AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 02/19/2019 N/A See Block 10
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X 69056718B000026
9B. DATED (SEE ITEM 11)
01/22/2019
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A D OTHER (Specify type of modification and authority)
N/A E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4 See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
AK PRA DENA 10(35)
Repave Denali Park Road MP 0.0 to 3.4
Amendment No. A002, dated 02/19/2019 Solicitation No. 69056718B000026
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Pages A-7 through A-14. Revises the Bid Schedule.
CONTRACT CLAUSES
SPECIAL CONTRACT REQUIREMENTS
Page F-1a, Subsection 204.07 Subexcavation. Revises Subsection
Page F-35, Subsection 501.03 Composition (Concrete Mix Design). Revises Subsection.
Pages F-50 through F-57, Section 636 Traffic Signal, Traffic Counter, Lighting, and Electrical System. Deletes Prior Requirements.
Pages F-57a through F-57b, Section 636 Traffic Signal, Traffic Counter, Lighting, and Electrical System. Adds New Requirements.
Pages G-6 through G-12, Section 721 Electrical and Illumination Material. Adds new Requirements and Deletes Prior Requirements.
PLANS
Plan Sheet A.2 Revises Index to Sheets.
Plan Sheets B.1-B.3 Revises Summary of Quantity Sheets.
Plan Sheet C.1 Revises Roughness Requirement.
Plan Sheet C.2 Revises Details and Requirements.
Plan Sheet D.1 Revises Tables and Footnotes.
Plan Sheet D.2 Revises Work and Callouts.
Plan Sheet E.1 Revises Roughness Requirement.
Plan Sheet F.1-F.2 Revises Roughness Requirement.
Plan Sheet H.3 Revises Standard Underdrain System Requirements.
Plan Sheet J.13 Revises and Adds New Traffic Detector System Requirements.
Plan Sheets J.14-J.20 Deletes Prior Traffic Detector System Sheets.
Notice to Bidders: Please submit revised pages A-7 through A-14 with your bid.
Amendment No. A002, dated 02/19/2019 Solicitation No. 69056718B000026
ENCLOSURES
Pages:
A-7 through A-14 F.1a F-35 F-50 through F-57 F-57a through F-57b G-6 though G-12
Plan Sheets:
A.2 B.1 through B.3 C.1 C.2 D.1 D.2 E.1 F.1 through F.2 H.3 J.13 J.14 through J.20
Amendment No. A002, dated 02/19/2019 Solicitation No. 69056718B000026
(Reserved)
A-7
Bid Schedule Project: AK PRA DENA 10(35)
Repave Denali Park Road 0.0 to 3.4
Bid Schedule
Project: AK PRA DENA 10(35) Repave Denali Park Road MP 0.0 to 3.4
Bidders please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit bid price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the Amount Bid for the item will be based on the Unit Bid Price.
When a “LPSM” (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total the amounts bid for all pay items and insert the total bid amount.
Do not include an amount to protect against contingent cost increases to prices subject to the escalation coverage.
BRAND NAME OR EQUAL NOTIFICATION
If providing other than the listed brand name products, complete the following (See FAR Provision 52.211-6, Brand Name or Equal):
A. For Item 63401-0000, MMA White Stop Line, our firm offers in lieu of the brand name Swarco, Megalux-Beads specified in 718.19:
Brand: __________________________________________
Manufacturer’s Name: _____________________________
B. For Item 63405-0050, MMA Railroad Approach Symbol, our firm offers in lieu of the brand name Swarco, Megalux-Beads specified in 718.19:
Brand: __________________________________________
Manufacturer’s Name: _____________________________
Revised by Amendment A002
A-8
Bid Schedule Project: AK PRA DENA 10(35)
Repave Denali Park Road 0.0 to 3.4
Include with your bid all documents needed by the Government to determine if the proposed product meets the requirements listed in the appropriate Section. The determination as to the equality of the product offered is the responsibility of the Government and will be based on the information furnished by the bidder as well as other information reasonably available to the contracting office. If proposed “equal” is determined by the government to be “not equal”, bid will be considered nonresponsive
A - 9
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
A0080 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0100 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE
400 LNFT $____________ $____________
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
9,550 LNFT $____________ $____________
A0160 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
2 EACH $____________ $____________
A0180 20103-0000 CLEARING AND GRUBBING
100 SQYD $____________ $____________
A0200 20301-2400 REMOVAL OF SIGN
16 EACH $____________ $____________
A0220 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE
438 LNFT $____________ $____________
A0240 20303-0300 REMOVAL OF CONCRETE
15 SQYD $____________ $____________
A0260 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
800 SQYD $____________ $____________
A0280 20303-3200 REMOVAL OF SIDEWALK, CONCRETE
200 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:AK PRA DENA 10(35)
Project Name:Repave Denali Park Road MP 0 to 3.4 Revised by Amendment A002
A - 10
A0300 20304-7000 REMOVAL OF UTILITY CONDUITS (EXISTING ABOVE PAVEMENT TRAFFIC
COUNTER)
ALL LPSM $___LPSM_____ $____________
A0320 20315-0000 SAWCUTTING PAVEMENT
308 LNFT $____________ $____________
A0340 20401-0000 ROADWAY EXCAVATION
500 CUYD $____________ $____________
A0360 20402-0000 SUBEXCAVATION
10,605 CUYD $____________ $____________
A0380 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A
