This solicitation seeks bids for a building 5 pharmacy cleanroom installation project. The project location is at the W.G. Hefner VAMC in Salisbury, North Carolina and requires all labor, material, supplies, equipment, transportation, permits, licenses and supervision to construct and prepare an area for a pre-manufactured modular ISO class 7 cleanroom with separate compounding areas that meet US Pharmacopeia chapters 797 and 800 standards for compounding nonhazardous and hazardous compounded sterile products. The opportunity is set aside for service-disabled veteran owned small businesses. The deadline for questions is February 18, 2022 and bids are due by March 4, 2022 with a virtual bid opening on March 10, 2022. The estimated magnitude of construction is between $500,000 and $1 million. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
C-VA
VA SIGN OFF COVER
Lic. No. 14913 Registered Architect
NO
R T H C A R OL I NA
R ICHARD KENNETH PERKIN
S
9 May 2021
CR
RP
CR
AutoCAD SHX Text
COR - ILSM AND ICRA COMPLETED:
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
REVIEWED: AFGE
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
REVIEWED: NAGE
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
APPROVED: INFECTION CONTROL
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
APPROVED: CONSTRUCTION SAFETY MANAGER
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
APPROVED: SAFETY MANAGER
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
APPROVED: CHIEF, POLICE SERVICE
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
APPROVED: SUPERVISORY FACILITIES OPERATION SPECIALIST
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
APPROVED: SUPERVISORY PROJECT ENGINEER
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
APPROVED: ENGINEERING DIVISION MANAGER
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
APPROVED: CHIEF, FACILITIES MANAGEMENT SERVICE
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
APPROVED: ASSOCIATE DIRECTOR FOR PATIENT CARE SERVICES
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
APPROVED: CHIEF OF STAFF
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
APPROVED: ASSOCIATE DIRECTOR FOR OPERATIONS
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
APPROVED: DIRECTOR, SALISBURY VA MEDICAL CENTER
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
DATE: __________
AutoCAD SHX Text
APPROVED: CHIEF, ENVIRONMENTAL MANAGEMENT SERVICE
AutoCAD SHX Text
APPROVED: CHIEF, OIT
AutoCAD SHX Text
APPROVED: CHIEF, MEDICINE SERVICE
AutoCAD SHX Text
APPROVED: ENERGY MANAGER
AutoCAD SHX Text
REVIEWED: WOMEN VETERANS PROGRAM MANAGER
PROJECT DRAWING SHEET INDEX
G-001 COVER SHEET
A-001 EXISTING AND PROPOSED ARCHITECTURAL PLANS
A-002 INTERIOR FINISHES PLAN
A-003 EXISTING ROOF PLAN
A-004 EXISTING AND PROPOSED SECTIONS
A-005 EXISTING AND PROPOSED REFLECTED CEILING PLAN
A-006 ARCHITECTURAL DETAILS
F-001 FIRE PROTECTION PLAN
E-001 GENERAL ELECTRICAL NOTES AND ABBREVIATIONS
E-002 GENERAL ELECTRICAL SYMBOL LEGEND
E-003 GENERAL ELECTRICAL KEY PLAN
ED101 ELECTRICAL DEMOLITION PLAN
E-101 NEW ELECTRICAL FLOOR PLAN
E-102 NEW ELECTRICAL CEILING PLAN
E-103 NEW ELECTRICAL ROOF PLAN
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL SCHEDULES
M-001 MECH GENERAL NOTES, LEGENDS, ABBREVS, DESIGN CRITERIA
M-002 MECHANICAL LEGENDS AND SYMBOLS
MD101 FIRST FLOOR DUCTWORK PLAN - DEMO
MD102 FIRST FLOOR PIPING PLAN - DEMO
MD103 ROOF DUCTWORK PLAN - DEMO
MH101 FIRST FLOOR DUCTWORK PLAN - NEW
MH102 FIRST FLOOR PIPING PLAN - NEW WORK
MH103 HVAC ROOF PLAN - NEW
MH111 HVAC RCP PLAN - NEW
M-501 MECHANICAL DETAILS
M-502 MECHANICAL CONTROLS AND DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
P-001 PLUMBING GENERAL NOTES, LEGENDS, ABBREVIATIONS, AND
SCHEDULE
P-101 PLUMBING FLOOR PLAN DEMO AND NEW
S-101 STRUCTURAL FLOOR PLAN
OWNER/CLIENT:
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 6
1601 BRENNER AVE
SALISBURY, NC 28144
SALISBURY VAMC B5 PHARMACY CLEAN ROOM
VA PROJECT #: 659-20-100
CONTRACT #: 36C24620C0064
RAYMOND PROJECT # RVA 1033.003
A/E DESIGN TEAM:
RAYMOND ENGINEERING, 1601 SUMMIT AVE, RICHMOND, VA 23230, (804) 726-9540
PROJECT CODE DATA
SALISBURY VAMC COR IS THE AHJ FOR THIS PROJECT
SALISBURY, NC IS IN ROWAN COUNTY NORTH CAROLINA, PROJECT IECC
CLIMATE ZONE 3, OCCUPANCY TYPE H-4 - CONTAINING MATERIALS THAT
POSE A HEALTH HAZARD, TO INCLUDE TOXIC CHEMICALS.
