This is an invitation for bids for a construction project. The solicitation is for the Spruce Railroad Trail Segment B project located in Olympic National Park in Clallam County, Washington. The work includes clearing and grubbing, excavation, aggregate base, shotcrete, drainage, fencing and signs. Bids are due by November 21, 2019. The contract will be awarded using A+B bidding considering both cost and time to complete the work, which is required to be finished within the completion date specified in the contract clauses. The pre-bid meeting information, points of contact, and other administrative details are provided for interested contractors.

View the file

Other files for this federal contract opportunity

Other files attached to WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B, newest first.
File Type Posted
Bid Opening Summary_Spruce Segment B.pdf PDF
Q&A_01-03-2020.pdf PDF
Q&A_12-31-19.pdf PDF
Q&A_12-26-19.pdf PDF
Amendment A002.pdf PDF
Q&A_12-20-19.pdf PDF
Q&A_12-18-19.pdf PDF
Amendment A001.pdf PDF
Q&A_12-11-19.pdf PDF
Q&A_12-10-19.pdf PDF
Q&A_12-04-19.pdf PDF
Spruce B Cross Sections_10-21-19.pdf PDF
Final Geotech Report - Spruce B_09072019.docx DOCX document
GR 10-18 Spruce Railroad Trail Segment B Unstable Slope Corridor Assessment Report Rev5.pdf PDF
10_olym201701_BID SET_Rev-SIGNED 10-15-19.pdf PDF
Plan Request form.pdf PDF
Hydraul Design Memo WA NPS OLYM 2017(1) Spruce Trail Segment B 03_2018.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BIDS

Solicitation No. 69056719B000004

WA NPS OLYM 2017(1)

Spruce Railroad Trail Segment B

Solicitation, Offer & Award, Bid Schedule, Contract Clauses, General Wage Decision, Special Contract Requirements, and Plans

This solicitation cites Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 This project uses U.S. Customary units of measure

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

610 EAST FIFTH STREET

VANCOUVER, WA 98661-3801

Phone: (360) 619-7520 – FAX: (360) 619-7932 e-mail : wfl.contracts@dot.gov

QUICK INDEX

Page Item --- Bid Submittal Checklist --- Authority to Sign --- Bid Bond --- Table of Contents A-1 Notice to Bidders A-3 SF 1442, Solicitation, Offer and

Award A-7 Bid Schedule B-1 Solicitation Provisions C-1 Contract Clauses D-1 General Wage Decision E-1 Special Contract Requirements H-1 Permits I-1 Reserved J-1 Fire Protection and Suppression

BID REMINDERS

Electronic bids will not be accepted. Submit printed copy of bid to the address listed on the enclosed SF 1442. Before submitting your bid, please review the following:

• Have you rechecked your bid figures?

• Have you completed the bid schedule?

• Have you completed and signed the SF 1442, Solicitation, Offer & Award?

• Have you acknowledged all amendments?

• Have you completed the Representations &

Certifications (Page B-1)?

• Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?

• Does the lower left corner of the proposal envelope state “Bid Enclosed”?

• Does the lower left corner include the Solicitation Number and the project number/name?

This solicitation is provided as full and open competition

Bid Opening Date:

See Page A-3, Block 13A

A-1 Notice to Bidders mailto:wfl.contracts@fhwa.dot.gov

PROJECT No. WA NPS OLYM 2017(1)

PROJECT NAME Spruce Railroad Trail Segment B

BASE OPTION X

BEGINNING AT See Plans See Plans

ENDING AT See Plans See Plans

LENGTH 1.86 Miles 3.83 Miles

NATIONAL Olympic National Park

COUNTY Clallam County

STATE Washington

FIXED COMPLETION DATE See FAR Clause 52.211-10 (FAR Clauses begin on page C-1)

Bid Submittal Checklist

WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B

Before submitting your bid, please review the following:

Done?

Is this in the envelope?

Bid Envelope Did I correctly address the envelope? (See page A-3, blocks 7 & 8) Does the lower left corner of the envelope include the Solicitation Number and the project name/number?

Pages A-3 & A-4 (SF 1442, Solicitation Offer & Award) Did I include our firm name and address in block 14?

Did I include our firm’s phone number in block 15?

Did I include our firm’s remittance address in block 16?

(Use when different than block 14) Did I include my unique entity identifier and Cage Code?

Did I include the number & date of all amendments in block 19?

Did the appropriate official sign/date in block 20A, 20B & 20C?

Bid Schedule (see page A-7) Did I insert “Unit Bid Price” and “Amount Bid” for each bid item?

Did the appropriate official initial corrections?

When applicable, did I include the totals for each schedule in the summary page? (See last page of bid schedules.)

Bid Bond (Standard Form 24) Bids received without a valid bid bond will be rejected.

Did I complete my bid bond correctly?

Did I include the original?

Did I attach the Power of Attorney to the bid bond?

Authority to Sign Did I include a completed form for each person signing the SF1442 and Bid Bond?

Representations & Certifications & FAR Clause Did I include the completed B-pages (beginning on B-1)?

Did I include the completed clause 1252.228-73 Notification of Miller Act Payment Bond Protection (See page C-112)?

System for Award Management (SAM) https://www.sam.gov/portal/public/SAM/ Do we have up-to-date data in SAM?

Veteran Reporting (FAR Clause 52.222-37) If applicable, did I ensure our firm has completed this annual report?

NOTE: The Contractor is fully responsible to verify that all data is correct each time a bid package is submitted. Failure to properly input and/or update your data may cause the bid to be rejected.

https://www.sam.gov/portal/public/SAM/

WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B

Driving Directions to our Vancouver Washington Office:

Directions to WFLHD https://www.google.com/maps/place/610+E+5th+St,+Vancouver,+WA+98661/data=!4m2!3m1!1s0x5495a8ae3f2d7083:0x5b7adcfa96ade37a?hl=en

Authority to Sign WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B

INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer/bid.

Corporate Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the corporation named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this corporation;

that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.

_____________________________________ (signature) Affix Corporate Seal

_____________________________________ (title)

INSTRUCTIONS: When the offeror/principal is a limited liability company, include this certification with your offer/bid.

Limited Liability Certificate

I, ____________________________________________ (name), certify that I am the

________________________________________(title), of the limited liability company named as the Offeror/Principal herein;

that _________________________________________(name), who signed this offer and/or bid bond on behalf of ___________________________ (company name) is

________________________________________ (title) of this company;

that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.

_____________________________________ (signature) Affix Company Seal (as applicable)

__________ _________________________ (title)

INSTRUCTIONS: When the offeror/principal is a partnership, include this certification with your offer/bid.

Authority to Bind Partnership

This certifies that the names and signatures of all partners are listed below, and that the person signing the proposal has the authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.

(Include names and signatures of all partners)

INSTRUCTIONS: When the offeror/principal is a joint venture, include this certification with your offer/bid.

Authority to Bind Joint Venture

This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting Officer.

(Include names and signatures of all applicable individuals)

INSTRUCTIONS: When the offeror/principal is a sole proprietorship, the signature on the offer/bid and on the bonds must be as follows:

Sole Proprietorship Requirement

An Offeror/Principal that is a sole proprietorship must submit an offer/bid and a bond signed by the sole proprietor, or by one duly authorized to sign for the sole proprietor.

If the signature is by someone other than the sole proprietor, a copy of the power of attorney authorizing the individual to sign must be provided with the offer/bid.

RESERVED

BID BOND

(See instructions on reverse)

DATE BOND EXECUTED (Must not be later than bid opening date) OMB Control Number: 9000-0045

Expiration Date: 8/31/2022 Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 25 minutes to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

SURETY(IES) (Name and business address)

PENAL SUM OF BOND BID IDENTIFICATION

PERCENT

OF BID

PRICE

AMOUNT NOT TO EXCEED BID DATE INVITATION NUMBER 69056719B000004

MILLION(S) THOUSAND(S) HUNDRED(S) CENTS

FOR (Construction, Supplies or Services)

WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.

Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

PRINCIPAL

SIGNATURE(S)

1.

(Seal)

2.

(Seal)

3.

(Seal) Corporate Seal NAME(S) &

TITLE(S)

(Typed)

1. 2. 3.

INDIVIDUAL SURETY(IES)

SIGNATURE(S) 1.

(Seal)

2.

(Seal)

NAME(S)

(Typed)

1. 2.

CORPORATE SURETY(IES)

SU

R

ET

Y

A

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal

SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 24 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)

INDIVIDUAL PARTNERSHIP JOINT VENTURE

CORPORATION OTHER (Specify)

STATE OF INCORPORATION

SU

R

ET

Y

B

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

C

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

D

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal SIGNATURE(S)

1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

E

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal

SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

F

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal

SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

SU

R

ET

Y

G

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

Corporate Seal

SIGNATURE(S) 1. 2.

NAME(S) &

TITLE(S)

(Typed)

1. 2.

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.

The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

STANDARD FORM 24 (REV. 8/2016) BACK

Table of Contents Project: WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B

TABLE OF CONTENTS

08/01/14–FP14

DESCRIPTION PAGE

Notice to Bidders ........................................................................................................................ A-1

Solicitation, Offer, and Award (SF 1442) ................................................................................... A-3

Bid Schedule ............................................................................................................................... A-7

Solicitation Provisions ................................................................................................................ B-1

Contract Clauses ......................................................................................................................... C-1

General Wage Decision .............................................................................................................. D-1

SCRs Table of Contents

SPECIAL CONTRACT REQUIREMENTS (SCR)

The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), U.S. Department of Transportation, Federal Highway Administration.

Division 100 ..................................................................................................................... E-1 Division 150 ................................................................................................................... E-27 Division 200 ..................................................................................................................... F-1 Division 250 ..................................................................................................................... F-5 Division 400 ................................................................................................................... F-24 Division 550 ................................................................................................................... F-26 Division 600 ................................................................................................................... F-47 Division 700 .................................................................................................................... G-1

Permits ........................................................................................................................................ H-1

Reserved ........................................................................................................................................ I-1

Fire Protection and Suppression Plan .......................................................................................... J-1

Table of Contents

(This page intentionally left blank)

A-1

Notice to Bidders Project: WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B

NOTICE TO BIDDERS

THIS PROJECT IS BEING SOLICITED AND AWARDED UNDER FP-14.

The FP-14 is FLH’s Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. To view the FP-14 electronically go to:

https://flh.fhwa.dot.gov/business/resources/specs/.

The FP-14 is a dual unit document with U.S. Customary units being the primary unit shown.

Metric equivalents are shown in parenthesis.

When submitting bids, drawings, calculations, and other construction documents, use only U.S. Customary units of measure, unless otherwise stated.

I. Project Location

General Location. The project work is located 29 miles west of Port Angeles in Clallam County.

Approximate Global Positioning System (GPS) coordinates for the beginning of the project are 48° 03’ 58” N, longitude 123° 51’ 19” W.

Project Limits. Signs have not been erected to identify the project limits. No Government personnel will be available for show-me tours.

II. Pre-bid Information.

GENERAL AND TECHNICAL QUESTIONS REGARDING PROPOSED WORK FOR

THIS PROJECT WILL BE ACCEPTED UNTIL CLOSE-OF-BUSINESS ON

12/30/2019

Refer to page A-5 for information on how to submit questions related to General Information and Technical Information. Answers to General and Technical Questions will be posted at https://www.fbo.gov/spg/DOT/FHWA/WFL/69056719B000004/listing.html Every attempt to respond to questions will be made. However, response to questions received after the above posted date is not guaranteed.

A+B Bidding with Base & Option Schedules. Bids for the construction of this project are being invited under a Base schedule and one Option schedule, designated Base Schedule and Option Z.

The Base Schedule and Option Z will each include the value of time in the low bid determination.

Complete both schedules and the A+B bidding in accordance with Subsection 102.02 of the special contract requirements and the instructions on the bid schedule on page A-7. Award of the contract will be made according to Subsection 102.05A. The apparent low bidder will be determined by the lowest bid for the Bid Schedule Project Total (Part A + Part B).

https://flh.fhwa.dot.gov/business/resources/specs/ https://www.fbo.gov/spg/DOT/FHWA/WFL/69056719B000004/listing.html

A-2

Electronic Plan Sheets. This solicitation includes electronic plan sheets available at b e t a . s a m . g o v . A paper copy of the plan sheets is available by submitting the form posted with this solicitation.

Physical Data. Physical data applicable to this project is listed in FAR Clause 52.236-4 Physical Data.

Representations & Certifications. Submit or update Representations and Certifications online at https://www.sam.gov/SAM/ before bid submittal. For more details go to FAR Provision 52.204- 8 Annual Representations and Certifications (see page B-2.). If you have previously registered on-line and the NAICS code for this solicitation is different than the code listed in your online file, please note the amended changes on the lines provided in FAR 52.204-8.

Requests for Information. Requests for technical information (Plan and Division 100 – 700 Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).