20,094 SQYD $____________ $____________
A0400 20703-2000 GEOGRID, STABILIZATION
48,234 SQYD $____________ $____________
A0420 30202-2000 ROADWAY AGGREGATE, METHOD 2 (SUBEX BACKFILL)
19,425 TON $____________ $____________
A0440 30202-2000 ROADWAY AGGREGATE, METHOD 2
1,344 TON $____________ $____________
A0460 30303-3000 ROADWAY RECONDITIONING
50 SQYD $____________ $____________
A0480 30604-0600 FULL DEPTH RECLAMATION WITH FOAMED ASPHALT, 6-INCH DEPTH
36,308 SQYD $____________ $____________
A0500 30611-0000 CEMENT
122 TON $____________ $____________
A0520 30613-0000 ASPHALT BINDER (GRADE PG 52-28)
360 TON $____________ $____________
A0540 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
9,412 TON $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 11
A0580 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
93 TON $____________ $____________
A0620 40301-0000 ASPHALT CONCRETE PAVEMENT (TYPE 1)
1,382 TON $____________ $____________
A0640 41201-0000 TACK COAT
52 TON $____________ $____________
A0660 50101-0800 MINOR CONCRETE PAVEMENT, REINFORCED, 8-INCH DEPTH
250 SQYD $____________ $____________
A0680 50101-2600 MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH DEPTH
105 SQYD $____________ $____________
A0700 60201-0800 24-INCH PIPE CULVERT (TEMPORARY)
150 LNFT $____________ $____________
A0720 60201-0800 24-INCH PIPE CULVERT (PVC)
250 LNFT $____________ $____________
A0740 60201-0800 24-INCH PIPE CULVERT
305 LNFT $____________ $____________
A0760 60412-2000 REMOVE AND RESET MANHOLE FRAME AND COVER
4 EACH $____________ $____________
A0780 60501-0000 STANDARD UNDERDRAIN SYSTEM
650 LNFT $____________ $____________
A0800 60902-1200 CURB AND GUTTER, CONCRETE, 14-INCH DEPTH
393 LNFT $____________ $____________
A0820 60907-1000 PAVED DITCH, ASPHALT
140 LNFT $____________ $____________
A0840 60920-0000 RESET WHEELSTOP
6 EACH $____________ $____________
A0860 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
20 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 12
A0880 62201-0350 BACKHOE
30 HOUR $____________ $____________
A0900 62201-2050 ROLLER
20 HOUR $____________ $____________
A0920 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE
20 HOUR $____________ $____________
A0940 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT
30 HOUR $____________ $____________
A0960 62301-0000 GENERAL LABOR
40 HOUR $____________ $____________
A0980 62502-0000 TURF ESTABLISHMENT
2,000 SQYD $____________ $____________
A1000 63401-0000 PAVEMENT MARKINGS (DOTTED, White)
100 LNFT $____________ $____________
A1020 63401-0000 PAVEMENT MARKINGS (MMA WHITE STOP LINE)
132 LNFT $____________ $____________
A1040 63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID (White)
2,000 LNFT $____________ $____________
A1060 63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID (White Stop Line)
600 LNFT $____________ $____________
A1080 63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID (Yellow)
80,250 LNFT $____________ $____________
A1100 63405-0050 PAVEMENT MARKINGS, SYMBOLS (Yield word message)
4 EACH $____________ $____________
A1120 63405-0050 PAVEMENT MARKINGS, SYMBOLS (MMA RAILROAD APPROACH SYMBOL)
2 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 13
A1140 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH
150 EACH $____________ $____________
A1160 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
60 EACH $____________ $____________
A1180 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
6 EACH $____________ $____________
A1200 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
1 EACH $____________ $____________
A1220 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
6,410 LNFT $____________ $____________
A1240 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
300 SQFT $____________ $____________
A1260 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
180 DAY $____________ $____________
A1280 63507-0800 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
60 DAY $____________ $____________
A1300 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER
3,600 FXHR $86.00 $309,600.00
A1320 63601-6000 SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM (Government Furnished)
ALL LPSM $___LPSM_____ $____________
A1340 63703-0000 RESIDENTIAL HOUSING
3 EACH $____________ $____________
A1360 63704-0000 VEHICLE
3 EACH $____________ $____________
A1380 64603-0000 FIXTURE (ASPHALT PAVEMENT CORE)
12 EACH $____________ $____________
A002 A1400 64620-0000 REMOVE AND RESET (Utilities/electrical box and cover)
3 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
A - 14
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
F-1a DIVISION 200
Special Contract Requirements Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
Section 204. — EXCAVATION AND EMBANKMENT
7/21/17– FP-14
Material
204.03 Add the following:
Minor Crushed Aggregate Section 302
Construction Requirements
204.07 Subexcavation. Delete the text of the Subsection and substitute the following:
Excavate material to the required limits. Subexcavation locations are shown on the plans. Prior to subexcavation take cross-sections according to Subsection 152.05. Place geotextile and geogrid according to Section 207. Place crushed aggregate backfill material in horizontal layers not exceeding 6 inches in compacted thickness and compact according to Section 302. Compact subexcavation according to Subsection 204.11. Prevent unsuitable material from mixing with backfill. Backfill the top two-inches of subexcavations according to Section 403.
