T able o f C ontents
-SWPPP/ESCP TABS
TAB 1: SWPPP/ESCP Narrative
TAB 2: NPDES Permit (Construction General Permit or Corresponding State Permit)
TAB 3: NOi, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence
TAB 4: Delegation of Authority
TABS: Maps
TAB 6: Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)
TAB 7: Permanent Stabilization and Revegetation Plan(plan sets and details)
TAB 8: SWPPP Amendment Log
TAB 9: Erosion/Sediment Control Inspection Reports and Requirements
TAB 10: Corrective Action Log
TAB il: Water Quality Monitoring, Reporting Requirements, and Reports
TAB 12: Training Log
TAB 13: Waste and/or Borrow Site Information
TAB 14: Grading and Stabilization _Log
TAB 15: Hazardous Spill Plan
TAB 16: Other Applicable Permits(§ 404, § 401, Oregon Remove-Fill Permit)
TAB 17: NPDES Quality Assurance Checklist
TAB 18: NPDES Notice of Termination (NOT)
Tab 1
CONTRACTOR:
Complete SWPPP narrative in accordance with contract 107.0lA(b).
Revise SWPPP narrative as needed throughout construction in accordance with contract 107.01A(f)
.. ALASKA, IDAHO AND WASHINGTON PROJECTS ONLY:
SWPPP narrative must be signed by General Contractor's responsible corporate officer as defined in CGP 1.11.2.
File approved SWPPP narrative in Tab 1.
Stormwater (SWPPP}
For Construction Activities at:
Project Name:
Project Site Location:
Repave Denali Park Road MP Oto 3.4, AK PRA DENA . 10(35)
City, County, State, Zip Code:
• Denali National Park and Preserve
Healy, Denali Borough, Alaska, 99743
SWPPP Prepared for:
Organization Name:
Address:
Telephone Number:
SWPPP Prepared by:
Name, Title:
Company/Organization:
Address:
Telephone Number:
FHW A, Western Federal Lands Highway Division
610 East Fifth Street
Vancouver, WA 98661-3801
360-619-7700
Denise E Steele, Environmental Protection Specialist
FHWA, Western Federal Lands Highway Division
610 East Fifth Street
Vancouver, WA 98661-3801
360-619-7593
SWPPP Preparation Date: 06/7/2018
Estimated Construction Start Date: 08/28/2019
Estimated Construction Completion Date: 08/28/2020
Estimated Revegetation Start Date: 8/15/2020
Estimated Revegetation Completion Date: 10/28/2020
TAB 1:
TAB2:
TAB3:
TAB4:
TAB5:
TAB6:
TAB7:
TABS:
TAB9:
TAB 10:
TAB 11:
TAB 12:
TAB 13:
TAB 14:
TAB 15:
TAB 16:
TAB 17:
TAB 18:
SWPPP T ABs (SWPPP Inclusions)
SWPPP/ESCP Narrative
NPDES Permit (Construction General Permit or Corresponding State Permit)
NOi, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence
Delegation of Authority
Maps
Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)
Revegetation Plan (if applicable)
SWPPP Amendment Log
Inspection Reports
Corrective Action Log
Water Quality Monitoring, Reporting Requirements, and Reports (if applicable)
Training/Certification Log
Government-Selected Waste, Borrow, Staging Sites
Grading and Stabilization Log
Hazardous Spill Plan or SPCC
Threatened and Endangered Species and Historic Preservation (Section 106) Documentation
NPDES Quality Assurance Checklist
NPDES Notice of Termination (NOT)
SWPPP/ESCP NARRATIVE
Table of Contents
SECTION 1: RESPONSIBLE PARTIES/CONTACT INFORMATION
1.1 Operator(s): ..............................................................................................................................•
1.2 Construction Site SWPPP Contact(s):
1.3 SWPPP Prepared by: .•...•......•••..••...•...•.•.•.•.....•.....••..•.••.•••.•....•.•.•...•...•.•...•.•...•.•...•....•.•.•.•.......••.••. 1
1.4 NPDES Stormwater Permit .•...•..•..•.•.•.•.....•.•.....•...•.•.•....•.•....•.....•.....•....•.•......••.•.•.•...••........•.•••...• 2
1.5 SWPPP Administrator
1.6 Permitting Authority for FHW AIW'FLHD Projects
SECTION 2: PROJECT INFORMATION ••..•••.•..•..•••.•...••••.•...•••....•.•.•...•.•.•.••........•...•......•••... 3
2.1 Project Name and Location .•.........•.....•.•.....•...•..••..•.•..•......•.•...................•.............................•••...• 3
2.2 Project Site Characteristics
SECTION 3: NATURE OF CONSTRUCTION ACTIVITY
3.1 General Description of Project and Scope ofWork:
3.2 Sequence and Estimated Dates of Construction Activities
3.3 Potential Sources of Pollutants
SECTION 4: SITE MAPS .•.•••••••••••••••.••••...•••••.••••...••••••••••••..••••.••••••.•••••••.•••...•••.•..•.•.•.•.•.•.....••• 11
SECTION 5: DISCHARGES .•.......•.............•..•.•.•.....••..•
5.1 Allowable Non-Stormwater Discharges
5.2 Receiving Waters: ....•.•.....•.•..••..•.••.•.•.•.•.•...•...•.•.•...•......•...•.•.••...•.•.••.•.•.•.•.••..•...•.......•.....•........•.•. 13
5.3 Water Quality Monitoring Requirements
SECTION 6: COMPLIANCE WITH OTHER APPLICABLE REQUIREMENTS
6.1 Endangered Species Protection •.•.•..•..•.••..•...•..•.•.•.•.•...•.•.•..•.••....••.•.•.•..•.•.•...........•.••.•.....•......••••. 15
6.2 Historic Preservation ....•...•.•..•......•.•.•.•.•.•.•.•...•...•.....•.....•..•.••••.•.•....•...•.•.•.•...•.•.••...•.•...••.......•..••. 16
