ora-curry595-1_plans.pdf
PDF 7 MB Posted
- Solicitation number
- 69056723B000014
About this file
This document appears to be a detailed bid schedule for the OR FLAP CURRY 595(1) Jerry's Flat Road Preservation and Improvements & OR FS RRSIS610 33(1) Agness Road Pavement Preservation federal contract opportunity. The bid schedule outlines the various line items, quantities, and unit prices for the required work, which includes mobilization, construction surveying and staking, quality control, soil erosion control measures, removal of bridge railing and guardrail, roadway aggregate, and asphalt concrete pavement. The contract opportunity is being solicited by the Department of Transportation Federal Highway Administration, with a solicitation number of 69056723B000014. The document does not contain additional details about the contract requirements, such as a Statement of Work or Performance Work Statement, or information on the response due date, award date, pricing terms, or set-asides.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidTab_OR FLAP CURRY 595(1) and OR FS RRSIS610 .pdf | ||
| BidSum_OR FLAP CURRY 595(1) OR FS RRSIS610 33(1).pdf | ||
| QA_06-04-2024.pdf | ||
| Amendment A002.pdf | ||
| Amendment A001.pdf | ||
| QA_05-24-2024.pdf | ||
| QA_05-23-2024.pdf | ||
| BR 15C36.pdf | ||
| BR 18059.pdf | ||
| Agness Road Pavement Eval.pdf | ||
| Memo Project Name Change.pdf | ||
| IFB 69056723B000014.pdf | ||
| BR 15C37.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRENT L COE Digitally signed by BRENT L COE Date: 2024.04.11 07:12:46 -07'00'
OR FLAP CURRY 595(1)
OR FS RRSIS610 33(1) A.2
Sheet and Description
SECTION D SECTION E SECTION F SECTION G SECTION H
LINE GRAPH
SOIL EROSION
AND SEDIMENT
CONTROL
SAFETY FEATURES
TEMPORARY
TRAFFIC CONTROL
PERMANENT
TRAFFIC CONTROL
ALLOWANCE
Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 1,000 50 1,050
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 3,500 1,300 4,800
A0160 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION EACH 4 1 5
A0180 20302-0150 REMOVAL OF BRIDGE RAILING LNFT 564 564
A0200 20302-1200 REMOVAL OF GUARDRAIL LNFT 675 675
A0220 30205-0500 ROADWAY AGGREGATE, SHOULDER FINISHING MILE 14.600 1.400 16.000
A0240 40101-0600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 13,554 446 14,000
A0280 40601-0000 FOG SEAL TON 53 2 55
A0300 40702-0300 CHIP SEAL, TYPE 1C SQYD 96,402 3,098 99,500
A0340 40711-0000 EMULSIFIED ASPHALT TON 146 4 150
A0360 41201-0000 TACK COAT TON 52 3 55
A0380 41301-0000 ASPHALT PAVEMENT MILLING SQYD 2,872 148 3,020
A0400 41402-2000 CRACKS, CLEANING AND SEALING MILE 6.4 6.4
A0420 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 SQYD 470 30 500
A0440 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 1,107 93 1,200
A0460 55601-0900 BRIDGE RAILING, STEEL LNFT 564 564
A0480 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS LNFT 500 500
A0500 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (TL-2) EACH 3 3
A0520 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (TL-3) EACH 7 7
A0540 61707-4000 STRUCTURE TRANSITION RAILING, MGS SYSTEM LNFT 250 250
A0560 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 80 80
A0580 62201-0350 BACKHOE HOUR 80 80
A0600 62201-2050 ROLLER HOUR 80 80
A0620 62301-0000 GENERAL LABOR HOUR 80 80
A0640 63316-1000 REMOVE AND RESET SIGN EACH 3 3
A0660 63316-2000 REMOVE AND RESET DELINEATOR EACH 11 11
