This is Amendment A001 to Solicitation No. 69056726R000005, issued by the Federal Highway Administration (FHWA) on January 22, 2026, for two related projects in Wyoming: Moose Wilson Road Phase 2 and Teton Park Road—Moose to Taggart Lake Trailhead. The amendment revises the original solicitation effective January 2, 2026, and does not extend the offer receipt deadline. Key revisions include removal of the "Electronic Documentation" subsection and addition of a new "Masterworks" subsection requiring contractors to use the Government's web-based Masterworks system for preparing Contractor's Daily Records (CDRs), measurement notes (pay notes), and field documentation. The amendment adds definitions for CDR and Masterworks, establishes abbreviations including CDR and updates to specifications. The bid schedule (pages A-7 through A-17) has been revised to add CTSM (Cost-Time Scheduled Materials) pricing for two line items: A2120 (System Installation, Electrical Company Compensation for LVE Connection) and A2140 (System Installation, Telephone Company Compensation for Silver Star Connection), each valued at $15,000.00. The Davis-Bacon General Wage Decision has been updated from WY20250044 to WY20260044, effective January 2, 2026, establishing prevailing wage rates for various construction classifications in Wyoming counties.

The amendment revises multiple sections of the Special Contract Requirements document, including updates to electronic documentation procedures mandating Masterworks usage with specified file formats and submission requirements. Measurement and payment procedures have been revised to require electronic submission of pay notes via Masterworks with specific decimal accuracy standards based on awarded unit prices. Pricing adjustment procedures now reference the profit limitation of 10 percent of total cost per FAR 15.404-9, and a new subsection 109.06(e) addresses equitable adjustments when estimated quantities vary more than 15 percent from actual quantities. Progress payment procedures have been substantially revised to establish specific invoice submission deadlines (7th day after closing for September-July work, 5th day for August invoices) with detailed defective invoice correction timelines. Section 155 (Schedules for Construction Contracts) has been expanded with comprehensive definitions and requirements for baseline schedules, Critical Path Method (CPM) schedules, look-ahead schedules, and Contractor's Daily Records using Masterworks. Section 155.12 requires contractors to enter labor, equipment, and subcontractor data into Masterworks before beginning work and maintain current information. Additional revisions include updates to Contractor Quality Control requirements (Section 153), coordination of contract documents hierarchy, and addition of Section 646 (Roadside Development) covering installation of fixtures including trash receptacles, benches, bicycle storage racks, vault toilets, kiosks, LiDAR detection systems, and CCTV surveillance cameras. Offerors must submit revised pages A-7 through A-17 with their proposals.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 01/22/2026 N/A WY NPS GRTE 2020(1), Moose Wilson Road Phase 2 and WY NP GRTE 11(1), Teton Park Road – Moose to Taggart Lake Trailhead

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X 69056726R000005

9B. DATED (SEE ITEM 11)

01/02/2026

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WY NPS GRTE 2020(1), Moose Wilson Road Phase 2 and

WY NP GRTE 11(1), Teton Park Road - Moose to Taggart Lake Trailhead

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 01-22-2026

Solicitation No. 69056726R000005 WY NPS GRTE 2020(1), Moose Wilson Road Phase 2

Page 2 and WY NP GRTE 11(1), Teton Park Road – Moose to Taggart Lake Trailhead

REVISIONS ARE AS FOLLOWS:

NOTICE TO OFFEROR

Page A-2a through A-2b, Section IV. Specifications and Permits. Removes subsection

“Electronic Documentation” and adds subsection “Masterworks.”

BID SCHEDULE

Page A-7 through A-17. Revises items A2120 and A2140 by adding CTSM pricing.

MINIMUM WAGE SCHEDULE

Page D-1 through D-6. Updates Davis-Bacon General Wage Decision Number WY20250044 to

WY20260044, current effective date of 01/02/2026.

SPECIAL CONTRACT REQUIREMENTS

Page E-1, Subsection 101.03 Abbreviations. Adds definition for CDR.

Pages E-1 through E-3, Subsection 101.04 Definitions. Adds definition for Masterworks.

Page E-15 through E-15a, Adds Subsection 104.04 Electronic Documentation.

Page E-36 through E-36a, Revises Subsection 109.01 Measurement of Work.

Page E-37, Subsection 109.06 Pricing Adjustments. Revises Subsection (c)(3) and revises the first paragraph of Subsection (d).

Page E-37 through E-40, Subsection 109.08 Progress Payments. Revises Subsection (c). Note-pages E-38 through E-40 are amended because the page content has shifted due to the revision on previous pages.

Page E-45, Updates Subsection 153.01 Description.

Page E-52, Updates Subsection 155.01 Description.

Page E-60 through E-61a, Revises Subsection 155.12 Contractor’s Daily Record of

Construction Operations.

Page F-47, Revises subsection 646.01 Description.

Notice to Offeror: Please submit revised pages A-7 through A-17 with your proposal.

Amendment No. A001, dated 01-22-2026

Solicitation No. 69056726R000005 WY NPS GRTE 2020(1), Moose Wilson Road Phase 2

Page 3 and WY NP GRTE 11(1), Teton Park Road – Moose to Taggart Lake Trailhead

ENCLOSURES

Pages:

A-2a through A-2b

A-7 through A-17

D-1 through D-6

E-1 through E-3

E-15 through E-15a

E-36 through E-40

E-45

E-52

E-60 through E-61a

F-47

A-2a

Notice to Offeror

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A001

Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected.

Issuance of this solicitation does not guarantee that an award will be made. Any resulting awards are subject to the availability of funding and the discretion of the awarding entity, including cancellation or amendment based on a determination of change in agency needs.

PLEASE NOTE: Federal Acquisition Regulation (FAR) Clause 52.211-10, Commencement, Prosecution, and Completion of Work has been removed due to the FAR Overhaul. See the SF-

1442 and Block 11 for contract requirements related to the fixed completion date.

