This document is a Questions and Answers (Q&A) file for a Western Federal Lands Highway Division (WFLHD) Architect/Engineer (AE) Indefinite Delivery/Indefinite Quantity (IDIQ) Request for Proposal (RFQ) solicitation number 69056726R0000042026. The Q&A covers key clarifications for potential proposers, including: confirmation that the AE Design IDIQ and CM/CI Support IDIQ are separate procurements, small businesses must have professional engineering licenses in Alaska, Idaho, Montana, Oregon, Washington, and Wyoming, and firms can submit proposals as both a prime contractor and subcontractor. Additional clarifications include document formatting requirements (8.5x11 pages, 12-point font), performance evaluation submission guidelines, and confirmation that a subcontracting plan is not required for the RFQ submission.
The document provides specific guidance on proposal preparation, such as limiting project examples to six, allowing Standard Form 330's 10-point font, confirming that state DOTs and other agencies like Bureau of Land Management and US Forest Service qualify as partner agencies, and specifying that a Past Performance Questionnaire (PPQ) must be created by the proposer without a government-provided template. Proposers are also informed that a two-page maximum applies specifically to the "Demonstration of Responsiveness, Flexibility, Leadership, and Adaptability" section, and that an organization chart may be submitted on an 11x17 page as an exception to the general page size requirement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE QUESTION ANSWER
12/12/2025 Can we show our IDIQ contract as a representative for Section F example projects?
An IDIQ is not a project. Page 8. If more than six examples are provided, the first six examples presented will be evaluated and the remainder will not beconsidered.
12/12/2025 Can the organization chart be presented on an 11x17 page? See Amendment 002. All pages must be 8.5 X 11 with the exception of the organization chart may be an 11x17
12/16/2025
Are firms able to submit a proposal for the WFL AE Design IDIQ with the understanding that their role would be limited to providing Construction Management and Construction Inspection support services? Yes.
12/16/2025 are the AE Design IDIQ and the CM/CI Support IDIQ considered separate procurements, or are they intended to be awarded and administered together? Separate and Independent IDIQs.
12/24/2025
Could you please confirm our team’s interpretation of the solicitation that a Subcontracting Plan is NOT necessary to submit with our Statement of Qualifications? Subcontracting Plan is not required for the RFQ.
12/24/2025 Could you please confirm if prospective proposers may submit a proposal cover sheet and cover letter as part of our Statement of Qualifications? Will not be presented to the evaluation team.
General question Can we respond as a prime and be a subcontractor for another prime? Yes.
12/31/2025
Font size is specified as no smaller than 12-point font. However, the SF330 form uses a 10-point font, and the font size cannot be modified within the form. May respondents use the 10-point font utilized by the SF330 form?
The seclected font size within Standard Form 330 is accpetable.
12/31/2025
Page 9 #3 discusses performance evaluations and states in the absence of CPARS an equivalent performance evaluation may be provided. Will a Past Performance Questionnaire (PPQ) form be provided by the Government or should responders utilize past PPQ forms that were provided/try to create a form that mirrors the CPARS evaluation? No, a form will not be provided. Provide a copy of an equivalent performance evaluation completed by the project owner/client agency.
12/31/2025
Pages 6 and 8 refers to partner agencies, do state DOTs qualify as partner agencies? Yes, in addition, partner agencies not limited to: Bureau of Indian Affairs, National Park Service, US Fish & Wildlife Service, Bureau of
Land Management, US Forest Service, US Army Corps of Engineers, the Bureau of Reclamation and State DOTs.
12/31/2025
Page 10 requests firms/subconsultants have offices within the primary six state WFLHD boundary, are offices needed in all states or just one/several?
Page 10 is not a request, or minimum requirement. Please reference the minimum requirements.
12/31/2025
In part 4 which discusses Section H material, you mention a 2 page maximum.
Does this refer to the portion about "Demonstration of Responsiveness, Flexibility, Leadership, and Adaptability", or the entirety of Section H? For Part I, Section H, the two page maximum is for "Demonstration of responsiveness, flexibility, leadership, and adaptability."
1/2/2026 Do the small businesses need to have licenses in all the states at time of selection?
Yes, prime contractors, in conjunction with subcontractors, must have a professional engineering license in each of the following states:
Alaska, Idaho, Montana, Oregon, Washington, and Wyoming to be evaluated further.