GR 10-18 Spruce Railroad Trail Segment B Unstable Slope Corridor Assessment Report Rev5.pdf
PDF 37 MB Posted
- Solicitation number
- 69056719B000004
About this file
This document provides details for a federal construction solicitation. The solicitation number 69056719B000004 from the Department of Transportation Federal Highway Administration seeks construction services for Spruce Railroad Trail Segment B. The opportunity description involves building Segment B of the Spruce Railroad Trail. Responses are due based on the standard solicitation timeline and the agency intends to award a contract to complete the described construction project. Key information includes the federal agency issuing the solicitation, the type of work sought, and the relevant identification details needed to directly respond to this opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary_Spruce Segment B.pdf | ||
| Q&A_01-03-2020.pdf | ||
| Q&A_12-31-19.pdf | ||
| Q&A_12-26-19.pdf | ||
| Amendment A002.pdf | ||
| Q&A_12-20-19.pdf | ||
| Q&A_12-18-19.pdf | ||
| Amendment A001.pdf | ||
| Q&A_12-11-19.pdf | ||
| Q&A_12-10-19.pdf | ||
| Q&A_12-04-19.pdf | ||
| Final Geotech Report - Spruce B_09072019.docx | DOCX document | |
| IFB_Spruce.pdf | ||
| 10_olym201701_BID SET_Rev-SIGNED 10-15-19.pdf | ||
| Spruce B Cross Sections_10-21-19.pdf | ||
| Plan Request form.pdf | ||
| Hydraul Design Memo WA NPS OLYM 2017(1) Spruce Trail Segment B 03_2018.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .