659-20-100_01-11-22_Structural Bid Documents - Revision 1.pdf

PDF 751 KB Posted

Attached to
Z1DA--Bldg. 5 Pharmacy Cleanroom
Solicitation number
36C24622B0004
Issued by

About this file

This document contains a solicitation for a federal construction project and related structural bid documents. The Department of Veterans Affairs is seeking a contractor to construct and prepare an area for a pre-manufactured modular cleanroom in Building 5 at the W.G. Hefner VA Medical Center in Salisbury, North Carolina. The project involves installing a ISO Class 7 cleanroom with separate compounding areas meeting USP Chapters 797 and 800 standards for non-hazardous and hazardous compounded sterile products. The solicitation is set aside for a service-disabled veteran-owned small business. The pre-bid site visit will take place on February 9th, with questions due by February 18th and bids due on March 4th. The virtual bid opening is scheduled for March 10th. The estimated budget for the construction project is between $500,000 and $1 million.

The structural bid documents provide plans for the project, including details on sawcutting existing concrete, verifying reinforcing and utilities, barricading work areas, and notes for installing new openings, mechanical equipment, and anchoring HVAC stacks. Relevant dimensions, locations, and specifications are included to aid contractor bidding.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100 97 82 79 66

62 49

101 96 83 78 67

102 95 84 77

60 51

103 94 85 76 69 59 52

104 93 88 75 70 58 53

92 89 74 71 57 54

RB-45 RB-46 RB-47 RB-48 RB-49 RB-50

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

RJ-13 RJ-11 RJ-10 RJ-8 RJ-7

EXISTING OPENING

RJ-2

R B

R B

R B

R B

R B

RJ-6

R B

RJ-13

R B

R B

R B

RJ-11 RJ-10

R B

R B

RJ-2

R B

R B

RJ-12

R B

R B

R B

R B

R B

RJ-6

RB-65 RB-66

EXISTING OPENING

EXISTING HEADER

EXISTING DOUBLE JOIST

R B

RJ-9

S-101

NEW 28"X16" OPENING

2'-4"

NEW 28" X 16" OPENING

2'-4"

9'-5

(TYP.)

BMEF-1

5'-7"

NEW EXHAUST FAN. REFER TO

MH103 FOR MORE INFORMATION.

AHU-49

NEW AIR HANDLING UNIT.

REFER TO MH103 FOR MORE

INFORMATION.

5" 13'-7" 13'-9" 24'-5" 23'-5" 23'-11" 21'-5" 21'-5" 21'-5" 21'-5" 21'-5" 22'-0" 5"

5" 18'-3"

5" 12'-0" 21'-1" 23'-5" 23'-11" 21'-5" 21'-5" 5"22'-0"21'-5"6'-8" 14'-9" 9'-9" 11'-8"

100 97 82 79 66

62 49

23 10 7

101 96 83 78 67

50 44 27 22 11 6

102 95 84 77

60 51 43 28

103 94 85 76 69 59 52 42 29

104 93 88 75 70 58 53 41 30

14 3

92 89 74 71 57 54 36 31 18 15 2

91 73 72 56 55 35 17 16 13334

RB-45 RB-46 RB-47 RB-48 RB-49 RB-50 RB-51 RB-54 RB-55

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

R B

RJ-13 RJ-11 RJ-10 RJ-8 RJ-7

EXISTING OPENING

RJ-2 RJ-3

13'-0"

RJ-2 RJ-9

R B

R B

R B

R B

R B

RJ-6

R B

RJ-5

R B

RJ-4

R B

R B

R B

R B

RJ-13

R B

R B

R B

RJ-11 RJ-10

R B

R B

RJ-2 RJ-2

R B

R B

RJ-2

R B

R B

R B

R B

R B

R

B

RJ-12

R B

R B

R B

R B

R B

R B

R B

R B

R B

RJ-12

R B

RJ-9 RJ-8

R B

R B

3'-4

13'-4" 7'-2

R B

R B

RJ-2 RJ-2

DOUBLE JOIST

EXISTING HEADER

R B

RJ-3

R B

RJ-2

RJ-1

R B

R B

RB-64 RB-63

RJ-7

RB-59 RB-58 RB-57 RB-56

R B

32'-10"

6"

RJ-2

RB-52

RB-53

RJ-2

DOUBLE JOIST

OVER MEAT TRACK

J

EXISTING OPENING

EXISTING HEADER

DOUBLE JOIST

RJ-6 RJ-5 RJ-4

RB-65 RB-66

EXISTING OPENING

EXISTING HEADER

EXISTING DOUBLE JOIST

R B

RJ-9

15" X 25" OPENING

RJ-2

R B

RB-48 RB-49 RB-62 RB-61

40'-6"

9'-0"

RB-60

S-101

NEW 28"X16" OPENING

2'-4"

NEW 28" X 16" OPENING

2'-4"

9'-5

(TYP.)

BMEF-1

5'-7"

NEW EXHAUST FAN. REFER TO

MH103 FOR MORE INFORMATION.