204.14 Disposal of Unsuitable or Excess Material. Delete the text of the first paragraph and substitute the following:
Salvage material according to Subsection 203.03.
Dispose of unused, unsuitable, or and excess material according to Subsection 203.05(a) Subsections 203.05(a) and (d). Place unused and excess material off the project and outside of Denali National Park and Preserve. Comply with Subsections 105.02 and 107.11 as well as any applicable local, state, and Federal laws.
Measurement
204.16 Add the following:
Measure roadway aggregate under Section 302.
Revised by Amendment A001
F-35 DIVISION 500
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
DIVISION 500
RIGID PAVEMENTS
Section 501. — MINOR CONCRETE PAVEMENT
08/01/14–FP14
Construction Requirements
501.03 Composition (Concrete Mix Design). Add the following.
Add a coloring agent to provide integrally colored concrete for the Section 501 Pay Items listed in the bid schedule. 50101-0800 and Pay Item 50101-2800. Add enough agent to match the Asphalt Concrete Pavement.
Prepare five square textured test panels with each panel being 1-Foot square. Determine coloring agent batch amounts by weight. The maximum amount of coloring agent is not to exceed 10 percent of the weight of the cement. Use coarse and fine aggregates and cement as delivered on the project at the job mix rates with variable quantities of coloring agent as directed by the CO. Provide additional mixing time as recommended by the manufacturer.
After the test panels have had at least two weeks exposure to sun, the CO will select a test panel to serve as a guide for the colored concrete. Use the same rate of coloring agent used in the selected panel on all relative subsequent work. Include the approved amount of coloring agent in the concrete mix design submittal.
Use an approved form release agent which will produce a minimum of staining, air holes, and hydration discoloration.
F-50 DIVISION 600
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
Section 636. — TRAFFIC SIGNAL, TRAFFIC COUNTER, LIGHTING, AND ELECTRICAL SYSTEMS
08/22/17–FP14
Delete this text of this Section and substitute the following:
Description
636.01 This work consists of installing, modifying, relocating, or removing traffic signals, traffic counter, flashing beacons, highway lighting, sign illumination, communication conduits, and electrical systems or provisions for future systems. This work also consists of installing Government furnished Traffic Detector System Traffic Counter including traffic counter, traffic counter cabinet and post, motion-activated camera, and inductive loops and wiring. This work also consists of painting the traffic counter cabinet with Government furnished paint.
Material
636.02 Conform to the following Subsections:
Backer rod 712.01(f) Electrical material 721.01 Joint sealant and crack fillers 712.01(a) Lighting material 721.02 Underground concrete utility structures 725.09(d)
Construction Requirements
636.03 Regulations and Codes. Furnish material and workmanship conforming to the standards of the National Electrical Code, local safety code, UL, and the National Electrical Manufacturers Association (NEMA).
Obtain permits, arrange for inspections, and pay fees necessary to obtain electrical service.
Furnish luminaires with crashworthy supports.
Notify the CO, local traffic enforcement agency, utility companies, or railroad company at least 7 days before operational shutdown to coordinate connections or disconnections to an existing utility or system.
When the requirements of specifications or drawings are more stringent than the codes, regulations, or standards, the specifications or drawings shall prevail.
F-51 DIVISION 600
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
636.04 General. At the preconstruction conference, submit a certified cost breakdown for all lump sum items for use in making progress payments and price adjustments.
Submit a list of proposed equipment and material 14 days before installation. Include the manufacturer’s name, size, and identification number of each item. Supplement the list with scale drawings, catalog cuts, and wiring diagrams showing locations and details of equipment and wiring.
The CO will approve the exact locations of the systems.
Remove structures and obstructions according to Section 203. Salvage material acceptable for reuse in the work. Excavate and backfill according to Section 209. Construct concrete according to Section 601.
Where roadways are to remain open to traffic and existing systems will be modified, maintain the existing systems in operation until final connection to the modified circuit to minimize traffic disruptions.
All electrical work shall be performed by licensed electricians or under the direct supervision of a licensed electrician.
Detector drawings do not attempt to show complete details of construction that affect installation. Diagrams are schematic only and do not necessarily show physical arrangement of equipment. Refer to drawings of other trades for additional details which affect work.
Stake the location of the inductive loops, traffic counter, traffic counter cabinet, and camera for approval by the CO prior to beginning installation activities.
Excavate and backfill according to Section 209. Bed the conduit according to Subsection 209.09(c).
636.05 Conduit. Cut conduit so the ends are smooth. Connect conduit sections with couplings to butt the ends of both conduits squarely against each other inside the couplings. Provide a metal expansion and deflection fitting where conduit crosses a structural expansion joint.
Install conduits continuous between outlets with at least couplings to permit pulling conductors.
End conduit with bell fittings or bushings. Furnish pull wires for conduits designated for future cable installation.
Maintain conduits clean and dry and protect ends of conduit with plugs, caps, or fittings.
The boring under the roadway to install conduit and lead-in cables should conform to the requirements of Alaska State.
F-52 DIVISION 600
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
636.06 Traffic Signal and Lighting Systems. Furnish systems according to the MUTCD or state adopted supplements to the MUTCD for the state in which the system is located. Design systems to operate according to NEMA.
