This document contains questions and answers related to a federal construction solicitation for Spruce Railroad Trail Segment B issued by the Department of Transportation Federal Highway Administration. The solicitation involves construction of a segment of railroad trail and includes items such as roadway aggregate, structural steel bridge fabrication, rock bolts, dowels, anchored wire mesh, weep holes, and geocomposite sheet drain systems. Bidders had various questions around design requirements, material specifications, quantities and measurement that were answered to help facilitate accurate bidding. Key dates include the question submission deadline of December 20th and answers provided within 5 business days of inquiry.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary_Spruce Segment B.pdf | ||
| Q&A_01-03-2020.pdf | ||
| Q&A_12-31-19.pdf | ||
| Q&A_12-26-19.pdf | ||
| Amendment A002.pdf | ||
| Q&A_12-18-19.pdf | ||
| Amendment A001.pdf | ||
| Q&A_12-11-19.pdf | ||
| Q&A_12-10-19.pdf | ||
| Q&A_12-04-19.pdf | ||
| IFB_Spruce.pdf | ||
| Spruce B Cross Sections_10-21-19.pdf | ||
| Final Geotech Report - Spruce B_09072019.docx | DOCX document | |
| GR 10-18 Spruce Railroad Trail Segment B Unstable Slope Corridor Assessment Report Rev5.pdf | ||
| 10_olym201701_BID SET_Rev-SIGNED 10-15-19.pdf | ||
| Plan Request form.pdf | ||
| Hydraul Design Memo WA NPS OLYM 2017(1) Spruce Trail Segment B 03_2018.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA NPS OLYM 2017(1)
Spruce Railroad Trail Segment B
# General Technical Question Answer Date
1 X The Final Geotechnical Report is missing the Appendixes‐ Will those be made available for review?
A link to the file with the appendices will be provided for this project on beta.sam.gov, and the link to the report without the appendices will be removed.
12/4/19
2 X Is this Solicitation being advertised as a Full and Open Contract or a Small Business Set Aside?
This Solicitation is being advertised as a Full and Open Contract.
12/10/19
3 X
Item #5521‐0200 & 55401‐1000 are being measured as contract quantity‐ but if the contractor has to do the design and submit, why is the quantity not being paid as actual quantity instead of contract quantity?
Bid Items 55201‐0200 and 55401‐1000 are for the foundation that’s been designed and is shown on the plans.
12/11/19
4 X
Item 30120‐2000 Roadway Aggregate is being measure contract quantity‐ there are previous parts of the trail which have less than design thickness of roadway aggregate‐ is this item being used to bring it all up to depth and if so can the item be measured per ton? Or provide accurate cross‐sections so we can verify the quantity?
The unit of measure for Base Schedule Bid Item 30201‐2000 will not be changed, and additional information will not be provided.
Bid accordingly.
12/11/19
5 X
Option Z‐ Item #30201‐2000 Roadway Aggregate, Method 2 is being measured as contract quantity but the typical section says it varies‐ can you provide a better section for the aggregate or make it per ton?
The unit of measure for Option Z Bid Item 30201‐2000 will not be changed, and additional information will not be provided.
Bid accordingly.
12/11/19
Check General or Technical
6 X
Traffic Control Flagger‐ The Lyre River Parking Area gets very busy, even with the road closed you get lots of people trying to enter the trail‐ why no flagging in the contract?
Bid accordingly. 12/11/19
7 X
Plan Sheet I.2 calls for weathering steel but there are references to paint on this sheet and in the specifications too. Can you confirm the structural steel material type?
This will be addressed in a forthcoming amendment.
12/11/19
8 X Regarding Plan Sheet I.2, can you clarify what bolted connections must be slip critical?
Design the bridge and bolt connections according to Subsection 555.03A.
12/11/19
9 X
Subsection 555.03A(a) says: “Coat all steel components with shop‐applied inorganic zinc primer or hot dip galvanize.
Completely coat all steel, including top surface of girder flanges.” Is shop applied inorganic zinc primer to be considered equal to hot dip galvanized? If supplied with shop applied primer only will field painting be required? Please clarify final finish requirements/options.
