL

CURB AND GUTTER,

EXPOSED

AGGREGATE, 12-INCH

SIDEWALK, EXPOSED

AGGREGATE

CONCRETE

SIDEWALK, EXPOSED

AGGREGATE

CONCRETE

MEDIAN, EXPOSED

AGGREGATE

CONCRETE

DETECTABLE

WARNING PANELS

END SECTION FOR 24-

INCH PIPE CULVERT

PRECAST

REINFORCED

CONCRETE BOX

PRECAST

REINFORCED

CONCRETE BOX

CATCH BASIN, FLH

TYPE 1

CURB, LOG

ASPHALT CONCRETE

PAVEMENT, TYPE 1

TACK COAT

BRIDGE RAILING,

TIMBER

18-INCH PIPE CULVERT

24-INCH PIPE CULVERT

PLACED RIPRAP,

CLASS 2

PLACED RIPRAP,

CLASS 3

ROADWAY

AGGREGATE, METHOD

FULL DEPTH

RECLAMATION,

METHOD 2, 4-INCH

AGGREGATE-TOPSOIL

COURSE

ROADWAY

OBLITERATION,

METHOD 2

Revised by Amendment A002 Page A-10

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Pay Item

Number

Supplemental

Description

Quantity Unit Unit Price AmountDescription

A1200 61902-1800 3.000 EACH

A1220 61902-2000 1.000 EACH

A1240 61920-2000 1.000 EACH

A1260 62201-0250 90.000 HOUR

A1280 62201-0600 60.000 HOUR

A1300 62201-0725

(SKID STEER, 40 HP

MINIMUM) 30.000 HOUR

A1320 62201-0850 30.000 HOUR

A1340 62201-1300 30.000 HOUR

A1360 62201-2050 20.000 HOUR

A1380 62201-2350 90.000 HOUR

A1400 62201-2850 30.000 HOUR

A1420 62201-3000

(MINI, 35 HP MINIMUM)

80.000 HOUR

A1440 62201-3150 30.000 HOUR

A1460 62301-0000 90.000 HOUR

A1480 62405-0300 39,685.000 SQYD

A1500 62801-0000

(LOWER STEWART

DRAW) ALL LPSM

A1520 62801-0000

(UPPER STEWART

DRAW) ALL LPSM

A1540 63301-0000 46.000 EACH

A1560 63301-0000

(WAYFINDING)

28.000 EACH

A1580 63308-3000 8.000 EACH

A1600 63309-0000 100.000 EACH

A1620 63313-0000 150.000 LNFT

OBJECT MARKER,

TYPE 3

DELINEATOR

RUMBLE STRIP

PLACING CONSERVED

TOPSOIL, 4-INCH

DEPTH

TEMPORARY STREAM

DIVERSION

TEMPORARY STREAM

DIVERSION

SIGN SYSTEM

SIGN SYSTEM

POWER BROOM

MOTOR GRADER, 12

FOOT MINIMUM BLADE

HYDRAULIC

EXCAVATOR

HYDRAULIC

EXCAVATOR, 1.0

CUBIC YARD MINIMUM

GENERAL LABOR

BACKHOE LOADER, 8

CUBIC FOOT MINIMUM

RATED CAPACITY

WHEEL LOADER

WHEEL LOADER, 1

CUBIC YARD MINIMUM

RATED CAPACITY

BULLDOZER, 160HP

MINIMUM FLYWHEEL

POWER

ROLLER

GATE, METAL, 24 FEET

WIDTH

GATE, METAL, 28 FEET

WIDTH

REMOVE AND RESET

GATE

DUMP TRUCK, 10

CUBIC YARD MINIMUM

CAPACITY

Revised by Amendment A002 Page A-11

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Pay Item

Number

Supplemental

Description

Quantity Unit Unit Price AmountDescription

A1640 63316-1000 3.000 EACH

A1660 63318-0000

(TYPE 1)

25.000 EACH

A1680 63401-0300

(WHITE)

300.000 LNFT

A1700 63401-0300

(YELLOW)

1,200.000 LNFT

A1720 63401-0400

(WHITE)

110.000 LNFT

A1740 63401-0700

(WHITE)

2,700.000 LNFT

A1760 63403-0200

(WHITE)

620.000 SQFT

A1780 63405-0050

(TYPE D, WHITE)