Price Evaluation Factor. This solicitation contains a Price Evaluation Factor. In accordance with 13 CFR subsection 126.613, we will apply a factor of 10% to an apparent low bid submitted for Bid Schedule Project Total (Part A+ Part B) by a large business when we also receive a bid from a HUBZone small business; the 10% factor does not apply to an apparent low bid submitted by a small business.

HUBZone. If the contract is awarded after applying the price preference for HUBZone small business concerns under FAR clause 52.219-4; at least 15 percent of the cost of the contract performance incurred for personnel must be spent on the prime Contractor’s employees or the employees of other qualified HUBZone small business concerns.

SF 1442, Solicitation, Offer, and Award. Particular attention should be paid to Standard Form l442, Solicitation, Offer and Award, to assure that Blocks 14, 15, 16, 19, 20A, and 20C are completed correctly. Sign Block 20B according to the instructions in Subsection 102.02. You must submit a completed ‘Authority to Sign’ document. You must also complete the representations and certifications contained in the Contract Provisions beginning on page B-1.

Failure to furnish or complete any of the above may result in your bid being considered nonresponsive and being rejected.

Facsimile and email bids, modifications, and withdrawals. Facsimile and email bids are not authorized for this solicitation. Bids may be modified or withdrawn by facsimile, if such notice is received by the time specified for receipt of bids. The Government will not be responsible for any failure attributable to the transmission or receipt of facsimile data. See FAR Provision 52.214-5, Submission of Bids. FAX 360.619.7932. To confirm receipt, call 360.619.7520.

Surety Bond Guarantee Program. Small businesses that need surety bonds can qualify for U.S.

Small Business Administration (SBA) backed surety bonds. SBA assistance in locating a participating surety company or agent, and completing application forms is available online. For more information on the U.S. SBA’s Surety Bond Guarantee program, go online to http://www.sba.gov/content/contractors or call 1-800-U-ASK-SBA

Notice to Bidders Project: WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B https://www.fbo.gov/spg/DOT/FHWA/WFL/69056719B000004/listing.html https://www.sam.gov/SAM/ http://www.sba.gov/content/contractors

A-2a

Fraud Alert. Current and potential U.S. Department of Transportation (DOT) Contractors have recently been receiving fraudulent letters purporting to be issued by DOT. These fraudulent letters request that the Contractors resubmit their banking information to DOT. If you receive such a letter, please DO NOT complete the requested worksheet that is attached to the letters and DO NOT release any information. To register or update information, Contractors are required to go directly through the System for Award Management (SAM) website and never through a third party. You can access SAM at https://www.sam.gov/portal/public/SAM/.

III. Post Award Information.

Insurance. Insurance requirements are described in Subsection 107.05.

Contractor Performance Evaluations. This office posts performance evaluations in the Contractor Performance Assessment Reporting System (CPARS); for additional information, see http://www.cpars.gov/index.htm. Upon receiving an email notice of evaluation availability, you will have 14-60 days to review the evaluation online and submit comments. If you are unable to access the system, call 360.619.7520 for assistance or for a copy of the evaluation.

IV. Specifications and Permits.

Specifications. This solicitation and subsequent contract are governed by the Federal Acquisition Regulation (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14. An electronic version may be found at http://flh.fhwa.dot.gov/business/resources/specs/. A single paper copy can also be obtained from the Research & Technology Product Distribution Center (RTPDC) by e-mail to:

report.center@dot.gov, or by phone 814-239-1160, or fax 814-239-2156.

Electronic Documentation. Requires all documents (including but not limited to correspondence, notifications, submittals, reports, and pay notes) to be submitted in a pdf format, or an approved fixed-layout electronic format. See Subsection 103.06.

Brand Name or Equal. Section 710, Fence and Guardrail and Section 725, Miscellaneous Material, specifies a proprietary product. See FAR Provision 52.211-6, Brand Name or Equal, when opting to use alternate products. Bid Item 65101, Drape Rockfall Protection, Wire Mesh (Exterior) and 65501, Anchored Wire Mesh System has been identified as "Brand Name or Equal".

If your offer is based on a brand name different than that listed in the Special Contract Requirements, the proposed "equal" must be identified in the space provided on the Bid Schedule.