6.3 Safe Drinking Water Act Underground Injection Control Requirements
SECTION 7: EROSION AND SEDIMENT CONTROLS
7.1 Natural Buffers or Equivalent Sediment Controls
7.2 Perimeter Controls •.•.••.•.•.•...•..•..•.....•.•..............•...•.....•...•...•.....•...•.•.•.•..•..•.•.•.•..•.•.••...•...•.•.....•.•.. 18
7 .3 Sediment Track-Out •...•.•...•.•.•...•••••..•.•.•...•.•...•.•...•.•.•.•....•.•..•.•.•.•••......•......•....•.•......•............••••• 19
7.4 Stockpiled Soil or Other Erodible Materials
7 .5 Minimize Dust ...............•.•.......•...•.•.•..•.•.•.....•...•.•.•............•....•.•...•....•...•.•.•...•...........................•••. 22
[i]
7.6
7.7
7.8
7.9
Minimize Disturbance of Steep Slopes ........•...•.•..........•.•...•...•...•.......•...•.•.....•..•...............•.......• 22
Topsoil Conservation .........•....•.•.......•.•.....•..........•.•..........•........•.•.•.•...••........•........•
Minimize Soil Compaction .•...........................................................................••.•........•......•
Storm Drain Inlets and Culvert Inlets
7.10 Constructed Stormwater Conveyance Channels and Culvert Outlets
7.11 Sediment Basins .•....•..•.•.•.........•..............................................................•...•........•...•.....•......••...•.. 24
7 .12 Chemical Treatment ...........•...•.................•...........................................................•...•.•.•....•
7.13 Dewatering Practices ..•..........••........................................................................•..•.•..•.....•.....•
7.14 Erosion Control and Stabilization
7.15 Removal of BMPs ....................•.........•..................•...........•.....•.•...........•.•.•..........•
7.16 Post Construction Measures ....•.•......•...•................••.........•..............•...•...............................•....•.. 26
SECTION 8: OPERATIONAL CONTROLS/GOOD HOUSEKEEPING MEASURES ... 27
8.1
8.2
8.3
8.4
8.5
8.6
Hazardous Spill Plan .......................•...•...........•..........•...•.........•.....•...........•.•......•.......................• 27
Spills/Releases in Excess of Reportable Quantities
EquipmentN chicle Fueling and Maintenance Practices
EquipmentN ehicle Washing ...•...................•......•...............•......................................•
Material Handling and Waste Management
Designate Concrete Washout Areas ....•................................•...........•................................•..•....•.• 29
SECTION 9: INSPECTIONS ...•.....•.............•...•........•.............................•........................•
9.1 Inspection Frequency .......•......•.•.....•..................................................................................•
9.2 Corrective Actions ...............................•.....•..........................•.....•......•.••.•.•.•
SECTION 10: DELEGATIONS OF AUTHORITY
SECTION 11: STAFF TRAINING ..•...•......•..•.......................................•..............•.....•..•..•.•.•.•. 33
SECTION 12: CERTIFICATION AND NOTIFICATION
[ii]
Section 1: Responsible Pa.rties/Contact Information
1.1 Operator(s):
Organization Name:
Address:
Telephone Number:
Contractor and PE
FHW A, Western Federal Lands Highway Division (WFLHD 610 East Fifth Street Vancouver, WA 98661-3801 360-619-7700
Note: Fill in all incomplete information following contract award date and prior to start of construction
General Contractor Name: TBD Address:
Telephone Number:
Contractor and PE Note: Fill in all incomplete information following contract award date and prior to start of construction
1.2 Construction Site SWPPP Contact(s):
· FHWA Contact Name:
Title:
Address:
Telephone Number:
General Contractor, Company:
(complete for all States) Erosion Control Supervisor Name:
( complete for all States) Address:
Telephone Number:
TBD
Project Engineer
1.3 SWPPP Prepared by:
Organization/Company:
Name, Position:
Role/Responsibility Telephone Number:
Email:
Denise E Steele, Environmental Protection Specialist SWPPP preparer 360-619-7593 Denise.steele@dotgov
[1]
1.4 NPDES Stormwater Permit
The Applicable EPA/State NPDES Stormwater Permit is located in TAB 2. The Project NOI and EPA/State Acknowledgement with NPDES Tracking Number is located in TAB 3.
1.5 SWPPP Administrator
The General Contractor (section 1.2) is responsible for maintaining the project SWPPP of Record. The General Contractor will provide a qualified Erosion Control Supervisor, who is responsible for managing the installation, maintenance, inspection, and reporting for erosion and sediment control measures, shall maintain and update the project SWPPP of Record and prepare all documentation required by the project NPDES stormwater permit and SWPPP.
The Erosion Control Supervisor (ECS) is identified in section 1.2 and his/her qualifications are documented in TAB 12.