Design the control unit to energize the lighting circuit upon failure of any component of its circuit.
Furnish a control with an "on" level adjustable between 1 and 5 foot candles (11 and 54 lux).
Operate luminaires with a series circuit distribution system at a potential not exceeding 2400 volts.
Control lights and luminaires by photocell controls. For current less than or equal to 10 amperes, furnish a photocell switch. For current greater than 10 amperes, furnish a photocell switch operating a magnetic relay for switching the lighting circuit.
636.07 Traffic Counter. Locate and install traffic counters as shown in the plans.
The Government will furnish the traffic counter at no cost to the Contractor. Coordinate with the CO to request delivery of a traffic counter for each traffic count station shown in the plans. Begin coordination between 21-28 days before traffic count station work is to begin.
The Government will furnish the modem at no cost to the Contractor. Coordinate with the CO to request delivery of a modem for each traffic count station shown in the plans. Begin coordination between 21-28 days before traffic count station work is to begin.
Mount a fan inside the cabinet and position to direct the majority of airflow over the traffic counter and modem. Mount a fan thermostat at the top of the cabinet and minimize its interference with other cabinet components.
Mount and orient the cabinet to provide an unobstructed, direct line of sight to the roadways that contain count station and vehicle detection equipment when cabinet door is opened. Install traffic counter and communications devices inside cabinet.
Identify and label loop wires inside each pull box in which the loop wires enter. Maintain consistent wiring identification and labeling when entering the cabinet and with connection to the traffic counter. Use water resistant material for wiring identification and labeling. Obtain approval for loop wire assignments at all locations.
Before powering-on equipment within the cabinet provide a copy of the following:
(a) Voltages for power supplies to include, but not limited to electrical meter, batteries, and communications devices, and
(b) Telephone number and/or IP address for all communication devices.
The National Park Service will provide a painted post for traffic counter cabinet installation. Set traffic counter cabinet 2-feet above finished grade.
F-53 DIVISION 600
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
636.08 Traffic Loop. Do not install loops when the pavement is wet. Saw cut, wire, and seal for loop wires on the same day. Do not allow vehicular traffic to pass over an open saw cut unless protected.
Wet cut clean, smooth, well-defined, 3/8-inch wide saw cuts at a depth to allow 2 to 2½ inches of cover without damaging the adjacent pavement. Drill 1½-inch diameter loop corners matching the saw cut depth. For the lead-in channel, saw clean, smooth, well-defined, 5/8-inch wide cuts providing a minimum cover of 2 inches. Ensure saw cuts are straight with less than ½-inch error in a 10-foot line. Saw cut the lead-in to the pull box as close as possible to the edge of pavement.
Thoroughly clean the saw cut of foreign material with compressed air and water blasting. Dry the joint with compressed air.
Install the loop wire in one continuous length at the bottom of the cut using a 3/16 - to ¼-inch thick rounded, smooth wood paddle. Install without kinks, curls, or other damage to the wire or its insulation. Replace damaged wires. Hold the loop wire in place with 1-inch lengths of half-inch backer rod spaced at 2-foot intervals.
For the number of loop wire turns, conform to Table 636-1.
Table 636-1 Required Number of Loop Wire Turns
Lead-in Length, feet Number of Turns ≤ 200 3
>200 to 500 4 >500 to 700 5
Where the loop wire crosses a crack or joint, use a plastic sleeve that extends 4 inches (100 millimeters) on each side of the crack or joint. Provide extra loop wire in the sleeve for joint expansion and contraction.
Twist the loop lead-in wires 6 turns per foot (20 turns per meter) from the loop to the pull box.
Do not twist different loop pairs together. Color code the wires of each loop using colored vinyl electrical tape for identification of separate loops inside each pull box as shown in Table 636-2 below. Coil 18 inches (450 millimeters) of lead-in slack in the pull box for each loop.
F-54 DIVISION 600
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
Table 636-2. Loop Labeling Convention
LOOP # of
Identifiers
COLOR
Loop 1 1 Red Loop 2 1 White Loop 3 1 Green Loop 4 1 Blue Loop 5 2 Red Loop 6 2 White Loop 7 2 Green Loop 8 2 Blue
Before applying sealant, test the loop and lead-in for continuity and resistance by applying a 1000-volt megohmmeter between each end of the loop lead-in and the nearest reliable electrical ground.
If no available ground exists, establish a ground for the measurement. Record the location and megohmmeter readings and submit readings and test equipment data to the CO. Replace the loop if the insulation resistance measured to earth ground is less than 100 megohms at 500 volts DC, the inductance is less than 50 microhenries or more than 800 microhenries, wire resistance is less than
1.75 ohms per 700 feet, or the loop quality (Q) factor is less than 5 at 50 kilohertz.
Installed inductive loops shall have dedicated saw cuts and separate PVC conduits for each sensor lead-in cable from the edge of pavement to the first pull box.
Apply sealant to the saw cuts with the backer rods in place. Apply the sealant in a manner that does not produce air bubbles. Remove excess sealant and finish level with the pavement. Follow the manufacturer’s instructions for sufficient time for the sealant to harden before allowing traffic to cross the loops.