MAINTAIN ALL EXISTING WALL AND CEILING RATINGS
EXTERIOR WALL MINIMUM IS R VALUE = R 13
EXISTING CEILING MINIMUM R VALUE = R 30
THE EXISTING FIBERTITE MEMBRANE ROOF IS UNDER SEAMAN
CORPORATION COMMERCIAL ROOFING WARRANTY EFFECTIVE 07/22/2020
UNTIL 07/22/2040 / WARRANTY SERIAL NO. 20201091 - ROOFING CONTRACTOR
FOR INSTALLATION : J-ELBERT ROOFING: 621 6TH AVENUE SUITE 5046,
NORTH MYRTLE BEACH, SC 29597 - PHONE # (843) 605-1809
RELEVANT VA STANDARDS:
ALL PG 18 SERIES DESIGN GUIDES (https://www.cfm.va.gov/til/) TO INCLUDE:
PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS
PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES
PG-18-4 STANDARD DETAILS AND CAD STANDARDS
PG-18-5 EQUIPMENT GUIDE LIST
PG-18-9 SPACE PLANNING CRITERIA
PG-18-10 DESIGN MANUALS (BY DISCIPLINE)
PG-18-12 PHARMACY SERVICE DESIGN GUIDE
PG-18-13 BARRIER FREE DESIGN GUIDES
PG-18-14 ROOM FINISHES, DOOR, AND HW SCHEDULES
PG-18-15c MINIMUM REQUIREMENTS FOR MINOR A/E SUBMISSIONS
PG-18-17 ENVIRONMENTAL COMPLIANCE MANUAL
H-18-8 SEISMIC DESIGN HANDBOOK
H-7545 VA CULTURAL RESOURCE MANAGEMENT
VA HVAC DESIGN MANUAL, REV 3/1/20
VA PLBG DESIGN MANUAL, REV 5/1/18
VA ELEC DESIGN MANUAL, REV 12/1/19
APPLICABLE NATIONAL CODES AND STANDARDS:
USP 797 (PHARMACEUTICAL COMPOUNDING - STERILE PREPARATIONS)
USP 800 (HAZARDOUS DRUGS-HANDLING IN HEALTHCARE SETTINGS)
IBC 2018
IEBC 2018
IECC 2018
IFC 2018
IMC 2018
IPC 2018
UFC 3-410-01 HEATING, VENTILATING, AND AC SYSTEMS
(CHANGE4,11/17)
NFPA 70 - NEC 2017
NFPA 101 & NFPA 13 LIFE SAFETY CODES WET SPRINKLERS EXTRA HAZ
VISN6 ENERGY AND WATER REQUIREMENTS
OSHA 1910.95 – OCCUPATIONAL NOISE EXPOSURE
SECTION NUMBER
DETAIL NUMBER
DWG. NO. WHERE
SECTION IS DRAWN
'DETAIL SECTION MARK'
A1
A101
ELEVATION
NUMBER
DWG. NO. WHERE
ELEVATION IS DRAWN
A101
'INTERIOR ELEVATION MARK'
DETAIL
NUMBER
AREA OF DTL
A101
SIM
'CALLOUT HEAD'
ROOM TAG
DOOR
A
X
PARTITION
TYPE
KEYNOTE
CEILING HGT.
CEILING TYPE
A 12'-0"
CEILINGEQUIPMENT
EQ1
REVISION
NORTH
ARROW
N
A1
ELEVATIONS, DETAILS & CALLOUTS
SCALE: 1/8" = 1'-0"
PLAN TAGS:
A1
A101
SIM
ARCHITECTURAL SYMBOLS
VIEW TITLES:
FLOOR PLAN, ELEVATION, DETAILS:
STOR
WINDOWS
LOUVERS
'WALL SECTION MARK'
DWG. NO. WHERE
SECTION IS DRAWN
SIM
SIM
DWG. NO. WHERE
DETAIL IS DRAWN
GENERAL NOTES:
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE VA
DESIGN GUIDES AND SPECIFICATIONS, WHERE REQUIRED THE
NATIONAL AND STATE BUILDING CODES, AND THE INTENT OF THE
CONTRACT DOCUMENTS.
2. FIELD VERIFY ALL DIMENSIONS TO ENSURE ACCURACY. REPORT ANY
INCONSISTENCIES TO THE A/E AND THE VA PROJECT MANAGER COR.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW THE
SPECIFICATIONS AND FOR THE MEANS, METHODS, AND TECHNIQUES
NECESSARY TO CORRECTLY CARRY OUT THE WORK IN ACCORDANCE
WITH THE CONTRACT DOCUMENTS.
4. THE VA IS RESPONSIBLE TO MANAGE ANY ASBESTOS AND LEAD
ABATEMENT UNCOVERED DURING THE CONSTRUCTION PROCESS.
SBYVAMC - BUILDING 5
PROJECT
LIMITS
A.F. ACCESS FLOORING
A.F.F. ABOVE FINISHED FLOOR
ACC. DR. ACCESS DOOR / PANEL
ADAAG AMERICAN WITH DISABILITIES
ACCESSIBILITY GUIDELINES
ADJ. ADJUST/ ADJUSTABLE
ACOUST. ACOUSTICAL
A.B. ANCHOR BOLT
ACT ACOUSTICAL CEILING TILE
ANOD. ANODIZED
A.C. AIR CONDITIONING
AL / ALUM. ALUMINUM
APP. APPROVED
APPROX. APPROXIMATE
ARCH. ARCHITECTURAL
AT / FP ANTI TERRORISM / FORCE PROTECTION
AVG. AVERAGE
A.W.I. ARCHITECTURAL WOODWORK INSTITUTE
B.H.M.I. BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION, INC.