22.000 EACH

A1800 63405-1650 4.000 EACH

A1820 63502-0400

(GOVERNMENT

FURNISHED GATE) 3.000 EACH

A1840 63502-0600 18.000 EACH

A1860 63502-1250 200.000 EACH

A1880 63502-1300 100.000 EACH

A1900 63502-2000 4.000 EACH

A1920 63502-3900 32.000 EACH

A1940 63506-0500 2,035.000 HOUR

A1960 63506-0600 980.000 HOUR

A1980 63507-0700 330.000 DAY

A2000 63601-3000

(100A NEMA FUSED

DISCONNECT SWITCH) ALL LPSM

A2020 63601-3000

(3RD PARTY

INSPECTION) ALL LPSM

A2040 63601-3000

(VMS SERVICE H-

FRAME) ALL LPSM

A2060 63601-3000

(VMS SERVICE H-

FRAME) ALL LPSM

TEMPORARY TRAFFIC

CONTROL, TRAFFIC

CONTROL

SYSTEM

INSTALLATION,

ELECTRICAL

SYSTEM

INSTALLATION,

ELECTRICAL

SYSTEM

INSTALLATION,

ELECTRICAL

SYSTEM

INSTALLATION,

ELECTRICAL

TEMPORARY TRAFFIC

CONTROL, DRUM

TEMPORARY TRAFFIC

CONTROL, PORTABLE

CHANGEABLE

TEMPORARY TRAFFIC

CONTROL,

CONSTRUCTION SIGN

TEMPORARY TRAFFIC

CONTROL, FLAGGER

TEMPORARY TRAFFIC

CONTROL, PILOT CAR

PAVEMENT

MARKINGS, SYMBOLS

PAVEMENT

MARKINGS, TYPE D,

ACCESSIBILITY

TEMPORARY TRAFFIC

CONTROL, BARRICADE

TYPE 1

TEMPORARY TRAFFIC

CONTROL, BARRICADE

TYPE 3

TEMPORARY TRAFFIC

CONTROL, TUBULAR

MARKER, TYPE 42-INCH

PAVEMENT

MARKINGS, TYPE B,

SOLID

PAVEMENT

MARKINGS, TYPE B,

SOLID

PAVEMENT

MARKINGS, TYPE B,

BROKEN

PAVEMENT

MARKINGS, TYPE D,

SOLID

PAVEMENT

MARKINGS, TYPE B

REMOVE AND RESET

SIGN SYSTEM

SNOW POLE HOLDER

Revised by Amendment A002 Page A-12

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Pay Item

Number

Supplemental

Description

Quantity Unit Unit Price AmountDescription

A002 A2065 63601-7000 ALL LPSM

A002 A2075 63602-1000

(PEDESTRIAN)

2.000 EACH

A2080 63602-6020 12.000 EACH

A2100 63602-8000 2.000 EACH

A2120 63603-0100

(LVE CONNECTION)

ALL CTSM $15,000.00 $15,000.00

A2140 63603-0200

(SILVER STAR

CONNECTION) ALL CTSM $15,000.00 $15,000.00

A2160 63610-0400 50.000 LNFT

A2180 63610-0500 130.000 LNFT

A2200 63610-1600 2,500.000 LNFT

A2220 63610-1700 80.000 LNFT

A2240 63610-1900 30.000 LNFT

A2260 63610-2000 30.000 LNFT

A2280 63610-2800 410.000 LNFT

A2300 63620-0000

(GOVERNMENT

FURNISHED) 2.000 EACH

A2320 63621-1000

(TYPE 1)

20.000 EACH

A2340 63706-0000 26.000 MO

A2360 64603-0000

(LIDAR DETECTION

SYSTEM) 2.000 EACH

A2380 64603-0100

(BEARSAVER CE340)

2.000 EACH

A2400 64603-0300 1.000 EACH

A2420 64603-0500 1.000 EACH

A2440 64603-0800 1.000 EACH

A2460 64603-1000 2.000 EACH

FIXTURE, KIOSK

FIXTURE, VAULT

TOILET

RESIDENTIAL HOUSING

FIXTURE

FIXTURE, TRASH

RECEPTACLE

FIXTURE, BENCH

FIXTURE, BICYCLE

STORAGE RACK

CONDUIT, 2 1/2-INCH,

PVC

CONDUIT, 2 1/2-INCH,

RIGID GALVANIZED

STEEL

CONDUIT, 4-INCH, PVC

POLE

UTILITY BOX, PULLBOX

SYSTEM

INSTALLATION,

TELEPHONE

CONDUIT, 1-INCH, PVC

CONDUIT, 1-INCH,

RIGID GALVANIZED

STEEL

CONDUIT, 2-INCH, PVC

CONDUIT, 2-INCH,

RIGID GALVANIZED

STEEL

SYSTEM

INSTALLATION, SPEED

FEEDBACK SIGN

SYSTEM

INSTALLATION,

TRAFFIC SIGNAL

SYSTEM

INSTALLATION,

TRAFFIC DETECTOR

SYSTEM

INSTALLATION,

RECTANGULAR RAPID-

SYSTEM

INSTALLATION,

ELECTRICAL

A001

A001

Revised by Amendment A001 Revised by Amendment A002

Page A-13Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Pay Item

Number

Supplemental

Description

Quantity Unit Unit Price AmountDescription

A2480 64605-0000

(CCTV SURVEILLANCE

CAMERA SYSTEM) ALL LPSM

A2500 64703-1000 75.000 EACH

A2520 64703-1000

(DOWNED, NATURAL)

37.000 EACH

A2540 64703-6000 30.000 EACH

A2560 64704-1000 180.000 CUYD

Submitted By:

Schedule : X

Schedule Type : Option

X0020 15101-0000 ALL LPSM

X0040 15201-0000 ALL LPSM

X0060 15301-0000 ALL LPSM

X0080 15401-0000 ALL LPSM

X0100 15501-0000 ALL LPSM

X0120 15705-1400 2,650.000 LNFT

X0140 15802-0000 ALL LPSM

X0160 20101-0000 1.700 ACRE

X0180 20301-0100 2.000 EACH

X0200 20301-2400 7.000 EACH

X0220 20401-0000 2,675.000 CUYD

X0240 20403-0000 2,350.000 CUYD

X0260 20470-0000

(LARGE)

6.000 EACH

Project Name : Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Schedule Total:

Project No :

REMOVAL OF BOLLARD

REMOVAL OF SIGN

ROADWAY

EXCAVATION

UNCLASSIFIED

BORROW

BOULDER

CONTRACTOR TESTING

CONSTRUCTION

SCHEDULE

SOIL EROSION

CONTROL, FIBER ROLL

WATERING FOR DUST

CONTROL

CLEARING AND

GRUBBING

ENVIRONMENTAL

DESIGN, FISH

PASSAGE BOULDER

ENVIRONMENTAL

DESIGN, STREAMBED

MATERIAL

MOBILIZATION

CONSTRUCTION

SURVEY AND STAKING

CONTRACTOR

QUALITY CONTROL

WY NPS GRTE 2020(1) & WY NP

GRTE 11(1)

FIXTURE

ENVIRONMENTAL

DESIGN,

LANDSCAPING LOG

ENVIRONMENTAL

DESIGN,

LANDSCAPING LOG

Revised by Amendment A002 Page A-14

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Pay Item

Number

Supplemental

Description

Quantity Unit Unit Price AmountDescription

X0280 20470-0000

(MEDIUM)

6.000 EACH

X0300 20470-0000

(SMALL)

4.000 EACH

X0320 25101-0100 16.000 CUYD

X0340 30201-2000 1,875.000 CUYD

X0360 31302-0000 330.000 SQYD

X0380 40301-0100 1,325.000 TON

X0400 41201-0000 6.000 TON

X0420 50101-0600 305.000 SQYD

X0440 50101-0900

(COLORED,

CHAMPAGNE) 180.000 SQYD

X0460 50101-0900

(COLORED, RUSTIC

BROWN) 65.000 SQYD

X0480 60103-4000 4.000 EACH

X0500 60901-1000 235.000 LNFT

X0520 60901-1000

(MOUNTABLE)

300.000 LNFT

X0540 60901-1000

(VERTICAL)

60.000 LNFT

X0560 60902-1000 920.000 LNFT

X0580 60902-1000

(CURB NOSE)

100.000 LNFT

X0600 61001-0100 80.000 SQYD

X0620 61003-1000

(COLORED,

CHAMPAGNE) 450.000 SQYD

X0640 61003-1000

(COLORED, RUSTIC

BROWN) 240.000 SQYD

X0660 61009-0000 27.000 SQYD

X0680 61108-4000 3.000 EACH

X0700 62201-0250 50.000 HOUR

ADJUST VALVE BOX

DUMP TRUCK, 10

CUBIC YARD MINIMUM

CAPACITY

CURB AND GUTTER,

CONCRETE, 12-INCH

DEPTH

SIDEWALK, CONCRETE

MEDIAN, CONCRETE

MEDIAN, CONCRETE

DETECTABLE

WARNING PANELS

CONCRETE,

FOUNDATION, LIGHT

POLE

CURB, CONCRETE, 12-

INCH DEPTH

CURB, CONCRETE, 12-

INCH DEPTH

CURB, CONCRETE, 12-

INCH DEPTH

CURB AND GUTTER,

CONCRETE, 12-INCH

DEPTH

ASPHALT CONCRETE

PAVEMENT, TYPE 1

TACK COAT

MINOR CONCRETE

PAVEMENT,

REINFORCED, 6-INCH

MINOR CONCRETE

PAVEMENT,

REINFORCED, 9-INCH

MINOR CONCRETE

PAVEMENT,

REINFORCED, 9-INCH

BOULDER

BOULDER

PLACED RIPRAP,

CLASS 1

ROADWAY

AGGREGATE, METHOD

AGGREGATE-TOPSOIL

COURSE

Revised by Amendment A002 Page A-15

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Pay Item

Number

Supplemental

Description

Quantity Unit Unit Price AmountDescription

X0720 62201-0600 50.000 HOUR

X0740 62201-0725

(SKID STEER, 40 HP

MINIMUM) 50.000 HOUR

X0760 62201-0850 50.000 HOUR

X0780 62201-1300 50.000 HOUR

X0800 62201-2350 50.000 HOUR

X0820 62201-2850 50.000 HOUR

X0840 62201-3000

(MINI, 35 HP MINIMUM)

50.000 HOUR

X0860 62201-3150 50.000 HOUR

X0880 62301-0000 50.000 HOUR

X0900 62405-0300 7,700.000 SQYD

X0920 63301-0000 26.000 EACH

X0940 63301-1000 4.000 EACH

X0960 63309-1200

(FIBERGLASS)

45.000 EACH

X0980 63309-1200

(METAL)