Repeat the resistance and continuity test after sealant is applied. Report the second test for comparison with the first test report.
Preformed inductive loops with 3 to 5 turns of #14 AWG cable with an insulation of XLPE (cross-linked polyethylene) encased in PVC pipe are an acceptable alternative to saw cuts for use in new construction before the pavement is installed. Loop dimensions and spacing based on lane width are shown in Table 636-3. Installation of loops on lanes less than 10 feet wide shall be approved by a Federal Lands traffic engineer prior to installation.
Table 636-3 Loop Dimensions and Spacing
Lane Width, feet Loop Dimension, feet Spacing to Centerline, feet 12 6 X 6 3 11 5 X 5 3 10 5 X 5 2.5
F-55 DIVISION 600
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
Install the preformed 6 Foot by 6 Foot inductive loops according to the construction plan set.
Install the inductive loops during the asphalt concrete pavement process. Place the inductive loops no more than 2 inches below the asphalt concrete pavement surface. Route loop ends and leads towards the side of the road where the traffic counter, traffic counter cabinet, and motion-activated camera are located.
636.09 Testing and Demonstration Period. Testing and Demonstration Period. Before energizing portions of the system, demonstrate that the conductor system is clear and free of short circuits, open circuits, and unintentional grounds. Repair or replace faulty circuits.
After energizing the system, demonstrate that all electrical components work properly. Repair or replace faulty electrical components.
Conduct an on-site verification test according to ASTM E2300, Type I-2 with a 10 percent tolerance and two exceptions: (1) the test should allow for a minimum of 15 minutes and 50 vehicles of counting with two human observers for each loop tested; and (2) test vehicles may be used if the test would likely last greater than 30 minutes to reach the 50 vehicle threshold.
Conduct the test at a date and time agreed to by the CO.
Upon completion of all construction at a location as defined in these specifications, the site will be placed in full scale operation for a 30-day demonstration period. The purpose of this demonstration period is to assess the adequacy of the installation and operation of the equipment.
During this 30-day demonstration period, any defects or adjustments deemed necessary by the CO shall be made. If failures occur during this demonstration period, the necessary repairs shall be made within 48 hours of being notified. If necessary repairs are not completed within 72 hours of notification, the demonstration period shall stop and resume only after such repairs and replacement of materials have been made, inspected, and approved. During this demonstration period, any material and equipment that becomes defective, lost, or damaged shall be repaired or replaced. If the equipment does not operate according to the specifications or manufacturer’s recommendations during the operation period, the CO has the option of returning the equipment at the Contractor’s cost.
Provide CO a minimum of five days’ notice of the anticipated day and time of specified tests.
Perform all tests in the presence of the Contracting Officer.
636.10 Warranties, Guarantees, and Instruction Sheets. When installations are permanent, deliver manufacturer’s warranties, guarantees, instruction sheets, and parts lists at the final inspection.
Within each cabinet, store one laminated copy of the cabinet wiring diagram and the field wiring diagram showing loops, pull boxes and conduit runs inside two one-gallon re-sealable storage bags, one inside the other. Provide an electronic copy of each document to the CO.
Amendment A002
F-56 DIVISION 600
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
636.11 Relocations. Use material equivalent to existing material, unless present codes require different or improved material. Existing material may be salvaged and reused, provided material and installation methods used meet the requirements of applicable codes and ordinances.
Measurement
636.12 Acceptance. Material for traffic signal, traffic counter, lighting and electrical systems will be evaluated under Subsections 106.02 and 106.03.
Installation of traffic signal, traffic counter, lighting and electrical systems will be evaluated under Subsections 106.02 and 106.04.
Structural excavation and backfill will be evaluated under Section 209.
Concrete will be evaluated under Section 601.
Final acceptance of the traffic counting system shall be contingent upon successful completion of the 30-day demonstration period. The demonstration period shall be considered as part of the work required to be completed by the final completion date specified for the project. Warranties and/or guarantees with respect to materials, parts, workmanship, or performance shall not begin until final acceptance of the project.
When measurement is for a system, do not measure materials and testing required to make a fully operational system.
Do not measure painting the traffic counter cabinet for payment.
636.13 Measure the Section 636 pay items listed in the bid schedule according to Subsection
109.02 and the following as applicable:
For relocations, do not measure additional line or connections necessary to place the fixture at the new location.
Measure conduits by the linear foot, including each conduit run placed in a singular trench.
Payment
636.14 The accepted quantities will be paid at the contract price per unit of measurement for the Section 636 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Full payment for the system shall not be made until after the demonstration period has been successfully completed although NPS may make partial or full payment before the end of the 30- day demonstration period.
F-57 DIVISION 600
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
Delete the second paragraph and substitute the following:
Payment for lump sum pay items will be prorated based on the certified cost breakdown and the work completed.
F-57a DIVISION 600
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
Section 636. — TRAFFIC SIGNAL, TRAFFIC COUNTER, LIGHTING, AND ELECTRICAL SYSTEMS
07/20/15-FP14
Construction Requirements
636.04 General. Add the following:
The government will furnish the following components of the traffic detector system. Obtain government furnished components from the CO, 21 to 28 days before performing work on the traffic detector system. Provide other components as needed to install the required traffic detector system.
(a) Post. A painted metal post, approximately 54-inches in length.