Facsimile and email offers, modifications, and withdrawals. Facsimile and email offers are not authorized for this solicitation. Offers may be modified or withdrawn by email, if such notice is received by the time specified for receipt of offers. The Government will not be responsible for any failure attributable to the transmission or receipt of email data. See FAR Provision 52.215-1, Instructions to Offerors – Competitive Acquisition. EMAIL WFL.Contracts@dot.gov. To confirm receipt, call 360.619.7520.

Fraud Alert. Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO

NOT release any information. To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party. You can access SAM at https://www.sam.gov/SAM/ .

III. Post Award Information.

Insurance. Insurance requirements are described in Subsection 107.05.

Contractor Performance Evaluations. This office posts performance evaluations in the

Contractor Performance Assessment Reporting System (CPARS); for additional information, see https://www.cpars.gov/cparsweb/home. Upon receiving an email notice of evaluation availability, you will have 14-60 days to review the evaluation online and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.

IV. Specifications and Permits.

Specifications. This solicitation and subsequent contract are governed by the Federal Acquisition

Regulation (FAR), agency supplemental regulations, and the Standard Specifications for

Construction of Roads and Bridges on Federal Highway Projects, FP-24. An electronic version may be found at https://highways.dot.gov/federal-lands/specs.

Electronic Documentation. Requires all documents (including but not limited to correspondence, notifications, submittals, reports, and pay notes) to be submitted in a pdf format, or an approved fixed-layout electronic format. See Subsection 104.04.

https://www.acquisition.gov/far-overhaul mailto:WFL.Contracts@dot.gov https://www.sam.gov/SAM/ https://www.cpars.gov/cparsweb/home https://highways.dot.gov/federal-lands/specs

A-2b

Notice to Offeror

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A001

Masterworks. Requires the Contractor to use the Government’s web-based system Masterworks to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes). Attend a training session on the use of Masterworks. The virtual training sessions will be either a video presentation or live training as determined by the

CO. Train additional staff. Submit a user account form to gain access to Masterworks. See

Subsection 104.04.

Material Sources. Government-provide material is identified under Subsection 105.02(a).

Government-provided material stockpiles are identified under Subsection 105.02(b), and a

Government-provided water source has been identified under Subsection 105.02(d). Secure all permits and clearances for Contractor-located sites and sources. See Subsection 105.02(c).

Progress Schedules. This project includes new specifications for Prosecution and Progress and for Schedules for Construction Contracts. Carefully review Special Contract Requirements

Section 108 - Prosecution and Progress, and Section 155 – Schedules for Construction Contracts.

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.

When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.

BID SCHEDULE

A-7Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Revised by Amendment A001

Project No : WY NPS GRTE 2020(1) & WY NP

GRTE 11(1)

Schedule : A

Project Name : Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Schedule Type : Base

Contract Quantity Pay Items

20101-0000 CLEARING AND GRUBBING

20403-0000 UNCLASSIFIED BORROW

21101-2000 ROADWAY OBLITERATION, METHOD 2

62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

AMD# Line Item Number

Pay Item Number

Description Supplemental Description

Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION ALL LPSM

A0040 15201-0000

CONSTRUCTION

SURVEY AND

STAKING

ALL LPSM

A0060 15301-0000 CONTRACTOR

QUALITY CONTROL ALL LPSM

A0080 15401-0000 CONTRACTOR

TESTING ALL LPSM

A0100 15501-0000 CONSTRUCTION

SCHEDULE ALL LPSM

A0120 15705-0100

SOIL EROSION

CONTROL, SILT

FENCE

310.000 LNFT

A0140 15705-0500

SOIL EROSION

CONTROL,

TEMPORARY

CULVERT PIPE

(12-INCH)

30.000 LNFT

A0160 15705-1400

SOIL EROSION

CONTROL, FIBER

ROLL

(EXCELSIOR FIBER)

3,945.000 LNFT

A0180 15706-1600

SOIL EROSION

CONTROL,

STABILIZED

CONSTRUCTION EXIT

(TEMPORARY

CONSTRUCTION

TURNAROUND) 1.000 EACH

A0200 15706-1600

SOIL EROSION

CONTROL,

STABILIZED

CONSTRUCTION EXIT

(TEMPORARY)

1.000 EACH

A0220 15802-0000 WATERING FOR DUST

CONTROL ALL LPSM

A0240 20101-0000 CLEARING AND

GRUBBING 9.300 ACRE

A0260 20301-0700 REMOVAL OF

DELINEATOR 100.000 EACH

A0280 20301-1100 REMOVAL OF GATE 2.000 EACH

A0300 20301-2400 REMOVAL OF SIGN 24.000 EACH

A0320 20302-0625 REMOVAL OF CURB,

LOG 290.000 LNFT

A0340 20302-0700 REMOVAL OF FENCE 1,000.000 LNFT

A0360 20302-0800 REMOVAL OF FENCE,

BARBED WIRE 126.000 LNFT

A0380 20302-0900 REMOVAL OF FENCE,

CHAIN LINK 1,400.000 LNFT

A0400 20303-1600 REMOVAL OF

PAVEMENT, ASPHALT 540.000 SQYD

A-8Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart

A0420 20304-1000

REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

(BARKER-DAVIS

RESIDENCE) ALL LPSM

A0440 20304-1000

REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

(SOIL EROSION

CONTROL, FIBER

ROLL (EXCELSIOR

FIBER))

