About this file

This is a Questions and Answers document for federal highway construction projects in Wyoming, specifically WY NPS GRTE 2020(1) Moose Wilson Road Phase 2 and WY NP GRTE 11(1) Teton Park Road from Moose to Taggart Lake Trailhead. All questions were answered on 1/22/26. The document addresses ten inquiries from prospective contractors regarding technical specifications and project requirements.

Technical questions address concrete specifications, including mix design requirements per Section 601 and Subsection 610.04, federal color codes for integrally colored concrete (Davis Colors Rustic Brown 6058 and Sandstone 5237), finish standards (medium broom per Subsection 601.03(b)), and exposed aggregate finish specifications per FP-24 Subsection 552.12(c)(4). Reinforcement details for colored concrete pavement items are referenced on FLH Standard 501-1 Minor Concrete Pavement. General questions address unclear line items A2120 and A2140 (described as contingency-related with per-invoice payment), contractor housing requirements within 20 miles of Moose, Wyoming per Section 107.12 Contractor's Camp, and conflicting specifications regarding vault toilet work between Sections 646.01 and 713.26. Several questions note that clarifications will be addressed under Amendment A001, indicating ongoing specification refinements for the project.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: WY NPS GRTE 2020(1), Moose Wilson Road

Phase 2 and WY NP GRTE 11(1), Teton Park Road -

Moose to Taggart Lake Trailhead

# General Technical Question Answer Date

1 X What concrete mix design is required for the exposed curb/sidewalk?

See FP-24, Subsection 552.12(c)(4) for exposed aggregate finish. Construct minor concrete according to Section 601, according to Subsection 610.04.

1/22/26

2 X What concrete mix design is required for the colored and non-colored concrete?

Construct minor concrete according to

Section 601, according to Subsection

610.04.

1/22/26

3 X What are the federal color codes for the integral-colored concrete? Champagne and Rustic Brown

These are Davis Colors,

a. Rustic Brown 6058

b. Sandstone 5237

1/22/26

4 X What is the finish on the integrally colored concrete?

Medium Broom?

Prepare colored concrete according to

Subsection 601.03(b).

1/22/26

5 X What depth of etch would be required for the exposed concrete on this project?

See FP-24, Subsection 552.12(c)(4) for exposed aggregate finish.

1/22/26

6 X

Please provide the reinforcement for the:

X0440 50101-0900 MINOR CONCRETE PAVEMENT,

REINFORCED, 9-INCH DEPTH,(COLORED,

CHAMPAGNE) SQYD 170

X0460 50101-0900 MINOR CONCRETE PAVEMENT,

REINFORCED, 9-INCH DEPTH,(COLORED, RUSTIC

BROWN) SQYD 62

See reinforcement shown on FLH Standard

501-1 Minor Concrete Pavement (sheet P.4 of the plans).

1/22/26

7 X

We are not getting any response from the companies associated to these connection items A2120 and

A2140. Since these Items are going to be paid per invoice should they really be included in the bid? If they are included, they should be a fixed amount to make it far across all bidders. Please advise how we should handle these items?

This will be addressed under Amendment

A001.

1/22/26

8 X

Could you please clarify the purpose Line Items

A2120 and A2140. They appear to be contingency amounts but with no contingency value listed. Should the contractor be pricing the contingency amount or entering 0 for the pricing on those items?

This will be addressed under Amendment

A001.

1/22/26

9 X

Are there going to be any provided Camper spots for this bid? When attending the onsite presentation, it was stated that some would be provided. Also, the

RFQ says to located facilities within 20 miles of

Moose WY. With construction slated during peak tourism season this is almost impossible to do. What if we can not locate housing within 20 miles?

See Section 107.12 Contractor’s Camp. 1/22/26

Check General or Technical

10 X

646.01 in the RFP states “Vault toilet work includes the complete installation of a government furnished pre-cast concrete double vault toilet building. This also includes painting, cleaning, and earthwork.” But, in 713.26 its states the requirements for ordering a new CXT vault toilet. Is one vault toilet being government furnished and one being ordered by

Contractor?

This will be addressed under Amendment

A001.

1/22/26

File details come from the government source that posted it. Updated .