Include with your offer all documentation needed by the Government to determine if the proposed product meets the requirements listed in the appropriate Section. The evaluation of offers and the determination as to equality of the product offered is the responsibility of the Government and will be based on information furnished by the Offeror as well as other information reasonably available https://www.sam.gov/portal/public/SAM/ http://www.cpars.gov/index.htm http://flh.fhwa.dot.gov/business/resources/specs/ mailto:report.center@dot.gov

A-2b

Project: WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B to the contracting office. If the proposed “equal” is determined by the government to be “not equal”, the bid will be considered nonresponsive.

Carefully review Sections 563 and 725 of the Special Contract Requirements, and account for all material lead time(s) associated with performing work under these Sections.

Material Sources. Material sources, water sources and haul roads have not been identified for this project. Secure all permits and clearances for Contractor-located sites and sources. See Subsection 105.02(c).

a. Sealed offers in original an

______________________ 1/07/2020

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE

SOLICITATION

(Construction, Alteration, or Repair)

3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Federal Highway Administration

Western Federal Lands Highway Div.

610 E. 5th St.

Vancouver WA 98661

690567 8. ADDRESS OFFER TO

Federal Highway Administration Western Federal Lands Highway Div.

610 E. 5th St. Vancouver WA 98661

a. NAME

See Page A-5

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

360-619-7520

See Block 10 x

11/21/2019

1. SOLICITATION NO.

69056719B000004

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This solicitation is designed WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B.

IN STRICT ACCORDANCE WITH:

Federal Acquisition Regulations (FAR) and Transportation Acquisition Regulations

(TAR).

General Wage Decision

Special Contract Requirements

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 calendar days and complete it within ________________ ________________ calendar days after receiving

See Page A-5

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time

________ 60 ______ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

A-3

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Federal Highway Administration Western Federal Lands Highway Div.

610 E. 5th St.

Vancouver WA 98661

690567

DEAN UMATHUM

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Unique Entity Identifier (Formerly DUNS) Cage Code:

See Bid Schedule

All Items on Bid Schedule

See Page A-5

X

A-4

Federal Highway Administration Western Federal Lands Highway Div.

610 E. 5th St.

Vancouver WA 98661

A-5

Continuation SF 1442 WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B

Block 9 FOR GENERAL INFORMATION, call 360.619.7520 from the hours of 8:00 a.m. to 4:00 p.m. local time or e-mail us at wfl.contracts@dot.gov.

FOR TECHNICAL INFORMATION (plan and specification questions only), requests for technical information about this project will only be accepted in writing.

Submit questions via fax (360.619.7932) or e-mail at wfl.plans-spec@dot.gov.

QUESTIONS/ANSWERS POSTED ONLINE. You can view questions and answers on the Federal Business Opportunities (FBO) Website https://www.fbo.gov/ .

• Insert the solicitation number in “Keyword / Solicitation #:”

• Scroll to the project.

• Make sure you are on the most recent view and look in the right section of the page for the most recent Q&A document.

FOR DAVIS-BACON WAGE RATE INFORMATION call the Department of Labor at 415.625.7716 (DRBA - Western Region)

FOR PHYSICAL DATA, See FAR Contract Clause 52.236-4, Physical Data, (clauses begin on page C-1) for a listing of available data. Physical Data will be posted with the solicitation on the Federal Business Opportunities website.

FOR BID RESULTS, Bid opening summary will be posted on the Federal Business Opportunities (FBO) Website https://www.fbo.gov/ shortly after bid opening. Bid tabulations will be available on our website approximately 3 work days after the bid opening. Our website is located at: http://flh.fhwa.dot.gov/business/construction/bids/ filter by WFL Division and applicable state.

Block 11 COMPLETION DATE: Work shall be completed on or before the date specified in FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work, subject to such extensions as may be authorized by the terms of the contract and the specifications made a part thereof. Contract Clauses begin on pages C-1.

Block 12A PERFORMANCE & PAYMENT BONDS: See FAR Clause, 52.228-15, Performance and Payment Bonds - Construction (clauses begin on page C-1) and Subsection 102.06 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units.

Block 13B BID BOND AMOUNT: See FAR Clause 52.228-1, Bid Guarantee (clauses begin on page C-1).

ADDITIONAL INFORMATION: See Subsections 102.03 and 102.04 of Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP- 14, U.S. Customary Units.

Block 24 SUBMITTING INVOICES: See Subsection 109.08 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14, U.S. Customary Units.

mailto:wfl.contracts@dot.gov mailto:wfl.plans-spec@dot.gov https://www.fbo.gov/ https://www.fbo.gov/ http://flh.fhwa.dot.gov/business/construction/bids/

A-6

Continuation SF 1442 WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B

ESTIMATED PRICE RANGE. The price range of the project work is between $5,000,000 and $7,000,000.