The FHW A/WFLHD Project Engineer (PE) is the duly authorized representative of the FHW A for the purpose of overseeing compliance with the NPDES stormwater permit and SWPPP at the construction site. See Delegation of Authority TAB 4.
All SWPPP documentation, revisions/updates, and reports will be approved/signed by both the General Contractor's ECS and the FHW A PE.
1.6 Permitting Authority for FHW A/WFLHD Projects
Delivery Confirmation documentation of the NOI is located in TAB 3.
The applicable EPA/State NPDES permit is located in TAB 2
Alaska Department of Environmental Conservation (ADEQ
State Permittin2 Authority Alaska • ADEC is permitting authority for most discharges within the state EXCEPT for:
• EPA is the permitting authority for the Denali National Park and Preserve and Metlakatla Indian Reservation.
[2]
Section 2: Project Information
2.1 Project Name and Location
This basic site information is used to file for National Pollutant Discharge Elimination System (NPDES) permit coverage. Permit coverage is obtained by filing the Notice of Intent (NOi) after the SWPPP is complete.
Project Name: Repave Denali Park Road MP Oto 3.4, AK PRA DENA 10(35)
Project Site Location: Denali National Park and Preserve
City, County, State, Zip Code: Healy, Denali Borough, Alaska, 99743
Latitude, Longitude:
63.728515°, -148.886676° *The method used for determining latitude/longitude was: USGS Topographic map
Township: 14S, Range: 7W, Section: 3
Is the project located in Indian country? No
Are you applying for permit coverage as a "federal operator?" Yes
The project Does Not discharge stormwater into a Municipal Separate Storm Sewer System?
2.2 Project Site Characteristics
The undeveloped site and features of the land that are incorporated into the final soil Erosion and Sediment Control plan sheets (TAB 6), as well as natural resources that should be protected are described below:
Vegetation, trees, and sensitive areas, such as stream buffers, wetlands, highly erodible soils, and steep slopes at the site include:
Vegetation: dwarf birch (Betula nana), bog blueberry (Vaccinium uliginosum), green alder (Alnus viridis), and crowberry (Empetrum nigrum). Trees: white spruce (Picea glauca), black spruce (Picea mariana), paper birch (Betula neoalaskana), balsam poplar (Populas balsamifera), and quaking aspen (Populas tremuloides).
Wetlands: Freshwater Forested/Shrub Wetland. Highly erodible soils: No data available on USDA Web Soil Survey website.
Also, see TAB 6
[3]
Stormwater currently drains from the site in the following manner, Sheet flow from asphalt road surface into roadside ditches.
Also, see TAB 6
The location of discharge points or areas
Hines Creek
Also see TAB 6
The location of all waters, including wetlands, are shown on the site map located in
TABs 5 and 6.
Critical slopes and slope lengths include:
Locations: None
Soil type(s) of highly erodible soils and the soils' infiltration capacity are identified as, 1
No data available on USDA Web Soil Survey website.
Any past soil contamination at the site is identified as, None
The following natural features, including trees, streams, wetlands, slopes and other features to be protected includes:
Also see TAB 6
Protected Natural Features:
See Section 2.2
Measures to protect these features:
Minimization and/or avoidance of construction disturbances, buffer zones, silt fences, temporary stabilization methods, rehabilitation of disturbed areas.
Mean Annual Precipitation at the Project Site:2 14.69 inches
1 Natural Resources Conservation Service Web Soil Survey 2 NRCS Annual Climate Data
[4]
The frequency, intensity, and duration of rainfall for the project site, which are the principal factors influencing erosion from a construction site, are described as, The 2-year, 24-hour storm event:3
1.48 Inches per day
The IO-year, 24-hour storm event:
2.27 Inches per day
The 25-year, 24-hour storm event:
2.76 Inches per day
Approximate Growing Season at the Project Site: 5/10 to 9/18
3 Precipitation frequency for W estem States
[5]
Section 3: Nature of Construction Activity
3.1 General Description of Project and Scope of Work:
(i.e. highway construction, roadway realignment, highway and bridge reconstruction, etc.) is described below:
Highway reconstruction: This project will replace all currently failing asphalt pavements on the Denali Park Road from the intersection at State Hwy 3, milepost (MP) 0 to MP 3.4. The project will be completed in 5 sections re-surfacing the worst sections first. The old asphalt surface will be roto-milled and recycled back into the sub grade and a 3" to 4" layer of new asphalt will then be applied. Soft spots will be dug out, refilled and compacted with suitable gravels prior to the application of new surfacing. The project will also include the repaving of all pullouts, tum lanes and intersections, and will replace several existing culverts with larger, 24" pipes. Centerline striping will then be reapplied. This portion of the overall project will also include total reconstruction of the scenic Government Hill pullout at MP 2.5. Subsurface failures in the roadway will be stabilized and the pullout will be widened to increase visitor parking capacity to 20 vehicles. Construction will consist of a 600-foot-long vehicle parking pullout with a viewing platform. The project will provide for safe year round vehicle access by addressing failing roadway, enhance distance vista viewing opportunities, decrease congestion and eliminate traffic and pedestrian conflicts. Since both components of the project are joined, the project will be contracted through the FHW A and both the failing road and improved pullout will be constructed together. Materials will be sourced at the neighboring 5-Mile Pit.