65.000 EACH

X1000 63318-0000

(TYPE 1, METAL SNOW

POLE) 65.000 EACH

X1020 63318-0000

(TYPE 2, FIBERGLASS

SNOW POLE) 45.000 EACH

X1040 63401-0300

(WHITE)

6,750.000 LNFT

X1060 63401-0300

(YELLOW)

6,250.000 LNFT

X1080 63401-0450

(4-INCH WHITE)

255.000 LNFT

X1100 63401-1500

(24-INCH WHITE)

1,050.000 LNFT

X1120 63405-0050

(TYPE H, BIKE

SYMBOL) 2.000 EACH

X1140 63405-2890

(YIELD LINE, WHITE)

4.000 EACH

PAVEMENT

MARKINGS, TYPE B,

DOTTED

PAVEMENT

MARKINGS, TYPE H,

SOLID

PAVEMENT

MARKINGS, SYMBOLS

PAVEMENT

MARKINGS, TYPE H

DELINEATOR, TYPE

SNOW POLE, 10 FEET

SNOW POLE HOLDER

SNOW POLE HOLDER

PAVEMENT

MARKINGS, TYPE B,

SOLID

PAVEMENT

MARKINGS, TYPE B,

SOLID

GENERAL LABOR

PLACING CONSERVED

TOPSOIL, 4-INCH

DEPTH

SIGN SYSTEM

SIGN SYSTEM,

GOVERNMENT-

FURNISHED SIGN

DELINEATOR, TYPE

SNOW POLE, 10 FEET

BULLDOZER, 160HP

MINIMUM FLYWHEEL

POWER

POWER BROOM

MOTOR GRADER, 12

FOOT MINIMUM BLADE

HYDRAULIC

EXCAVATOR

HYDRAULIC

EXCAVATOR, 1.0

CUBIC YARD MINIMUM

BACKHOE LOADER, 8

CUBIC FOOT MINIMUM

RATED CAPACITY

WHEEL LOADER

WHEEL LOADER, 1

CUBIC YARD MINIMUM

RATED CAPACITY

Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Revised by Amendment A002 Page A-16

Pay Item

Number

Supplemental

Description

Quantity Unit Unit Price AmountDescription

X1160 63405-2950 5.000 EACH

X1180 63502-0500 2.000 EACH

X1200 63502-0600 3.000 EACH

X1220 63502-1250 50.000 EACH

X1240 63502-1300 25.000 EACH

X1260 63502-2000 3.000 EACH

X1280 63502-3900 24.000 EACH

X1300 63503-0400 420.000 LNFT

X1320 63503-0700 3,450.000 LNFT

X1340 63506-0500 2,980.000 HOUR

X1360 63507-0700 216.000 DAY

X1380 63601-2000 ALL LPSM

X1400 63602-6020 8.000 EACH

X1420 63612-0100 4.000 EACH

X1440 63612-0300 3.000 EACH

X1460 63620-0000 4.000 EACH

X1480 63621-1000 5.000 EACH

X1500 63621-3000 9.000 EACH

UTILITY BOX, PULLBOX

UTILITY BOX,

JUNCTION BOX

Submitted By: Schedule Total:

SYSTEM

INSTALLATION,

LIGHTING

SYSTEM

INSTALLATION,

TRAFFIC DETECTOR

LUMINAIRE, TYPE A

LUMINAIRE, TYPE C

POLE

TEMPORARY TRAFFIC

CONTROL,

CONSTRUCTION SIGN

TEMPORARY TRAFFIC

CONTROL, PORTABLE

TRAFFIC BARRIER

TEMPORARY TRAFFIC

CONTROL, PAVEMENT

MARKINGS

TEMPORARY TRAFFIC

CONTROL, FLAGGER

TEMPORARY TRAFFIC

CONTROL, TRAFFIC

CONTROL

TEMPORARY TRAFFIC

CONTROL, BARRICADE

TYPE 2

TEMPORARY TRAFFIC

CONTROL, BARRICADE

TYPE 3

TEMPORARY TRAFFIC

CONTROL, TUBULAR

MARKER, TYPE 42-INCH

TEMPORARY TRAFFIC

CONTROL, DRUM

TEMPORARY TRAFFIC

CONTROL, PORTABLE

CHANGEABLE

PAVEMENT

MARKINGS, TYPE H,

STRAIGHT ARROW

Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Page A-17

Schedule Bid Total

Schedule A - Base $

Schedule Bid Total

Schedule X - Option $

Bid Total

BID SCHEDULE SUMMARY

Total-Schedule(s) and Option(s)

Schedule A, Option X

Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Page A-18

E-20 DIVISION 100

Special Contract Requirements

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A002

(d) Levee Access Road Staging Area (only when performing work at this site).

(e) Station 346+00 on Moose Wilson Road.

(f) One 40-foot-long office trailer and two dedicated parking stalls can be staged at the following locations:

(1) Area northwest of the Moose Post Office

(2) The Barker-Davis site at Station 346+00 on Moose Wilson Road.