This will be addressed in a forthcoming amendment.
12/11/19
10 X Q&A 12‐04‐19 states that a new link will be provided that publishes the Final Geotech Report. When will this be provided?
Response not posted. Helped bidder navigate beta.sam over telephone.
12/17/19
11 X Will the government allow the use of couplers while testing Rock Bolts?
See Subsection 260.06(b). 12/18/19
12 X
Will the government allow the contractor to have the Rock Bolt and Dowel material (bar) pre cut to length during the manufacturing process?
See Subsection 260.06(a). 12/18/19
13 X Will the contractor have to order the bar for bolting and dowels in maximum commercially available bar lengths?
Order bar lengths to meet the contract requirements.
12/18/19
14 X Based on the limited work area on both sides of the tunnel will the government allow the contractor to use couplers for Rock Bolts?
See Subsection 260.06(b). 12/18/19
15 X
The specifications (page F‐30) reference a vertical picket safety system, yet the plans (sheet I.7)detail a horizontal rail safety system.
Can you please clarify which safety system the bridge should be provided with?
This will be addressed under a forthcoming amendment.
12/18/19
16 X
The specifications (page F‐31) state that only an AISC Simple Bridge Certified Fabricator (SBR) certification is required for this project.
Typically, a structure of this magnitude would require the fabricator to be at least certified as a Major Bridge Fabricator (IBR or ABR) per AISC.
Can you please confirm the fabricator requirements?
This will be addressed under a forthcoming amendment.
12/18/19
17 X
The design loads on sheet I.2 calls for an AASHTO H‐12 load. This load designation does not exist within AASHTO can you please clarify the required live load that this bridge needs to be designed too?
This will be addressed under a forthcoming amendment.
12/18/19
18 X
The design loads on sheet I.2 calls for an AASHTO H‐12 load. This load designation does not exist within AASHTO can you please clarify the required live load that this bridge needs to be designed too?
Revised Response to Question #17. Design is per AASHTO LRFD Bridge Design Specifications current edition and AASHTO LRFD Guide Specifications for the Design of Pedestrian Bridges current edition. See AASHTO LRFD Guide Specifications for the Design of Pedestrian Bridges Figure 3.2.1 for the base designation of H‐12 truck. Live Load is per AASHTO LRFD Guide Specifications for the Design of Pedestrian Bridges Section 3, using loads specified on sheet I.2 and SCR Section 555.03A Design sub‐section (b).
12/19/19
19 X
On sheet number G.3, Notes 4. This section discusses applying anchored wires mesh with Rock Dowels. Will government provide a line item which indicates the total LNFT of Rock Dowels to pin the 120 SQYDs of anchored wire Mesh?
No. Bid according to the contract requirements.
12/19/19
20 X
Will the interior dowels for the Anchored Wire Mesh System (A1000) need to be tested? If they do, what will be the total design load for the 5' Dowels?
See Subsection 260.11. 12/19/19
21 X What is the total LNFT of Weep Holes to be drilled?
This will not be provided. Bid according to the contract requirements.
12/19/19
22 X
There is no H12 designation in Figure 3.2.1 of the AASHTO LRFD Guide Specifications for the Design of Pedestrian Bridges. That figure includes an H10 and H5 vehicle. Can you please clarify your response?
There is no H12 designation; however, common practice is to extrapolate from the other designations shown.
12/19/19
23 X
Item 60504‐0000 Geocomposite Sheet Drain System‐Sheet G.3‐ Under Notes says locations will be Identified by the CO‐ is the weep holes, mesh, dowels and sheet drain all part of the system? Seems very vague on the items and leaves it all to the CO at the time of installation‐ hard to bid that. Especially the sheet drain‐ to identify and order the materials could be a large delay.
Item 60504‐0000 does not include shotcrete, mesh, or dowels. Bid the contract quantities.
12/20/19
24 X Sheet G.1 The 710 lf of weep holes that are incidental both the 3” and 4” shotcrete is that 1420 lf total or just 710 lf of weep holes?
See Plan Sheet G.3. 12/20/19