PRELIMINARY
INDEX TO SHEETS
A.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d d e n a a b .d g n
AK PFH DENA 10(35)
A
M
S e p te m b e r
T
P h a n
C h e c k e d b y
D e s ig n e d b y
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
3201 3558346.933 1816069.249 1750.111 63°44'00.943545"N 148°54'57.608572"W 1794.7465 0.99984952 5/8" IR W/FHWA ALUM CAP 1.
3202 3558413.222 1816151.158 1749.164 63°44'01.582324"N 148°54'55.764235"W 1793.7995 0.9998496 5/8" IR W/FHWA ALUM CAP
13301 3554221.140 1809785.940 2070.375 63°43'21.364736"N 148°57'18.672153"W 2115.1876 0.99983178 5/8" IR W/FHWA ALUM CAP
13302 3554685.173 1810860.986 2047.231 63°43'25.758535"N 148°56'54.632948"W 2092.0174 0.9998333 5/8" IR W/FHWA ALUM CAP
13303 3554814.106 1811576.615 2005.368 63°43'26.911428"N 148°56'38.695598"W 2050.1413 0.99983557 5/8" IR W/FHWA ALUM CAP
13304 3555044.355 1812188.113 1966.002 63°43'29.078066"N 148°56'25.032783"W 2010.7589 0.99983769 5/8" IR W/FHWA ALUM CAP
13305 3555033.138 1812652.544 1933.484 63°43'28.891737"N 148°56'14.724250"W 1978.2376 0.99983942 5/8" IR W/FHWA ALUM CAP
23172 3554500.963 1810340.782 2064.562 63°43'24.029529"N 148°57'06.250844"W 2109.3582 0.99983227 1/2" IR W/YPC
25100 3553982.374 1809414.955 2075.527 63°43'19.074250"N 148°57'26.995792"W 2120.3527 0.99983139 1/2" IR W/RPC
25101 3554012.631 1809155.927 2073.436 63°43'19.413633"N 148°57'32.736031"W 2118.265 0.99983139 1/2" IR W/RPC
DENA1 3557364.642 1815636.234 1766.133 63°43'51.347383"N 148°55'07.595861"W 1810.798 0.99984858 5/8" IR W/FHWA ALUM CAP
RILEY1 3558095.725 1819614.314 1639.084 63°43'57.872971"N 148°53'38.963573"W 1683.7063 0.99985624 5/8" IR W/FHWA ALUM CAP
PROJECT : Denali Park Road MP 0 to 3.4 DATE OF FIELD WORK : Multiple Entries
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Alaska zone 4 SPCS NAD83 CORS96
EPOCH DATE : 2002.000
VERTICAL DATUM : Orthometric Elevations based on the NAVD88 GEOID09
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
\A la sk a\
D en al i\
G
PS
En tr an ce _C on tr ol S he et .x ls x]
Sh ee t 4-
A pr
-2
:1
A M
W
FL
H D s ur ve y
W
FL
H D s ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.
SHEET
NUMBER
DENA 10(35)AK
SURVEY CONTROL
NOTE:
2.
1.
CONTROL QUANTITIES
EROSION /SEDIMENT
TABULATION OF
the CO.
material storage areas. Place silt fence as directed by
Silt fence is allowance quantity to be used at staging, locations.
Locations are approximate. Coordinate with the CO for final
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a d a .d g n
AK PFH DENA 10(35)
P
S e p te m b e r
T
P h a n
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. 184/80295
NPS PMIS No. 185904A
10.4 x 16 60201 -0800
60201 -0800
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
-I
N C H
P
IP
E C U
LV
ER
T
-I
N C H
P
IP
E C U
LV
ER
T (T
EM
PO
R A R Y)
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD LNFT LNFT Lt Rt
4+95 2 56 50 30 A, AS
39+00 2 65 58 20 A, AS
Roundabout 1 36 40 40 A, AS Roundabout 1 36 40 40 A, AS 159+60 2 67 60 45
PROJECT TOTAL 260 248 80
Allowable Pipe Material
NOTE: A Aluminum AS Aluminized steel P Plastic
1. Aluminized steel pipe culvert minimum wall thickness is the thickness required by the Std. 602-1 fill height table (steel).