BM. BEAM
BLKG. BLOCKING
BD. BOARD
BTM. BOTTOM
BLDG. BUILDING
B.U.R. BUILT-UP ROOFING
CFCI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CFMF COLD FORMED METAL FRAMING
CH. CHANNEL
CPT CARPET
CLG. CEILING
CLG. HT. CEILING HEIGHT
C / CTR. CENTER
C CENTER LINE
C. TO C. CENTER TO CENTER
CT CERAMIC TILE
CLR CLEAR
CO CLEANOUT
CLOS. CLOSET
COL. COLUMN
CONC. CONCRETE
CORR. CORRIDOR
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CMU CONCRETE MASONRY UNIT
CONF. CONFERENCE
CONST. CONSTRUCTION
CONT. CONTINUOUS
CONTR. CONTRACTOR
CJ CONTROL JOINT
CY CUBIC YARD
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DR DOOR
DN DOWN
DS DOWNSPOUT
DESC. DESCRIPTION
DWG DRAWING
EA EACH
ELEC ELECTRICAL OR ELECTRIC
EL. ELEVATION
EWC ELECTRIC WATER COOLER
ERD EMERGENCY ROOF DRAIN
EP EPOXY PAINT
ENGR ENGINEER
EOS EDGE OF SLAB
EQUIP EQUIPMENT
EQ EQUAL
EXIST EXISTING
EXP EXPANSION / EXPOSED
EJ (EXP. JT.) EXPANSION JOINT
EXP ST EXPOSED TO STRUCTURE
EXT EXTERIOR
ETD ESTIMATED TRAVEL DISTANCE
FAC FACTORY
FDC FIRE DEPARTMENT CONNECTION
FT FEET
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHC FIRE HOSE CABINET
FIN. FINISH
F.P. FLAT PAINT
FF FINISHED FLOOR
FLR FLOOR
FD FLOOR DRAIN
FLUOR FLUORESCENT
F/O FACE OF
F.O.G. FACE OF GIRT
FTG. FOOTING
FDN. FOUNDATION
FV FIELD VERIFY
GA. GAGE OR GAUGE
GALV. GALVANIZED
G.B.F. GYPSUM BOARD FURRING
GC GENERAL CONTRACTOR
GFCI GOVERNMENT FURNISHED CONTRACTOR
INSTALLED
GFGI GOVERNMENT FURNISHED GOVERNMENT
INSTALLED
G.L. GIRT LINE
G.P. GLOSSY PAINT
GL. GLASS
GOVT. GOVERNMENT
GYP. GYPSUM
GYP. / G.W.B. GYPSUM BOARD
HKS HOOKS
HR. HANDRAIL
HDW. HARDWARE
HGT. HEIGHT
H. HIGH
H.P. HIGH POINT
H.M. HOLLOW METAL
HORIZ. HORIZONTAL
HB HOSE BIBB
H.V.A.C. HEATING VENTILATION & AIR
CONDITIONING
IN. INCH
I.D. INSIDE DIAMETER
INSUL. INSULATION
INT. INTERIOR
JAN. JANITOR
J.C. JANITOR'S CLOSET
JT. JOINT
JST. JOIST
K.P. KICK PLATE
LAM. LAMINATE
LDG. LANDING
LAV. LAVATORY
L.H. LEFT HAND
LHR LEFT HAND REVERSE
LT. LIGHT
LTG. LIGHTING
LOC. LOCATION
LONG. LONGITUDINAL
LVR. LOUVER
L.P. LOW POINT
MAS. MASONRY
M.O. MASONRY OPENING
MGR. MANAGER
MANF / MFR MANUFACTURER
MATL / MAT. MATERIAL
MAX. MAXIMUM
MECH. MECHANICAL
MTG. MOUNTING
MTL. METAL
M.W.P. METAL WALL PANEL
MIN. MINIMUM
MISC. MISCELLANEOUS
N.I.C. NOT IN CONTRACT
NO. (#) NUMBER
NTS NOT TO SCALE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
O.C. ON CENTER
O.H. OPPOSITE HAND
OPNG. OPENING
O.W. OPEN WEB
OPP. OPPOSITE
O.D. OUTSIDE DIAMETER
OSHA OCCUPATIONAL SAFETY AND HEALTH
ACT
OVHD OVERHEAD
PDU POWER DISTRIBUTION UNIT
PT PAINT
PR. PAIR
PNL. PANEL
PART. PARTITION
PLAS. PLASTER OR PLASTIC
PL PLATE
PLYWD. PLYWOOD
LBS. OR # POUNDS
PSF POUNDS / SQUARE FOOT
Q.T.
RAF
RECEP.
REF.
REINF.
REQ'D.
REV.
R.D.
R.D.
RH
RM.
R.O.
RB
RRTP
SC
SCW
SCHED.
SECT
S.G.P.
SSK
SHT. MET.
SIM.
STC
SPEC(S)
SFRM
SQ.
ST.
S.S.
STD.
STL.
STOR.
STRUCT.
SUSP.
TBD
TOIL. / TLT
TEL.
THK.
T'HOLD
TG
T/
TOB
TOC
T/C
TOS
T/W
TU
TYP.
U.L.
UNFIN
U.N.O.
VERT.
VEST.
VCT
VCB
V.T.R.
W. WIDTH
W/ WITH
W.C. WATER CLOSET
WCO WALL CLEAN OUT
WD. WOOD
WDW. WINDOW
W.M.P. WIRE MESH PARTITION
W/O WITHOUT
W.R.G.B. WATER RESISTANT GYPSUM BOARD
W.S. WEATHERSTRIPPING
W.R.O. WINDOW ROUGH OPENING
YD. YARD
ARCHITECTURAL
ABBREVIATIONS:
V.I.F.
USP
IBC INTERNATIONAL BUILDING CODE
IEBC INTERNATIONAL EXISTING BUILDING
CODE
IECC INTERNATIONAL ENERGY
CONSERVATION CODE
INTERNATIONAL MECHANICAL CODE
INTERNATIONAL PLUMBING CODE
IMC
IPC
NEC NATIONAL ELECTRIC CODE
VISN
POC POINT OF CONTACT
SBYVAMC
AHJ AUTHORITY HAVING JURISDICTION
QAS
ICRA INFECTION CONTROL RISK
ASSESSMENT
MEP MECHANICAL ELECTRICAL PLUMBING
PSI
P.M.J.F.
PRE-FAB.