The type or function of the project is: Road Construction
Contractor and PE
Note: Fill in all incomplete information following contract award date and prior to start of construction
Construction Support Activities: If applicable, describe any construction support activities such as dedicated concrete or asphalt batch plants, dedicated aggregate sites, equipment staging yards, material storage areas, borrow, or disposal sites (government-selected sites):
TBD by contractor
NOTE: All Contractor-selected sources and support sites are the sole responsibility of the General Contractor. The SWPPP and NPDES permitting for Contractor-selected sites and sources are separate from this documentation (SCR 107.0lA(h)).
Support activities are located on the general vicinity map and/or site map in 6.
Size of the Construction Project:
(Including all Government-selected support sites such as staging, borrow, waste, access roads, etc.)
Estimated Area
• Total project area (outermost project footprint):
• Project area to be disturbed (area of digging):
[6]
Units
15.64 Acres
3.25 Acres
Percent Impervious Project Area BEFORE Construction: 99.8 %
Runoff Coefficient BEFORE Construction: 0.87 %
Percent Impervious Project Area AFTER Construction: 100 %
Runoff Coefficient AFTER Construction: 0.87 %
[7]
3.
Se qu en ce a nd
E st im at ed D at es o f C on st ru ct io n
A ct iv it ie s
T he in te nd ed c on st ru ct io n se qu en ci ng a nd ti m in g o f m aj or c on st ru ct io n ac ti vi ti es i s de ta il ed h er e, i nc lu di ng th e ph as ed g ra di ng a nd s ta bi li za ti on ac ti vi ti es u se d to m in im iz e ov er al l am ou nt o f d is tu rb ed s oi l.
C on tr ac to r an d
P E
N ot e:
F il l in a ll i nc om pl et e in fo rm at io n fo ll ow in g co nt ra ct a w ar d da te a nd p ri or to s ta rt o f c on st ru ct io n
P ha se
C on st ru ct io n se gu en ce d es cr il!
ti on
D ur at io n o f s eg ue nc e:
B M
P s as so ci at ed w it h t hi s se gu en ce
St ab il iz at io n m ea su re s:
li ck h er e to e nt er te xt
C li ck h er e to e nt er te xt
C li ck h er e to e nt er te xt
C li ck h er e to e nt er te xt
P ha se
C on st ru ct io n se gu en ce d es cr il!
ti on
D ur at io n o f s eg ue
P s as so ci at ed w it h t hi s se gu en ce
St ab il iz at io n m ea su li ck h er e to e nt er te xt
C li ck h er e to e nt er te xt
C li ck h er e to e nt er te xt
C li ck h er e to e nt er te xt
P ha se
C on st ru ct io n se gu en ce d es cr il!
ti on
D ur at io n o f s eg ue
P s as so ci at ed w it h t hi s se gu en ce
St ab il iz at io n m ea su
[8
P ha se
C on st ru ct io n se qu en ce d es cr ip ti on
D ur at io n of se qu en ce
B
M P s as so ci at ed w it h th is s eq ue nc e:
I S ta bi li za ti on m ea su
[9 g .c ·;:
.: c;
'0 rJJ
[81
[81
IX!
n n
IX!
IX!
3.3 Potential Sources of Pollutants
Contractor and PE
Note: Fill in all incomplete information following contract award date and prior to start of construction
The follow table identifies all potential sources ( checked activities in column 1) of sediment and other sources of pollutiori, which may reasonably be expected to affect the quality of stormwater discharges from the construction site.
Potential Construction Site Pollutants
Construction Activity "' = ... ll
.. "' C = ..
~-:!l
.. .. C ·c c;.:, '0 .. ·.; El b ~ o(! "' .. .: :a c; = .c "' .. = = = § rJJ :z = C. E--< Q Q..
Clearing, excavating, and grading X X
Fill of roadway embankment, backfill at structures X X
Vehicle/equipment fueling and maintenance X X
Vehicle/equipment use and storage X
Sanitary/septic waste X X
Dewatering operations X X
Drilling and blasting operations X X X
Concrete washout and waste X X
Structure construction/painting/cleaning X X X
Demolition and debris disposal X X X
Solid waste (trash and debris) X
Hazardous waste or contaminated spills X
Paving operations X X
Landscaping operations X X X
Mining, rock extraction, crushing X X X
Contractor and PE
Note: Fill in all incomplete information following contract award date and prior to start of construction
Construction and waste material expected to be stored on-site includes:
Material Storage Location
(10]
"' i ..
X
X ll C = ..... .. = -= = ... 0
OQ..
X
X
X
X
X
X
Section 4: Site Maps
Vicinity maps are located in TAB 5. Site maps and erosion and sediment control plan maps are located in TAB 6.
[I I]
Section 5: Discharges
Industrial stormwater discharges associated with industrial activity other than construction at the site (including dedicated asphalt plants and dedicated concrete plants that are covered by this permit) include:
NOTE: An Industrial Activity Multi-Sector General Permit may be required for some activities.
Industrial Activity Stormwater Discharge Multi-Sector General Location Permit Number (if applicable)
I.NIA
2.
3.
5.1 Allowable Non-Stormwater Discharges
Non-stormwater discharges used at the construction sited are identified below, along with control measures used to eliminate or reduce the discharges and BMPs used to prevent stormwater contamination.