A0680 63316-3000 REMOVE AND RESET OBJECT MARKER EACH 2 2
A0700 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) MILE 116.0 116.0
A0720 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) MILE 116.0 116.0
A0740 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW (RIGHT) EACH 2 2
A0760 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW (LEFT) EACH 4 4
A0780 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW EACH 5 5
A0800 63405-0600 PAVEMENT MARKINGS, TYPE B, STRAIGHT/TURN ARROW COMBINATION EACH 1 1
A0820 63405-0650 PAVEMENT MARKINGS, TYPE B, "ONLY" WORD MESSAGE EACH 1 1
MileStone: 100% Report Date: 04/03/24
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES -
-A p r-
:1 P
M
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities c:
\p w -w o rk
\d o ra
-c u rr y5 -1
S O
Q .x ls m
]S h ee t
PROJECT
B.1
OR FLAP CURRY 595(1)
OR FS RRSIS610 33(1)
SHEET
NUMBER
joshua.christopher Sticky Note Accepted set by joshua.christopher joshua.christopher Sticky Note Completed set by joshua.christopher
LINE GRAPH
SOIL EROSION
AND SEDIMENT
CONTROL
SAFETY FEATURES
TEMPORARY
TRAFFIC CONTROL
PERMANENT
TRAFFIC CONTROL
ALLOWANCE
Bid
Schedule
A0840 63405-0700 PAVEMENT MARKINGS, TYPE B, "STOP" WORD MESSAGE EACH 1 1
A0860 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 200 200
A0880 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 2 2
A0900 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 52 7 0
A0920 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1,200 1,200
A0940 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 600 600
A0960 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 60 60
-A p r-
:1 P
M
MileStone: 100% Report Date: 04/03/24 c:
\p w -w o rk
\d o ra
-c u rr y5 -1
S O
Q .x ls m
]S h ee t (2
SUMMARY OF QUANTITIES -
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities Remarks and/or
Determination of Estimated Quantity
PROJECT
B.2
OR FLAP CURRY 595(1)
OR FS RRSIS610 33(1)
SHEET
NUMBER
joshua.christopher Sticky Note Accepted set by joshua.christopher joshua.christopher
LINE GRAPH
SOIL EROSION
AND SEDIMENT
CONTROL
SAFETY FEATURES
TEMPORARY
TRAFFIC CONTROL
PERMANENT
TRAFFIC CONTROL
ALLOWANCE
Bid
Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
X0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0080 15401-0000 CONTRACTOR TESTING LPSM ALL
X0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 500 150 650
X0140 40601-0000 FOG SEAL TON 50 50
X0160 40702-0300 CHIP SEAL, TYPE 1C SQYD 91,520 480 92,000
X0200 40711-0000 EMULSIFIED ASPHALT TON 138 2 140
X0220 41402-2000 CRACKS, CLEANING AND SEALING MILE 6.0 6.0
X0240 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 SQYD 2,193 2,193
X0260 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 840 840
X0280 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
X0300 62201-0350 BACKHOE HOUR 40 40
X0320 62201-2050 ROLLER HOUR 40 40
X0340 62301-0000 GENERAL LABOR HOUR 40 40
X0360 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 400 400
X0380 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 200 200
X0400 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 20 20
-A p r-
:1 P
M
MileStone: 100% Report Date: 04/03/24 c:
\p w -w o rk
\d o ra
-c u rr y5 -1
S O
Q .x ls m
]S h ee t (3
SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities Remarks and/or
Determination of Estimated Quantity
PROJECT
B.
