DENA_1035_Planset_Dec2018.pdf
PDF 17 MB Posted
- Solicitation number
- 69056718B000026
About this file
Plans
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J -
TYPICAL
SECTIONS PLAN & PLAN APPROACH
ROADS ROUNDABOUT
SOIL
EROSION AND
SEDIMENT
CONTROL
DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PLAN
PERMANENT
TRAFFIC
CONTROL
PLAN
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANC LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 360 40 400
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 8,950 600 9,550
A0160 15706-1600 SOIL EROSION CONTROL, STABILIZED
CONSTRUCTION EXIT EACH 2 2
A0180 20103-0000 CLEARING AND GRUBBING SQYD 83 17 100
A0200 20301-2400 REMOVAL OF SIGN EACH 12 4 16
A0220 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE LNFT 422 16 438
A0240 20303-0300 REMOVAL OF CONCRETE SQYD 13 2 15
A0260 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 750 50 800
A0280 20303-3200 REMOVAL OF SIDEWALK, CONCRETE SQYD 183 17 200
A0300 20304-7000 REMOVAL OF UTILITY CONDUITS (EXISTING
ABOVE PAVEMENT TRAFFIC COUNTER) LPSM All ALL
A0320 20315-0000 SAWCUTTING PAVEMENT LNFT 308 308
A0340 20401-0000 ROADWAY EXCAVATION CUYD 436 64 500
A0360 20402-0000 SUBEXCAVATION CUYD 9,605 1,000 10,605
A0380 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE,
CLASS 1, TYPE A SQYD 17,594 2,500 20,094
A0400 20703-2000 GEOGRID, STABILIZATION SQYD 44,918 3,316 48,234
A0420 30202-2000 ROADWAY AGGREGATE, METHOD 2 (SUBEX
BACKFILL) TON 17,661 1,764 19,425
A0440 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 600 57 538 149 1,344
A0460 30303-3000 ROADWAY RECONDITIONING SQYD 36 14 50
A0480 30604-0600 FULL DEPTH RECLAMATION WITH FOAMED
ASPHALT, 6-INCH DEPTH SQYD 33,215 751 1,853 489 36,308
A0500 30611-0000 CEMENT TON 101 5 6 10 122
A0520 30613-0000 ASPHALT BINDER (GRADE PG 52-28) TON 303 14 17 26 360
A0560 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY
MIX, 1/2-INCH OR 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3
MILLION ESAL TON 7,363 122 732 535 660 9,412
A0580 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 75 9 6 3 93
A0620 40301-0000 ASPHALT CONCRETE PAVEMENT (TYPE 1) TON 1,249 133 1,382
A0640 41201-0000 TACK COAT TON 39 1 5 3 4 52
A0660 50101-0800 MINOR CONCRETE PAVEMENT, REINFORCED,
8-INCH DEPTH SQYD 235 15 250
MileStone: 100% Final Date Completed: In Progress Report Date: 11/07/18
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
6-
N ov
-2
9:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities c:
\m yf ile s\ pw
_p ro du ct io n\ d0 su m m ar y.