ALL LPSM

A0460 20304-1000

REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

(WILLIAMS

RESIDENCE) ALL LPSM

A0480 20304-1000

REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

(WITTMER

RESIDENCE) ALL LPSM

A0500 20401-0000 ROADWAY

EXCAVATION 10,484.000 CUYD

A0520 20402-0000 SUBEXCAVATION 700.000 CUYD

A0540 20403-0000 UNCLASSIFIED

BORROW 9,257.000 CUYD

A0560 20410-0000 SELECT BORROW 700.000 CUYD

A0580 20435-2000 BACKFILL, GRANULAR 40.000 CUYD

A0600 20470-0000 BOULDER 10.000 EACH

A0620 20470-0000 BOULDER (LANDSCAPING) 109.000 EACH

A0640 20701-1000 SEPARATION

GEOTEXTILE, WOVEN 530.000 SQYD

A0660 20701-2000

SEPARATION

GEOTEXTILE, NON-

WOVEN

40.000 SQYD

A0680 20703-1200

GEOTEXTILE FILTER,

CLASS 1, NON-

WOVEN

280.000 SQYD

A0700 20820-0000 DEWATERING (LOWER STEWART

DRAW) ALL LPSM

A0720 20820-0000 DEWATERING (UPPER STEWART

DRAW) ALL LPSM

A0740 21101-1000

ROADWAY

OBLITERATION,

METHOD 1

31,900.000 SQYD

A0760 21101-2000

ROADWAY

OBLITERATION,

METHOD 2

16,680.000 SQYD

A0780 25101-0200 PLACED RIPRAP,

CLASS 2 50.000 CUYD

A0800 25101-0300 PLACED RIPRAP,

CLASS 3 275.000 CUYD

A0820 30201-2000

ROADWAY

AGGREGATE,

METHOD 2

4,550.000 CUYD

A0840 30402-5200

FULL DEPTH

RECLAMATION,

METHOD 2, 4-INCH

DEPTH

6,100.000 SQYD

A0860 31303-0000 AGGREGATE-

TOPSOIL COURSE 180.000 CUYD

A0880 40301-0100 ASPHALT CONCRETE

PAVEMENT, TYPE 1 5,660.000 TON

A0900 41201-0000 TACK COAT 9.500 TON

A0920 55601-1300 BRIDGE RAILING,

TIMBER

(BOX CULVERT) 58.000 LNFT

A0940 60201-0600 18-INCH PIPE

CULVERT

(RCP WITH CRITTER

CONTROL) 480.000 LNFT

A0960 60201-0800 24-INCH PIPE

CULVERT 50.000 LNFT

A0980 60210-0800 END SECTION FOR 24-

INCH PIPE CULVERT 2.000 EACH

A-9Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart

A1000 60220-0000

PRECAST

REINFORCED

CONCRETE BOX

CULVERT

(LOWER STEWART

DRAW AOP) 32.000 LNFT

A1020 60220-0000

PRECAST

REINFORCED

CONCRETE BOX

CULVERT

(UPPER STEWART

DRAW AOP) 32.000 LNFT

A1040 60404-1000 CATCH BASIN, FLH

TYPE 1

(TYPE B GRATE) 4.000 EACH

A1060 60901-7000 CURB, LOG 210.000 LNFT

A1080 60902-2500

CURB AND GUTTER,

EXPOSED

AGGREGATE, 12-INCH

DEPTH

1,400.000 LNFT

A1100 61001-0500

SIDEWALK, EXPOSED

AGGREGATE

CONCRETE

(4-INCH DEPTH)

1,020.000 SQYD

A1120 61001-0500

SIDEWALK, EXPOSED

AGGREGATE

CONCRETE

(6-INCH DEPTH)

10.000 SQYD

A1140 61003-2000

MEDIAN, EXPOSED

AGGREGATE

CONCRETE

(RIVER ROCK INLAY)

150.000 SQYD

A1160 61009-0000 DETECTABLE

WARNING PANELS 8.000 SQYD

A1180 61901-2250 FENCE, RAIL (WOOD) 2,530.000 LNFT

A1200 61902-1800 GATE, METAL, 24

FEET WIDTH 3.000 EACH

A1220 61902-2000 GATE, METAL, 28

FEET WIDTH 1.000 EACH

A1240 61920-2000 REMOVE AND RESET

GATE 1.000 EACH

A1260 62201-0250

DUMP TRUCK, 10

CUBIC YARD MINIMUM

CAPACITY

90.000 HOUR

A1280 62201-0600

BACKHOE LOADER, 8

CUBIC FOOT MINIMUM

RATED CAPACITY

BUCKET, 30-INCH

WIDTH

60.000 HOUR

A1300 62201-0725 WHEEL LOADER (SKID STEER, 40 HP

MINIMUM) 30.000 HOUR

A1320 62201-0850

WHEEL LOADER, 1

CUBIC YARD MINIMUM

RATED CAPACITY

30.000 HOUR

A1340 62201-1300

BULLDOZER, 160HP

MINIMUM FLYWHEEL

POWER

30.000 HOUR

A1360 62201-2050 ROLLER 20.000 HOUR

A1380 62201-2350 POWER BROOM 90.000 HOUR

A1400 62201-2850

MOTOR GRADER, 12

FOOT MINIMUM

BLADE

30.000 HOUR

A1420 62201-3000 HYDRAULIC

EXCAVATOR

(MINI, 35 HP

MINIMUM) 80.000 HOUR

A1440 62201-3150

HYDRAULIC

EXCAVATOR, 1.0

CUBIC YARD MINIMUM

CAPACITY WITH

THUMB ATTACHMENT

30.000 HOUR

A1460 62301-0000 GENERAL LABOR 90.000 HOUR

A1480 62405-0300

PLACING

CONSERVED

TOPSOIL, 4-INCH

DEPTH

39,685.000 SQYD

A1500 62801-0000 TEMPORARY STREAM

DIVERSION

(LOWER STEWART

DRAW) ALL LPSM

A-10Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart

A1520 62801-0000 TEMPORARY STREAM

DIVERSION

(UPPER STEWART

DRAW) ALL LPSM

A1540 63301-0000 SIGN SYSTEM 46.000 EACH

A1560 63301-0000 SIGN SYSTEM (WAYFINDING) 28.000 EACH

A1580 63308-3000 OBJECT MARKER,

TYPE 3 8.000 EACH

A1600 63309-0000 DELINEATOR 100.000 EACH

A1620 63313-0000 RUMBLE STRIP 150.000 LNFT

A1640 63316-1000 REMOVE AND RESET

SIGN SYSTEM 3.000 EACH

A1660 63318-0000 SNOW POLE HOLDER (TYPE 1) 25.000 EACH

A1680 63401-0300

PAVEMENT

MARKINGS, TYPE B,

SOLID

(WHITE)

300.000 LNFT

A1700 63401-0300

PAVEMENT

MARKINGS, TYPE B,

SOLID

(YELLOW)

1,200.000 LNFT

A1720 63401-0400

PAVEMENT

MARKINGS, TYPE B,

BROKEN

(WHITE)