· Applicable to this Project (check all that apply)
12] 12]
Potential Non-Stormwater Discharges
Waters used to wash vehicles where detergents are not used
Water used to control dust
Potable water including uncontaminated water line flushings
D Construction dewatering (uncontaminated)
12] Ground water or spring water ( uncontaminated)
0 Routine external building wash down that does not use detergents
0 Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed) and where detergents are not used
0 Foundation or footing drains where flows are not contaminated with process materials such as solvents
D Landscape irrigation
12] Discharges from emergency fire-fighting activities
D Fire hydrant flushings
0 Uncontaminated air conditioning or compressor condensate
Control Measures
NOTE: The likely locations of these discharges are identified on the site map TAB 5 and/or
TAB6
[12]
5.2 Receiving Waters:
Are there any surface waters located within 50 feet of the construction disturbance? No
Name(s) of the first surface water that receives stormwater directly from your site and/or from the MS4
Impaired Waters/TDMLs:
Answer the following for each surface water listed in Table 1:
Is this surface What pollutant(s) is HasaTMDL Pollutant(s) for which water listed as causing the been there is a TDML "impaired?" impairment? completed?
1. YesD No~ YesD No~
Source used to determine whether or not your project discharges into an impaired water:
Click here to enter text.
Tier 2, 2.5 or 3 Waters
Answer the following for each surface water listed in Table 1:
Is this surface If yes, specify which Tier.
water designated as Tier 1,2 or 3?
1. YesD No~ Choose an item.
If applicable, documentation of consultation with State or Federal TMDL authorities on consistency ofSWPPP conditions with the approved TMDL is found in TAB 11. The control measures required to ensure that discharge of pollutants from the site are consistent with the assumptions and requirements of the EPA-established or approved TMDL, including any specific waste-load allocations are included in that documentation.
5.3 Water Quality Monitoring Requirements
Provisions in Permit Conditions of the applicable NPDES stormwater permit, as well as the associated §401 certification or other special conditions, define additional monitoring and reporting requirements. Details about water quality monitoring and reporting requirements applicable to this project are included in TAB 11.
Samples and measurements taken for the purpose of monitoring will be representative of the monitored activity. Records of all monitoring information will be retained in TAB 11, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation.
(13]
Records of monitoring information will include:
1. The date, exact place, and time of sampling or measurements;
2. The individual( s) who performed the sampling or measurements;
3. The date(s) analyses were performed
4. The individual(s) who performed the analyses;
5. The analytical techniques or methods used; and
6. The results of such analyses.
[14]
Section 6: Compliance Other Applicable Requirements
6.1 Endangered Species Protection
Under which criterion is project eligible for Endangered Species coverage under the NPDES permit (EPA)?
~A De De Do DE DF Criterion A.
Criterion B.
Criterion C
Criterion D.
No federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site's "action area" as defined in Appendix A of EPA permit.
The construction site's discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility for your action area under eligibility Criterion A, C, D, E, or F and there is no reason to believe that federally-listed species or federally-designated critical habitat not considered in the prior certification may be present or located in the "action area". To certify your eligibility under this Criterion, there must be no lapse ofNPDES permit coverage in the other operator's certification.
By certifying eligibility under this Criterion, you agree to comply with any effluent limitations or conditions upon which the other operator's certification was based. You must include in your NOI the tracking number from the other operator's notification of authorization under this permit. If your certification is based on another operator's certification under Criterion C, you must provide EPA with the relevant supporting information required of existing dischargers in Criterion C in the EPA NOI form.
Federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in or near your site's "action area," and your site's discharges and discharge-related activities are not likely to adversely affect listed threatened or endangered species or critical habitat. This determination may include consideration of any stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to adversely affect listed species and critical habitat. To make this certification, you must include the following in your NOI: 1) any federally listed species and/or designated habitat located in your "action area"; and 2) the distance between your site and the listed species or designated critical habitat (in miles). You must also include a copy of your site map with the
NOI.
Coordination between you and the Services has been concluded. The coordination must have addressed the effects of your site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat, and must have resulted in a written concurrence from the relevant Service(s) that your site's discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat. You must include copies of the
[15]
Criterion E.
Criterion F.
correspondence between yourself and the Services in your SWPPP and NOi.
Consultation between a Federal Agency and the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service under section 7 of the ESA has been concluded. The consultation must have addressed the effects of the construction site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally designated critical habitat. The result of this consultation must be either:
1. a biological opinion that concludes that the action in question (taking into account the effects of your site's discharges and discharge-related activities) is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat; or
11. written concurrence from the applicable Service(s) with a finding that the site's discharges and discharge-related activities are not likely to adversely affect federally-listed species or federally-designated habitat.
You must include copies of the correspondence between yourself and the Services in your SWPPP and NOi.
Your construction activities are authorized through the issuance of a permit under section 10 of the ESA, and this authorization addresses the effects of the site's discharges and discharge-related activities on federally listed species and federally-designated critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and NOi.
Support Documentation for Endangered Species criterion eligibility is filed in TAB 16.
6.2 Historic Preservation
1. Will the project involve installation of any of the following stormwater controls that entail subsurface earth disturbance? No
• Dike D Berm
D Catch Basin
D Pond D Ditch, trench, swale, perimeter drain, etc.
D Culvert
D Other ground-disturbing stormwater control Click here to enter text.
If the project involves no installation of earth-disturbing stormwater controls, then no further historic preservation screening is necessary (for NPDES permitting purposes).