OR FLAP CURRY 595(1)
OR FS RRSIS610 33(1)
SHEET
NUMBER
joshua.christopher Sticky Note Accepted set by joshua.christopher joshua.christopher
LINE GRAPH
SOIL EROSION
AND SEDIMENT
CONTROL
SAFETY FEATURES
TEMPORARY
TRAFFIC CONTROL
PERMANENT
TRAFFIC CONTROL
ALLOWANCE
Bid
Schedule
Y0020 15101-0000 MOBILIZATION LPSM ALL
Y0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
Y0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
Y0080 15401-0000 CONTRACTOR TESTING LPSM ALL
Y0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
Y0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 500 150 650
Y0140 30205-0500 ROADWAY AGGREGATE, SHOULDER FINISHING MILE 0.160 0.340 0.500
Y0160 40601-0000 FOG SEAL TON 48 48
Y0180 40702-0300 CHIP SEAL, TYPE 1C SQYD 87,796 2,204 90,000
Y0220 40711-0000 EMULSIFIED ASPHALT TON 132 3 135
Y0240 41402-2000 CRACKS, CLEANING AND SEALING MILE 5.9 5.9
Y0260 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 SQYD 3,395 3,395
Y0280 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 754 754
Y0300 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
Y0320 62201-0350 BACKHOE HOUR 40 40
Y0340 62201-2050 ROLLER HOUR 40 40
Y0360 62301-0000 GENERAL LABOR HOUR 40 40
Y0380 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 63,360 640 64,000
Y0400 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 400 400
Y0420 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 200 200
Y0440 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 20 20
-A p r-
:1 P
M
MileStone: 100% Report Date: 04/03/24 c:
\p w -w o rk
\d o ra
-c u rr y5 -1
S O
Q .x ls m
]S h ee t (4
SUMMARY OF QUANTITIES - Option Y
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities Remarks and/or
Determination of Estimated Quantity
PROJECT
B.
OR FLAP CURRY 595(1)
OR FS RRSIS610 33(1)
SHEET
NUMBER
joshua.christopher Sticky Note Accepted set by joshua.christopher joshua.christopher
LINE GRAPH
SOIL EROSION
AND SEDIMENT
CONTROL
SAFETY FEATURES
TEMPORARY
TRAFFIC CONTROL
PERMANENT
TRAFFIC CONTROL
ALLOWANCE
Bid
Schedule
Z0020 15101-0000 MOBILIZATION LPSM ALL
Z0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
Z0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
Z0080 15401-0000 CONTRACTOR TESTING LPSM ALL
Z0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
Z0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,000 250 1,250
Z0140 40601-0000 FOG SEAL TON 26 26
Z0160 40702-0300 CHIP SEAL, TYPE 1C SQYD 44,494 506 45,000
Z0200 40711-0000 EMULSIFIED ASPHALT TON 67 1 68
Z0220 41402-2000 CRACKS, CLEANING AND SEALING MILE 3.2 3.2
Z0240 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 SQYD 1,734 1,734
Z0260 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 160 160
Z0280 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
Z0300 62201-0350 BACKHOE HOUR 40 40
Z0320 62201-2050 ROLLER HOUR 40 40
Z0340 62301-0000 GENERAL LABOR HOUR 40 40
Z0360 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 34,848 152 35,000
Z0380 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 400 400
Z0400 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 200 200
Z0420 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 20 20
-A p r-
:1 P
M
MileStone: 100% Report Date: 04/03/24 c:
\p w -w o rk
\d o ra
-c u rr y5 -1
S O
Q .x ls m
]S h ee t (5
SUMMARY OF QUANTITIES - Option Z
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities Remarks and/or
Determination of Estimated Quantity
PROJECT
B.
OR FLAP CURRY 595(1)
OR FS RRSIS610 33(1)
SHEET
NUMBER
joshua.christopher Sticky Note Accepted set by joshua.christopher joshua.christopher
1.50 to 2.88
3.70 to 5.14
5.16 to 7.87
BASE
7.89 to 9.66
9.66 to 15.31
15.33 to 16.00
OPTION X 16.00 to 22.00
22.00 to 26.88
OPTION Y
27.01 to 28.00
28.00 to 28.83
OPTION Z 28.88 to 30.63
30.72 to 31.30
MAINLINE ROADWAY QUANTITIES
30205-0500
LOCATION
MILE
IJ.J'
f-- l'.)
� 5:
ex: V) l'.) � < l'.l t0 f-- � rrj )... [5 a..
...... ::E: �3 ex: < Cl :::i l.J l'.)