SUBCONTRACTING PLAN. This invitation for bids requires a low bidder who is a LARGE business to submit an acceptable subcontracting plan prior to contract award. Do not submit this form with your bid. A large business is one whose average gross annual receipts over the past 3 years equal $36.5 million or more. For your information the subcontracting plan form is included beginning on page A-6a.

This requirement does not apply to SMALL businesses.

A-7

Bid Schedule Project No: WA NPS OLYM 2017(1) Project Name: Spruce Railroad Trail Segment B

BID SCHEDULE INSTRUCTIONS

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions.

Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule.

Multiply the unit bid price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.

When a “LPSM” (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.

When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.

Total the amounts bid for all pay items and insert the total bid amount.

A+B Bidding

When completing the bid schedules, provide the number of calendar days necessary to complete all contract work for both Base Schedule and Option Z schedule combined, from the Notice to Proceed (see FAR Clause 52.211-10) until the day of final construction completion, both dates included. The total number of calendar days bid (Part B) will become the basis for determining the final fixed completion date of the contract. It is against this date that liquidated damages will be assessed according to Subsection 108.04.

The number of calendar days bid may not exceed 238 days for both the Base Schedule and Option Z Schedule combined.

Multiply the number of days bid, for both the Base Schedule and Option Z Schedule combined, by the Administrative Cost of $3200.00 per day to determine the Administrative Cost Subtotal (Part B).

Add the Construction Price Totals (Part A: Base Schedule + Part A: Option Z Schedule) to determine the Construction Price Grand Total (Part A). Add the Construction Price Grand Total (Part A) to the Administrative Cost Total (Part B) to determine the Bid Schedule Project Total (Part A + Part B).

BRAND NAME OR EQUAL NOTIFICATION

If providing other than the brand name product listed in Section 563, complete the following: (See FAR Provision 52.211-6, Brand Name or Equal)

For Section 563 – Painting in Schedule A, our firm offers in lieu of the brand name Natina® Steel Specified in subsection 725.19 Weathering Agent:

A-8

Bid Schedule Project No: WA NPS OLYM 2017(1) Project Name: Spruce Railroad Trail Segment B

Brand: __________________________________________

Manufacturer’s Name: _____________________________

Include with your bid all documents needed by the Government to determine if the proposed product meets the requirements listed in the appropriate Section. The determination as to the equality of the product offered is the responsibility of the Government and will be based on the information furnished by the bidder as well as other information reasonably available to the contracting office. If proposed “equal” is determined by the government to be “not equal”, bid will be considered nonresponsive.

If providing other than the brand name product listed in Section 651, complete the following: (See FAR Provision 52.211-6, Brand Name or Equal)

Offering on Item 65101-1000, Draped Rockfall Protection, Wire Mesh (Exterior) in Schedule A, our firm offers in lieu of the brand name Geobrugg Tecco® G65 wire mesh specified in Subsection

710.12 Draped Rockfall Protection Fabric.

Brand: __________________________________________

Manufacturer’s Name: _____________________________

Include with your bid all documents needed by the Government to determine if the proposed product meets the requirements listed in the appropriate Section. The determination as to the equality of the product offered is the responsibility of the Government and will be based on the information furnished by the bidder as well as other information reasonably available to the contracting office. If proposed “equal” is determined by the government to be “not equal”, bid will be considered nonresponsive.

If providing other than the brand name product listed in Section 655, complete the following: (See FAR Provision 52.211-6, Brand Name or Equal)

Offering on Item 65501-0000, Anchored Wired Mesh System in Schedule A, our firm offers in lieu of the brand name Geobrugg Tecco® G65 wire mesh specified in Subsection 710.12 Draped Rockfall Protection Fabric.

Brand: __________________________________________

Manufacturer’s Name: _____________________________

Include with your bid all documents needed by the Government to determine if the proposed product meets the requirements listed in the appropriate Section. The determination as to the equality of the product offered is the responsibility of the Government and will be based on the information furnished by the bidder as well as other information reasonably available to the contracting office. If proposed “equal” is determined by the government to be “not equal”, bid will be considered nonresponsive.

A - 9

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.