(3) Provide an office trailer according to Subsection 637.03(a)(1). Electricity and phone services are available at the Contractor's expense. Provide a licensed electrician for all electrical connections. Potable water and sewer service connections are not available. Cell phone coverage is not reliable.

The designated limits of the staging areas are as shown in the plans, which must not be exceeded unless otherwise approved.

Use only approved portions of the right-of-way for storing material or equipment. Provide additional space as needed. Do not use private property for staging, storage, or disposal without written permission of the owner or lessee and prior to completion of the requirements of

Subsection 107.10(d). Submit copies of agreements and documents and do not use property until approved.

E-28 DIVISION 100

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A002 of the Endangered Species Act prepared by a biological specialist with a minimum of

3 years of experience in Endangered Species Act compliance or other qualifications acceptable to the CO; or

(b) Documentation showing the proposed activities have previously been determined to comply with the Endangered Species Act and this determination remains valid. This documentation must be from the State, Tribal Government or Federal Land

Management Agency responsible for the land. Attach evidence of compliance, including correspondence with the U.S. Fish and Wildlife Service and National Marine

Fisheries Service.

(4) Wetlands and Waters. Submit written documentation satisfactory to the CO, that the proposed action will comply with Sections 404 and 401 of the Clean Water Act, Executive

Order 11990, and will not affect any wetlands or waters under Federal, State, or local jurisdiction. Documentation must be prepared by a wetland specialist with a minimum of

3 years of experience in wetland and ordinary high water mark delineation.

(5) Federal Lands. Before use of sites on Federal Lands, submit a copy of the Letter of

Approval or Special Use Permit from the applicable Federal agency allowing use of the site for intended purposes.

(6) Tribal, state and local approvals. Comply with applicable laws regarding the proposed activities. Submit copies of required clearances, including hazardous waste compliance, tribal, State and local permits and approvals.

Add the following:

(e) Other requirements. Comply with the following requirements:

(1) Use biodegradable vegetable-based oil in any equipment that operates or reaches into wetlands

(2) Vegetation removal can only occur from August 1 to March 15 (dates inclusive) to avoid impacts to nesting birds (May 1 to August 1) and greater sage-grouse (March 15 to

June 30).

(3) If active bird nests are identified during clearing operations; immediately suspend operations within 500 feet of the nest, and notify the CO within 1 hour. Obtain approval from the CO before restarting operations.

(2) Comply with the Migratory Bird Treaty Act of 1918 (MBTA; 16 U.S.C. 703) and

Executive Oder 13186.

(a) Complete work involving vegetation clearing, tree felling, fill placement, excavation, or other construction activities for outside of the nesting season, when feasible; Generally, May 1 to August 1 for songbirds or as dictated by nesting chronology. If activities that involve removal or manipulation of vegetation including

E-29 DIVISION 100

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A002 large trees, grasses, and shrubs must occur during the nesting season (May 1 to August

1) then nesting bird surveys must be conducted by a park staff before tree removal and/or ground disturbing activities begin. Provide two-week advanced notification for park staff to complete surveys. Work must be completed within two weeks of nesting bird survey.

(b) Report any nesting bird activity in the vicinity of proposed activity to the Park in a timely way so that they may assess whether additional mitigation measures are needed to comply with the MBTA.

(4)(3) Immediately report all bear and wolf sightings and any carcasses found or observed within 1 hour to the CO and the Teton Interagency Dispatch Center (TIDC) at 307-739-

3301. Notify CO within 24 hours of locating a dead, injured, or sick endangered or threatened species. Listed wildlife species include Canada lynx, North American

Wolverine, and yellow-billed cuckoo. Provide CO date, time, precise location of the injured animal or carcass, and any other pertinent information. Do not disturb any evidence associated with the specimen.

(5)(4) Store all food, toiletries, and other potential attractants (e.g., petroleum products, antifreeze, personal hygiene items, garbage, drinks, trash, or food and drink containers) in wildlife-proof containers, vehicles, trailers, buildings, or enclosed construction equipment, except during actual use. Contractor-supplied garbage bins must be bear-proof and meet

Park requirements. Any mishandling of garbage, trash, food, and other potential bear attractants described above will result in a citation, which may include a fine. Remove from the project any employee who receives more than one citation for a food storage violation.

(6)(5) Remove all trash from the project site daily and dispose of trash according to

Subsection 203.07.

(7)(6) Do not disturb, feed, or approach any wildlife species (e.g., amphibians, reptiles, migratory birds, mammals, raptors, or bats) found nesting, hibernating, estivating, or otherwise living in, or immediately nearby, worksites. Stay a minimum of 100 feet from bears or wolves. Monitor for and report adverse impacts on wildlife or wildlife habitat to the CO.

(8)(7) Do not allow equipment to idle longer than 10 minutes. Equip all motor vehicles and equipment at all times with mufflers conforming to original manufacturers specifications.

Ensure that they are in good working order to prevent excessive or unusual noise.

(9)(8) Do not collect artifacts. Do not damage archeological sites or historic properties.

(10)(9) Separate work areas from active stream flow according to Subsection 157.10.

Immediately remove diversions after completing in-stream activities.