� ...... �o
-.J 0 ::i::
Cl � ex: V)
OVERLAY 1.38
OVERLAY 1.44
ALI_JERRY_01
OVERLAY 2.71
OVERLAY 1.77
CHIP SEAL -
ALI_AGNESS_01
CHIP SEAL -
BASE TOTAL 7.30
CHIP SEAL ALI_AGNESS_01 -
OPTION X TOTAL -
CHIP SEAL 0.08
ALI_AGNESS_01
CHIP SEAL -
OPTION Y TOTAL 0.08
[1
CHIP SEAL -
CHIP SEAL ALI_AGNESS_01 -
CHIP SEAL -
OPTIONZ TOTAL -
BASE + ALL OPTIONS TOTAL 7.38
40101-0600
TON
f--' < rrj -.J
::E: -.J lJJ ::::,. ::i:: lJJ ::E: l.J N I'"\ �Q..
< ..._, V ...... V) ��::E: 2 lJJ ..-; :::i ex: '::E: I') l.J )< ...... c:i <....., x 0 ::E: s:i:: IJJ' l.J >- ::t f--f-- ex: -.J �
-.12�63 �� ...... c:x: -.J a.. ex: ::E: l'.) � V):,..:0l'.>V) �l'.l<:�IJJ 2,572
2,547
4,793
3,131
13,042
13,042
40601-0000
TON
-.J uS V) l'.)
ft
PROJECT SHEET
NUMBER
OR FLAP CURRY 595(1) D.1 OR FS RRSIS610 33(1)
40702-0300 40711-0000 41201-0000 41402-2000
SQYD TON TON MILE
Cl f-- � l.J -.J l'.)
lJJ a.. � � � uS f--la f-- -.J -.1' � l.J uS t 0 'l'.) ...... l.J V) <V) V) � a.. -.J � l.J -.J
5:
:::i l.J
� uS ::E: � u lJJ u V)
- - 10 -
- - 10 -
- - 19 -
- - 13 -
86,182 130 - 5.70
10,220 16 - 0.70
96,402 146 52 6.40
91,520 138 - 6.00
91,520 138 - 6.00
74,437 112 - 4.90
13,359 20 - 1.00
87,796 132 - 5.90 NOTE:
11,687 18 - 0.80 1. Conversion factor of 1.94 ton/cuyd for asphal concrete pavement.
24,640 37 - 1.80 2. Conversion factor of 233 gal/ton for fog seal, emulsified asphalt, and tack coat.
8,167 12 - 0.60
44,494 67 - 3.20
320,212 483 52 21.50
FOOTNOTE:
[1] Option Y shoulder finishing occurs from MP 26.76 to MP 26.84 only.
TABULATION OF
PLAN QUANTITIES
joshua.christopher Sticky Note Accepted set by joshua.christopher joshua.christopher
1.70
1.80
1.80
1.80
1.90
2.00
2.00
2.00
2.30
2.70
2.70
2.80
2.80
2.80
2.80
4.50
4.50
4.60
4.60
5.10
5.10
5.20
LOCATION
f- C:t::
-.J
RT
LT
LT
LT
LT
RT
LT
LT
RT
LT
RT
APPROACH ROAD, DRIVEWAY,
AND TURNOUT QUANTITIES (BASE ONLY)
f-i l!)
-.J -:i::
40101-0600
TON
LOCATION
f C:t::
-.J
80 5.20 LT
68 5.30 RT
57 5.50 LT
103 5.70 LT
56 5.90 RT
32 6.20 LT
330 6.20 RT
f-i l!)
-.J -:i::
40101-0600
TON
268 6.80 LT 67
233 6.90 LT 120
60 6.90 LT 120
60 7.20 RT 133
__ _, ALI_JERRY_01 1--------+----+-----1 ALI_JERRY_ 01 1------ ----1
LT
LT
RT
LT
RT
RT
RT
LT
RT
LT
LT
SUBTOTAL
100 7.40 LT 107
29 7.40 LT 63
213 7.40 RT 40
50 7.70 RT
50 8.00 LT
200 8.10 RT
217 8.30 LT
83 8.70 LT
192 9.40 RT
192 9.50 RT
420 9.60 LT
3,093 SUBTOTAL
TOTAL
4,037
7,130
NOTE:
PROJECT
OR FLAP CURRY 595(1)
OR FS RRSIS610 33(1)