PG
POUNDS / SQUARE INCH
PRE-MOLDED JOINT FILLER
PREFABRICATED
PROGRAM GUIDE
QLEAN AIR OF SCANDINAVIA
QUARRY TILE
RAISED ACCESS FLOOR
RECEPTIONIST
REFERENCE
REINFORCEMENT
REQUIRED
REVISIONS / REVISED
ROOF DRAIN
RIGHT HAND
RIGHT HAND REVERSE
ROOM
ROUGH OPENING
RUBBER BASE
RESIDENTIAL REHABILITATION
TREATMENT PROGRAM
SALISBURY VA MEDICAL CENTER
SEALED CONCRETE
SOLID CORE WOOD
SCHEDULE
SECTION
SEMI-GLOSS PAINT
SERVICE SINK
SHEET METAL
SIMILAR
SOUND TRANSMISSION CLASS
SPECIFICATION
SPRAYED FIRE RESISTIVE
MATERIAL
SQUARE
STAIN
STAINLESS STEEL
STANDARD
STEEL
STORAGE
STRUCTURAL
SUSPENDED
TO BE DETERMINED
TOILET
TELEPHONE
THICK
THRESHOLD
TEMPERED GLASS
TOP OF
TOP OF BEAM
TOP OF CONCRETE
TOP OF CURB
TOP OF STEEL
TOP OF WALL
TOUCH-UP
TYPICAL
UNDERWRITERS LABORATORIES
UNFINISHED
UNLESS NOTED OTHERWISE
UNITED STATES PHARMACOPEIA
VERIFY IN FIELD
VERTICAL
VESTIBULE
VETERANS INTEGRATED SERVICE
NETWORK
VINYL COMPOSITION TILE
VINYL COVE BASE
VENT THRU ROOF
FFU FAN FILTER UNIT
N
B5
SBYVAMC
CAMPUS
MAP
(SHOWING CURRENT
ENTRY FROM
HEDRICK ST)
CONTRACTOR
PERMITTED
STAGING
LAB
SHEET NAMING CONVENTION
E-001A
2 DIGIT DISCIPLINE
DESIGNATOR
G GENERAL
A ARCHITECTURAL
S STRUCTURAL
F FIRE PROTECTION
E ELECTRICAL
ED ELECTRICAL DEMOLITION
M MECHANICAL
MD MECHANICAL DEMOLITION
MH MECHANICAL HVAC
P PLUMBING
1 DIGIT SHEET TYPE
DESIGNATOR
0 - GENERAL 1 - PLANS 2 - ELEVATIONS 3 - SECTIONS 4 - ENLARGED PLANS
5 - DETAILS 6 - SCHEDULES AND DIAGRAMS 7 - VARIES 8 - VARIES 9 - 3D
VIEWS (ISO, PERSPECTIVES)
2 DIGIT SEQUENTIAL # (01-99)
1 DIGIT AREA
DESIGNATOR
(AREA DESIGNATOR
ONLY USED WHEN
PLANS ARE SUBDIVIDED
INTO AREAS.)
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
C-1
CR
RP
CR
COVER SHEET
Lic. No. 14913 Registered Architect
NO
R T H C A R OL I NA
R ICHARD KENNETH PERKIN
S
9 May 2021 or EQUAL TYP.
AutoCAD SHX Text
LOT 6
AutoCAD SHX Text M A I N
AutoCAD SHX Text
LOT 42
AutoCAD SHX Text
STREET
AutoCAD SHX Text H E D R I C K S T R E E T
AutoCAD SHX Text M A I N
AutoCAD SHX Text
LOT 43
AutoCAD SHX Text D R I V E "A"
AutoCAD SHX Text D R I V E "B"
AutoCAD SHX Text M A I N
AutoCAD SHX Text M A I N
HAZARDOUS (STERILE)
COMPOUNDING ROOM
(ISO 7 - 35 ACR) - 85 sf
V
I F
V
I F
6'-10" V.I.F. 4'-11" V.I.F.
8'-11 1/2" (AFF TO UNDERSIDE
EXISTING ACT CEILING)
12'-5 1/2" (AFF TO UNDERSIDE
EXISTING CONCRETE ONE
WAY SLAB DECK)
15'-11" V.I.F.
STORAGE
261 SF
EXISTING MEDICAL MEDIA
310 SF
V
I F
C101
V
I F
16'-1
" V.I.F.
20'-6
" V.I.F.
EQ3
EQ4
ARCHITECTURAL GENERAL NOTES:
GENERAL
1. GENERAL CONTRACTOR SHALL VERIFY ALL
DIMENSIONS IN FIELD AND MANUFACTURER'S
RECOMMENDATIONS PRIOR TO COMMENCING WORK.
MAINTAIN THE WALL AND SLAB RATINGS OF THE
EXISTING STRUCTURE.
2. NO PROJECT PHASING SHALL BE REQUIRED FOR ANY
DISCIPLINE. VA GUIDES STATE NO PERMITS
REQUIRED.
3. DEMOLISH WALLS AS SHOWN BY GENERAL
CONTRACTOR. PREPARE EXISTING CONCRETE SLAB
SUBFLOOR FOR CEMENTITIOUS PRIMER AND
SELF-LEVELING UNDERLAYMENT PER QAS OR EQUAL
TOLERANCE OF " WITHIN PERIMETER COPE, PRIOR TO
WALL COATING AND CLEAN ROOM INSTALLATION.
4. GENERAL CONTRACTOR TO BUILD THERMAL
BLACKOUT OF THE EXTERIOR WALL WINDOW.
5. SPECIALITY HIGH BUILD WALL COATING TO ALL
EXISTING WALLS WITHIN PROJECT FOOTPRINT LIMITS
PRIOR TO THE CLEAN ROOM INSTALL.
6. PER COR THERE IS POTENTIAL ASBESTOS ON
PLUMBING PIPES IN WALL. IF UNCOVERED DURING
CONSTRUCTION THE SBYVAMC SHALL MANAGE
ABATEMENT.
7. WELD SHEET FLOOR WITH INTEGRAL COVE BASE TO
BE INSTALLED BY QAS OR EQUAL IN LAST SEQUENCE
PER A-002.
8. FACILITY CONTRACTOR TO REMEDIATE EXISTING
FLOORING SLOPE NOT TO EXCEED 3/8" VERTICAL
DIFFERENCE WITHIN THE OVERALL PERIMETER COPE
OF THE CLEANROOM AND 1/8 : 12 INCREMENTAL
SLOPE. ANY ADHESIVES OR IMPERFECTIONS TO BE
SANDED PRIOR TO INSTALLATION OF CLEANROOM.
EQUIPMENT AND INTERIOR FURNISHINGS SCHEDULE
NOTE: **(IN STORAGE IN TRAILER ON SITE AT SBYVAMC, CONFIRM STAND IS ALSO READY AND PROVIDED)
LABEL DESCRIPTION SERIES SIZE LOCATION / NOTES
**EQ-1 LAMINAR AIR FLOW HORIZONTAL WORKSTATION BZ-6SS 49.5"H x 73"L x 34"D (+ 36" STAND) USE QAS REMOVEABLE PANEL
TO PROVIDE ACCESS.
**EQ-2 BENCHTOP BIOFUME HOOD BTE-6SS 58"H x 72"L x 34"D (+ 36" STAND) USE QAS REMOVEABLE PANEL
TO PROVIDE ACCESS.
EQ-3 HAZARDOUS PASS THROUGH NA 18" X 18" QAS TO INSTALL.
EQ-4 NON-HAZARDOUS PASS THROUGH NA 18" X 18" QAS TO INSTALL.
EQ-5 HANDS FREE STAINLESS STEEL SINK BY QAS TBD BY QAS, GC TO INSTALL.
EQ-6 NOT USED. - - -
EQ-7 NOT USED. - - -
EQ-8 REFRIGERATOR X2 BY FACILITY TBD DEDICATED CIRCUIT, GFCI.
EQ-9 PHARMACY STAGING AREA REFRIGERATOR BY FACILITY TBD DEDICATED CIRCUIT, GFCI.
EQ-10 FURNISHINGS BY FACILITY TBD BY FACILITY, GFCI.
EQ-11 PHARMACY STAGING AREA DESK BY FACILTY TBD BY FACILITY, GFCI.
EXISTING TO
REMAIN
ARCHITECTURAL LEGEND
DEMO
NEW
N
BUILDING 5 - KEY PLAN
TO SITE
STAGING AND
PARKING
LOTS
EQ8
EQ5
EQ10
EQ1
A-004
A-004
EQ2
TOTAL PROJECT
AREA = 625 SF
+/-4" V.I.F.
1'-9" V.I.F.
1 2
V
I F
2'-0
STORAGE
42 SF
10'-7
"4'-4"
ARCHITECTURAL KEY NOTES:
1. DEMOLISH EXISTING PARTITIONS AND DOORS SHOWN.
2. NEW DOOR, FUR OUT EXISTING 6 1/2 " THICK BLOCK
WALL WITH NEW 3
" STUDS AND MOLD RESISTANT
DRYWALL FOR NEW RECEPTACLES AND SWITCHES.
3. DEMOLISH EXISTING ACT CEILING, SEE SHEET A-005.
4. SALVAGE EXISTING LAVATORY SINK AND MILLWORK AS
REQUIRED BY SBYVAMC COR. ROUTE/PROVIDE NEW
PLUMBING FOR NEW STAINLESS STEEL HANDS FREE
SURGICAL SINK IN ANTEROOM, SEE SHEET P-101.
5. EXISTING PLUMBING TO REMAIN.
6. BUILD, BLOCK OUT, THERMALLY INSULATE EXISTING
EXTERIOR WINDOW, SEE SHEET A-006.
7. PATCH DRYWALL IN THIS LOCATION AND PROVIDE
CONTINUOUS VERTICAL FACE OF WALL.
8. EXISTING DRYWALL TO REMAIN.
9. APPLY HIGH BUILD SPECIALTY COATINGS AT ALL
INTERIOR VERTICAL WALL SURFACES, SEE SHEET
A-002.
10. EXISTING DUMBWAITER TO REMAIN ABANDONED AS IS
UNO BY SBYVAMC COR.
11. NEW FINISHES AS SHOWN ON A-002.
12. OUTLINE OF NEW CLEAN ROOM WALLS ARE 50 MM
THICK OR 1.9685 INCHES, DOUBLE SIDED WHERE
SHOWN, AND ASSEMBLED ON SITE.
13. TEMPORARY BARRIER TO BE CONSTRUCTED OUTSIDE
THE SPACE TO PROTECT DURING CONSTRUCTION.
14. QAS OR EQUAL REMOVEABLE ACCESS PANEL FOR
INSTALLATION OF BIOMED EQUIPMENT.
15. THIS SPACE IS TO BE NOT USED.
EQ9
EQ11
A-006
T Y
P
T Y
P
+/-2"
TYP
+/-2"
A-006
NON-HAZARDOUS (STERILE)
COMPOUNDING ROOM
(ISO 7 - 35 ACR) - 141 SF
PHARMACY STAGING
AREA - 188 SF
LINE OF EXISTING
SPRINKLER MAIN
SHOWN AT 6'-8"
OFF WALL.
DEMO JUNCTION
BOX AND CONDUIT,
PER ES004
HAZARDOUS STORAGE
(12 ACR) - 45 sf
ANTE ROOM (ISO 7 - 35
ACR) - 94 SF
A-004
A-004
EQ10
D I R
T Y
C L
E A
N
G L A
S S
G L A
S S
G L A
S S
EQ10
EQ10
DEMOUNT
PANEL
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
A-001
EXISTING AND PROPOSED
ARCHITECTURAL PLANS
SCALE: 1/8" = 1'-0"
PROPOSED FLOOR PLAN
SCALE: 1/8" = 1'-0"
EXISTING DEMOLITION PLAN
CR
RP
CR
Lic. No. 14913 Registered Architect
NO
R T H C A R OL I NA
R ICHARD KENNETH PERKIN
S
9 May 2021
DOOR & HARDWARE
SCHEDULE
TYPE
SINGLE - LEFT HINGE
STAINLESS STEEL PANEL
AND HINGES PER SPECS
SYMBOL
U1
HARDWARE:
SH3
DIMENSIONS:
3'-8" WIDE X 7'-0" TALL
NOTES:
RATED 3/4 HOUR, CARD
READER-CONTROLLED-
ELECTRIC-STRIKE
DOORS PART OF THE
CLEANROOM BOX ARE BY
QAS OR EQUAL.
F2W3
APPLY TO
FACES OF
ALL
EXISTING
VERTICAL
WALL
SURFACES
APPLY TO BOTH FACES OF
NEW THERMAL BLOCK OUT
B1
F2
F1B
F1A
INTERIOR FINISH NOTES:
INTERIORS SEQUENCE OF CONSTRUCTION:
1.1. GC TO DEMOLISH INTERIOR WALLS WITH
1.2.
1.3.
1.4.
1.5.
1.6.
1.7.
SELECTIVE MEP DEMOLITION PER 2/A-001 AND
MEP DEMOLITION SHEETS.
GC TO VERIFY CONCRETE SUBFLOOR IS LEVEL
AND READY TO ACCEPT FLOORING AND
MOISTURE REMEDIATION / PRIMING AS AND IF
NEEDED PER SPECIFICATIONS AND FINISH
SCHEDULE ABOVE.
GC TO BUILD OUT THERMAL BLOCK OUT AT
EXTERIOR WALL WINDOW.
GC TO APPLY SPECIALTY COATINGS TO ALL
EXISTING WALLS AND SURFACES WITHIN
PROJECT LIMITS AS SHOWN AT LEFT.
QAS OR EQUAL TO INSTALL CLEAN ROOM
SYSTEM AND BIO EQUIPMENT PER OUTLINE
SHOWN.