110.000 LNFT

A1740 63401-0700

PAVEMENT

MARKINGS, TYPE D,

SOLID

(WHITE)

2,700.000 LNFT

A1760 63403-0200 PAVEMENT

MARKINGS, TYPE B

(WHITE) 620.000 SQFT

A1780 63405-0050 PAVEMENT

MARKINGS, SYMBOLS

(TYPE D, WHITE) 22.000 EACH

A1800 63405-1650

PAVEMENT

MARKINGS, TYPE D,

ACCESSIBILITY

SYMBOL

4.000 EACH

A1820 63502-0400

TEMPORARY TRAFFIC

CONTROL,

BARRICADE TYPE 1

(GOVERNMENT

FURNISHED GATE) 3.000 EACH

A1840 63502-0600

TEMPORARY TRAFFIC

CONTROL,

BARRICADE TYPE 3

18.000 EACH

A1860 63502-1250

TEMPORARY TRAFFIC

CONTROL, TUBULAR

MARKER, TYPE 42-

INCH

200.000 EACH

A1880 63502-1300 TEMPORARY TRAFFIC

CONTROL, DRUM 100.000 EACH

A1900 63502-2000

TEMPORARY TRAFFIC

CONTROL, PORTABLE

CHANGEABLE

MESSAGE SIGN

4.000 EACH

A1920 63502-3900

TEMPORARY TRAFFIC

CONTROL,

CONSTRUCTION SIGN

32.000 EACH

A1940 63506-0500 TEMPORARY TRAFFIC

CONTROL, FLAGGER 2,035.000 HOUR

A1960 63506-0600 TEMPORARY TRAFFIC

CONTROL, PILOT CAR 980.000 HOUR

A1980 63507-0700

TEMPORARY TRAFFIC

CONTROL, TRAFFIC

CONTROL

SUPERVISOR

330.000 DAY

A2000 63601-3000

SYSTEM

INSTALLATION,

ELECTRICAL

(100A NEMA FUSED

DISCONNECT

SWITCH)

ALL LPSM

A2020 63601-3000

SYSTEM

INSTALLATION,

ELECTRICAL

(3RD PARTY

INSPECTION) ALL LPSM

A2040 63601-3000

SYSTEM

INSTALLATION,

ELECTRICAL

(VMS SERVICE H-

FRAME) ALL LPSM

A-11Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart

A2060 63601-3000

SYSTEM

INSTALLATION,

ELECTRICAL

(VMS SERVICE H-

FRAME) ALL LPSM

A2080 63602-6020

SYSTEM

INSTALLATION,

TRAFFIC DETECTOR

WIRE LOOP

12.000 EACH

A2100 63602-8000

SYSTEM

INSTALLATION,

RECTANGULAR

RAPID-FLASHING

BEACON

2.000 EACH

A2120 63603-0100

SYSTEM

INSTALLATION,

ELECTRICAL

COMPANY

COMPENSATION

(LVE CONNECTION)

ALL CTSM $15,000.00 $15,000.00

A2140 63603-0200

SYSTEM

INSTALLATION,

TELEPHONE

COMPANY

COMPENSATION

(SILVER STAR

CONNECTION)

ALL CTSM $15,000.00 $15,000.00

A2160 63610-0400 CONDUIT, 1-INCH,

PVC 50.000 LNFT

A2180 63610-0500

CONDUIT, 1-INCH,

RIGID GALVANIZED

STEEL

130.000 LNFT

A2200 63610-1600 CONDUIT, 2-INCH,

PVC 2,500.000 LNFT

A2220 63610-1700

CONDUIT, 2-INCH,

RIGID GALVANIZED

STEEL

80.000 LNFT

A2240 63610-1900 CONDUIT, 2 1/2-INCH,

PVC 30.000 LNFT

A2260 63610-2000

CONDUIT, 2 1/2-INCH,

RIGID GALVANIZED

STEEL

30.000 LNFT

A2280 63610-2800 CONDUIT, 4-INCH,

PVC 410.000 LNFT

A2300 63620-0000 POLE (GOVERNMENT

FURNISHED) 2.000 EACH

A2320 63621-1000 UTILITY BOX,

PULLBOX

(TYPE 1) 20.000 EACH

A2340 63706-0000 RESIDENTIAL

HOUSING 26.000 MO

A2360 64603-0000 FIXTURE (LIDAR DETECTION

SYSTEM) 2.000 EACH

A2380 64603-0100 FIXTURE, TRASH

RECEPTACLE

(BEARSAVER CE340) 2.000 EACH

A2400 64603-0300 FIXTURE, BENCH 1.000 EACH

A2420 64603-0500 FIXTURE, BICYCLE

STORAGE RACK 1.000 EACH

A2440 64603-0800 FIXTURE, KIOSK 1.000 EACH

A2460 64603-1000 FIXTURE, VAULT

TOILET 2.000 EACH

A2480 64605-0000

FIXTURE (CCTV

SURVEILLANCE

CAMERA SYSTEM)

ALL LPSM

A2500 64703-1000

ENVIRONMENTAL

DESIGN,

LANDSCAPING LOG

75.000 EACH

A2520 64703-1000

ENVIRONMENTAL

DESIGN,

LANDSCAPING LOG

(DOWNED, NATURAL)

37.000 EACH

A2540 64703-6000

ENVIRONMENTAL

DESIGN, FISH

PASSAGE BOULDER

30.000 EACH

A-12Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Revised by Amendment A001

A001

A001

A2560 64704-1000

ENVIRONMENTAL

DESIGN, STREAMBED

MATERIAL

180.000 CUYD

Submitted By: Schedule Total: $

A-13Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart

Project No : WY NPS GRTE 2020(1) & WY NP

GRTE 11(1)

Schedule : X

Project Name : Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart Lake Trailhead