2. If answer to step 1 is Yes, have professional surveys or evaluations determined that historic properties do not exist ( or have prior disturbances at the site precluded the existence of historic properties)? Choose an item.
Provide documentation for the basis of this determination. Click here to enter text.
[16]
3. If answer to step 2 is No, have professional surveys or evaluations determined that installation of stormwater controls will have no effect on historic properties? Yes
Provide documentation for the basis of this determination. SHPO concurrence letter
4. Has the State Historic Preservation Officer (SHPO), Tribal Historic Preservation Office (THPO) or other tribal representative concurred with the determinations of effects on historic properties? Yes
Provide the nature of their response. NO Historic Properties Affected
6.3 Safe Drinking Water Act Underground Injection Control Requirements
Will the project plan install any of the following controls? No
Check all that apply:
D Infiltration trenches (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than is widest surface dimension, or has a subsurface fluid distribution system)
D Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults, chambers, or other devices designed to capture and infiltrate stormwater flow.
D Drywells, seepage pits, or improved sinkholes (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system)
If yes, provide documentation of communications with the EPA or applicable State agency.
Click here to enter text.
[17]
Section 7: Erosion and Sediment Controls
Control measures at the construction site are selected, installed, implemented, and maintained to minimize pollutants in the discharge as necessary to meet applicable water quality standards.
The objectives of this SWPPP include:
• Stabilize the site as soon as possible (targeting the preparation and implementation of erosion and sediment controls to get the site to final grade, and either permanently or temporarily stabilize all bare soil areas as soon as possible).
• Perimeter controls will be installed before ground disturbing activities are initiated.
• Perimeter protection will remain in place until final stabilization has been achieved.
• Slopes and channels will be protected by conveying concentrated stormwater runoff around the top of slopes and stabilize slopes as soon as possible. A void disturbing natural channels and the vegetation along natural channels as much as possible.
• Divert stormwater coming on to the site by conveying it safely around, through, or under the work area. (Divert the clean water, trap the dirty water.)
• Protect receiving waters and other environmentally sensitive waters or areas adjacent to the site.
• Follow pollution prevention measures by providing proper containers for waste and garbage at the site. Store hazardous materials and chemicals so that they are not exposed to stormwater.
• Minimize the area and duration of exposed soils. Clear only land that will be under construction in the near future.
7.1 Natural Buffers or Equivalent Sediment Controls
This section only applies if a surface water is located within 50 feet of the project's earth disturbing activities.
Are there any surface waters within 50 feet of the project's earth disturbances? No
If No, then no further documentation is required for the SWPPP.
7 .2 Perimeter Controls
All Perimeter Sediment Controls will be installed prior to ground disturbing activities taking place. There will be no clearing or grubbing outside the physical clearance limits.
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
The following perimeter controls will be implemented:
Measure: Silt Fence Implementation: The silt fence shall be functional before other land disturbing activities take place. Silt fence should be functional throughout the duration ·of construction and for a long enough duration following construction to allow disturbed areas to stabilize following revegetation and seeding. Please also refer to project schedule, contract, and plan set (Erosion
[18]
Control section).
Maintenance: Silt fences should be inspected periodically for damage (such as tearing by wind, animals, or equipment) and for sediment that has accumulated. Remove the sediment when it reaches one-half the height of the silt fence. In situations where access is available, machinery can be used. Otherwise, silt should be removed manually. The following are key elements to remember:
• The sediment deposits should be removed when heavy rain or high water is anticipated.
• The sediment deposits should be placed in an area where there is little danger of erosion.
• The silt fence should not be removed until adequate vegetative growth ensures no further erosion of the slopes. Generally, the fabric is cut at ground level, the wire and posts are removed, then the sediment is spread, seeded, and protected (mulched) immediately.
Measure: Fiber rolls Implementation: All fiber rolls will be installed prior to any ground disturbing activities. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Sediment will be removed from fiber roll perimeter controls before deposits reach
50% of the above ground height. It is the Contractor's responsibility to upgrade erosion control measures as necessary if the sediment controls are ineffective and turbid water is observed discharging from the site. Fiber rolls will not be removed until vegetation is satisfactorily established.
Measure: Stabilized Construction Exit
Implementation: Wherever traffic will be leaving a construction site and traveling onto paved roads or other paved areas, within 1,000 feet of the site. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Any sediment that is tracked onto pavement shall be removed by shoveling or sweeping. The sediment collected by sweeping shall be removed or stabilized on site. The pavement shall not be cleaned by washing down the street, except when sweeping is ineffective and there is a threat to public safety.
Add other measures as needed.
7.3 Sediment Track-Out
The following methods will be implemented to minimize off-site vehicle tracking of sediment onto paved surfaces. If sediment escapes the construction site, off-site accumulations of sediment will be removed at a frequency sufficient to minimize off-site impacts.
Locations and design specifications ofBMPs are shown on the erosion and sediment control plan sheets in TAB 6.
[19]
Measure: Temporary construction access Implementation: Temporary construction access will be installed at the beginning of construction and will provide access to and from the sites. Vehicle use will be restricted to designated construction entrances to minimize the tracking out of sediment. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Where sediment has been tracked-out from the site and onto the surface of off-site streets, other paved areas, and sidewalks, remove the deposited sediment by the end of the same work day in which the track-out occurs, or by the end of the next work day if track-out occurs on a non-work day. Remove the track-out by sweeping, shoveling, or vacuuming these surfaces, or by using other, similarly effective means of sediment removal. Hosing or sweeping tracked-out sediment into any stormwater conveyance (unless it is connected to a sediment basin, sediment trap, or similarly effective control), storm drain inlet, or surface water is prohibited.