GC TO PROVIDE AND INSTALL SUSPENDED
HYGENIC CLEAN ROOM ACOUSTICAL CEILING IN
PHARMACY STAGING AREA OUTSIDE THE CLEAN
PER SPECIFICATIONS PER RCP ON SHEET A-005.
FLOORING SHALL BE INSTALLED LAST BY QAS OR
EQUAL, BOTH INSIDE AND OUTSIDE THE CLEAN
ROOM AS SHOWN AT LEFT, HYGENIC HEAT WELD
VINYL SHEET FLOORING WITH INTEGRAL COVE
BASE AS SPECIFIED AND PER INSTALLER.
INTERIOR FINISHES SCHEDULE
TYPE SYMBOL DESCRIPTION MANUFACTURER PRODUCT INSTALLATION NOTES
FLOOR F1A PRIMER AND MOISTURE TREATMENT ARDEX OR EQ ARDEX-MC RAPID, P 51, P82 INSTALL AS NEEDED PER SPEC
FLOOR F1B SELF-LEVELING UNDERLAYMENT ARDEX OR EQ ARDEX-K15 INSTALL AS NEEDED PER SPEC
FLOOR F2 HOT WELD VINYL SHEET FLOORING FORBO COLOREX QAS INSTALL AS SHOWN A-002.
BASE B1 4" RESILIENT / RUBBER INTEGRAL COVE FORBO INTEGRAL COVE QAS INSTALL PER MANUF INSTRUCT
WALL W1 HB SPECIALTY WALL COATING SYSTEM PER SBYVAMC TBD INSTALL AS SHOWN A-002.
WALL W2 HB SPECIALTY WALL PANELS (TBD) LSP BIO/CR 4 GRIDLOCK INSTALL PER MANUF INSTALL INSTRUC.
WALL W3 QAS WALL SYSTEM QAS NA PER QAS INSTALL.
CEILING C1 QAS CEILING SYSTEM QAS NA QAS TO INSTALL AS SHOWN ON 1/A-005.
CEILING C2 CLEAN ROOM VL UNPERFORATED ARMSTRONG CR-VL-868 CLASS 5 INSTALL AS SHOWN ON 1/A-005.
CLEAN ROOM
WALLS
U1
W1
W1
W1
W3
C1
C1
C2
B1
F2W3
C1
F2W3
C1 B1
B1
B1
EXISTING TO
REMAIN
ARCHITECTURAL LEGEND
DEMO
NEW
N
BUILDING 5 - KEY PLAN
TO SITE
STAGING AND
PARKING
LOTS
A-004
A-004
**ENTIRE FLOOR WITHIN
PROJECT LIMITS IF REQUIRED BY
QAS OR EQUAL TOLERANCES
PHARM STAGING
AREA OUTSIDE
CLEANROOM
APPLY TO FACES OF ALL
EXISTING VERTICAL
WALL SURFACES,
INCLUDING NEW
THERMAL BLOCK OUT
W1
W2
B1
W3
B1 F2
W3
B1
F2
QAS OR EQUAL
REMOVEABLE
ACCESS
PANEL FOR
BIOMED
EQUIPMENT.
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
A-002
INTERIOR FINISHES PLAN
CR
RP
CR
Lic. No. 14913 Registered Architect
NO
R T H C A R OL I NA
R ICHARD KENNETH PERKIN
S
OR EQUAL
EXISTING TO
REMAIN
ARCHITECTURAL LEGEND
DEMO
NEW
N
BUILDING 5 - KEY PLAN
TO SITE
STAGING AND
PARKING
LOTS
EXISTING ROOF PLAN KEY NOTES:
1. OUTLINE CLEAN ROOM FOOTPRINT BELOW.
2. EXISTING ROOF TOP HVAC UNIT TO REMAIN.
3. OUTLINE SERVICE ELEVATOR FROM BELOW.
4. OUTLINE TYPICAL COLUMN BELOW.
5. EXISTING 2" VENT.
6. EXISTING 3" VENT.
7. EXISTING 4" VENT.
8. EXISTING EXHAUST FANS.
9. EXISTING CAPPED ROOF CURBS.
10. EXISTING 4" ROOF DRAIN.
11. OUTLINE EXISTING DUMBWAITER BELOW.
12. ROOF PARAPET AT LOWER ROOF.
13. LADDER AT ROOF PARAPET AT UPPER ROOF.
14. SOUTHEAST CORNER OF BUILDING ROOF SHOWN FOR
REFERENCE.
EXISTING ROOF GENERAL NOTES:
1. EXISTING ROOFTOP EQUIPMENT IS TO REMAIN U.N.O.
2. REFER TO MECHANICAL DEMOLITION SHEETS FOR ANY
HVAC DEMOLITION AT THE ROOF LEVEL.
3. THE EXISTING KEE MEMBRANE ROOF IS UNDER SEAMAN
CORPORATION COMMERCIAL ROOFING WARRANTY
EFFECTIVE 07/22/2020 UNTIL 07/22/2040 & WARRANTY
SERIAL NO. 20201091, SEE SPECIFICATIONS.
4. EXISTING ROOF CONTRACTOR IS: J-ELBERT ROOFING:
621 6TH AVENUE SUITE 5046, NORTH MYRTLE BEACH, SC
29597 - PHONE # (843) 605-1809, SEE SPECIFICATIONS.
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
A-003
EXISTING ROOF PLAN
SCALE: 1/8" = 1'-0"
EXISTING ROOF PLAN
CR
RP
CR
Lic. No. 14913 Registered Architect
NO
R T H C A R OL I NA
R ICHARD KENNETH PERKIN
1 2
V
I F
E
X I S
T I N
G
C
L G
1 2
A
F
V
I F
C ABD 98
C ABD 98
AA
AA
BB
SECTION KEY PLAN:
N
BB
A
F
F
A
F
F
P
R
Q
A S
O R
E Q
U
AL
1 2
A
I F
ARCHITECTURAL SECTION NOTES:
1. GC TO VERIFY EXISTING STRUCTURAL DIMENSIONS IN
FIELD AND COORDINATE WITH MEP WORK AS DESIGNED
AND SHOWN AND PER SPECIFICATIONS.