Schedule Type : Option

Contract Quantity Pay Items

62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

AMD# Line Item Number

Pay Item Number

Description Supplemental Description

Quantity Unit Unit Price Amount

X0020 15101-0000 MOBILIZATION ALL LPSM

X0040 15201-0000

CONSTRUCTION

SURVEY AND

STAKING

ALL LPSM

X0060 15301-0000 CONTRACTOR

QUALITY CONTROL ALL LPSM

X0080 15401-0000 CONTRACTOR

TESTING ALL LPSM

X0100 15501-0000 CONSTRUCTION

SCHEDULE ALL LPSM

X0120 15705-1400

SOIL EROSION

CONTROL, FIBER

ROLL

2,650.000 LNFT

X0140 15802-0000 WATERING FOR DUST

CONTROL ALL LPSM

X0160 20101-0000 CLEARING AND

GRUBBING 1.700 ACRE

X0180 20301-0100 REMOVAL OF

BOLLARD 2.000 EACH

X0200 20301-2400 REMOVAL OF SIGN 7.000 EACH

X0220 20401-0000 ROADWAY

EXCAVATION 2,675.000 CUYD

X0240 20403-0000 UNCLASSIFIED

BORROW 2,350.000 CUYD

X0260 20470-0000 BOULDER (LARGE) 6.000 EACH

X0280 20470-0000 BOULDER (MEDIUM) 6.000 EACH

X0300 20470-0000 BOULDER (SMALL) 4.000 EACH

X0320 25101-0100 PLACED RIPRAP,

CLASS 1 16.000 CUYD

X0340 30201-2000

ROADWAY

AGGREGATE,

METHOD 2

1,875.000 CUYD

X0360 31302-0000 AGGREGATE-

TOPSOIL COURSE 330.000 SQYD

X0380 40301-0100 ASPHALT CONCRETE

PAVEMENT, TYPE 1 1,325.000 TON

X0400 41201-0000 TACK COAT 6.000 TON

X0420 50101-0600

MINOR CONCRETE

PAVEMENT,

REINFORCED, 6-INCH

DEPTH

305.000 SQYD

X0440 50101-0900

MINOR CONCRETE

PAVEMENT,

REINFORCED, 9-INCH

DEPTH

(COLORED,

CHAMPAGNE) 180.000 SQYD

X0460 50101-0900

MINOR CONCRETE

PAVEMENT,

REINFORCED, 9-INCH

DEPTH

(COLORED, RUSTIC

BROWN) 65.000 SQYD

A-14Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart

X0480 60103-4000

CONCRETE,

FOUNDATION, LIGHT

POLE

4.000 EACH

X0500 60901-1000 CURB, CONCRETE, 12

-INCH DEPTH 235.000 LNFT

X0520 60901-1000 CURB, CONCRETE, 12

-INCH DEPTH

(MOUNTABLE) 300.000 LNFT

X0540 60901-1000 CURB, CONCRETE, 12

-INCH DEPTH

(VERTICAL) 60.000 LNFT

X0560 60902-1000

CURB AND GUTTER,

CONCRETE, 12-INCH

DEPTH

920.000 LNFT

X0580 60902-1000

CURB AND GUTTER,

CONCRETE, 12-INCH

DEPTH

(CURB NOSE)

100.000 LNFT

X0600 61001-0100 SIDEWALK,

CONCRETE 80.000 SQYD

X0620 61003-1000 MEDIAN, CONCRETE (COLORED,

CHAMPAGNE) 450.000 SQYD

X0640 61003-1000 MEDIAN, CONCRETE (COLORED, RUSTIC

BROWN) 240.000 SQYD

X0660 61009-0000 DETECTABLE

WARNING PANELS 27.000 SQYD

X0680 61108-4000 ADJUST VALVE BOX 3.000 EACH

X0700 62201-0250

DUMP TRUCK, 10

CUBIC YARD MINIMUM

CAPACITY

50.000 HOUR

X0720 62201-0600

BACKHOE LOADER, 8

CUBIC FOOT MINIMUM

RATED CAPACITY

BUCKET, 30-INCH

WIDTH

50.000 HOUR

X0740 62201-0725 WHEEL LOADER (SKID STEER, 40 HP

MINIMUM) 50.000 HOUR

X0760 62201-0850

WHEEL LOADER, 1

CUBIC YARD MINIMUM

RATED CAPACITY

50.000 HOUR

X0780 62201-1300

BULLDOZER, 160HP

MINIMUM FLYWHEEL

POWER

50.000 HOUR

X0800 62201-2350 POWER BROOM 50.000 HOUR

X0820 62201-2850

MOTOR GRADER, 12

FOOT MINIMUM

BLADE

50.000 HOUR

X0840 62201-3000 HYDRAULIC

EXCAVATOR

(MINI, 35 HP

MINIMUM) 50.000 HOUR

X0860 62201-3150

HYDRAULIC

EXCAVATOR, 1.0

CUBIC YARD MINIMUM

CAPACITY WITH

THUMB ATTACHMENT

50.000 HOUR

X0880 62301-0000 GENERAL LABOR 50.000 HOUR

X0900 62405-0300

PLACING

CONSERVED

TOPSOIL, 4-INCH

DEPTH

7,700.000 SQYD

X0920 63301-0000 SIGN SYSTEM 26.000 EACH

X0940 63301-1000

SIGN SYSTEM,

GOVERNMENT-

FURNISHED SIGN

4.000 EACH

X0960 63309-1200 DELINEATOR, TYPE

SNOW POLE, 10 FEET

(FIBERGLASS) 45.000 EACH

X0980 63309-1200 DELINEATOR, TYPE

SNOW POLE, 10 FEET

(METAL) 65.000 EACH

X1000 63318-0000 SNOW POLE HOLDER (TYPE 1, METAL

SNOW POLE) 65.000 EACH

A-15Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart

X1020 63318-0000 SNOW POLE HOLDER (TYPE 2, FIBERGLASS

SNOW POLE) 45.000 EACH

X1040 63401-0300

PAVEMENT

MARKINGS, TYPE B,

SOLID

(WHITE)

6,750.000 LNFT

X1060 63401-0300

PAVEMENT

MARKINGS, TYPE B,

SOLID

(YELLOW)

6,250.000 LNFT

X1080 63401-0450

PAVEMENT

MARKINGS, TYPE B,

DOTTED

(4-INCH WHITE)