(b) Cabinet. A painted, five-sided, securable cabinet that is mounted to the post specified under Subsection 636.04(a).
(c) Traffic Counter with Connectors and Battery. International Road Dynamics Inc., TRS Plus Traffic Counter and Classifier; equipped with the optional Solar Panel; internal Power Sonic, Model PS-6100, 6 volts, 12 ampere hour battery; and includes the connectors for interfacing traffic loop lead-in cables to the traffic counter.
(d) Traffic Loops. Reno Agriculture & Electronics, PLH Preformed Loops for Highway Applications include loop wires and lead-in cables that are designed to be overlaid with hot asphalt pavements.
Perform the work under Section 152 as needed, to stake the location of each traffic detector system component. Do not install components of the traffic detector system until the location for each component is approved by the CO.
Install pull boxes flush with surrounding surfaces on a bed of granular backfill that is 6-inches thick, and 6-inches wider than the bottom dimensions of the pull box.
Install post with mounted cabinet, and place the traffic counter within the cabinet as directed by the CO. Secure cabinet and submit any keys to the CO after completing the installation.
636.05 Conduit. Delete the text of this Subsection and substitute the following:
Excavate a 12-inch wide trench for conduit installations. Construct a 4-inch thick bedding for conduits according to Subsection 209.08(b). Install PVC, Schedule 80, Conduits and Fittings with at least 18-inches of cover. Backfill conduit trenches according to Subsection 209.09(b)(1), installing warning tape before completely backfilling the trench.
Organize and tag traffic loop lead-in cables through conduits as directed by the CO.
F-57b DIVISION 600
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
636.07 Traffic Counter. Delete the text of this Subsection and substitute the following:
Join each government furnished interfacing connector to the applicable end of a traffic loop lead-in cable, and plug each interfacing connector into the traffic counter, and ground the unit according to the manufacturer’s recommendations. Orient the unit’s solar panel toward the direction of sunlight.
636.08 Traffic Loop. Delete the text of this Subsection and substitute the following:
After placing the first lift of asphalt concrete pavement, install and secure loop cables, splice enclosures, and lead-in cables according to the manufacturer’s recommendations, installing lead-in cables to pull boxes for organization and tagging before installing cables through conduits.
636.09 Testing and Demonstration Period. Delete the text of the first and second paragraphs and substitute the following:
Before energizing portions of the system, demonstrate that the conductor system is clear and free of short circuits, open circuits, and unintentional grounds. Repair or replace circuits that are damaged during the installation.
After energizing the system, demonstrate that all electrical components work properly. Repair or replace components that are damaged during the installation.
636.10 Warranties, Guarantees, and Instruction Sheets. Add the following:
Within each cabinet, store one laminated copy of the cabinet wiring diagram and the field wiring diagram showing loops, pull boxes and conduit runs inside two one-gallon re-sealable storage bags, one inside the other. Provide an additional laminated copy, and an electronic copy of each document to the CO.
Payment
636.14 Delete the second paragraph and substitute the following:
Payment for lump sum pay items will be prorated based on the certified cost breakdown and the work completed.
G-6 DIVISION 700
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
Section 721. — ELECTRICAL AND ILLUMINATION
MATERIAL
08/22/17–FP14
721.01 Electrical Material. Delete paragraph (b) and substitute the following:
(b) Pull boxes, frames, and covers. Provide fiberglass reinforced polymer concrete pull boxes that conform to ANSI 77/SCTE for tier 22 loading.
Provide waterproof, detachable cover with pull slots rated for minimum 3,000 pound pull out. Provide stainless steel or brass lock-down bolts with a penta-heads.
Delete this text of this Section and substitute the following:
721.01 Electrical Material. Conform to the following:
(a) Conduit. Conform to the following:
(1) Nonmetallic conduit and duct couplings, elbows, bends, and nipples. For above ground and underground use without concrete encasement, furnish rigid PVC, heavy wall conduit conforming to UL 651, Schedule 40, 80, Type EB and A Rigid PVC Conduit and Fittings. Conform to ASTM D2564 for solvent cement to join conduit.
(2) Metallic conduit and duct, couplings, elbows, bends, and nipples. Furnish rigid galvanized steel conduit conforming to UL 6, Electrical Rigid Metal Conduit - Steel. Uniformly coat the conduit on the outside with an asphalt mastic conforming to AASHTO M 243 or a 20-mil (0.5-millimeter) PVC coating. Furnish rigid, full-mass sherardized or galvanized threaded fittings.
(3) Flexible conduit. Furnish a watertight metallic conduit conforming to UL 360, Liquid-Tight Flexible Metal Conduit acceptable for equipment grounding. Furnish insulated throat, grounding, malleable iron watertight fittings.
(4) Conduit bodies, boxes, and fittings. Furnish watertight, galvanized steel conforming to UL 514B, Conduit, Tubing, and Cable Fittings.
(b) Pull boxes, frames, and covers. Pull boxes shall be sized per the National Electric Code (NEC) to accommodate the necessary wires and conduit for proper splicing of loop wires.
