Q&A_02-11-19.pdf

PDF 87 KB Posted

Attached to
AK PRA DENA 10(35), Repave Denali Park Road MP 0. 0 to 3. 4
Solicitation number
69056718B000026
Issued by

View the file

Other files

File Type Posted
Bid_Summary_AK_PRA_DENA_10(35).pdf PDF
Q&A_02-20-19.pdf PDF
Amendment_A003.pdf PDF
Amendment_A002.pdf PDF
Q&A_02-14-19.pdf PDF
Amendment_A001.pdf PDF
Q&A_02-06-19.pdf PDF
DENA_1035_Planset_Dec2018.pdf PDF
SWPPP_AK_PRA_DENA_10(35).pdf PDF
Plan_Request_Form.pdf PDF
IFB_Denali_Park_Road.pdf PDF
GM12-17_FINAL_Denali_Park_Road_Geotechnical_Recommendations.pdf PDF
PROJECT_DESCRIPTION_10(35).pdf PDF
Preliminary_Plans_dena01035_Planset_WW.pdf PDF
DENA1035_Preliminary-Plans-Letter.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AK PRA DENA 10(35)

Repave Denali Park Road MP 0.0 to 3.4

# General Technical Question Answer Date

1 X

Is the 5 mile pit an available material source for this project?

SWPPP ‐ 3.1 General Description of project and scope of work names the 5 mile pit as the source of materials.

No. A forthcoming amendment will clarify the requirements.

2/1/19

2 X

Brian Collins is listed as the geotechnical engineer on this Denali Park Road Repave deep patch project in Alaska. I am hoping to get some clarification as to the separation/stabilization geotextile. The drawing states Class 1 Type A nonwoven geotextile. AASHTO specs dictate a “Class 1A Enhancement Geotextile” be ,50% elongation which would mean a woven geotextile. Can you please clarify if this is just Class 1 nonwoven, or is this Class 1A Enhancement and a woven?

See FP‐14 Subsection 714.01(a) requirements for Separation and Stabilization Geotextile Class 1, Nonwoven, Type A.

2/5/19

3 X Can you kindly send me the link to this subsection 714.01(a)?

See the first link on Page A‐1 of the Notice to Bidders.

2/5/19

4 X What was the percentage of oil used in the asphalt for the previous phase?

Not available. Design the Job Mix Formula according to Subsection 401.03.

2/6/19

5 X For Pay Item # 40101‐5600 Asphalt Concrete Pavement Gyratory mix, will you confirm that PG 82‐40 Binder is correct.

This will be addressed under a forthcoming amendment.

2/6/19

6 X What are the asphalt oil content requirements for this project?

Contractor to determine. See Subsection

401.03. 2/6/19

Check General or Technical

7 X

Regarding Pay Item # 30604‐0600 Full Depth Reclamation with Asphalt, the specification is vague whether we are required to grind the roadway once for mixing then come back and re‐ grind and foam or if the roadway can be ground and foamed in a single pass. Please clarify.

In accordance with Subsection 306.09, pulverizing and mixing may be performed in a single pass, or more than one pass.

2/6/19

8 X

The specification mentions the mile 5 pit can be used for stockpiling excavation. Can the excavation be left in the mile 5 pit or will it have to be hauled off before project completion?

This will be addressed under a forthcoming amendment.

2/6/19

9 X

Please elaborate on the asphalt pay factor tables. Is the 40101‐5600 Asphalt Concrete Pavement Gyratory mix a type 1 mix? If so, does that mean we must improve the Pavement Roughness factor by 25‐42% in order to receive full compensation?

No. Pavement Roughness is Type II‐A as shown on Plan Sheets C.1‐3. See Subsection 401.16 and Table 401‐4 for percent improvements and pay factors; and also see Subsection 401.16 Payment.

2/6/19

10 X

Could a comprehensive list be generated regarding the equipment to be supplied for the Traffic Detection System (A1320, 63601‐ 6000)?...and a consolidated drawing that includes only the equipment required including the conduit schedule?

This will be addressed under a forthcoming amendment.

2/8/19

11 X Drawing J.13 shows no junction box….j‐14 through 16 drawings do. What is required?

This will be addressed under a forthcoming amendment.

2/8/19

12 X Plans describe PVC conduits, plans j‐14 through 17 shows 2” RGS. What is required?

This will be addressed under a forthcoming amendment.

2/8/19

13 X Drawing J.13 shows a camera, but no other information can be found regarding a camera.

What are the camera requirements?

This will be addressed under a forthcoming amendment.

2/8/19

14 X Is cabinet supplied?

This will be addressed under a forthcoming amendment.

2/8/19

15 X Is a fan supplied or even required?

This will be addressed under a forthcoming amendment.

2/8/19

16 X Is the solar panel and battery referenced in drawing J.16 and 17 supplied or required?

This will be addressed under a forthcoming amendment.

2/8/19

17 X What part of the traffic detection system is actually being supplied by the Government?

This will be addressed under a forthcoming amendment.

2/8/19

18 X Traffic Counter is listed, so is the pole and supply of the paint for the cabinet. But what of the cabinet itself?

This will be addressed under a forthcoming amendment.

2/8/19

19 X

Hard to agree to supply a cabinet and have to mount it to an unknown pole, even more difficult to construct a foundation for an unknown pole.

This will be addressed under a forthcoming amendment.

2/8/19

20 X Bid Item Remove & Reset Utilities electrical box & cover. (2).

This will be addressed under a forthcoming amendment.

2/8/19

21 X

Bid Item Traffic Detector System. Please identify how many loops are being installed on this project. Drawing J.20 suggests 8 Loops.

Drawing J.13 suggests 4 loops. Drawing J.14 suggests either 12 or 4 loops.

This will be addressed under a forthcoming amendment.

2/8/19

22 X

Traffic Detector System. Specification 636.07.

Specifications calls for a fan & thermostat. Is this fan being provided by the Government? If not is it a 120V or 12V fan?

This will be addressed under a forthcoming amendment.

2/8/19

23 X Traffic Detector System. Is the system being provided by the Government a solar system with batteries as shown on J18?

This will be addressed under a forthcoming amendment.

2/8/19

24 X Traffic Detector System. Is a 1‐line wiring diagram available for the camera installation?

This will be addressed under a forthcoming amendment.

2/8/19

25 X Amendment #1 clarified that asphalt is to be 52‐

40. The bid schedule calls for 52‐28. Please clarify.

Amendment A001 changed the asphalt binder requirement for work under Section

401. Bid item 30613‐0000 as shown in the bid schedule is the asphalt binder required for work under Section 306.

2/8/19

26 X

The bid schedule calls for 93 tons of type 3 (lime) anti‐strip. Specification 401.01 allows the use of type 1 (liquid) antistrip. Liquid antistrip is commonly used in Alaska at ¼% and is included in the cost of the asphalt oil. Please clarify how this item will be treated if liquid anti‐strip is utilized.

See SCR Subsection 401.18. 2/11/19

27 X

The SWPPP prepared by Ms. Steele on 6/7/18 indicates an estimated construction start date of 8/28/19. I do not see any such limitation in the RFP, am I missing something?

The NTP date in the SWPPP is an estimated date, and the actual NTP will be set by the CO after award. See FAR Clause 52.211‐10 on Page C‐21.

2/11/19