E-30 DIVISION 100

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A002

(11)(10) Take action to keep waters free of turbidity that cause a nuisance or adversely affect aquatic resources and beneficial use. Slowly re-water the stream channel to avoid creating visible turbidity.

(12)(11) Comply with the following requirements when working in wetlands or in-stream locations:

(a) Power wash vehicle and equipment with hot water (140 °F, allow spray to contact surfaces for 2 minutes) using a hot pressure washer before using vehicles and equipment in wetlands or streams.

(b) Use drip pans or absorbent pads underneath all equipment when working on equipment in wetlands.

(c) Remove temporary fills in their entirety and return the affected areas to preconstruction elevations after completing work.

(d) Dispose of excess wetland material according to Subsection 203.07 or as directed.

(13)(12) Only use decontaminated pumping equipment to initiate pumping from a waterbody. Decontaminate all external and internal surfaces of the foot valve, draft hose, or other pump apparatus using a park-approved procedure or procedure agreed to by the park biologist specializing in aquatic invasive species management. Ensure backflow from the water tank does not contaminate the water source. Do not prime the water pump from the water tank; instead, prime from the drafting source. Do not allow the tank to overfill.

When pumping, prevent intake of organic, bottom, or other material to the extent possible.

When spraying water, do not apply water into waterbodies. Do not dispose or dump the tank water in or near a waterbody. Use Park approved pump decontamination methods as follows:

(a) Power wash with hot water (140 °F, allow spray to contact surfaces for 2 minutes) using a hot pressure washer; or

(b) Dry the gear in the hot sun until completely dry to the touch (sunlight intensifies the decontamination process).

(c) Use a chemical solution approved for aquatic invasive species treatment when other methods, such as hot water or drying, are not options. Chemicals can be used for small gear items ONLY (e.g., foot valves, draft hoses, or screens) in volumes appropriate for small buckets. Surfaces of the drafting hose and foot valve can be decontaminated by coiling and submerging in a bucket filled with disinfectant or by spray application with a backpack pump or a large spray bottle. Dispose used chemical solutions according to

Subsections 203.08.

(14)(13) The Contractor is responsible to obtain Temporary Turbidity Increase and

Temporary Discharge permits from the Wyoming Department of Environment Quality

(WYDEQ) if flow is present, or anticipated, within the work area. Permits should be obtained at least 30 days in advance of construction. Notify the CO before applying for the

E-31 DIVISION 100

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A002 permits. Link to WYDEQ permit information as follows: CWA Section 401 – Turbidity –

Wetland – Wyoming Department of Environmental Quality. Use absorbent pads, booms, and other materials on construction sites that involve heavy equipment to contain oil, hydraulic fluid, solvents, and hazardous material spills.

(15)(14) Wyoming Department of Environment Quality (WYDEQ) Temporary Discharge

Permit Requirements. Use NetDMR to electronically summarize and report effluent monitoring results obtained during the previous monitoring period

(https://usepa.servicenowservices.com/oeca_icis). For assistance with setting up NetDMR accounts, contact Katherine McCrea of WYDEQ – WYPDES at 307-777-5990 or katherine.mccrea@wyo.gov. If no discharge occurs during an entire reporting period, report "no discharge" within NetDMR for that period. If discharge is intermittent during any reporting period, sampling is required while the facility is discharging. Failure to submit discharge monitoring reports for each monitoring period will result in facility noncompliance. Submit NetDMR reports each month, no later than the 28th day of each month, following the completed reporting period.

(16)(15) Only ford Stewart Draw if the channel is dry and the crossing occurs within the existing footprint of the culvert replacement impact area.

(17)(16) When construction is ended prior to a winter season, protect all disturbed areas and soil stockpiles from snowmelt impacts by using erosion-control best management practices for subsoil, and soil conservation practices for topsoil.

(18)(17) Enclose fueling and fuel storage areas with berms and lining to contain spills.

(19)(18) Inspect construction equipment for fluid leaks, including hydraulic and oil leaks prior to use on construction sites, and implement inspection schedules to prevent contamination of soil and water. Promptly clean up any leaks or accidental spills, such as hydraulic fluid, oil, fuel, or antifreeze from construction equipment.

(20)(19) Do not operate or park any vehicles or equipment outside the construction limits.

In any area where the construction limits are not otherwise defined, do not operate or park any vehicles or equipment off the paved roadway except in approved areas according to

Subsection 105.04. Avoid rutting or excessive soil compaction caused by vehicles or equipment. Restrict construction activities during saturated soil conditions or severe weather conditions to avoid damage to soils and vegetation.

(21)(20) Do not stage equipment in riparian areas. Locate waste and excess excavation material outside of riparian areas. Limit construction near riparian areas to periods of low precipitation to reduce the risk of accidental hydrocarbon leaks or spills reaching surface and/or groundwater.