Pull boxes shall be fiberglass reinforced polymer concrete and shall be weatherproof with a detachable cover at ground level. Precast concrete is acceptable if approved by the CO and Federal Land Management Agency. Pull boxes shall conform to ANSI 77/SCTE and tier 22 loading Use a waterproof, detachable, cover with lift opening. Ensure the pull slots are rated for a minimum pull out of 3,000 pounds. Lock-down bolts shall be stainless steel or brass with a penta-head.
(c) Wire and cable.
G-7 DIVISION 700
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
(1) Lighting. Furnish either ozone resistant cross-linked polyethylene (XLP) or polyvinyl chloride (PVC) insulated cable, with or without a nylon jacket conforming to the following:
(a) Polyethylene (XLP). Insulated Cable Engineers Association (ICEA) S-66-524, ICEA S-95- 658/NEMA WC70, Non-Shielded Power Cables Rated 2000 V or Less, ICEA S-96-659/NEMA WC71, Non-Shielded Power Cables Rated 2001-
5000 V, ICEA S-93-639/NEMA WC74,
Shielded Power Cable 5,000-46,000 V; or
(b) Polyvinyl chloride (PVC). Conform to UL 83, Thermoplastic-Insulated Wires and Cables.
(2) Electrical. Furnish soft drawn or annealed copper conductors conforming to ASTM B3 and stranding conforming to ASTM B8.
Furnish 7 strand for #10 AWG through #2 AWG (5.3 square millimeters through 33.6 square millimeters), and 17 strand for #1 AWG through #4/0 AWG (42.4 square millimeters through 107 square millimeters). Furnish #6 AWG (13.3 square millimeters) minimum solid copper ground wires.
Furnish type THHN #14 AWG, stranded, single-conductor loop wire according to the International Municipal Signal Association (IMSA) Specification 51-7.
Furnish type THHN, stranded, single-conductor lead-in cable according to IMSA Specification 50-2.
Selection of wire insulation color within the RS-232 cable inside the cabinet shall follow the convention shown in Table 721-1. This arrangement will allow up to eight loops to be connected to the traffic counter. At the terminal block, one RS-232 cable can connect up to four loops to the traffic counter; if more than four lanes are counted, two RS-232 cables will be needed. Table 2 shows the color assignments for the RS-232 cables. Cable 1 shall be connected to loops 1-4 and cable 2 shall be connected to loops 5-8. The RS- 232 cables directing the traffic counter to read a specific loop, based on the color assignments shown in Table 721-1.
G-8 DIVISION 700
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
Table 721-1. Loop Assignments for RS-232 Cable 1 (Loops 1-4) and Cable 2 (Loops 5-8).
RS-232 CABLE LOOP COLOR
1 Loop 1 Red 1 Loop 2 White 1 Loop 3 Green 1 Loop 4 Blue 1 Ground Light Green 2 Loop 5 Red 2 Loop 6 White 2 Loop 7 Green 2 Loop 8 Blue 2 Ground Light Green
Source: Peek Operating Manual High Density Surge Suppression System.
(d) Circuit breakers and panels. Conform to UL 489, Molded-Case Circuit Breakers, Molded-Case Switches and Circuit-Breaker Enclosures and UL 67, Panelboards.
Furnish molded case thermal magnetic trip type breakers. Furnish panel enclosures conforming to NEMA 250, Enclosures for Electrical Equipment (1,000 V Maximum), Type 3R, lockable with padlocks.
(e) Safety disconnect switches. Furnish heavy duty, NEMA 250, Enclosures for Electrical Equipment (1,000 V Maximum), Type 3R, safety disconnect switches conforming to UL 98, Enclosed and Dead-Front Switches.
(f) Grounding and bonding equipment. Furnish ⅝-inch (16-millimeter) diameter, 8-foot (2.5-meter) long, copper-clad steel ground rods, ground clamps, grounding and bonding bushings, and lock nuts conforming to UL 467, Grounding and Bonding Equipment.
Furnish 14 square inch copper grounding plates that shall be installed before pouring the concrete foundation.
Ground rods or plates shall be connected to the cabinet ground bussbar and covered with 6 inches of approved backfill.
(g) Contactors and control transformers. Furnish a magnetic 60-ampere, two-pole contactor with a 120-volt coil, equipped with control switches for automatic actuation conforming to UL 508, Industrial Control Equipment. Furnish cadmium-sulfide type photocell controls for 120 or 240-volt operation as applicable; rated at 1000 watts resistive load or 1800 volt-amperes inductive load; adaptable for pole-top mounting in a plug-in, locking-type receptacle conforming to UL 773, Plug-In Locking Type Photocontrols for Use with Area Lighting and with a built-in surge protective device for protection from induced high-voltage and follow-through currents.
G-9 DIVISION 700
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
Furnish single-phase, 240/480 volt primary, 120/240 volt secondary, dry type, 60 hertz, 1 KVA transformers for indoor or outdoor use, conforming to UL 506, Specialty Transformers.
(h) Secondary lightning arrester. Furnish a secondary lightning arrester rated for a maximum operating voltage of 650 volts RMS with a bracket for mounting on the control cabinet backboard.
(i) Service poles. Furnish treated southern yellow pine, treated Douglas fir, butt-treated western red cedar, or butt-treated northern white cedar service poles that are at least 30 feet (9 meters) long. Treat the poles according to Subsection 716.03.
(j) Meter cabinet. Conform to local power company requirements.