Measure: Stabilized Construction Exit
Implementation: Wherever traffic will be leaving a construction site and traveling onto paved roads or other paved areas, within 1,000 feet of the site. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Any sediment that is tracked onto pavement shall be removed by shoveling or sweeping. The sediment collected by sweeping shall be removed or stabilized on site. The pavement shall not be cleaned by washing down the street, except when sweeping is ineffective and there is a threat to public safety.
Measure: Washing within perimeter, without detergents or solvents Implementation: During active construction, as necessary. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Care must be taken that runoff is directed within construction perimeter and is to be managed by established control methods already in place. Any uncontrollable runoff must be remedied and additional BMPs put in place.
Add other measures as needed.
7.4 Stockpiled Soil or Other Erodible Materials
Stockpile management includes measures to minimize surface erosion and sediment transport from soil stockpiles or other erodible materials.
Locate erodible stockpiles away from drainages including storm sewer inlets and culvert inlets.
Locations of stockpiles are shown on the erosion and sediment control plan sheets in TAB 6.
Measure: Distribute layer of soft vegetative top soil after compaction complete Implementation: After soil compaction is complete and prior to revegetation efforts. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Maximize depth whenever possible and seed as soon as practicable. If seeding
[20] cannot occur in a timely manner, other BMPs (nets, blankets, etc.) will be placed to mitigate erosion.
Measure: Plastic sheets Implementation: Soil stockpiles and other erodible materials should be covered by plastic as soon as they are generated. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Contractor should frequently check plastic to ensure soil or other erodible material is covered.
Measure: Fiber rolls Implementation: All fiber rolls will be installed prior to any ground disturbing activities. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Sediment will be removed from fiber roll perimeter controls before deposits reach 50% of the above ground height. It is the Contractor's responsibility to upgrade erosion control measures as necessary if the sediment controls are ineffective and turbid water is observed discharging from the site. Fiber rolls will not be removed until vegetation is satisfactorily established.
Measure: Silt Fence Implementation: The ~ilt fence shall be functional before other land disturbing activities take place. Silt fence should be functional throughout the duration of construction and for a long enough duration following construction to allow disturbed areas to stabilize following revegetation and seeding. Please also refer to project schedule, contract, and plan set (Erosion
Control section).
Maintenance: Silt fences should be inspected periodically for damage (such as tearing by wind, animals, or equipment) and for sediment that has accumulated. Remove the sediment when it reaches one-half the height of the silt fence. In situations where access is available, machinery can be used. Otherwise, silt should be removed manually. The following are key elements to remember:
• The sediment deposits should be removed when heavy rain or high water is anticipated.
• The sediment deposits should be placed in an area where there is little danger of erosion.
• The silt fence should not be removed until adequate vegetative growth ensures no further erosion of the slopes. Generally, the fabric is cut at ground level, the wire and posts are removed, then the sediment is spread, seeded, and protected
(mulched) immediately.
Add other measures as needed.
[21]
7 .5 Minimize Dust
Dust control includes practices used to reduce or prevent the surface and air transport of dust during construction
Measure: Application of water for dust control Implementation: During active construction as needed. Apply at a rate of 3 gallons per acre, using a diffused or sprinkled flow. Care should be taken not to saturate or muddy the dust and that dust generation does not increase. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Application of water for dust control requires constant attention. Sprinkling will likely need to be done several times per day, especially during hot, dry weather.
Add other measures as needed.
7 .6 Minimize Disturbance of Steep Slopes
Describe how disturbance of steep slopes will be minimized. Describe controls ( e.g. erosion control blankets, tackifiers) that will be implemented to minimize sediment discharges from slope disturbances.
If applicable, describe how stormwater run-on and run-off will be managed. Flows may be diverted from exposed soils by retaining/detaining flows or otherwise minimizing runoff and the discharge of pollutants from exposed areas of the site. Placement of structural practices in floodplains will be avoided to the degree technologically and economically practicable and achievable.
~ Not applicable to this project Reason: No steep slopes
Add other measures as needed.
7.7 Topsoil Conservation
Describe how topsoil will be preserved, if feasible. If conservation of topsoil is infeasible, explain why, and describe alternate methods to be used to insure optimum vegetation survival and growth.
Erosion and sediment control measures for topsoil stockpiles (and other erodible materials) are shown in section 4.4.
Contractor and PE
Note: Fill in all incomplete information following contract award date and prior to start of construction
• Conservation of topsoil is Infeasible:
Reason: Click here to enter text.
Alternate method: Click here to enter text.
[22]
• Conservation of topsoil is Feasible:
Measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance: Click here to enter text.
Add other measures as needed.
7.8 Minimize Soil Compaction
Minimize soil compaction in areas where final vegetative stabilization will occur and where infiltration practices will be installed.
Measure: Distribute layer of soft vegetative top soil after compaction coJ,Dplete Implementation: After soil compaction is complete and prior to revegetation efforts. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Maximize depth whenever possible and seed as soon as practicable. If seeding cannot occur in a timely manner, other BMPs (nets, blankets, etc.) will be placed to mitigate erosion.
Add other measures as needed.
