Q_A Response 01.13.26.pdf
PDF 87 KB Posted
- Attached to
- WFL AE Design IDIQ
- Solicitation number
- 69056726R000004
About this file
This document is a Questions and Answers (Q&A) file for a Request for Proposal (RFP) for the 2026 Western Federal Lands Highway Division (WFLHD) Architect/Engineer (A/E) Indefinite Delivery/Indefinite Quantity (IDIQ) contract, solicitation number 69056726R000004. The Q&A covers critical details about proposal submission requirements, including key points such as: firms must have professional engineering licenses in Alaska, Idaho, Montana, Oregon, Washington, and Wyoming; proposal submissions are limited to eight key personnel resumes totaling 16 pages; past performance evaluations can include CPARS or equivalent documentation; and the solicitation covers separate A/E Design and Construction Management/Construction Inspection (CM/CI) Support IDIQs for the six-state WFLHD region. The document provides clarifications on formatting, page limits, acceptable documentation, and evaluation criteria, with responses spanning from December 2025 to January 2026, offering potential offerors comprehensive guidance for preparing their qualifications submissions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE QUESTION ANSWER
12/12/2025 Can we show our IDIQ contract as a representative for Section F example projects?
An IDIQ is not a project. Page 8. If more than six examples are provided, the first six examples presented will be evaluated and the remainder will not beconsidered.
12/12/2025 Can the organization chart be presented on an 11x17 page?
See Amendment 002. All pages must be 8.5 X 11 with the exception of the organization chart may be an 11x17
12/16/2025
Are firms able to submit a proposal for the WFL AE Design IDIQ with the understanding that their role would be limited to providing Construction Management and Construction Inspection support services? Yes.
12/16/2025 are the AE Design IDIQ and the CM/CI Support IDIQ considered separate procurements, or are they intended to be awarded and administered together? Separate and Independent IDIQs.
12/24/2025
Could you please confirm our team’s interpretation of the solicitation that a Subcontracting Plan is NOT necessary to submit with our Statement of Qualifications? Subcontracting Plan is not required for the RFQ.
12/24/2025 Could you please confirm if prospective proposers may submit a proposal cover sheet and cover letter as part of our Statement of Qualifications? Will not be presented to the evaluation team.
General question Can we respond as a prime and be a subcontractor for another prime? Yes.
12/31/2025
Font size is specified as no smaller than 12-point font. However, the SF330 form uses a 10-point font, and the font size cannot be modified within the form.
May respondents use the 10-point font utilized by the SF330 form?
The seclected font size within Standard Form 330 is accpetable.
12/31/2025
Page 9 #3 discusses performance evaluations and states in the absence of CPARS an equivalent performance evaluation may be provided. Will a Past Performance Questionnaire (PPQ) form be provided by the Government or should responders utilize past PPQ forms that were provided/try to create a form that mirrors the CPARS evaluation?
No, a form will not be provided. Provide a copy of an equivalent performance evaluation completed by the project owner/client agency.
12/31/2025
Pages 6 and 8 refers to partner agencies, do state DOTs qualify as partner agencies?
Yes, in addition, partner agencies not limited to: Bureau of Indian Affairs, National Park Service, US Fish & Wildlife Service, Bureau of Land Management, US Forest Service, US Army Corps of Engineers, the Bureau of Reclamation and State DOTs.
12/31/2025
Page 10 requests firms/subconsultants have offices within the primary six state WFLHD boundary, are offices needed in all states or just one/several?
Page 10 is not a request, or minimum requirement. Please reference the minimum requirements.
12/31/2025
In part 4 which discusses Section H material, you mention a 2 page maximum.
Does this refer to the portion about "Demonstration of Responsiveness, Flexibility, Leadership, and Adaptability", or the entirety of Section H?
For Part I, Section H, the two page maximum is for "Demonstration of responsiveness, flexibility, leadership, and adaptability."
1/2/2026
Do the small businesses need to have licenses in all the states at time of selection?
Yes, prime contractors, in conjunction with subcontractors, must have a professional engineering license in each of the following states: Alaska, Idaho, Montana, Oregon, Washington, and Wyoming to be evaluated further.
1/5/2026
Please confirm that since the SF330 Section H is only allowed two (2) total pages, the CPARS and PPQ documents are required to be submitted in an Appendix after SF330 Part II.
Yes, CPARS or equivalent performance evaluations may be submitted in an appendix after SF330, Part I, H, Additional Information.
1/2/2026
On Page 9, Section 4. Part I – Section H, it states “Highlight the six areas above,” however there are only five bullet points. Please provide clarification. See Amendment 003. Highlight the five areas.
1/5/2026
For the above section H, could you please clarify how the bullet point scoring and the narrative requirements work together? The bullet points give a number of points per bullet, but then the narrative after it asks for more information without citing number of points the narrative is worth.
Past performance is maximum 20 points. Additional information is maximum 20 points.
1/5/2026
Are section dividers/tabs allowed (and are they counted against the page count)?
No, please do not include section dividers or tabs. They are not required for the electronic submission and sticking to a continuous PDF format ensures the page counts are strictly adhered to.
1/6/2026
A fillable SF 330 form has been posted on SAM.gov under the subject solicitation. Is the intent that the provided form be used for the solicitation response, or is it just being provided for reference?
Please use and return Standard Form 330 with response to the RFQ.
1/7/2026 In addition to the proposal criteria, can proposers include a cover letter? Yes, a cover letter may be included but will not be evaluated.
1/7/2026
Under Criteria 1. Part I, Section E: Resumes of Key Personnel Proposed for this Contract. Can proposers include resumes for subconsultants proposed on our team, in addition to the 8 total resumes requested for the categories of Project Management, QA/QC, Contract Manager, Highway Design, Environmental, and Bridge/Highway?
Personnel resumes can have more than one role listed, however no more than a total of eight resumes, limited to 16 pages in total, will be accepted. If more than the accepted number of resumes are provided, only the first eight resumes presented in the proposal will be evaluated.
1/7/2026
The current RFQ does not reference Part 1, Section G: Key Personnel Participation in Example Projects Matrix. We assume this form is intended to be included; please confirm.
Please utilize Standard Form 330 attached in SAM.gov.
1/7/2026
Under Criteria 3. Part I, Section H, Additional Information. Past Performance of the Prime and/or Subconsultant. Please confirm that you want us to include actual copies of past CPARs and/or PPQs for each of the 6 projects included in Section F? Is there a page limit for this criterion as the length of those forms can vary?
Yes, provide copies of past CPARS and or equivalent performance evaluations in their entirety.
1/7/2026
Under Criteria 4. Part I, Section H, Additional Information. Demonstration of responsiveness, flexibility, leadership, and adaptability, it states that a maximum of 2 pages will be allowed. Is WFLH willing to extend the page limit in this section for proposers to further expand our qualifications?
No, the page limit is set to a two page maximum.
1/7/2026
Is it mandatory that the Environmental Key Personnel have experience working with permitting in each of the 6 states covered by WFL? If so, if one personnels’ experience does not cover all 6 states, how else can we demonstrate that our team as a whole, will be able to provide experience working with permitting in each of the 6 states? Can we explain this in Section H Additional Information?
Refer to the RFQ for criteria to be used for evaluating the Environmental resume.
1/7/2026
We would like to request clarification that the “Demonstration of Responsiveness, flexibility, leadership and adaptability” section will be limited to 2 pages but the entirety of section H will be greater than 2 pages due to other requirements such as CPARS and PPQs?
Yes, that is correct.
1/9/2026
Do we need to have licenses in all the states for each professional engineering discipline or just a professional engineering license in each of the following states?
Prime contractors, in conjunction with subcontractors, must have professional engineering licenses in each of the following states: Alaska, Idaho, Montana, Oregon, Washington, and Wyoming.
1/9/2026
Are the Project Managers required to have a PE or other professional certification? Refer to the RFQ for criteria to be used for evaluating the Project Managment resumes.
1/9/2026
If design for a project has been completed, but it is currently under construction, does that meet the requirement per the RFP that the project is considered completed?
Yes, a project is considered completed if all deliverables in the contract for the project have been delivered and the final invoice has been approved.
1/9/2026 Are there license requirements for the "Environmental" Lead, such as PE/PG, or PWS? Refer to the RFQ for criteria to be used for evaluating the Environmental resume.
1/9/2026 Is there a limitation on the size of the font we can use in tables and graphics? The minimum acceptable font size is 12 pont.
1/13/2026
Part I, Section G: Key Personnel Participation in Example Projects-This section is not addressed in the solicitation requirements. Could you please confirm whether it is a requirement? If so, how many points will it be allocated within the total evaluation score?
Refer to the RFQ, #2, Part I, Section F.
1/13/2026
Part I, Section G: Key Personnel Participation in Example Projects -Staff Representation-Are we permitted to include additional staff beyond the designated key personnel in this section, or should it be limited to key staff only?
Refer to the RFQ, #1, Part 1, Section E.
1/13/2026
Covers and Tabs-May we include covers and tab dividers in our submission? If included, will they be excluded from the official page count? See previously answered question.
Questions and Answers for Request for Proposal 69056726R000004 2026 WFL Architect/Engineer IDIQ
File details come from the government source that posted it. Updated .