xl sm
]S he et
STATE PROJECT
B.1NPS DENA 10(35)WA
SHEET
NUMBER
NPS PMIS No. 185904A NPS Drwg No. 184/80295
TYPICAL
SECTIONS PLAN & PLAN APPROACH
ROADS ROUNDABOUT
SOIL
EROSION AND
SEDIMENT
CONTROL
DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PLAN
PERMANENT
TRAFFIC
CONTROL
PLAN
ALLOWANCE Bid Schedule
A0680 50101-2600 MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH
DEPTH SQYD 99 6 105
A0700 60201-0800 24-INCH PIPE CULVERT (TEMPORARY) LNFT 150 150
A0720 60201-0800 24-INCH PIPE CULVERT (PVC) LNFT 250 250
A0740 60201-0800 24-INCH PIPE CULVERT LNFT 278 27 305
A0760 60412-2000 REMOVE AND RESET MANHOLE FRAME AND COVE EACH 3 1 4
A0780 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 600 50 650
A0800 60902-1200 CURB AND GUTTER, CONCRETE, 14-INCH DEPTH LNFT 373 20 393
A0820 60907-1000 PAVED DITCH, ASPHALT LNFT 130 10 140
A0840 60920-0000 RESET WHEELSTOP EACH 6 6
A0860 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM
CAPACITY HOUR 20 20
A0880 62201-0350 BACKHOE HOUR 30 30
A0900 62201-2050 ROLLER HOUR 20 20
A0920 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE HOUR 20 20
A0940 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD
MINIMUM CAPACITY WITH THUMB ATTACHMENT HOUR 30 30
A0960 62301-0000 GENERAL LABOR HOUR 40 40
A0980 62502-0000 TURF ESTABLISHMENT SQYD 1,800 200 2,000
A1000 63401-0000 PAVEMENT MARKINGS (DOTTED, White) LNFT 80 20 100
A1020 63401-0000 PAVEMENT MARKINGS (MMA WHITE STOP LINE) LNFT 120 132
A1040 63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID (White) LNFT 1,900 100 2,000
A1060 63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID (White
Stop Line) LNFT 520 80 600
A1080 63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID
(Yellow) LNFT 250 72,482 7,518 80,250
A1100 63405-0050 PAVEMENT MARKINGS, SYMBOLS (Yield word message) EACH 4 4
A1120 63405-0050 PAVEMENT MARKINGS, SYMBOLS (MMA
RAILROAD APPROACH SYMBOL) EACH 2 2
A1140 63502-1250 TEMPORARY TRAFFIC CONTROL, TUBULAR
MARKER, TYPE 42-INCH EACH 150 150
A1160 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 60 60
A1180 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING
LIGHT TYPE A EACH 6 6
A1200 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC
SIGNAL SYSTEM EACH 1 1
A1220 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT
MARKINGS LNFT 6,410 6,410
6- N ov -2
9:
P M
MileStone: 100% Final Date Completed: In Progress Report Date: 11/07/18 c:
\m yf ile s\ pw
_p ro du ct io n\ d0 su m m ar y.
xl sm
]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2NPS DENA 10(35)WA
SHEET
NUMBER
TYPICAL
SECTIONS PLAN & PLAN APPROACH
ROADS ROUNDABOUT
SOIL
EROSION AND
SEDIMENT
CONTROL
DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PLAN
PERMANENT
TRAFFIC
CONTROL
PLAN
ALLOWANCE Bid Schedule
A1240 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION
SIGN SQFT 277 23 300
A1260 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC
CONTROL SUPERVISOR DAY 180 180
A1280 63507-0800 TEMPORARY TRAFFIC CONTROL, PORTABLE
CHANGEABLE MESSAGE SIGN DAY 60 60
A1300 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 3,600 3,600
A1320 63601-6000 SYSTEM INSTALLATION, TRAFFIC DETECTOR
SYSTEM (Government Furnished) LPSM All ALL
A1340 63703-0000 RESIDENTIAL HOUSING EACH 3 3
A1360 63704-0000 VEHICLE EACH 3 3
A1380 64603-0000 FIXTURE (ASPHALT PAVEMENT CORE) EACH 12 12
A1400 64620-0000 REMOVE AND RESET (Utilities/electrical box and cover) EACH 2 2
6- N ov -2
9:
P M
MileStone: 100% Final Date Completed: In Progress Report Date: 11/07/18 c:
\m yf ile s\ pw
_p ro du ct io n\ d0 su m m ar y.