255.000 LNFT

X1100 63401-1500

PAVEMENT

MARKINGS, TYPE H,

SOLID

(24-INCH WHITE)

1,050.000 LNFT

X1120 63405-0050 PAVEMENT

MARKINGS, SYMBOLS

(TYPE H, BIKE

SYMBOL) 2.000 EACH

X1140 63405-2890 PAVEMENT

MARKINGS, TYPE H

(YIELD LINE, WHITE) 4.000 EACH

X1160 63405-2950

PAVEMENT

MARKINGS, TYPE H,

STRAIGHT ARROW

5.000 EACH

X1180 63502-0500

TEMPORARY TRAFFIC

CONTROL,

BARRICADE TYPE 2

2.000 EACH

X1200 63502-0600

TEMPORARY TRAFFIC

CONTROL,

BARRICADE TYPE 3

3.000 EACH

X1220 63502-1250

TEMPORARY TRAFFIC

CONTROL, TUBULAR

MARKER, TYPE 42-

INCH

50.000 EACH

X1240 63502-1300 TEMPORARY TRAFFIC

CONTROL, DRUM 25.000 EACH

X1260 63502-2000

TEMPORARY TRAFFIC

CONTROL, PORTABLE

CHANGEABLE

MESSAGE SIGN

3.000 EACH

X1280 63502-3900

TEMPORARY TRAFFIC

CONTROL,

CONSTRUCTION SIGN

24.000 EACH

X1300 63503-0400

TEMPORARY TRAFFIC

CONTROL, PORTABLE

TRAFFIC BARRIER

420.000 LNFT

X1320 63503-0700

TEMPORARY TRAFFIC

CONTROL, PAVEMENT

MARKINGS

3,450.000 LNFT

X1340 63506-0500 TEMPORARY TRAFFIC

CONTROL, FLAGGER 2,980.000 HOUR

X1360 63507-0700

TEMPORARY TRAFFIC

CONTROL, TRAFFIC

CONTROL

SUPERVISOR

216.000 DAY

X1380 63601-2000

SYSTEM

INSTALLATION,

LIGHTING

ALL LPSM

X1400 63602-6020

SYSTEM

INSTALLATION,

TRAFFIC DETECTOR

WIRE LOOP

8.000 EACH

X1420 63612-0100 LUMINAIRE, TYPE A 4.000 EACH

X1440 63612-0300 LUMINAIRE, TYPE C 3.000 EACH

X1460 63620-0000 POLE 4.000 EACH

X1480 63621-1000 UTILITY BOX,

PULLBOX 5.000 EACH

X1500 63621-3000 UTILITY BOX,

JUNCTION BOX 9.000 EACH

Submitted By: Schedule Total:

A-16Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart

Total-Schedule(s) and Option(s) Bid Total

Schedule A, Option X $

BID SCHEDULE SUMMARY

Schedule Bid Total

Schedule A - Base $

Schedule Bid Total

Schedule X - Option $

A-17Bid Schedule Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 & Teton Park Road - Moose to Taggart

D - 1

General Wage Decision

Project: Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton Park Road –

Moose to Taggart Lake Trailhead

General Decision Number: WY20260044 01/02/2026

Superseded General Decision Number: WY20250044

State: Wyoming

Construction Types: Heavy and Highway

Counties: Albany, Big Horn, Campbell, Carbon, Converse, Crook, Fremont, Goshen, Hot Springs, Johnson, Lincoln, Niobrara, Park, Platte, Sheridan, Sublette, Sweetwater, Teton, Uinta, Washakie and Weston Counties in Wyoming.

Heavy and Highway Construction Projects

Modification Number Publication Date

0 01/02/2026

SAWY2025-004 05/01/2025

Rates Fringes

Carpenter........................$ 29.40 5.25

Concrete Finisher................$ 30.12 7.39

Electrician (Inside Wireman, Outside Lineman and Signal and Lighting work)...............$ 58.83 21.89

Equipment Operator

(Electrical work)................$ 48.91 20.61

Groundman (Electrical work)......$ 34.72 17.64

Ironworker.......................$ 46.00 0.00

Laborers (Group 1)...............$ 21.68 0.00

Erector & Installer (fences, guardrail & barrier); Flag persons (traffic control); Form stripper; General laborer;

Heater tender; Material checker; Pick-up truck driver; Pilot car driver; Pre-watering, presetting & pre-irrigation (all work); Riprap man; Tar & asphalt pot tender

Laborers (Group 2)...............$ 22.90 4.08

Asphalt raker and tamper; Bin wall installer; Chain saw operator (clearing & grubbing); Concrete saw (all types); Form setter (paving); Hand operated vibratory roller; High scalar;

D - 2

Project: Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton Park Road –

Moose to Taggart Lake Trailhead

Jackhammer & pavement breaker; Maintainer (Traffic Control);

Nozzle man (air, water, gunnite & sandblasting); Landscaper, landscape laborer; Mortar man on stone riprap; Tamper operator

(pneumatic, electric, gas & similar); Painter (brush & spray);

Pipe setter (all pipe types); Pot Tender

Laborers (Group 3)...............$ 24.50 6.52

Dump man; Miner (driller), Machineman, Timberman, Steelman;

Drill Doctor, Form setter and mover, Spader, Spilling and/or

Caisson Worker; Powderman, Blaster, Tender; Traffic Control

Supervisor; Wagon drill, air-trac., (diamond and other drills for Blasting powder or grouting).

