Amendment A002.pdf
PDF 561 KB Posted
- Attached to
- WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B Federal contract opportunity
- Solicitation number
- 69056719B000004
About this file
This document is an amendment to a solicitation for construction services. The amendment provides revisions to the design and fabrication requirements for a prefabricated steel bridge to be constructed as part of the Spruce Railroad Trail Segment B project. The bridge must be designed and fabricated by a certified fabricator according to AASHTO standards and have a minimum width of 12 feet with 54-inch railings and vertical pickets spaced at 4 inches or less. Revisions include adding lifting devices to the bridge components to facilitate assembly using hand tools, requiring the fabricator to be certified under the AISC Quality Certification Program, and mandating preassembly of components at the shop prior to delivery. The solicitation number is 69056719B000004 and is issued by the Department of Transportation Federal Highway Administration for the construction of Spruce Railroad Trail Segment B by the National Park Service Olympic National Park.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary_Spruce Segment B.pdf | ||
| Q&A_01-03-2020.pdf | ||
| Q&A_12-31-19.pdf | ||
| Q&A_12-26-19.pdf | ||
| Q&A_12-20-19.pdf | ||
| Q&A_12-18-19.pdf | ||
| Amendment A001.pdf | ||
| Q&A_12-11-19.pdf | ||
| Q&A_12-10-19.pdf | ||
| Q&A_12-04-19.pdf | ||
| Spruce B Cross Sections_10-21-19.pdf | ||
| Final Geotech Report - Spruce B_09072019.docx | DOCX document | |
| GR 10-18 Spruce Railroad Trail Segment B Unstable Slope Corridor Assessment Report Rev5.pdf | ||
| 10_olym201701_BID SET_Rev-SIGNED 10-15-19.pdf | ||
| IFB_Spruce.pdf | ||
| Plan Request form.pdf | ||
| Hydraul Design Memo WA NPS OLYM 2017(1) Spruce Trail Segment B 03_2018.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 12/20/2019 N/A See Block 10
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056719B000004
9B. DATED (SEE ITEM 11)
11/21/2019
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A002, dated 12-20-2019 WA NPS OLYM 2017(1) Solicitation No. 69056719B000004 Spruce Railroad Trail Segment B
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Page F-30, Subsection 555.03A, Design. Modifies the fifth paragraph of Subsection (a).
Page F-31, Subsection 555.07, Fabrication. Modifies bridge fabricator requirements.
ENCLOSURES
Pages:
F-30 through F-31
F-30 DIVISION 550
Special Contract Requirements Project: WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B
Section 555. — STEEL STRUCTURES
07/20/15–FP14
Description
555.01 Delete the text of this Subsection and substitute the following:
This work consists of providing a fully engineered and prefabricated steel bridge. It includes designing, furnishing, fabricating, delivering, and erecting the bridge superstructure, bridge timber deck, bearing devices, and all appurtenances.
Construction Requirements
555.03A Design (Added Subsection).
(a) Design Features. Perform structural design of the bridge structure, footing, and micropiles by or under the direct supervision of a Licensed Professional Engineer, registered in the State of Washington, and in accordance with recognized engineering practices and principles.
Provide a modular design that employs steel beams or hollow structural sections (HSS) as the main load carrying members. Design and fabricate the bridge such that the components may be assembled in the field with basic tools and skills. Make all field connections using high strength bolts.
Furnish all necessary bearing assemblies, anchor bolts, and connectors to fully assemble the bridge on timber sills.
Design the bridge as a Steel Truss Span. Furnish a bridge with 125 feet overall length horizontal rail safety system per plans. The minimum bridge width is 12 feet rail-to-rail.
Provide 54” railing above the floor deck. Provide Continuous vertical pickets located on the inside of the trusses. Maximum opening between pickets is 4”.
Coat all steel components with shop-applied inorganic zinc primer or hot dip galvanize.
Completely coat all steel, including top surface of girder flanges. Use connection details for installing the decking without damaging the coating on the girders. Do not mask faying surfaces prior to painting.
Rig main superstructure components with lifting devices to facilitate efficient installation of the bridge using hand labor, light duty equipment (rubber tire backhoe). Place lifting devices so as not to interfere with traffic utilizing the structure, or make provisions to remove the lifting devices after the bridge is assembled in place.
Revised by Amendment A001
Revised by Amendment A002
PROJECT TEAM LEADER
0053955
P R
O F
E S
SIONAL E
NG
IN
E E
R
S T A T
E
OFWASHIN
G
T O
N
B R
A D
F
O
RD D. SH
A F F
E R
R E
GISTERE
D
F-31 DIVISION 550
Special Contract Requirements Project: WA NPS OLYM 2017(1), Spruce Railroad Trail Segment B
(b) Design Criteria. Design the bridge according to AASHTO LRFD Bridge Design Specifications, Current Edition, with Interim Specification. Use design live load according to AASHTO Guide Specifications for Design of Pedestrian Bridges. In addition, check for the following load combinations: DL + 5000 lb live load point load; DL + 35 psf snow load.
Design for maximum live load deflection of L/500.
For basis of footing design, the maximum allowable stress does not exceed the values listed on the plans.
555.03 Drawings and Diagrams. Amend as follows:
(a) Fabrication drawings. Add the following:
Prepare drawings to adequately fabricate and erect the bridge. This includes, but is not limited to, bridge detail plans including girder and deck member dimensions, anchor bolt layouts, footing details, erection drawings and instructions.
Include in the General Notes the following information: design specification and method used (LRFD, LFD, ASD); assumed dead and live loads; live load deflection criteria; steel grade(s);
timber grade and allowable bending stress; and any other information necessary to perform an independent structural check of the design. Furnish erection instructions including a full list of bridge components, hardware, and fasteners and an erection plan identifying pieces by piece mark and location in the structure.
For manufactured components other than rolled steel members, or sawn lumber, indicate on the drawings the relevant section properties (such as location of neutral axis, and moment of inertia or section modulus), as well as recommended maximum loading if given by the manufacturer, to allow a structural analysis of those components.
Affix the seal and signature of a professional engineer proficient in bridge design in the State of Washington to the final acceptance drawings (record set) and calculations.
(d) Transportation drawings. Add the following:
Coordinate and schedule the delivery with the CO at least 14 days prior to shipping the bridge.
555.07 Fabrication. Delete the text of the first sentence of the first paragraph and substitute the following:
Fabricate the structural steel in a fabricating plant that is certified in: SBR IBR (Certified Bridge Fabricator - Simple Intermediate) under the AISC Quality Certification Program.
555.14 Preassembly of Field Connections. Add the following to the first paragraph.
Assemble the bridge at the fabrication shop prior to delivery to ensure proper fit-up of all components. Provide the CO 3 days’ notice prior to this action. Disassemble the bridge and transport the bridge in sections.
Revised by Amendment A001
Revised by Amendment A002
PROJECT TEAM LEADER
0053955
P R
O F
E S
SIONAL E
NG
IN
E E
R
S T A T
E
OFWASHIN
G
T O
N
B R
A D
F
O
RD D. SH
A F F
E R
R E
GISTERE
D
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A002 |
File details come from the government source that posted it. Updated .