xl sm
]S he et
3)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.3NPS DENA 10(35)WA
SHEET
NUMBER
k "O QJ -"' u
QJ
.r:: u
.D
"O
QJ
C:
Cl "iii
QJ
STATE PROJECT SHEET
NUMBER
AK PRA DENA 10(35)
See safety edge details � NPS PMIS No. 185904A
E: - - � NPS Drwg. No. 184/80295
I
Pullout width varies
::::: ,,,, Varies..____ , r21 <t. Varies �
--�1� -ro�
-..._c\ _____________ 1 _2 _
______________ 1--------------�[���-------------------1_
_t_o_ 2_
-.i
/ B Shoulder \ Traveled lane Traveled lane Shoulder :§ ::J
Finished grade \.>
\ I tj Varies [lJ Varies r11 .S
. 1 ,,,- , ____, Asphalt concrete pavement, gyratory mix, Place tack coat , '-- ground l-----,,,,fJ'-t/ ---- ------ · �------------- (3 r Existing
E . . I- _ _,,,- See Safety Edge Detail O 3 3 .11. ES"AL 3 • h d xtstmg pavement or I this sheet, typical . to < mt ton ,.., , -me compacte
1..-..--+--+---� l ½-inch or ¾-inch nominal maximum size aggregate, Existing pavement surface full depth reclamation depth, placed in 2 equal lifts, type II-A roughness See Safety Edge Asphalt concrete pavement / Roadway aggregate, method 2 Place tack coat between lifts Detail this sheet, typical
' ,,, / Existing ground Roadway aggregate, method 2
PAVED PULLOUT
r31
• • i.;: Extstmg � ground j_-�--
Varies 1' to 2'
Shoulder
OVERLAY TYPICAL SECTION, MAINLINE
2+50.00 to 62+00.00
63+00.00 to 73+85.00
75+80.00 to 169+46.00
175+76 to 181+20.47
[2]
Traveled lane
See Safety Edge Detail this sheet, typical
Roadway aggregate, method 2
Varies Ill
Full depth reclamation with foamed asphalt, 6-inch compacted depth
[2]
Traveled lane Match existing pavement surface
Asphalt concrete pavement (see above typical section)
FULL DEPTH RECLAMATION TYPICAL SECTION, MAINLINE rsJ
2+50 to 3+50
Existing road
NOTE:
Varies 1' to 2'
Shoulder i:
� · . ~ -.. } ~ ~ r Ex;seng ground
Roadway aggregate,------ - -method 2
See Safety Edge Detail this sheet, typical
C.2
Place roadway aggregate to cover safety edge
Existing
Asphalt concrete pavement
7+55 to 14+80
18+60 to 22+60
24+60 to 36+25
39+35 to 51+75
53+15 to 62+00
63+00 to 80+ 70
81 +30 to 125+00
131 +00 to 143+20
159+80 to 169+46
175+76 to 178+55
1. See Final Geotechnical Memorandum No. 12-17, dated July, 2017 for geotechnical information, including boring logs, existing pavement depths, etc.
First lift asphalt concrete pavement
Second lift asphalt concrete pavement
(\ ,. 0 •• .._J1),1/
SAFETY EDGE DETAIL
2' Shoulder
__/ � Existing ground Roadway aggregate, method 2 ground
'-!l'es •oi;·�;,. ,. ·)oi;•�ii- ,. )oli : : : : : : : : : : .
179+90 to 181+20.47
[2]
Roadway aggregate, method 2, Full depth 3-inch minimum reclamation compacted depth
AGGREGATE PULLOUT
<t.
I
[3] [4]
[2] 2' Traveled lane
Varies f1l
Traveled lane Match existing pavement surface Variesfll
Shoulder
Roadway aggregate, method 2, 6-inch compacted depth
Asphalt concrete pavement, gyratory mix, 1, 1/2-inch or 3/4-inch nominal maximum size aggregate,
0.3 to < 3 million ESAL, 4-inch compacted " � .
depth, placed in 2 equal lifts, type II-A roughness Place tack coat between lifts Existing ground
TYPICAL SECTION, RECONSTRUCTION
62+00 to 63+00
NO SCALE
2. After full depth reclamation is complete, perform Denali Park Road Overlay work, see typical this sheet.
3. Full Depth Reclamation includes paved pullouts. See E-Sheets for Pullout Quantities.
FOOTNOTE:
Ill 3% minimum cross slope on tangent and match existing superelevation on curvature and transitioning section of the roadway.
r21 Match existing top pavement width. See SCRs 152.0S(m), 306.0lA, and 401.06. Pavement width quantities computed using 24-foot width.
£31 See D Sheets (D.2 - D.8) for pullout locations. See Section E for paved pullout quantities.
£41 Aggregate pullout quantities included in ITEM 30202-2000.
£51 Some roadway aggregate may be required to bring the finished surface to grade elevation matching with immediate sorounding roadway surface elevation. Quantity for this is accounted in allowance.