7 .9 Storm Drain Inlets and Culvert Inlets
Applicable for stormwater drain inlets which are connected to separate storm sewer systems (usually in urban locations) AND for culvert inlets that discharge stormwater from the project into surface waters.
Locations and design specifications ofBMPs are shown on the erosion and sediment control plan sheets in TAB 6.
~ Not applicable to this project. Reason: No storm drains or culverts
7.10 Constructed Stormwater Conveyance Channels and Culvert Outlets
Describe velocity dissipation and/or erosion control devices to be installed at stormwater conveyance channels (such as roadside ditches) and culvert outlets. Includes permanent and temporary devices (specify).
Velocity dissipation devices will be placed at discharge locations and along the length of any outfall channel to provide a non-erosive flow velocity from the structure to a water course so that the natural physical and biological characteristics and functions are maintained and protected (e.g., no significant changes in the hydrological regime of the receiving water).
[23]
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
181 Not applicable to this project.
7.11 Sediment Basins
If applicable, provide site design specifications and other details for design of sediment basins and ponds. This may also include sediment infiltration swales.
Locations and design specifications ofBMPs are shown on the erosion and sediment control plan sheets in TAB 6.
At a minimum, sediment ponds must provide storage for either the calculated volume of runoff from the 2-year, 24-hour storm event or 3,600 cubic feet per acre drained. Sediment ponds must also use outlet structures that withdraw water from the surface, unless infeasible.
181 Not applicable to this project.
7.12 Chemical Treatment
If chemical sediment control (such as polymers) will be used, provide design specifications and other details considered when choosing treatment type and locations.
181 Not applicable to this project.
7 .13 Dewatering Practices
Discharge of ground water or accumulated stormwater that is removed from excavations, trenches, foundations, etc. into surface waters is prohibited unless such waters are first effectively managed by appropriate sediment controls. Uncontaminated non-turbid dewatering water can be discharge without being routed to a control.
181 Not applicable to this project
7.14 Erosion Control and Stabilization
Commence temporary soil stabilization measures immediately if no further disturbance of an area of the site or stockpile is expected within the next 14 days. Complete temporary soil stabilization measures to disturbed sites or stockpiles within 14 days of last disturbance. Provide for temporary stabilization of all exposed soil prior to winter construction shut down ..
Specify whether stabilization measure is temporary or permanent.
181 Temporary Measures:
Measure: Revegetation with contractor-approved seed mix Implementation: In places where exposed soil surfaces are not to be fine-graded for periods longer than 30 days. Please also refer to project schedule, contract, and plan set (Erosion Control
[24] section).
Maintenance: Frequent inspections until proper vegetative establishment has been made.
Measure: Fiber rolls Implementation: All fiber rolls will be installed prior to any ground disturbing activities. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Sediment will be removed from fiber roll perimeter controls before deposits reach 50% of the above ground height. It is the Contractor's responsibility to upgrade erosion control measures as necessary if the sediment controls are ineffective and turbid water is observed discharging from the site. Fiber rolls will not be removed until vegetation is satisfactorily established.
Measure: Silt Fence Implementation: The silt fence shall be functional before other land disturbing activities take place. Silt fence should be functional throughout the duration of construction and for a long enough duration following construction to allow disturbed areas to stabilize following revegetation and seeding. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Silt fences should be inspected periodically for damage (such as tearing by wind, animals, or equipment) and for sediment that has accumulated. Remove the sediment when it reaches one-half the height of the silt fence. In situations where access is available, machinery can be used. Otherwise, silt should be removed manually. The following are key elements to remember:
• The sediment deposits should be removed when heavy rain or high water is anticipated.
• The sediment deposits should be placed in an area where there is little danger of erosion.
• The silt fence should not be removed until adequate vegetative growth ensures no further erosion of the slopes. Generally, the fabric is cut at ground level, the wire and posts are removed, then the sediment is spread, seeded, and protected (mulched) immediately.
Measure: Stabilized Construction Exit
Implementation: Wherever traffic will be leaving a construction site and traveling onto paved roads or other paved areas, within 1,000 feet of the site. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Any sediment that is tracked onto pavement shall be removed by shoveling or sweeping. The sediment collected by sweeping shall be removed or stabilized on site. The pavement shall not be cleaned by washing down the street, except when sweeping is ineffective and there is a threat to public safety.
[25]
Add other measures as needed.
181 Permanent Measures:
Measure: Revegetation with contractor-approved seed mix Implementation: In places where exposed soil surfaces are not to be fine-graded for periods longer than 30 days. Please also refer to project schedule, contract, and plan set (Erosion Control section).
Maintenance: Frequent inspections until proper vegetative establishment has been made.
Add other measures as needed.
7.15 Removal of BMPs
Remove erosion and sediment control BMPs that are no longer needed and leave in good working order those BMPs that will remain at the construction site after close-out.
BMPs are no longer needed when the site that the BMP is protecting has reached final stabilization as defined in the applicable NPDES Stormwater Permit.
Final stabilization means:
• All ground disturbing activities at the site have been completed, AND
• Vegetation has been established that provides a uniform perennial vegetative cover with a density of 70% of the natural vegetative cover prior to construction.
• In arid (0-10" annual precipitation) or semiarid (10-20" annual precipitation) areas, final stabilization is considered to be achieved when the area is seeded or planted and vegetation is expected to provide 70% cover within 3 years; AND, erosion controls are in place that provide soil protection for at least 3 years without active maintenance.
Document…