(22)(21) Do not sleep in vehicles or camp within the Park or National Forest boundaries except as allowed in Subsection 107.12.

https://deq.wyoming.gov/water-quality/watershed-protection/cwa-section-401-turbidity-wetland/#:~:text=Oklahoma%20Department%20of%20Environmental%20Quality https://deq.wyoming.gov/water-quality/watershed-protection/cwa-section-401-turbidity-wetland/#:~:text=Oklahoma%20Department%20of%20Environmental%20Quality https://usepa.servicenowservices.com/oeca_icis mailto:katherine.mccrea@wyo.gov

E-32 DIVISION 100

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A002

(23)(22) Do not use explosive material within the Park or National Forest boundaries.

(24)(23) Ensure that all contractor and subcontractor employees attend Park orientation meetings presented by the NPS prior to beginning work. Notify the CO 14 days prior to beginning work and 7 days before adding staff so orientations can be scheduled.

(25)(24) Do not carry firearms while working within the Park or National Forest boundaries.

(26)(25) Do not use engine braking systems while driving unloaded anywhere in the Park.

(27)(26) Implement a dust abatement program. Standard dust abatement measures may include the following elements: water spraying or otherwise stabilizing soils, covering haul trucks, employing speed limits on unpaved roads, minimizing vegetation clearing, and revegetating after construction.

(28)(27) Fence around open holes when not actively being worked and provide for a slope out of the hole such that wildlife trapped in the excavation may be able to escape. Cover post holes and other narrow cavities or crevices to prevent wildlife entrapment.

(29)(28) Conduct machinery maintenance and refueling at a distance of 200 feet or greater from any wetlands or waters. Refueling of equipment may occur within 200 feet of waterbodies if approved and spill prevention measures are in place.

(30)(29) When operating stationary equipment (e.g., generators, cranes, etc.) within 100 feet of any wetlands or waters. Provide and install CO approved secondary containment measures. Inspect equipment for fluid leaks daily, and address all fluid leaks according to

Subsection 107.10(b).

(31)(30) Take action to keep waters free of turbidity that cause a nuisance or adversely affect aquatic resources and beneficial uses. Immediately remove all debris that falls into any stream as a result of construction operations.

(32)(31) Secure portable toilets (such as by staking) to prevent tipping and blow-overs.

(33)(32) Conduct construction activities between ½ hours after sunrise and ½ hours before sunset for all work.

(34)(33) Comply with Park Superintendent’s Compendium (latest version) for closures implemented around active nesting or den or rendezvous sites. Seasonal area closures may be implemented as follows:

(a) Bald Eagles. ½ mile around active nesting sites between February 1 and April 15;

(b) Raptors and other bird species. ¼ mile around active nesting sites between April

1 and September 1; and

E-33 DIVISION 100

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A002

(c) Wolves. Up to 1 mile around den or rendezvous sites as needed between April 15 and August 15.

107.12 Contractor’s Camp. (Added Subsection).

Camping or temporarily residing for any length of time by Contractor employees is not allowed on the National Forest or Park lands unless in designated locations.

(a) Gros Ventre Campground. Gros Ventre Campground is located east of the project site.

Designated camping spots are available for contractor reservation (four in 2025, seven in 2026, and seven in 2027). Gros Ventre Campground has full recreational vehicle hookups. Camping reservation fees are required at this location.

(b) Barker-Davis site. The Barker-Davis site is located on a dirt road roughly 3 miles south of Moose. The location is designated for Contractor camping and a Contractor office trailer.

Electrical service is available at this site.

Notify the CO of intent to occupy this site within 21 days after Contract Award. The site may not be occupied prior to the Notice to Proceed. Provide 14 days’ notice to the CO before the site will be occupied. The CO will provide a location and access plan for Barker-Davis site and a plan showing designated parking spaces at the Preconstruction Conference.

Vacate the site and restore it to its original condition within 5 calendar days after final acceptance or any winter shutdown.

(1) Contractor camping. Three dry camping locations are available for a maximum of three hard-sided trailers and 10 personnel. Power can be provided to RV sites at the contractor’s expense and maintenance. No potable water or sewer hookups are available.

Comply with the following:

(a) Designate an on-site camp boss at each location with adequate authority to ensure the Contractor Camp operation remains in compliance with Park regulations and this

Subsection.

(b) Submit the name, phone number and position of the proposed camp boss for approval by the CO at least two days prior to occupying camp sites. The responsibilities of the camp boss will include but are not limited to ensuring proper food handling and storage, solid waste storage and disposal, management of camp facilities, and acting as the contact for the National Park Service. The camp boss will also be responsible for ensuring that no Contractor employee camps or temporarily resides outside the designated camp location(s). Designate a new camp boss if they are unable to maintain compliance. Camping will not be allowed without an approved camp boss.

(c) Provide conditions and activities at campsites according to Subsections 107.08 and

107.11. Provide and regularly service additional portable toilets and bear proof garbage bins for campsite residents. Submit a waste disposal plan for approval at least seven

E-33a DIVISION 100

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A002 days prior to using the site for camping, that details the methods and schedule for solid and sanitary waste storage and disposal.

(d) All campsite residents are required to attend the Park orientation meetings, according to Subsection 107.10(e)(24) prior to occupying any campsite.

(e) Camping may be reduced or eliminated at any location due to noncompliance, including situations where employees are camping or temporarily residing outside the designated locations(s), or for resource protection such as bear activity, other wildlife activity, or unfavorable soil and plant impacts.