Bid Schedule

Project No:WA NPS OLYM 2017(1)

Project Name:Spruce Railroad Trail Segment B

A - 10

Contract Quantity Pay Items

30201-2000 ROADWAY AGGREGATE, METHOD 2

55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

55401-1000 REINFORCING STEEL

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

A0060 15301-0000 CONTRACTOR QUALITY CONTROL

ALL LPSM $___LPSM_____ $____________

A0080 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

A0100 15501-0000 CONSTRUCTION SCHEDULE

ALL LPSM $___LPSM_____ $____________

A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE

500 LNFT $____________ $____________

A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

200 LNFT $____________ $____________

A0160 15705-2000 SOIL EROSION CONTROL, FLOATING TURBIDITY CURTAIN

200 LNFT $____________ $____________

A0180 20101-0000 CLEARING AND GRUBBING

2.1 ACRE $____________ $____________

A0200 20401-0000 ROADWAY EXCAVATION

7,280 CUYD $____________ $____________

A0220 20435-2000 BACKFILL, GRANULAR

70 CUYD $____________ $____________

A0240 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A (NONWOVEN)

15,500 SQYD $____________ $____________

Bid Schedule

Schedule: BaseProject No:WA NPS OLYM 2017(1)

A - 11

A0260 20801-0000 STRUCTURE EXCAVATION

90 CUYD $____________ $____________

A0280 20810-0000 SHORING AND BRACING

ALL LPSM $___LPSM_____ $____________

A0300 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2

50 CUYD $____________ $____________

A0320 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3

2,245 CUYD $____________ $____________

A0340 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE (Contractor

Designed)

5,917 SQFT $____________ $____________

A0360 25701-0200 CONTRACTOR FURNISHED MECHANICALLY STABILIZED EARTH WALL

DESIGN

ALL LPSM $___LPSM_____ $____________

A0380 26001-0000 ROCK BOLT (25 KIP EXTERIOR)

2,615 LNFT $____________ $____________

A0400 26001-0000 ROCK BOLT (50 KIP EXTERIOR)

640 LNFT $____________ $____________

A0420 26002-0000 ROCK DOWEL (TRANSITION)

100 LNFT $____________ $____________

A0440 26002-0000 ROCK DOWEL (EXTERIOR)

685 LNFT $____________ $____________

A0460 26002-0000 ROCK DOWEL (INTERIOR)

1,600 LNFT $____________ $____________

A0480 30201-2000 ROADWAY AGGREGATE, METHOD 2

3,790 CUYD $____________ $____________

A0500 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

26 CUYD $____________ $____________

Bid Schedule

Schedule: Base Project No:WA NPS OLYM 2017(1)

A - 12

A0520 55401-1000 REINFORCING STEEL

2,634 LB $____________ $____________

A0540 55504-0000 PRE-FABRICATED STEEL BRIDGE

ALL LPSM $___LPSM_____ $____________

A0560 55601-0900 BRIDGE RAILING, STEEL (Approach)

24 LNFT $____________ $____________

A0580 55706-1000 STRUCTURAL TIMBER AND LUMBER, UNTREATED

ALL LPSM $___LPSM_____ $____________

A0600 56601-0000 SHOTCRETE (MIN 4-INCH)

480 SQYD $____________ $____________

A0620 56601-0000 SHOTCRETE (MIN 3-INCH)

360 SQYD $____________ $____________

A0640 56701-0000 MICROPILE (7" OD x 0.5" WT, Installed in 10" Diam. Bored Hole)

128 LNFT $____________ $____________

A0660 56705-0000 MICROPILE LOAD VERIFICATION TEST

1 EACH $____________ $____________

A0680 56706-0000 MICROPILE PROOF LOAD TEST

2 EACH $____________ $____________

A0700 60201-0800 24-INCH PIPE CULVERT

359 LNFT $____________ $____________

A0720 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

12 EACH $____________ $____________

A0740 60504-0000 GEOCOMPOSITE SHEET DRAIN SYSTEM

40 SQYD $____________ $____________

A0760 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

100 HOUR $____________ $____________

A0780 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM

CAPACITY WITH THUMB ATTACHMENT

100 HOUR $____________ $____________

Bid Schedule

Schedule: BaseProject No:WA NPS OLYM 2017(1)

A - 13

A0800 62302-0100 SPECIAL LABOR, SLOPE SCALING (SAFETY SCALING)

20 HOUR $____________ $____________

A0820 62302-0100 SPECIAL LABOR, SLOPE SCALING

900 HOUR $____________ $____________

A0840 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

11,250 SQYD $____________ $____________

A0860 62515-1000 MULCHING, DRY METHOD (CONSERVED CHIP DEBRIS, 4" DEPTH)