Power Equipment Operators

(Group 1)........................$ 26.90 5.13

Skid Steer (all attachments); Air Compressor (all types);

Backhoes & Excavators (to 5 CY.); Batch Bin Weighman, Scissorman or Hopper; Broom Operator (self propelled); Chip

Spreader Operator; Conveyor Belt Operator; Crusher Oiler; Form

Grader Operator; Joint Machine Operator; Longitudinal Float

Operator; Oiler, Utility; Power Loader (belt & bucket type);

Pump Operator; Roller Operator, self-propelled (Dirt); Tire

Repairman (large construction equip. tires); Tractor Operator

(farm with/without power attachments); Tugger (all types)

(Group 2)........................$ 28.56 8.01

Articulated Rock Truck (all capacity); Asphalt Plant Operator;

Backhoe, Excavator & Shovel (5 CY. & larger); Batch Plant

Operator; Bituminous Laydown Machine Operator; Concrete Batch

Plant Operator; Concrete Finish Machine Operator; Concrete

Spreader & Paver Operator; Concrete Multi Blade Span Saw

(Hunt process); Crusher Operator; Dozer Operator (all sizes & power attachments); Drilling Machine, Integrated (core, rotary, caisson, or diamond); Draglines, Cranes, Piledriver &

Truck Mounted Cranes (Mfg Rating: less than 3.5 CY. and/or less than 50 tons all attachments); Front End Loaders (up to

10 CY.); Hydro-type Crane (to 50 tons); Mixer Operator, Concrete (over 1 yd.); Motor Patrol Operator (all excluding finish); Mulching Machine Operator; Oiler (crane & shovels);

Pavement Breaker, Hydro-Tamper & similar; Roller Operators, Asphalt (steel & pneumatic); Roto-Milling Machine (under 8 ft.

wide); Scraper Equipment (all types and sizes); Screed

Operator; Trenching Machine Operator

(Group 3)........................$ 32.72 8.10

Draglines, Cranes, Piledrivers & Truck Mounted Cranes (Mfg.

Rating: 3.5 CY. or larger, and/or 50 tons and larger all attachments); Front End Loaders (10 CY. & larger); Heavy Duty

D - 3

Project: Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton Park Road –

Moose to Taggart Lake Trailhead

Mechanic; Welder; Hoist Operator (two or more drums, shafts, or raises); Motor Patrol Operator (finish); Roto-Milling

Machine (8 ft. & larger); Mixer Operator (dual drum)

Truck Drivers (Group 1)..........$ 26.01 3.69

""A"" Frame truck driver; Coring Machine (self propelled); Dump

Truck Driver (to and including 13 CY.); Flat Rack Material

Truck Driver (to 5 tons); Fuel Service Truck Driver; Gang

Truck Driver; Gravel Spreader; Greaseman, Tireman, Serviceman;

Oil Distributor Driver (to & including 3,600 gal.); Power

Broom Driver (street sweeper); Snow Plow Driver (the cy. rate of the truck); Transit Mix or Wet Mix Truck Driver; Utility

Winch Truck Driver; Water Truck Driver (to & including 3,600 gal.)

Truck Drivers (Group 2)..........$ 28.37 5.93

Dump Truck Driver (13 to 45 CY.); Flat Rack Material Truck

Driver (over 5 tons); Low Boy & Tandem Axle Float Driver;

Multiple Axle Type Truck (semi); Winch Trailer Truck Driver;

Water Truck Driver (3,600 gal. & larger); Oil Distributor

Driver (3,600 gal. & larger); Truck Mechanics

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal

Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-

Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022.

Executive Order 13658 does not apply to contracts subject only to the

Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage https://www.dol.gov/agencies/whd/government-contracts

D - 4

Project: Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton Park Road –

Moose to Taggart Lake Trailhead determination, if it is higher) for all hours spent performing on the contract in

2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"",’SA’, or ‘SC’ denotes that a union rate was prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE: UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers http://www.dol.gov/whd/govcontracts

D - 5

Project: Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton Park Road –

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example:

SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

‘SU’ wage rates typically remain in effect until a new survey is conducted.

However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-

(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ‘SA’ identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

mailto:davisbaconinfo@dol.gov

D - 6

Project: Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton Park Road –

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of

Construction Wage Determinations. Requests can be submitted via email to BCWD-

Office@dol.gov or by mail to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29

CFR Part 7). Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals

Board). Write to:

Administrative Review Board

U.S. Department of Labor

Washington, DC 20210.

END OF GENERAL DECISION

mailto:BCWD-Office@dol.gov mailto:BCWD-Office@dol.gov mailto:dba.reconsideration@dol.gov

E-1 DIVISION 100

Special Contract Requirements

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A001

DIVISION 100

GENERAL REQUIREMENTS

Section 101. — TERMS, FORMAT, AND DEFINITIONS

01 APR 2024 – FP-24

101.03 Abbreviations. Add the following to paragraph (a)

ADA – Americans with Disabilities Act

AOP – Aquatic Organism Passage

CDR – Contractor’s Daily Record

GPS – Global Positioning System

LVE – Lower Valley Energy

OHWM or OHW — Ordinary High-Water Mark

RCP – Reinforced concrete pipe

SCTE – Society of Cable Telecommunications Engineers

TERO — Tribal Employment Rights Office

VMS – Video Management System

101.04 Definitions. Delete the definition of (c) Supplemental agreement under Contract

Modification.

Delete the following definitions and substitute the following:

Award — The written acceptance of an offeror’s proposal by the CO.

Bid — When used in a project package, carries the same meaning as Offer.

Bidder — When used in a project package, carries the same meaning as Offeror.

Bid Guarantee — A form of security assuring that the offeror will not withdraw an offer within the period specified for acceptance and will execute a written Task Order and provide required bonds.

E-2 DIVISION 100

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A001

Bid Schedule — The prepared schedule included with the offer forms, containing the estimated quantities of pay items for which unit prices are requested.

Contract — The written agreement between the Government and the Contractor setting forth the obligations of the parties for the ordering of, performance of, and payment for, the prescribed work. Refers to both the Basic Contract and the Task Orders.

Contract Time — The specified time allowed for completion of all Task Order work.

Notice to Proceed — Written notice to the Contractor to start the Task Order work.

Offeror — An individual or legal entity submitting an offer.

Payment Bond — The security executed by the Contractor and surety or sureties and provided to the Government to ensure payments as required by law to all persons supplying labor or material according to the Task Order.

Performance Bond — The security executed by the Contractor and surety or sureties and provided to the Government to guarantee completion of the Task Order work.

Project — The specific section of the highway or other property on which construction is to be performed under the Task Order.

Solicitation — The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective offerors.

Surety — An individual or corporation legally liable for the debt, default, or failure of a Contractor to satisfy a Task Order obligation.

Work — The providing of labor, material, equipment, and other incidentals required to successfully complete the project according to the Task Order.