AHU-49

NEW AIR HANDLING UNIT.

REFER TO MH103 FOR MORE

INFORMATION.

1'-4"

5" 5"

1 2

1 4

EXISTING FLOOR SLAB EXISTING REINFORCING

EXISTING FLOOR JOIST

1 2

M

I N

" CAP

" DIA. STD. PIPE

(HOT DIPPED

GALVANIZED)

TOUCH UP W/ ZINC RICH

PAINT - HOT DIPPED

GALVANIZED

"x6"x6" PLATE W/ 1 - 1

" DIA. EXP.

BOLTS W/ 1"-2" EMBEDMENT

" NONSHRINK

CEMETITIOUS GROUT

CONCRETE ROOF

" DIA. S.S. PAD EYE

& NUT

1. CONTRACTOR TO SAW CUT OPENINGS IN EXISTING

CONCRETE SLAB AT LOCATIONS SHOWN IN PLAN.

2. CONTRACTOR SHALL FIELD VERIFY LOCATIONS OF

REINFORCED CONCRETE RIBS ON THE BOTTOM

SURFACE OF THE SLAB TO INSURE THAT OPENING

LOCATIONS DO NOT INTERFERE WITH THESE RIBS. ANY

CONFLICT BETWEEN THE OPENINGS AND THE EXISTING

CONCRETE RIBS SHALL BE REFEREED TO THE

CONTRACTING OFFICER PRIOR TO SAW-CUTTING

OPENING FOR RESOLUTION.

3. CONTRACTOR SHALL FIELD VERIFY THAT NO EXISTING

UTILITIES OR EQUIPMENT ARE LOCATED DIRECTLY

BELOW THE LOCATIONS OF THE NEW OPENINGS.

4. DURING THE SAW-CUTTING OPERATIONS, THE

CONTRACTOR SHALL BARRICADE THE AREA BENEATH

THE NEW OPENING TO INSURE THAT NO PERSONNEL IS

INJURED DUE TO FALLING CONCRETE.

5. CONTRACTOR SHALL COORDINATE THE REMOVAL OF

THE EXISTING CONCRETE FROM THE NEW OPENING TO

INSURE THAT NO LARGE SECTIONS OF CONCRETE HIT

THE FLOOR BELOW.

6. CARE SHALL BE TAKEN TO INSURE THAT THE FACES OF

THE OPENING ARE SMOOTH; ANY CRACKS, CHIPPING OR

PALLING OF THE CONCRETE SHALL BE REPAIRED TO

PROVIDE A SMOOTH FACE TO THE OPENING.

7. THE EXPOSED FACE OF ANY REINFORCING THAT WAS

CUT SHALL BE COATED WITH A ZINC-RICH PRIMER.

8. CONTRACTOR SHALL VERIFY THE NEW OPENING

LOCATIONS AND SIZE WITH MECHANICAL SUPPLIER.

9. CONTRACTOR SHALL NOT CUT THE FLOOR JOISTS.

STRUCTURAL GENERAL NOTES

DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.

Phone: (804) 726-9540 https//raymond.global

1601 Summit Avenue

Richmond, VA 23230

DATE DESCRIPTION

PROJECT NO.: RVA1033.003

OWNER:

WG HEFNER VAMC

BUILDING 5

PHARMACY CLEAN ROOM

1601 BRENNER AVE

SALISBURY, NC, 28144

SENSITIVE UNCLASSIFIED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUES / REVISIONS

09/15/20 15% SD SUBMISSION

10/29/20 35% SD SUBMISSION

DATE VA COR SIGN OFF

09/15/20 ANDRE L. NOBS

SUB

15% SD

11/18/20 ANDRE L. NOBS35% SD

12/19/20 65% DD SUBMISSION

02/25/21 95% DD SUBMISSION

2/2/21 ERIC STEWART65% DD

3/12/21 ERIC STEWART95% DD

03/26/21 100% DD SUBMISSION

05/09/21 FINAL BID DOCUMENTS

4/16/21 ANDRE HAYLES100% DD

09/29/21 DILANDRO COMMENTS

S-101

STRUCTURAL FLOOR PLAN

PROJECT

NORTH

KEY PLAN

NEW OPENING

Sai Jiang

Sai Jiang

David Willers

S-101

S-101

S-101

NOTE: EXISTING

DIMENSIONS,

CONTRACTOR TO

FIELD VERIFY.

NOTE:

1) PROVIDE THREE POST

ANCHORS PER HVAC STACK.

SPACE EACH POST ANCHOR

NOT LESS THAN 10'-0" FROM

STACK AND AT 120 DEGREES

FROM EACH OTHER IN A

CIRCULAR ARC AROUND THE

STACK.

2) LOCATE POST ANCHORS TO

AVOID CUTTING

REINFORCING BAR DURING

INSTALLATION.

5-09-2021

Raymond Engineering GA, Inc 316 W. Millbrook, Rd., Suite 201 Raleigh, NC 27609 919-872-7866 NC License No. C-4282

Sheets and Views
S101