TYPICAL SECTIONS
.0 "O
QI
QI
C: "' it
.0 "O
QI
"iii
QI
5' N "' '5' l/)1 U)
C i'
C
C.
u
STATE PROJECT
SHEET
NUMBER
ITEM 60412-2000
AK PRA DENA 10(35) D.1
REMOVE AND RESET MANHOLE
NPS PMIS No. 185904A
ITEM 20303-0300 NPS Drwg. No. 184/80295
REMOVAL OF CONCRETE
FRAME AND COVER
QUANTITY
QUANTITY LOCATION LT/RT NOTE PAVEMENT CORRECTION LOCATION LT/RT NOTE (EACH)
(SQYD) CORE QUANTITIES 11+88 RT 1 On Approach Rd 3 Existing Approach Rd, 22+80 LT 13 Divider Island 12+13 LT 1 On Approach Rd 4
TOTAL 13 22+41 LT 1 On Approach Rd 5
TOTAL 3 LOCATION
192+00
ITEM 20304-7000 198+00 ITEM 60920-0000 REMOVAL OF UTILITY CONDUITS
RESET WHEELSTOP
279+00
(EXISTING ABOVE PAVEMENT 295+00
TRAFFIC COUNTER) QUANTITY 324+o0
LOCATION LT/RT (LNFT) NOTE
325+o0 QUANTITY LOCATION 395+00 (LPSM) 62+76 TO 63+31 RT 6 In Paved Parking
10+02 1.0 TOTAL 6
559+o0 637+o0
TOTAL 1.0 645+00
707+o0
728+00
TOTAL
UTILITY SLEEVE
ITEM 63601-6000
SYSTEM INSTALLATION, ITEM 64620-0000
ITEM 60201-0800 TRAFFIC DETECTOR SYSTEM REMOVE AND RESET
LOCATION £3l 24-INCH PIPE CULVERT (PVC) (Government Furnished) (Utilities/electrical box and cover)
(LNFT) LOCATION QUANTITY QUANTITY
(LPSM) LOCATION LT/RT NOTE
12+45.90 80 (LNFT)
21+10.13 70 14+75 1.0 12+o0 LT 2 On Approach road 4 22+80 LT 100 Total 1.0
TOTAL 2
TOTAL 250
PAVEMENT CORRECTION QUANTITIESr11
ITEM DESCRIPTION
260+75{l}
LOCATION
480+oo f2l 544+o0
QUANTITY UNIT
20303-1600 REMOVAL OF PAVEMENT, ASPHALT 750 - 0.15 750 SQYD
20315-0000 SAWCUTTING PAVEMENT 250 50 8 308 LNFT
30604-0600 FULL DEPTH RECLAMATION WITH FOAMED ASPHALT, 6-INCH DEPTH 750 - 0.44 751 SQYD
30611-0000 CEMENT 4.6 - 0.003 5 TON
30613-0000 ASPHALT BINDER (GRADE PG 52-28) 13.7 - 0.008 14 TON
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH
40101-5600 NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TYPE II-A 121 - 0.07 122 TON
ROUGHNESS
41201-0000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, SS-1H 0.3125 - 0.001 1 TON
63401-0100 PAVEMENT MARKINGS, TYPE A, SOLID (YELLOW) 250 - - 250 LNFT
ITEM 64603-0000
FIXTURE (ASPHALT
PAVEMENT CORE)
(EACH)
L
Exfr;Ong Rd. e/evahon
A I I
I I
A I Depth va,fes
Fill core to match existing elevation I _J
L __ I
PAVEMENT CORRECTION CORE DETAIL
FOOTNOTE
£11 Location is approximate. Start, stop points and layout to be approved by CO. See typical section Sheet C.2 for pavement structure.
r21 Saw cut 50 ft along RT edge of pavement. Location is approximate.
Start, stop points to be approved by CO.
TABULATION OF PLAN
QUANTITIES
k "O
QJ
-"' u
QJ
.r:: u
.D
C:
Cl "iii
QJ
Existing
Asphalt concrete pavement, gyratory mix, ½-inch or ¾-inch maximum size aggregate,
0.3 to < 3 million £SAL, 3-inch compacted depth, placed in 2 equal lifts, type II-A roughness
50' pavement surl'ace ~ Transition
Sawcut vertical joint.
Apply tack coat
Full depth reclamation with foamed asphalt, 6-inch compacted depth
PAVEMENT CONNECTION
DETAIL
Approach road 4 Match overlay pavement to existing elevation.
Offset 98', LT.
Protect water valve boxes in this Radius widening ~
10+02 area. Location shown is approximate. \ Remove of utility conduits (existing above pavement f--' traffic counter) o q ~1
3+50 to 7+55 Subexcavation, type 1 See Sheet C.3 for details b.= 18° 50' 58" (RT) R= 1,200.00' T= 199.19' L= 394.66'
-I> "-J
N 30° 39' 45" W !
"1J n -I> "-J u, "' w 0, b.= 0° 52' 31" (RT) R= 3,000.00' T= 22.92' L= 45.83'
STATE PROJECT SHEET
NUMBER
AK PRA OENA 10(35) 0.2
BEGIN PROJECT
AK PRA DENA 10(35)
0+00. 00, MP 0. 0
N = 3556533.058 E = 1820940.468
Remove and reset manhole frame and cover a a a a a
Remove and reset utilites features (2, Each)
N= 3,557,458.66 E= 1,820,104.35
12+45.90 [l] @
Install 24-inch pipe culver (PVC) 11-ft approximate depth below road centerline.
N= 3,557,488.95 E= 1,820,178.40
Approach road 3 Match overlay pavement to existing elevation.
(end of gate) Offset 70', RT
FOOTNOTE
I I I
I
N 48° 48' 01" W
NPS PMIS No. 185904A NPS Drwg. No. 184/80295
4+95 Install 24" pipe culvert.
See Sheet H.1 for quantity
2+50 Begin pavement reclamation and overlay
3+50 to 7+55 Subexcavation, type 1 See Sheet C.3 for details
V1
Appnmch Rood-No Wo~-1 :~"~ --_ _/ / , / "1J n -I> "-J !J' N f--' V1
'- '- I
Approach Road 2 '- '-' 1 1 1 1/ I Match overlay , ~-= ~· --1 Do not disturb existing curb pavement to existing pavement elev. Offset at 26', RT
14+75 b.= 0° 51' 31" (LT) R= 2,000.00' T= 14.99' L= 29.98'
<t a 1/"1 co 1/"1 u 0..
N a 1/"1
System installation, Traffic detector system (Government furnished)
"1J n "-J N w a a
"-J + u, "-J w N b.= 0° 59' 00" (RT) R= 2,000.00' T= 17.16' L= 34.32'
29° 39' 45" w
14+80 to 18+60 Subexcavation, type 1.
See Sheet C.3 for details r11 Plug each end the pipe with a temporary plug before backfill. Mark the location of the pipe ends with a steel bar or 4 X 4 wood post.
Exact location will be directed by the CO.
CURVILINEAR LINE GRAPH
0+00 to 20+00
N
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
3201 3558346.933 1816069.249 1750.111 63°44'00.943545"N 148°54'57.608572"W 1794.7465 0.99984952 5/8" IR W/FHWA ALUM CAP 1.
3202 3558413.222 1816151.158 1749.164 63°44'01.582324"N 148°54'55.764235"W 1793.7995 0.9998496 5/8" IR W/FHWA ALUM CAP
13301 3554221.140 1809785.940 2070.375 63°43'21.364736"N 148°57'18.672153"W 2115.1876 0.99983178 5/8" IR W/FHWA ALUM CAP
13302 3554685.173 1810860.986 2047.231 63°43'25.758535"N 148°56'54.632948"W 2092.0174 0.9998333 5/8" IR W/FHWA ALUM CAP
13303 3554814.106 1811576.615 2005.368 63°43'26.911428"N 148°56'38.695598"W 2050.1413 0.99983557 5/8" IR W/FHWA ALUM CAP
13304 3555044.355 1812188.113 1966.002 63°43'29.078066"N 148°56'25.032783"W 2010.7589 0.99983769 5/8" IR W/FHWA ALUM CAP
13305 3555033.138 1812652.544 1933.484 63°43'28.891737"N 148°56'14.724250"W 1978.2376 0.99983942 5/8" IR W/FHWA ALUM CAP
23172 3554500.963 1810340.782 2064.562 63°43'24.029529"N 148°57'06.250844"W 2109.3582 0.99983227 1/2" IR W/YPC
25100 3553982.374 1809414.955 2075.527 63°43'19.074250"N 148°57'26.995792"W 2120.3527 0.99983139 1/2" IR W/RPC
25101 3554012.631 1809155.927 2073.436 63°43'19.413633"N 148°57'32.736031"W 2118.265 0.99983139 1/2" IR W/RPC
DENA1 3557364.642 1815636.234 1766.133 63°43'51.347383"N 148°55'07.595861"W 1810.798 0.99984858 5/8" IR W/FHWA ALUM CAP
RILEY1 3558095.725 1819614.314 1639.084 63°43'57.872971"N 148°53'38.963573"W 1683.7063 0.99985624 5/8" IR W/FHWA ALUM CAP
PROJECT : Denali Park Road MP 0 to 3.4 DATE OF FIELD WORK : Multiple Entries
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Alaska zone 4 SPCS NAD83 CORS96
EPOCH DATE : 2002.000
VERTICAL DATUM : Orthometric Elevations based on the NAVD88 GEOID09
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
\A la sk a\
D en al i\
G
PS
En tr an ce _C on tr ol S he et .x ls x]
Sh ee t 4-
A pr
-2
:1
A M
W
FL
H D s ur ve y
W
FL
H D s ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.9
SHEET
NUMBER
DENA 10(35)AK
SURVEY CONTROL
NOTE:
2.