EXISTING AHU ABOVE PROJECT
LIMITS TO REMAIN - SEE
MECHANICAL DRAWINGS FOR NEW
ROOFTOP EQUIPMENT.
SELECTED EXISTING HVAC
DUCTWORK FOR DEMOLITION
PER MECHANICAL DRAWINGS
NEW DUCTWORK PER
MECHANICAL DRAWINGS
ANTE
ROOM
HAZARDOUS
COMPOUNDING
HAZARDOUS
STORAGE
NON
HAZARDOUS
COMPOUNDING
HEIGHT OF EXISTING SPRINKLER
MAIN AT 9'-3" AFF.
EXISTING CEILING 8'-11.5" AFF.
A
F
F
A
F
F
P
R
Q
A S
O R
E Q
U
AL
1 2
A
I F
HEIGHT OF EXISTING
SPRINKLER MAIN &
BRANCHES @ 9'-3" AFF
A L I G
N
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
A-004
EXISTING AND PROPOSED SECTIONS
SCALE: 1/8" = 1'-0"
EXISTING SECTION - DEMO (CUT LINE AA)
SCALE: 1/8" = 1'-0"
EXISTING SECTION - DEMO (CUT LINE BB)
SCALE: 1/8" = 1'-0"
PROPOSED SECTION - (CUT LINE AA)
SCALE: 1/8" = 1'-0"
PROPOSED SECTION - (CUT LINE BB)
CR
RP
CR
Lic. No. 14913 Registered Architect
NO
R T H C A R OL I NA
R ICHARD KENNETH PERKIN
C101
EXISTING TO
REMAIN
ARCHITECTURAL LEGEND
DEMO
NEW
N
BUILDING 5 - KEY PLAN
TO SITE
STAGING AND
PARKING
LOTS
ARCHITECTURAL RCP NOTES:
1. SUSPENDED CEILING AND LIGHTING AND FAN FILTER
UNITS INSIDE OF THE CLEAN ROOM TO BE PROVIDED
AND INSTALLED BY QAS OR EQUAL PER ELECTRICAL
SERIES DRAWINGS.
2. 9'-0" CEILINGS AFF REQUIRED IN ALL ROOMS.
3. CENTER ACOUSTICAL CEILING TILES OUTSIDE THE
CLEAN ROOM ON PHARMACY STAGING AREA CORRIDOR
AS SHOWN.
4. COORDINATE CEILING AREAS INSIDE THE CLEAN ROOM
WITH ELECTRICAL SERIES DRAWINGS.
C1 9'-0"
PLEASE REFER TO ELECTRICAL
CEILING PLAN FOR DETAILED
CEILING LAYOUT, SHEET E-102
9'-0"C1
C1 9'-0"
C1 9-0"
9'-0"C2
CENTER CEILING TILES ON THE
CORRIDOR BETWEEN THE
EXISTING WALL AND THE CLEAN
ROOM WALL.
INTERIOR FINISHES SCHEDULE
TYPE SYMBOL DESCRIPTION MANUFACTURER PRODUCT INSTALLATION NOTES
FLOOR F1A PRIMER AND MOISTURE TREATMENT ARDEX OR EQ ARDEX-MC RAPID, P 51, P82 INSTALL AS NEEDED PER SPEC
FLOOR F1B SELF-LEVELING UNDERLAYMENT ARDEX OR EQ ARDEX-K15 INSTALL AS NEEDED PER SPEC
FLOOR F2 HOT WELD VINYL SHEET FLOORING FORBO COLOREX QAS INSTALL AS SHOWN A-002.
BASE B1 4" RESILIENT / RUBBER INTEGRAL COVE FORBO INTEGRAL COVE QAS INSTALL PER MANUF INSTRUCT
WALL W1 HB SPECIALTY WALL COATING SYSTEM PER SBYVAMC TBD INSTALL AS SHOWN A-002.
WALL W2 HB SPECIALTY WALL PANELS (TBD) LSP BIO/CR 4 GRIDLOCK INSTALL PER MANUF INSTALL INSTRUC.
WALL W3 QAS WALL SYSTEM QAS NA PER QAS INSTALL.
CEILING C1 QAS CEILING SYSTEM QAS NA QAS TO INSTALL AS SHOWN ON 1/A-005.
CEILING C2 CLEAN ROOM VL UNPERFORATED ARMSTRONG CR-VL-868 CLASS 5 INSTALL AS SHOWN ON 1/A-005.
OPEN
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
A-005
EXISTING AND PROPOSED REFLECTED
CEILING PLANS
SCALE: 1/8" = 1'-0"
PROPOSED REFLECTED CEILING PLAN
SCALE: 1/8" = 1'-0"
EXISTING REFLECTED CEILING PLAN - DEMO
CR
RP
CR
Lic. No. 14913 Registered Architect
NO
R T H C A R OL I NA
R ICHARD KENNETH PERKIN
S
OR EQUAL
+/-3
"+/-2"
M
I N
I M
U M
T
O
U
N D
E R
S I D
E
C
E I L
I N
G
T
Y P
1 2
V
I F
BENCHTOP
BIOFUME HOOD
2'-1"
TYP
C.L.
EXISTING EXTERIOR WALL
APPLY NEW THERMAL WINDOW FILM TO
INSIDE OF GLAZING PER SPECS, CLOSE
INTERNAL BLINDS IN WINDOWS
INSET 3 5/8" NON-STRUCTURAL METAL STUDS (20 GA)
AT 16" O.C. AS REQUIRED WITH RIGID INSULATION TO
MAINTAIN MIN. R13 WITH 5/8" MOLD-RESISTANT
GYPSUM WALL BOARD OR GLAS MAT PANELS SEALED
TOP, BOTTOM, AND SIDE PER SPECS, AT BOTH SIDES
EXISTING ENTRY DOOR TO MEDICAL CENTER
HALLWAY TO BE REPLACED WITH NEW STAINLESS
STEEL DOOR WITH ELECTRONIC STRIKE AND PIV
CARD READER
EXISTING 1 HOUR BLOCK WALL WITH GYP BD
BOTH SIDES AT MEDICAL CENTER HALLWAY,
REMOVE DRYWALL ON INTERIOR
FUR OUT EXISTING WALL WITH 3 5/8"
NON-STRUCTURAL METAL STUDS (20 GA) AT 16" O.C.