2.2 ACRE $____________ $____________

A0880 62515-3000 MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX

0.5 ACRE $____________ $____________

A0900 63302-0000 SIGN SYSTEM

40.1 SQFT $____________ $____________

A0920 63501-0000 TEMPORARY TRAFFIC CONTROL

ALL LPSM $___LPSM_____ $____________

A0940 64703-1000 MITIGATION, LANDSCAPING LOG

35 EACH $____________ $____________

A0960 65101-1000 DRAPED ROCKFALL PROTECTION, WIRE MESH (EXTERIOR)

6,800 SQYD $____________ $____________

A0980 65301-0000 MIDSLOPE ROCKFALL ATTENUATOR

200 SQYD $____________ $____________

A1000 65501-0000 ANCHORED WIRED MESH SYSTEM

120 SQYD $____________ $____________

Submitted by:____________________________________ Base Schedule Total:____________________

Bid Schedule

Base ScheduleProject No:WA NPS OLYM 2017(1)

A - 14

Contract Quantity Pay Items

30201-2000 ROADWAY AGGREGATE, METHOD 2

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

Z0020 15101-0000 MOBILIZATION

ALL LPSM $___LPSM_____ $____________

Z0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

ALL LPSM $___LPSM_____ $____________

Z0060 15301-0000 CONTRACTOR QUALITY CONTROL

ALL LPSM $___LPSM_____ $____________

Z0080 15401-0000 CONTRACTOR TESTING

ALL LPSM $___LPSM_____ $____________

Z0100 21201-0000 LINEAR GRADING

2.0 MILE $____________ $____________

Z0120 30201-2000 ROADWAY AGGREGATE, METHOD 2

1,205 CUYD $____________ $____________

Z0140 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 (3 inch compacted depth)

3,800 TON $____________ $____________

Z0160 60201-0400 12-INCH PIPE CULVERT

10 LNFT $____________ $____________

Z0180 60915-1000 WHEELSTOP, CONCRETE

20 EACH $____________ $____________

Z0200 63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID (WHITE)

890 LNFT $____________ $____________

Z0220 63405-0450 PAVEMENT MARKINGS, TYPE A, ACCESSIBILITY SYMBOL (WHITE)

2 EACH $____________ $____________

Z0240 63501-0000 TEMPORARY TRAFFIC CONTROL

ALL LPSM $___LPSM_____ $____________

Bid Schedule

Schedule: Option ZProject No:WA NPS OLYM 2017(1)

A - 15

Submitted by:____________________________________ Schedule Option Z Total:___________________

Bid Schedule Schedule: Option Z

Project No:WA NPS OLYM 2017(1)

A - 16

Bid Schedule Summary

Base Schedule: Construction Price (Part A)

Base Schedule Total ( pg A-13)

Option Z Schedule: Construction Price (Part A)

Option Z Schedule Total (pg A-15)

Number of Calendar Days* Administrative Cost

$3,200.00

*The number of calendar days used shall include all weekends, holidays, periods of inclement weather, winter shutdown periods, and all other days during which work may or may not be performed.

Construction Price Grand Total (Part A)

Administrative Costs Total (Part B)

Bid schedule project Total (Part A+ Part B) Submitted By: ________________________________

Bid Schedule

Project No:WA NPS OLYM 2017(1)

Project Name:Spruce Railroad Trail Segment B

Administrative Cost Total (Part B)

Bid Schedule Project Total (Part A + Part B)

Construction Price Grand Total (Part A)

Construction Price (Part A base schedule + Part A Option Z Schedule)

Base Schedule: Construction Price Total (Part A)

Option Z Schedule: Construction Price Total (Part A)

Administrative Cost Total Part B

B - 1

Solicitation Provisions

FEDERAL ACQUISITION REGULATION

SOLICITATION PROVISIONS

Representations, Certifications and Other Statements of Bidders

The bidder makes the following representations and certifications as a part of its bid.

52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017)

(a) Definition.

“Internal confidentiality agreement or statement,” “subcontract”, and “subcontractor”, as used in this provision, are defined in the clause at 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

(b) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions), Government agencies are not permitted to use funds appropriated (or otherwise made available) for contracts with an entity that requires employees or subcontractors of such entity seeking to report waste, fraud, or abuse to sign internal…