Add the following:

Basic Contract — The Indefinite Delivery, Indefinite Quantity (IDIQ) contract which is a written agreement between the Government and the Contractor(s) setting forth the general obligations of the parties for the ordering of, performance of, and payment for, the work to be performed under the subsequent Task Orders.

Holidays — Holidays occur on the following days:

• 1st day of January — New Years’ Day;

• 3rd Monday of January — Martin Luther King, Jr. Day;

• 3rd Monday of February — Presidents' Day;

• Last Monday of May — Memorial Day;

E-3 DIVISION 100

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A001

• 19th day of June — Juneteenth National Independence Day;

• 4th day of July — Independence Day;

• 1st Monday of September — Labor Day;

• 2nd Monday of October — Columbus Day;

• 11th day of November — Veterans’ Day;

• 4th Thursday of November — Thanksgiving Day;

• 25th day of December — Christmas Day;

• Other days declared holidays by the Congress or the President; and

• If a holiday occurs on a Saturday, the preceding Friday is also a legal holiday. If a holiday occurs on a Sunday, the Monday following is also a legal holiday.

In-Water Work — Work below the ordinary high-water mark.

Masterworks — A web-based system used by the Government, Contractors, and Subcontractors on this Government contract to prepare CDRs, measurement notes (pay notes and field measurement documentation), and transmit submittals, and documents and drawings.

Offer — A written proposal by an offeror to perform work at a proposed price.

Pneumatic Roller — Self-propelled compaction device with smooth pneumatic tires staggered in position to provide overlap between the front and rear tires.

Task Order — An order for a specific level of work that may or may not be related to one or more projects.

E-15 DIVISION 100

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A001

Section 104. — CONTROL OF WORK

06 OCT 2025 – FP-24

104.04 Electronic Documentation. Delete this Subsection and substitute the following:

Provide documents and drawings electronically using Masterworks.

In addition to electronic documents, provide paper copies of the following documents and as requested by the CO:

(a) ESCP/SWPPP of Record required under Subsection 107.01A; and

(b) Final voucher and release of claims required under Subsection 109.09.

Obtain Masterworks user accounts by completing and signing Form Masterworks 001, Masterworks Access for A/E Staff and Construction Contractors. An electronic version of the form is available at:

https://highways.dot.gov/federal-lands/estimates/forms.

Complete and electronically submit Form Masterworks-001 for each individual requiring

Masterworks access. Allow at least 7 days for system access.

Contact the CO to schedule a training session on the use of Masterworks. The virtual training session will be either a video presentation or live training as determined by the CO. The Contractor is responsible for training additional staff that were not present during the original training session.

Maintain active Masterworks accounts for all Contractor staff who use Masterworks. Notify the

CO within 24 hours after an account holder is reassigned or no longer employed by the Contractor and submit a Form Masterworks-001 requesting their account be disabled.

Provide documents and drawings in their native file format (the format produced by the software that the document and drawing was created in) upon request.

Documents and drawings include but are not limited to correspondence, submittals, measurement notes, reports, plans, diagrams, qualifications, certifications, payrolls, schedules, invoices, mix designs, job-mix formulas, test results, notifications, requests, permits, and agreements.

Provide a resolution quality with color, text, and lines clearly discernible. Submit each document and drawing in an individual file. Name files with a unique document name.

Documents and drawings delivered after 5:00 pm local time will be considered received on the next business day.

The CO will reject documents that are unreadable, corrupted, illegible, or include malicious content.

https://highways.dot.gov/federal-lands/estimates/forms

E-15a DIVISION 100

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A001

104.07 Coordination of Contract Documents. Delete this Subsection and substitute the following:

Coordination of Contract Documents. The FAR, TAR, Basic Contract, Special Contract

Requirements (SCR), plans, and Standard Specifications are contract documents. A requirement in one document is binding as though occurring in all the contract documents. The contract documents are intended to be complementary and to describe and provide for a complete contract.

In case of discrepancy, calculated and shown dimensions govern over scaled dimensions. The contract documents govern in the following order:

(a) FAR;

(b) TAR;

(c) Basic IDIQ Contract;

(d) SCR;

(e) Plans; and

(f) Standard Specifications.

104.08 Load Restrictions. Add the following:

Submit oversized and overweight permit requests for non-legal loads transported within the Grand

Teton National Park boundary. Use the FLH Bridge Oversized/Overweight Permit Load Request form listed under Subsection 102.02A.

104.11 Other Contracts. Add the following:

Other projects in the vicinity include:

(a) Reimagining Taggart Lake Area, PMIS #: 314711 – Anticipated Construction 2026 -

Contact: Genna Mason-Bjornstad

Project Manager

Genna_Mason@nps.gov

307-669-2058

(b) Moose Entrance Station Replacement, PMIS#: 329012 – Anticipated Construction 2027

Contact: Nate Ritchie

Project Manager

Nathan_Ritchie@nps.gov

720-930-7617

E-36 DIVISION 100

Project: WY NPS GRTE 2020(1) & WY NP GRTE 11(1), Moose Wilson Road Phase 2 and Teton

Park Road – Moose to Taggart Lake Trailhead

Revised by Amendment A001

Section 109. — MEASUREMENT AND PAYMENT

06 OCT 2025 – FP-24

109.01 Measurement of Work. Delete the text fourth paragraph of this Subsection and substitute the following:

For individual pay items, the decimal accuracy for measurement of quantities will be determined by the CO.

Delete Table 109-1.

Delete the sixth paragraph.

Delete the seventh paragraph and substitute the following:

Prepare, sign, and submit electronic measurement notes (pay notes and supporting field documentation) using Masterworks. Assign measurement note quantities to the correct funding source and account description for the work performed as designated in the plans. Unacceptable measurement notes will be electronically rejected and returned. Correct rejected measurement notes and resubmit them using Masterworks.

Take and record measurements and perform calculations to determine pay quantities for invoicing for work performed. Take or convert all measurements of work according to U.S. Customary measure.

Unless otherwise specified, measure when the work is in-place and complete according to the contract. Measure the actual work performed, except do not measure work outside the design limits or other adjusted or…