(k) Control enclosure. Furnish a NEMA 250, Enclosures for Electrical Equipment (1,000 V Maximum), Type 3R outdoor cabinet, watertight, fabricated from 0.125-inch thick ASTM B209 aluminum alloy 5052-H-32, with continuous welded seams, rounded corners, hinge with stainless steel pin, stainless steel external hardware, and backboard for mounting apparatus. The Government will furnish a padlock.
Install loop surge protection devices conforming to Table 721-2 at the terminal block on all lead-ins.
Table 721-2 Surge Protection Device Minimum Requirements
Criteria Rating Operating voltage 75 voltage direct current (VDC) Clamping voltage 130 VDC Peak surge current 250 A
Technology Silicon breakover device Operating temperature -40 °F to 185 °F
Weight 3 oz Dimensions 1.2-inch cube
Furnish a surge protections power strip, 120-volt with RJ-11 surge protection. Connect incoming phone line and modem phone line to power bar RJ-11 ports.
As directed by CO, furnish a tube axial compact type, 120-volt, corrosion resistant cabinet fan with a minimum 100-cubic foot per minute capacity, minimum 100,000-hour design life, maximum 40- decibel operating noise, and a five-year duty cycle. The fan shall be fused at 125 percent of the motor’s ampere capacity. Ensure the fan’s magnetic field does not affect the performance of the surrounding traffic counting equipment.
G-10 DIVISION 700
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
As directed by CO, furnish an inline type, single pole, 120-volt, 10-ampere cabinet fan thermostat that is adjustable in 10-degree increments from 70 °F to 200 °F, and with a turn-on setting that is adjustable from 90 °F to 120 °F. Run the fan until the cabinet temperature decreases 20 degrees below the turn-on temperature.
Mount the fan inside the cabinet and position to direct the majority of airflow over the traffic counter and modem. Mount the fan thermostat at the top of the cabinet and minimize its interference with other cabinet components.
(i) Splices and crimps. Furnish industrial grade copper-alloy wire crimps of appropriate size.
Use UL listed crimp type connectors and terminals. Do not splice with wire nuts. Comply with MIL-T-7928. Do not use vinyl plastic electrical tape or liquid electrical coating as a splicing material. If needed for insulation protection, furnish cold and weather resistant, ¾-inch wide, 7-millimeter thick tape and a compatible fast drying sealant applied by brush.
If soldering splice, furnish electronic-grade, rosin-core, 60 lead/40 tin solder. Do not use acid-core solder or acid-type soldering pastes.
721.02 Lighting Material. Conform to the following:
(a) Poles. Furnish 11 gage (3-millimeter thick) round steel conforming to ASTM A595 or aluminum shafts conforming to ASTM B429, alloy 6063-T6, tapered uniformly at 0.14 inches per foot (12 millimeters per meter). Provide hand holes with no rough edges and a reinforcing frame and cover designed to maintain the required pole strength. Weld a 2.375- to 3.0-inch (60- to 75-millimeter) outside diameter vertical tenon, fabricated from the same material as the pole, and welded at the top and on the same axis as the pole.
Furnish pole sections in minimum 15-foot (4.5-meter) lengths. Furnish pole sections less than 70 feet (21 meters) in height in two sections or less; between 70 and 100 feet (21 and 30 meters) in three sections or less; and over 100 feet (30 meters) in four sections or less.
Design and furnish poles capable of sustaining the following loadings:
(1) A horizontal load of 500 pounds (2.2 kilonewtons) applied 18 inches (450 millimeters) from the shaft top, in any direction, without failure of any component part, and a maximum allowable vertical deflection of 7.5 percent of the shaft length.
(2) A horizontal load of 50 pounds (220 newtons) applied at the luminaire attachment point and normal to the pole bracket member plane, with a vertical load of 30 pounds (130 newtons) on the luminaire supporting arm, and a maximum allowable horizontal deflection of 10 percent of the luminaire supporting arm's horizontal length.
(3) A vertical load of 100 pounds (440 newtons) applied at the luminaire attachment point, and a maximum allowable vertical deflection of 5.5 percent of the pole arm's horizontal length.
G-11 DIVISION 700
Project: AK PRA DENA 10(35), Repave Denali Park Road MP 0.0 to 3.4
(4) A vertical load of 250 pounds (1.1 kilonewtons) applied at the luminaire attachment point, and no collapse or rupture of any portion of the structure.
(5) The pole arm and luminaire mass with a maximum allowable deflection from vertical at the top of the pole of 1 percent of the total shaft length.
Prime the poles inside and out according to the fabricator's recommendation. Use epoxy modified enamel matching FED-STD 595 color 27040 for the finish coat.
(b) Pole arms.
(1) Material. Furnish steel or aluminum. Use the same material as the pole.
(2) Type. Furnish bracket type, truss or single member arms. Furnish single member arms with a minimum diameter of 2 inches (50 millimeters) and the same taper as the pole.
(3) Connection. Furnish a weather resistant connection to the pole and a smooth raceway for wiring. Furnish fittings for connection to the pole.
(c) Anchor bases. Furnish a one-piece base dimensioned for adequate pole mounting and structural support with holes for anchor bolts and tapped holes for anchor bolt covers.
Fabricate anchor bases from material similar to the pole material and conform to the following:
(1) Steel…