AS REQUIRED WITH MIN 5/8" MOLD RESISTANT
GYPSUM WALL BOARD. WALL TO HOUSE NEW
RECEPTACLE AND SWITCH JUNCTION BOXES PER
ELECTRICAL DRAWINGS
HIGH BUILD SPECIALTY WALL COATING
SYSTEM APPLIED TO ALL GYPSUM
BOARD VERTICAL SURFACES WITHIN
PROJECT LIMITS PER SPECS.
SEAL ALL SEAMS, TYP.
ALIGN
RAISED HEIGHT OF NEW SPRINKLER
MAIN TO ACCOMODATE NEW HEADS
ON SHEET F-001.
VA SPRINKLER FACILITY
CONTRACTOR TO COORDINATE THE
INSTALLATION OF FLUSH MOUNT POP
UP TYPE SPRINKLER HEADS PER PLAN
LAYOUT ON SHEET F-001.
HAZARDOUS COMPOUNDING ROOM
OF PREFAB QAS OR EQUAL PHARMACY
CLEANROOM (CLGS @ 9'-0" AFF, TYP).
SELF-SUPPORTING ALUMINUM CORE WALL
OF QAS OR EQUAL CLEAN ROOM.
SOLAR BLOCKOUT TINT OR FILM
APPLIED TO THE INTERIOR OF THE
WINDOW PER SPECS.
HIGH BUILD SPECIALTY WALL COATING
SYSTEM APPLIED TO ALL GYPSUM
BOARD VERTICAL SURFACES WITH
PROJECT LIMITS PER SPECS.
INSET 3 5/8" NON-STRUCTURAL METAL
STUDS (20 GA) AT 16" O.C. WITH RIGID
WOOL INSULATION TO MAINTAIN MIN. R13
5/8" MOLD-RESISTANT GYPSUM WALL
BOARD OR GLAS MAT PANEL WITH SEALANT
AT TOP, BOTTOM, & SIDES PER THE SPECS.
ALIGN FACE OF GYP BD WITH FACE OF THE
ADJACENT WALL, TYP.
HIGH BUILD SPECIALTY WALL COATING
SYSTEM APPLIED TO ALL GYPSUM
BOARD VERTICAL SURFACES WITH
PROJECT LIMITS PER SPECS.
VINYL HOT WELDED SHEET FLOORING
WITH 4" INTEGRAL COVE BASE
THROUGHOUT BY QAS OR EQUAL. INSTALL
PER SPECS.
NOTE: REFER TO QAS OR EQUAL SHOP
DRAWINGS FOR CLEANROOM SYSTEM
DETAILS AND FINAL DIMENSIONS.
A L I G
N A
L I G
N
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
A-006
ARCHITECTURAL DETAILS
SCALE: 3/4" = 1'-0"
SECTION AT THERMAL BLOCKOUT
CR
RP
CR
SCALE: 3/4" = 1'-0"
PLAN DETAIL AT THERMAL BLOCKOUT
SCALE: 3/4" = 1'-0"
PLAN DETAIL AT FUR OUT ENTRY WALL
Lic. No. 14913 Registered Architect
NO
R T H C A R OL I NA
R ICHARD KENNETH PERKIN
S
FIRE PROTECTION NOTES:
1. VERIFY WITH THE COR THAT SPRINKLER SYSTEM TO REMAIN ACTIVE
DURING CONSTRUCTION.
2. GENERAL CONTRACTOR SHALL VERIFY EXISTING SPRINKLER SYSTEM
IN CEILING ABOVE IN FIELD AND ALTER FIRE PROTECTION SYSTEM
PER NFPA 13. ADJUST TO PROVIDE WITH MINIMUM ONE IN EACH
ROOM O.C. IN ACOUSTICAL TILE. PER NFPA 13, MIN SPACING IS 6' AND
MAX SPACING IS 12'.
3. GENERAL CONTRACTOR MUST PROVIDE SUBMITTAL OF
CONSTRUCTION AND INSTALL PROCESS TO VERIFY IN FIELD AND CUT
NEW OPENINGS IN PREFABRICATED CEILINGS TO PERMIT SPRINKLER
HEADS AS REQUIRED PRIOR TO INSTALLATION.
4. ALL NEW HEADS TO BE FLUSH MOUNT, POP-UP TYPE HEADS AT NEW
CLEAN ROOM CEILINGS BOTH INSIDE AND OUTSIDE THE CLEAN ROOM
PROPER.
EXISTING TO
REMAIN
DEMO
NEW
N
C101
PROPOSED LOCATIONS OF POP/UP TYPE SPRINKLER
HEADS PER NFPA13 - SPRINKLER CONTRACTOR TO
VERIFY AND COORIDANTE WITH ALL TRADES.
OS
LED
PA
LED
LED
LEDLED OS
VERIFY IN FIELD LINE OF EXISTING SPRINKLER MAIN - GC
TO MOVE AND/OR RAISE EXISTING FIRE SPRINKLER MAIN
TO ACCOMODATE NEW FAN FILTER UNITS AND LED
FIXTURES - REFER TO ELECTRICAL DRAWINGS TO
COORDINATE WITH LOCATION OF NEW FFUS AND LED
FIXTURES.
FFU
FFU FFU
FFU
FFUFFU
FFU FFU
FFU
FFU
FFUFFU
FFU
FFU
LED
LED
LED
LED
LED
LED
LEDLED
LED
LED LED
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
F-001
SCALE: 1/4" = 1'-0"
FIRE SPRINKLER HEAD PLAN
FIRE PROTECTION PLAN
CR
RP
CR
Lic. No. 14913 Registered Architect
NO
R T H C A R OL I NA
R ICHARD KENNETH PERKIN
S
| Sheets and Views |
| RVA1033-003 full drawing set-18X24 VA SIGNED COVER |
| RVA1033-003 full drawing set-18X24 G-001 |
| RVA1033-003 full drawing set-18X24 A-001 |
| RVA1033-003 full drawing set-18X24 A-002 |
| RVA1033-003 full drawing set-18X24 A-003 |
| RVA1033-003 full drawing set-18X24 A-004 |
| RVA1033-003 full drawing set-18X24 A-005 |
| RVA1033-003 full drawing set-18X24 A-006 |
| RVA1033-003 full drawing set-18X24 F-001 |