1. Conversion factor of 1. 94 ton/cuyd for asphal concrete pavement.
TABULATION OF
PLAN QUANTITIES
SHEET
NUMBER
D.2 joshua.christopher Sticky Note Accepted set by joshua.christopher joshua.christopher
PROJECT
SHEET
NUMBER
OR FLAP CURRY 595(1)
D.3
OR FS RRSIS610 33(1)
41301-0000
ASPHALT PAVEMENT MILLING
MP ALIGNMENT DESCRIPTION LENGTH WIDTH AREA
(LNFT) (LNFT) (SQYD)
1.50 BEGIN ALI_JERRY_Ol 100 32 356 41801-2000
I- ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
2.88 SAUNDERS CREEK BRIDGE APPROACH 100 29 322
I-
2.89 SAUNDERS CREEK BRIDGE DEC,/
59 36 236 MP ALIGNMENT LENGTH (LNFT) WIDTH (LNFT) AREA (SQYD)
2.90
SAUNDERS CREEK BRIDGE 100 29 322
APPROACH/SUSPEND ALI JERRY 01 4.00 AU_JE R RY_Ol 60 10 67
3.70 RESUME ALI_JERRY_Ol 100 32 356
BASE I- ALI_JERRY_Ol 10.30 100 26 289
5.14 JIM HUNT CREEK BRIDGE APPROACH 100 23 256 BASE
I- 13.50 ALI_AGNESS_ 01 200 26 578
5.16 JIM HUNT CREEK BRIDGE APPROACH 100 23 256
,_ 14.40 60 26 173
7.87 KIMBALL CREEK BRIDGE APPROACH 100 23 256
,- BASE TOTAL 1,107
7.89 KIMBALL CREEK BRIDGE APPROACH 100 23 256
-- 17.20 10 12 13
9.66 END ALI_JERRY_Ol 100 23 256
18.50 20 12 27
TOTAL 2,872
OPTION X 19.00 ALI_AGNESS_ 01 100 12 133
20.10 100 12 133
20.80 200 24 533
41801-1000
OPTION X TOTAL 840
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1 22.70 200 24 534
OPTION Y 23.80 ALI_AGNESS_ 01 15 12 20
MP ALIGNMENT LENGTH (LNFT) WIDTH (LNFT) AREA (SQYD)
24.30 150 12 200
15.00 100 23.5 261 OPTION Y TOTAL 754
B4SE AU_AGNESS_Ol
15.10 80 23.5 209 28.40 60 12 80
OPTION Z ALI_AGNESS_ 01
BASE TOTAL 470 30.40 60 12 80
16.80 500 23.5 1,306 OPTION Z TOTAL 160
17.20 10 23.5 26 BASE + ALL OPTIONS TOTAL 2,861
OPTION X 17.60 AU_AGNESS_ 01 60 11.75 78
17.90 200 23.5 522
21.60 100 23.5 261
OPTION X TOTAL 2,193
FOOTNOTE:
OPTION Y 22.30 AU_AGNESS_Ol 1,300 23.5 3,395
OPTION Y TOTAL 3,395
ftJ Existing pavement on the bridge deck has a depth of 4".
28.90 150 24 400 OPTION Z AU_AGNESS_Ol
30.00 500 24 1,333
OPTION Z TOTAL 1,733
BASE + ALL OPTIONS TOTAL 7,792
TABULATION OF
PLAN QUANTITIES
joshua.christopher Sticky Note Accepted set by joshua.christopher joshua.christopher
PLAN MP 1.50 TO MP 5.00
joshua.christopher Sticky Note Accepted set by joshua.christopher joshua.christopher
OR FS RRSIS610 33(1) F.2
OR FS RRSIS610 33(1) F.
OR FS RRSIS610 33(1) F.
OR FS RRSIS610 33(1) F.5
OR FS RRSIS610 33(1) G.2
OR FS RRSIS610 33(1) G.3
OR FS RRSIS610 33(1) G.
OR FS RRSIS610 33(1) G.5
OR FS RRSIS610 33(1) G.6
OR FS RRSIS610 33(1) G.7
File details come from the government source that posted it. Updated .