1.
storage areas. Place silt fence as directed by the CO.
Silt fence is allowance quantity to be used at staging, material based on observed drainage patterns.
locations with the CO prior to placement. Locations may be revised
Locations are approximate. Review proposed erosion control device
CONTROL QUANTITIES
EROSION /SEDIMENT
TABULATION OF SOIL
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d d e n a d a .d g n
AK PFH DENA 10(35)
P
M o v e m b e r
T
P h a n
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. 184/80295
N
181+20.47, MP 3.4
165+00 to EOP
EROSION CONTROL PLAN
SUSPEND PROJECT
G.9
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a d i.
d g n
AK PRA DENA 10(35)
A o v e m b e r
P h a n
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. 184/80295
NPS PMIS No. 185904A
169+46
SUSPEND WORK
175+76
RESUME WORK
10.4 x 16 60201 -0800
60201 -0800
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
-I
N C H
P
IP
E C U
LV
ER
T
-I
N C H
P
IP
E C U
LV
ER
T (T
EM
PO
R A R Y)
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD LNFT LNFT Lt Rt
4+95 2 56 50 30 A, AS
39+00 2 65 58 20 A, AS
Roundabout 1 54 60 80 A, AS 3 Roundabout 1 45 50 70 A, AS 3
159+60 2 67 60 45 A,AS
PROJECT TOTAL 287 278 150
Allowable Pipe Material
NOTE: A Aluminum AS Aluminized steel
1. Aluminized steel pipe culvert minimum wall thickness is the 3. All mateirals are allowable for temporary pipe culverts.
thickness required by the Std. 602-1 fill height table (steel).
2. Aluminum pipe culvert minimum wall thickness is the thickness required by the Std. 602-1 fill height table.
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\m yf ile s\ pw _p ro du ct io n\ d0
D en a1
5_ ea
.x ls x] S he et
N ov
:2
PM
T.
P ha n
4/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
H.1
SHEET
NUMBER
PRA DENA 10(35)AK
NPS PMIS No. 185904A NPS Drwg. No. 184/80295
Note: The quantities shown hereon are approximate and are subject to field adjustments.
QUANTITIES
PERMANENT TRAFFIC CONTROL
TABULATION OF
J.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a p a .d g n
AK PFH DENA 10(35)
A o v e m b e r
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
contractor's construction activities.
The government will perform final sign installation at the end of the activities. Relocate signs as directed by the CO during construction.
Remove signs only if they immediately conflict with construction [1]
NPS Drwg. No. 184/80295
N
END PROJECT
181+20+47, MP 3.4
165+00 to EOP
TRAFFIC CONTROL PLAN
PERMANENT
J.9
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a p i.
d g n
AK PRA DENA 10(35)
P o v e m b e r
P h a n
C h e c k e d b y
D e s ig n e d b y
NOTE:
pavement surface.
1. Pavement markings for 169+46 to 176+46 is on old asphalt
NPS Drwg. No. 184/80295
NPS PMIS No. 185904A type B, solid white stop line
Pavement markings, type B, solid white stop line
Pavement markings, stop line type B, solid white
Pavement markings, Solid (Yellow)
Pavement markings, type B
File details come from the government source that posted it.