2. Aluminum pipe culvert minimum wall thickness is the thickness required by the Std. 602-1 fill height table.
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\m yf ile s\ pw
_p ro du ct io n\ d0
D en a1
5_ ea .x ls x]
S he et 6-
S ep
-2
8:
A
M T.
P ha n 4/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
H.1
SHEET
NUMBER
PRA DENA 10(35)AK
NPS PMIS No. 185904A NPS Drwg. No. 184/80295
Note: The quantities shown hereon are approximate and are subject to field adjustments.
QUANTITIES
PERMANENT TRAFFIC CONTROL
TABULATION OF
J.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a p a .d g n
AK PFH DENA 10(35)
S e p te m b e r
C h e c k e d b y
D e s ig n e d b y
FOOTNOTE:
contractor's construction activities.
The government will perform final sign installation at the end of the activities. Relocate signs as directed by the CO for during construction.
Remove signs only if they are immediately conflict with construction [1]
NPS Drwg. No. 184/80295
PAVEMENT MARKINGS
LINEAR
NO SCALE
J.10
STATE PROJECT
NUMBER
SHEET
S e p te m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a p j.
d g n
AK NPS DENA 10(35)
C h e c k e d b y
D e s ig n e d b y
10'30'10'30'10'
4" broken yellow centerline
NOTE:
s s
Transition
Curve widening
Transition
S h o u ld e r s
T ra v e l
L
T ra v e l
L
S h o u ld e r s s L
L s
S h o u ld e r
L a n e
T r a v e l
L a n e
T r a v e l
S h o u ld e r
TYPICAL PAVEMENT MARKING APPLICATIONS
CENTERLINE MODIFICATION FOR CURVES WITH WIDENING APPLIED ON INSIDE
CENTERLINE DETAIL
See Note 2 for treatment of curves when widening "w" is split equally on both sides of centerline
L w
Minor approach w w w
CL
CL
L a n e
L a n e
Design location of top lift pavement joint pavement markings and
Offset centerline for
Centerline as required
4" solid double yellow centerline
Edge of pavement markings when specified
Approach road pavement
Major approach road required by the maintaining agency when specified in the plans or when
Increase spacing between parallel lines
Varies
See Detail this sheet allow sufficient sight distance.
Locate 12" wide stop line to m a x m in
STOP LINE DETAIL
CROSSWALK DETAIL
24" 84"
4.
3.
2.
1.
Adjust crosswalk marking width if directed by the CO.
by the maintaining agency.
pavement markings when specified on the plans or when required
Typical pavement marking widths are shown. Use wider locations.
widening area. See staking details for curve widening transition
Maintain a constant shoulder width "s" throughout the curve widening "w" to achieve equal lane widths within the roadway.
Paint centerline pavement markings on curves with curve interface when curb is present.
Place edge line pavement markings at asphalt/concrete curb
Edge of road
2'
2' to 6'
4" dotted white line to roundabout
Turnout or approach NPS Drwg. No. 184/80295
Thickness
Material
SECTION A - A
NOTE:
AA
PLAN
INLAID PAVEMENT MARKINGS
other requirements.
4. See SCR Section 634 for marking installation tolerances and dimensions.
3. See Sheets J.4 and J-11 for marking length and width
"Standard Highway Signs", current edition.
2. All letters, numerals and symbols shall conform with the current edition.
the "Manual on Uniform Traffic Control Devices" (MUTCD),
1. Place pavement word and symbol markings in accorance with
NO SCALE
PAVEMENT MARKINGS
TYPE
PAVEMENT MARKING AREAS
SQFT
YIELD Word Marking 24
J.12
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d a k k i.
d g n
AK PRA DNA 10(35)
S e p te m b e r
K
H A
R R I S
O N
H I N
S H
A W
C h e c k e d b y
D e s ig n e d b y
Marking Length
Taper
3 ± 1 in.
Taper
3 ± 1 in.
.1 i n
M a r k in g w id th
W id th
M a r k in g
Top of pavement Marking material d e p th
G r o o v e
"YIELD" WORD MARKING
7'
4" minimum
File details come from the government source that posted it.