(2) Contractor Office Trailer. Contractor may place an office trailer at the Barker-Davis

Site according to Subsection 105.04.

E-37 DIVISION 100

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A001

Revised by Amendment A002

109.04 Receiving Procedures. Delete Subsection (b) and substitute the following:

(b) Task Order line item number, pay item number and description;

109.06 Pricing of Adjustments. Delete Subsection (c)(3) and substitute the following:

(3) Profit. Include a reasonable profit, except when precluded by the FAR. Limit profit to

10 percent of the total cost. Due to the limited risk in post-work pricing, a lower project profit may be determined by a profit analysis according to FAR 15.404-9 Profit.

Delete the first paragraph of Subsection (d) and substitute the following:

(d) Cost or pricing data. When the contract modification exceeds the amount indicated in

FAR Clause 52214-27 Price Reduction for Defective Cost or Pricing Data – Modifications –

Sealed Bidding, FAR Clause 52.215-10 Price Reduction for Defective Certified Cost or Pricing

Data, or FAR Clause 52.215-11 Price Reduction for Defective Cost or Pricing Data –

Modifications, and the CO has determined that an exception does not apply, submit cost or pricing data according to Subsection 109.06(b) or (c) as applicable and as defined in FAR

Subpart 2.1 Definitions, for the Contractor and each major subcontractor. See FAR Subpart

15.4 Contract Pricing and FAR Table 15-1 Instructions for Submitting Cost/Price Proposals

When Certified Cost or Pricing Data Are Required for guidance.

Add the following:

(e) Variation in Estimated Quantity. If the quantity of a unit-priced item is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price will be made upon demand of either party. The equitable adjustment will be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity.

109.08 Progress Payments. Amend as follows: Delete Subsection (c) and substitute the following:

(c) Government’s receiving report. The Government’s receiving report will be developed using the measurements and quantities from pay notes received by the CO in Masterworks and determined acceptable.

Delete Subsection (d) and substitute the following:

(d) Closing date and invoice submittal date. The closing date for progress payments will be designated by the CO. Include work performed after the closing date in the following month's invoice. For work performed between September and July of any year, submit invoices to the designated billing office by the 7th day after the closing date. Invoices received by the

F-46 DIVISION 600

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A002

Section 637. — FACILITIES AND SERVICES

Description

637.02 General. Add the following to the second paragraph:

Locate the facilities within 20 miles of the project office in Moose, WY.

637.03 Facilities. Delete this Subsection and substitute the following:

637.03 Facilities.

Provide and maintain facilities according to Tables 637-1 and 637-2. If not otherwise specified, provide furnishings of standard size, character, and condition for their function. Provide batteries and light bulbs necessary for the provided furnishings.

Provide safe, secure, sanitary, weatherproof buildings or trailers in good condition. Provide services according to Subsection 637.04.

a. Residential housing. Provide 2 separate residential housing units. If the units are part of a larger building, separate units with partitions and provide separate outside doors with locks.

F-46a DIVISION 600

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and

Teton Park Road – Moose to Taggart Lake Trailhead

Table 637-1

Minimum Requirements for Field Facilities and Associated Services

(1) As required by local code.

(2) Includes one bedroom.

(3) If window air conditioning is provided, provide a separate unit for each room

Property

Residential

Housing, Each

Floor space, square feet 880

Locking outside door, deadbolt with 2 sets of keys 1

Steps with slip-proof tread and handrails ✓(1)

Windows with locks 3

Total window area, square feet 60

Ceiling height, 7 feet ✓

Rooms including toilet room 3(2)

Room size, except toilet room, square feet (min) 100

Closet, 45-cubic foot 2

Shelves, 12-inch depth, square feet 12

Electrical lighting ✓

Heat and air conditioning, maintain temperature of 72±7 °F(3) ✓

Adequate electrical outlets ✓

Surge protectors 3

Adequate electricity

(120 and 240 V, 60 cycle as applicable)

Adequate potable water supply ✓

Drinking water cooler with water supply −

Sink with faucets for both hot and cold water ✓

Adequate hot and cold water supply ✓

Shower/bath facilities ✓

Parking for three vehicles on gravel, or paved surface ✓

6-foot-high chain link fence with gate around building and parking area

F-46b DIVISION 600

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and

Teton Park Road – Moose to Taggart Lake Trailhead

Table 637-2

Minimum Facility Furnishings

Property Residential

Housing, Each

Table, wood or like, 96 inches L x 30 inches W x 30 inches H −

File cabinet, 2-drawer, fire resistant, metal, with lock and keys −

File cabinet, 4-drawer, metal −

Desk, wood or like, 60 inches L x 30 inches W x 30 inches H(1) −

Desk lamp(1) −

Office chair(1) −

Storage cabinet, 72 inches L x 36 inches W x 18 inches H −

Fire extinguisher 2

Refrigerator, 18-cubic foot 1

Range and oven, standard 36-inch 1

Microwave oven, 1.1 cubic foot, 1100…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .