This solicitation is for the construction and preparation of a modular ISO class 7 cleanroom at the W.G. Hefner VA Medical Center in Salisbury, North Carolina. The project involves installing a pre-manufactured cleanroom system to create separate compounding areas meeting USP chapters 797 and 800 standards for nonhazardous and hazardous compounded sterile products. The estimated value is between $500,000 and $1 million. The NAICS code is 236220. The opportunity is set aside for SDVOSBs. The pre-bid site visit will take place on February 9, 2022 and questions are due by February 18th. Bids must be submitted by March 4th and the virtual bid opening is scheduled for March 10th. The work will be performed at the 1601 Brenner Avenue location.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL MECHANICAL NOTES
1. MECHANICAL WORK SHALL BE IN ACCORDANCE WITH THE 2018 IBC
AND IMC
2. INSTALLATION OF HVAC WORK SHALL BE COORDINATED WITH OTHER
TRADES. EQUIPMENT, PIPING OR DUCTWORK INTERFERING WITH
OTHER TRADES SHALL BE RELOCATED AS REQUIRED AT NO
ADDITIONAL COST TO THE GOVERNMENT.
3. WRITTEN DIMENSIONS ON DRAWINGS SHALL HAVE PRECEDENCE
OVER SCALED DIMENSIONS.
4. AT START OF CONSTRUCTION, THE HVAC CONTRACTOR AND EACH
OF HIS SUBCONTRACTORS SHALL PREPARE TYPED LISTS OF
EQUIPMENT THAT THEY ARE SUPPLYING REQUIRING ELECTRICAL
WORK, AND SEND LISTS TO THE ELECTRICAL CONTRACTOR FOR HIS
REVIEW AND COORDINATION.
5. COORDINATE MECHANICAL AND ELECTRICAL SUCH THAT
MECHANICAL PIPING AND EQUIPMENT IS NOT LOCATED OVER ANY
ELECTRICAL EQUIPMENT.
6. EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH
MANUFACTURER'S APPROVED PUBLISHED LITERATURE.
7. INSTALLATION OF EQUIPMENT SHALL PERMIT ACCESSIBILITY FOR
SERVICE AND/OR REPLACEMENT.
8. THE HVAC CONTRACTOR SHALL COORDINATE ALL WORK AND
SYSTEM OUTAGES WITH THE OWNER.
9. THE HVAC CONTRACTOR SHALL CAULK WITH SILICONE All GAPS
BETWEEN NON-RATED WALL, CEILING AND FLOOR OPENINGS AND
HVAC EQUIPMENT PENETRATIONS.
10. SUPPLEMENTAL STEEL MEMBERS REQUIRED TO SUPPORT HVAC
EQUIPMENT FROM MAIN STRUCTURE SHALL BE PROVIDED BY THE
HVAC CONTRACTOR UNLESS NOTED OTHERWISE.
11. EQUIPMENT REMOVED FROM THE BUILDING SHALL BE PROPERLY
DISPOSED BY THE CONTRACTOR.
12. EXACT LOCATIONS OF THERMOSTATS SHALL BE COORDINATED WITH
EXISTING LOCATIONS OF WALL-MOUNTED THERMOSTAT.
13. CONTRACTOR SHALL COMPLY WITH SMACNA IAQ GUIDELINES FOR
OCCUPIED BUILDINGS UNDER CONSTRUCTION.
14. NOT ALL ABBREVIATIONS AND SYMBOLS SHOWN WILL BE USED FOR
THIS PROJECT.
MECHANICAL ABBREVIATIONS
AFF ABOVE FINISHED FLOOR
AD AUTOMATIC DAMPER
AHU AIR HANDLING UNIT
AMCA AMERICAN MOVEMENT AND
CONTROL ASSOCIATION
ARCH ARCHITECT, ARCHITECTURAL
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATING AND AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
BAS BUILDING AUTOMATION SYSTEM
BD BACKDRAFT DAMPER
BLDG BUILDING
BTU BRITISH THERMAL UNIT
CFM CUBIC FEET PER MINUTE
CTRL CONTROLLER, CONTROLS
DB, Tdb DRY BULB (TEMPERATURE)
DBL DOUBLE
DEFL DEFLECTION
DIA., Ø DIAMETER
DIM DIMENSION
DN DOWN
DPS DIFFERENTIAL PRESSURE SWITCH
DWG DRAWING
EA, EAD EXHAUST AIR, EA DUCT
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EFF EFFICIENCY
EMCS ENERGY MANAGEMENT CONTROL SYSTEM
EQT EQUIPMENT
ESP EXTERNAL STATIC PRESSURE
DEG. DEGREES
°F FAHRENHEIT
FEF FUME EXHAUST FAN
FT.W.G. FEET WATER GAUGE
FLA FULL LOAD AMPS
GA GAGE
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
HVAC HEATING, VENTILATING AND AIR CONDITIONING
HZ HERTZ
IAQ INDOOR AIR QUALITY
IBC INTERNATIONALS BUILDING CODE
IMC INTERNATIONAL MECHANICAL CODE
IN.W.G. INCHES WATER GAUGE
IPC INTERNATIONAL PLUMBING CODE
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LEED LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN
LOG LOOK OUT GALLERY
LEV LAB EXHAUST VALVE
LSV LAB SUPPLY VALVE
MOD MOTOR OPERATED DAMPER
MBH 1,000s OF BTUs (ALSO, kBTU)
MCA MINIMUM CIRCUIT AMPACITY
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT PROTECTION
MUA MAKE-UP AIR
NEC NATIONAL ELECTRICAL CODE
NO. NUMBER
NTS NOT TO SCALE
OA, OAD OUTSIDE AIR, OA DUCT
OBD OPPOSED BLADE DAMPER
PH PHASE
RH RELATIVE HUMIDITY
RL, RS REFRIGERANT LIQUID, REFRIGERANT SUCTION
RPM REVOLUTIONS PER MINUTE
RTU ROOFTOP UNIT
SA, SAD SUPPLY AIR, SA DUCT
SEER SEASONAL ENERGY EFFICIENCY RATIO
SGL SINGLE
SKD SMOKE DETECTOR
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS'
NATIONAL ASSOCIATION
SP STATIC PRESSURE
TOA TEMPERED OA (ENERGY RECOVERY SUPPLY AIR)
TU TERMINAL UNIT
TYP TYPICAL
UFC UNIFORM FACILITIES CRITERIA
USGBC U.S. GREEN BUILDING COUNCIL
V VOLTAGE
VOC VOLATILE ORGANIC COMPOUND
VD VOLUME DAMPER (MANUAL)
W WATT
W/ WITH
W/O WITHOUT
WB WET BULB
WG WATER GAUGE
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
SHEET NAMING CONVENTION
EXISTING EQUIPMENT
NEW OR RELOCATED EQUIPMENT
DASHED INDICATES EQUIPMENT TO BE DEMOLISHED
DEMOLITION NOTES
M-001
MECHANICAL GENERAL NOTES,
LEGENDS, ABBREVIATIONS AND DESIGN
CRITERIA
1. ALL EXISTING EQUIPMENT IS SHOWN IN HALFTONE
LINEWORK. ALL DEMOLISHED EQUIPMENT IS SHOWN IN BOLD
LINEWORK, DASHED. ALL NEW OR RELOCATED EQUIPMENT IS
SHOWN IN BOLD LINEWORK. BELOW IS AN EXAMPLE OF
EACH:
CAH
CAH
VN
M-001A
2 DIGIT DISCIPLINE
DESIGNATOR
G GENERAL
A ARCHITECTURAL
S STRUCTURAL
FA FIRE ALARM
E ELECTRICAL
ED ELECTRICAL DEMOLITION
M MECHANICAL
MD MECHANICAL DEMOLITION
MH MECHANICAL HVAC
P PLUMBING
1 DIGIT SHEET TYPE
DESIGNATOR
0 - GENERAL
1 - PLANS
2 - ELEVATIONS
3 - SECTIONS
4 - ENLARGED PLANS
5 - DETAILS
6 - SCHEDULES AND DIAGRAMS
7 - VARIES
8 - VARIES
9 - 3D VIEWS (ISO, PERSPECTIVES)
2 DIGIT SEQUENTIAL # (01-99)
1 DIGIT AREA
DESIGNATOR
(AREA DESIGNATOR
ONLY USED WHEN
PLANS ARE SUBDIVIDED
INTO AREAS.)
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
DUCT SIZE TRANSITION
FLOW ARROW
RETURN OR EXHAUST AIR DUCT UP / DOWN
SUPPLY OR OUTSIDE AIR DUCT UP / DOWN
RETURN OR EXHAUST AIR DEVICE
90 DEGREE DUCT ELBOW WITH TURNING VANES
16"Ø
16x12
THERMOSTAT (DIGITAL, PROGRAMMABLE)
T
RECTANGULAR DUCT
(SIZE SHOWN IS CLEAR INSIDE DIMENSION, INDICATED IN INCHES, FIRST
NUMBER IS SIDE SHOWN)
ROUND DUCT
(SIZE SHOWN IS CLEAR INSIDE DIAMETER, INDICATED IN INCHES)
SUPPLY AIR DIFFUSER, RECTANGULAR, ROUND
(ARROWS INDICATE FLOW DIRECTION; IF NO ARROWS, DIFFUSER HAS
UNRESTRICTED FLOW IN ALL DIRECTIONS)
RADIUS DUCT ELBOW - ROUND OR RECTANGULAR
(1.5 RADIUS MINIMUM BEND UNLESS OTHERWISE NOTED)
RECTANGULAR DUCT BRANCH TAKE-OFF W/ 45 DEGREE BRANCH INLET
SQUARE TO ROUND DUCT BRANCH TAKE-OFF W/ 45 DEGREE BRANCH
INLET
ON/OFF WALL SWITCH
PIPE DOWN / UP
NON-FREEZE WALL HYDRANT
MVD - MANUAL VOLUME DAMPER
PRESSURE REDUCING VALVE
DUCTWORK LEGEND
DAMPERS
PIPING LEGEND
MISCELLANEOUS LEGEND
MECHANICAL PIPING SYMBOLS:
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHR
CH
LOW PRESSURE CONDENSATE RETURN
LCR
HOT WATER RETURN
HWR
HOT WATER SUPPLY
HW
M-002
MECHANICAL LEGENDS AND SYMBOLS
DUCT SMOKE DETECTOR
SD
STEAM SUPPLY
D
TEMPERATURE TRANSMITTER
TT
PRESSURE DIFFERENTIAL TRANSMITTER
PDT
STATIC PRESSURE SENSOR
SPS
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
MT MOISTURE (HUMIDITY) TRANSMITTER
PT PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
CT CONDUCTIVITY TRANSMITTER
SPS STATIC PRESSURE SENSOR
SD SMOKE DETECTOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
KR LOCAL RECORDING TIME CLOCK (RUNTIME)
TSL TEMPERATURE SWITCH, LOW (FREEZESTAT)
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
ZC VALVE OR DAMPER POSITION CONTROLLER
LC LEVEL CONTROLLER
LT LEVEL TRANSMITTER
PDS PRESSURE DIFFERENTIAL SWITCH
TSH TEMPERATURE SWITCH, HIGH (FREEZESTAT)
EPT ELECTRONIC TO PNEUMATIC TRANSDUCER
AT CARBON DIOXIDE TRANSMITTER
CARBON MONOXIDE TRANSMITTER
CO2
AT
CO
OCCUPANCY SENSORAT
OC
LTCP LOCAL TEMPERATURE CONTROL PANEL
HVAC HVAC CONTROL PANEL
ECC
INTEGRATE CONTROL POINT ON REMOTE GRAPHICS
WORKSTATION AT ENERGY CONTROL CENTER
TC TEMPERATURE CONTROLLER
VSMC VARIABLE SPEED MOTOR CONTROLLER
PC PRESSURE CONTROLLER
SC SPEED CONTROLLER
FC FLOW CONTROLLER
PSH PRESSURE SWITCH HIGH
FSH FLOW SWITCH HIGH
PSL PRESSURE SWITCH LOW
KC TIME CLOCK CONTROLLING EQUIPMENT ON A SCHEDULE
FSL FLOW SWITCH LOW
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
CONTROLS LEGEND
CAH
CAH
VN
9 8
TU-46-1 (E)
TU-46-8 (E)
TU-46-9 (E)
TU-46-10 (E)
x ø
9"ø
16"x14" x x
59"x14"
26"x20"12"x12" x x ø x
10"ø
16"x14"
12"x18"ø x x
6"ø
10"ø ø ø
14"ø
20"x18" 10"x12"
10"x12"
16"x15" x x
EXISTING MEDICAL
MEDIA
D.1
B.8
A
1. MECHANICAL DEMO AND COORDINATION BY GENERAL CONTRACTOR.
GENERAL NOTES
KEYED NOTES
SCALE: 3/16" = 1'-0"
FIRST FLOOR DUCTWORK PLAN - DEMO
1. REMOVE DUCTWORK AND AIR DEVICES AS SHOWN IN DASHED. CAP, SEAL
AND INSULATE. COORDINATE WITH NEW WORK ON SHEET MH101.
2. REMOVE EXISTING TERMINAL UNIT, THERMOSTAT, CONTROL WIRING
AND ASSOCIATED DUCTWORK.
3. DUCTWORK UP TO EXISTING AHU-46 ON ROOF.
4. MAIN SUPPLY AND RETURN DUCTS TO AHU-46 ARE AT 10'-7" AFF.
RELOCATE OR REMOVE ALL OTHER DUCTS TO ABOVE 10'-7" TO ALLOW
FOR THE INSTALLATION OF THE CLEAN ROOM ENCLOSURE. COORDINATE
ENCLOSURE AREA WITH NEW WORK ON MH101.
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
MD101
FIRST FLOOR DUCTWORK PLAN - DEMO
PROJECT
NORTH
DUCTWORK LEGEND
DUCTWORK TO BE DEMOLISHED
EXISITING DUCTWORK
CAH
CAH
VN
CHR
CH
D
CH
CHR
D
CHR
CH
D
CHR
CH
D
CHR
CH
D
D
2"
1"
1"
1"
1"
D/P
CH
CHR
TU-46-1 (E)
TU-46-9 (E)
TU-46-10 (E)
EXISTING MEDICAL MEDIA
CH CH CH CH CH CH CH
CHR CHR CHR
C H
R
C H
HW
HWR
HW
HWR
HW
HWR
HW
HWR
H W
R
H
3/4"
3/4"
3/4"
3/4"
3/4"
D
L C
R
2"
1 1/2" STEAM AND
CONDENSATE TO
AHU-47
1 1/2" HOT WATER
SUPPLY AND
RETURN UP FROM
FLOOR BELOW
2 1/2" CHILLED
WATER UP TO
AHU-47
TU-46-8 (E)
1. MECHANICAL DEMO AND COORDINATION BY GENERAL CONTRACTOR.
GENERAL NOTES
KEYED NOTES
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
MD102
FIRST FLOOR PIPING PLAN - DEMO
1. REMOVE HOT WATER PIPING FROM TERMINAL UNIT TO ISOLATION
VALVES FOR UNIT.
2. AREA OF PROJECT
3. REMOVE 1 1/4" CH AND CHR PIPE BACK TO 1 1/2" PIPE. SEE MH102 FOR
NEW WORK.
4. REMOVE ELBOW IN EXISTING 1 1/2" HWS AND HWR PIPE. FIELD VERIFY
EXACT SIZE. SEE MH102 FOR NEW WORK.
SCALE: 1/16" = 1'-0"
FIRST FLOOR PIPING PLAN - DEMO
PROJECT
NORTH
CAH
CAH
EXHAUST
FAN (E)
EXHAUST
FAN (E)
EXHAUST FAN (E)
EXISTING
CAPPED
ROOF
CURB
4" VENT (E)
2" VENT (E)
3" VENT (E)
ROOF VENT FOR
DUMBWAITER (E)
2" VENT (E)
(1
" V.), 2"
VENT
THRU
ROOF (E)
3" VENT (E)
3" VENT (E)
OFF-SET IN ROOF
SPACE (E)
4" ROOF
DRAIN (E)
EXISTING
AHU TO
REMAIN
AHU-46 (E)
FIRST FLOOR
ROOF
GROUND FLOOR
ROOF
1. MECHANICAL DEMO AND COORDINATION BY GENERAL CONTRACTOR.
GENERAL NOTES
KEYED NOTES
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
MD103
ROOF DUCTWORK PLAN - DEMO
SCALE: 3/16" = 1'-0"
ROOF DUCTWORK PLAN - DEMO
PROJECT
NORTH
CAH
CAH
9 8
8"ø
10"ø
12"ø ø
CD-1
8"ø
200 CFM
CD-2
6x6
50 CFM
TU-46-10
x
700 CFM
LSV-49-4
LSV-49-3
LSV-49-2
LSV-49-1
12"ø
SD
x x x x x
8"ø x x
12"ø
10"ø ø
LEV-49-1
LEV-49-2
LEV-49-3
LEV-49-4
LEV-49-7
LEV-49-5
LEV-49-6
12"ø
12"ø
8"ø
4"ø
6"ø
5"ø
8"ø
EG-1
12X8
350 CFM
8"ø
10"ø
D.1
B.8
A
1. REFER TO M-601 EXHAUST AND SUPPLY AIR VALVE SCHEDULE FOR
AIRFLOWS IN EACH ROOM.
2. ALL CONNECTIONS TO THE CLEAN ROOM PLENUM ARE TO BE
COORDINATED WITH THE CLEAN ROOM MANUFACTURER.
3. CONTRACTOR SHALL ADJUST AND COORDINATE THE NEW DUCT WITH
EXISTING CONDITIONS. DO NOT BLOCK SERVICE ACCESS TO EXISTING
EQUIPMENT
GENERAL NOTES
KEYED NOTES
SCALE: 3/16" = 1'-0"
FIRST FLOOR DUCTWORK PLAN - NEW
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
MH101
FIRST FLOOR DUCTWORK PLAN - NEW
24X12 UP TO BMEF-1.
REFER MH103 FOR
CONTINUATION
24X12 UP TO AHU-49 ON
ROOF. REFER MH103 FOR
CONTINUATION
PROJECT
NORTH
1. ROUTE SUPPLY DUCT TO SIDE OF PLENUM AND CONNECT TO PLENUM.
2. ROUTE 12" DIA DUCT FROM CONNECTION ON TOP OF THE HOOD
THROUGH PLENUM.
3. EXHAUST DUCT CONNECTIONS AT THE SIDE OF PLENUM.
4. TRANSITION AS NEEDED FROM NEW DUCT TO EXISTING RETURN AIR
DEVICE. BALANCE THE RETURN AIR DEVICE TO AIR FLOW AS SHOWN.
5. TRANSITION AS NEEDED TO THE TERMINAL UNIT.
6. EXISTING DUCTWORK UP TO EXISTING AHU-46.
7. DIFFERENTIAL PRESSURE SENSOR TO CONTROL LEV-49-6 AND MAINTAIN
THE STAGING AREA SLIGHTLY LESS PRESSURE THAN THE CORRIDOR.
8. INSTALL SMOKE DETECTOR IN SUPPLY DUCTWORK.
9. DISCHARGE AIR DEVICE ABOVE CLEAN ROOM PLENUM.
10. DUCTWORK ABOVE THE PLENUM TO BE CONNECTED TO TOP OF STORAGE
ROOM AREA PLENUM.
11. TEST SWITCH FOR SMOKE DETECTOR. SEE SPECIFICATION DIVISION 28.
DUCTWORK LEGEND
NEW DUCTWORK
EXISITING DUCTWORK
PHARMACY
STAGING
AREA
PHARS
NON-HAZARDOUS
COMPOUNDING AREA
PHSC1
ANTE ROOM
PHAR1
HAZARDOUS
COMPOUNDING
ROOM
PHHD1
HAZARDOUS
STORAGE
PHHD2
3TYP. 3
CAH
CAH
CHR
CH
D
CH
CHR
D
CHR
CH
D
CHR
CH
D
CHR
CH
D
D
2"
1"
1"
1"
1"
D/P
CH
CHR
TU-46-1 (E)
TU-46-9 (E)
TU-46-10 (E)
EXISTING MEDICAL MEDIA
CH CH CH CH CH CH CH
CHR CHR CHR CHR
C H
R
C H
HW
HWR
HW
HWR
HW
HWR
HW
HWR
H
3/4"
3/4"
3/4"
D
L C
R
2"
LSV-49-4
LSV-49-3
LSV-49-2
LSV-49-1
CH
CHR
HW
HWR
HW
HWR
HW
HWR
3/4"
3/4"
3/4"
1"
1"
ROUTE 1 1/2" CH/CHR
AND 1 1/4" STEAM, 1"
CONDENSATE UP TO
PIPE CHASE AT
AHU-49
1 1/2"
LCR
D
LCR
D
3/4"
1 1/4" STEAM
PIPE ANCHOR
PIPE ANCHOR
PIPE GUIDE. REFER 2/M-504
PIPE GUIDE.
REFER 2/M-504
PIPE GUIDE.
REFER 2/M-504
1" CONDENSATE
1. MECHANICAL DEMO AND COORDINATION BY GENERAL CONTRACTOR.
GENERAL NOTES
KEYED NOTES
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
MH102
FIRST FLOOR PIPING PLAN - NEW WORK
1. INSTALL TEE SAME SIZE AS THE MAIN PIPE. CONNECT BRANCH 1" LINES
AND EXTEND 1" LINES WITH ISOLATION VALVES.
2. INSTALL 1 1/2" TEE IN CH AND CHR LINES. EXTEND 1 1/2" LINES TO
AHU-49.
3. EXTEND 3/4" HWS AND HWR FROM EXISTING TU-46-10 CONNECTIONS TO
NEW LOCATION FOR NEW TU-46-10.
4. PRESSURE REDUCING VALVE STATION. SEE DETAIL 1/M-503.
5. EXTEND 1 1/4" STEAM AND 1" CONDENSATE RETURN PIPING TO FLOOR
BELOW AND CONNECT TO EXISTING 3" STEAM AND 2" CONDENSATE
RETURN PIPING.
6. PROVIDE CONDENSATE DRIP LEG. SEE DETAIL 3/M-501.
7. OFFSET CHILLED WATER SUPPLY AND RETURN, STEAM SUPPLY AND
CONDENSATE RETURN AS NEEDED TO ENTER PIPE CHASE AT AIR
HANDLER.
SCALE: 1/16" = 1'-0"
FIRST FLOOR PIPING PLAN - NEW WORK
PROJECT
NORTH
CAH
CAH
EXHAUST
FAN (E)
EXHAUST
FAN (E)
EXHAUST FAN (E)
EXISTING
CAPPED
ROOF
CURB
4" VENT (E)
2" VENT (E)
3" VENT (E)
ROOF VENT FOR
DUMBWAITER (E)
2" VENT (E)
(1
" V.), 2"
VENT
THRU
ROOF (E)
3" VENT (E)
3" VENT (E)
OFF-SET IN ROOF
SPACE (E)
4" ROOF
DRAIN (E)
SPACE
EXISTING
AHU TO
REMAIN
AHU-49
BMEF-1
PIPE
CHASE
AHU-46 (E)
FIRST FLOOR
ROOF
GROUND FLOOR
ROOF
24X12" TO FIRST FLOOR
19"
24X12" TO FIRST FLOOR
COIL PULL AND
SERVICE
CLEARANCE
GENERAL NOTES
KEYED NOTES
SCALE: 3/16" = 1'-0"
ROOF DUCTWORK PLAN - NEW
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
MH103
HVAC ROOF PLAN - NEW
PROJECT
NORTH
1. COORDINATE ROOF PENETRATION WITH STRUCTURAL DRAWINGS S-101
AND FLASHING DETAIL WITH SPECIFICATIONS.
2. PROVIDE ROOF RAIL. COORDINATE WITH STRUCTURAL FOR GUY WIRE
STRUCTURAL POINTS. DUCTWORK TO BE INSULATED UP TO STORM
COLLAR.
3. ROUTE CONDENSATE TO NEAREST DRAIN LOCATION.
4. TRANSITION AS NEEDED FROM AIR HANDLER SUPPLY OPENING TO
24"X12" DUCT INSIDE THE CURB.
CAH
CAH
FFU
FFU FFU
FFU
FFUFFU
FFU
FFU
FFU
FFU
FFU
FFU
FFU
6"ø
4"ø
5"ø
6"ø
6"ø
8"ø
6"ø
6"ø
6"ø 8"ø 10"ø
FFU
10"ø
10"ø
10"ø
6"ø
6"ø
PROJECT
NORTH
GENERAL NOTES
KEYED NOTES
HVAC RCP PLAN - NEW
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
MH111
HVAC RCP PLAN - NEW
1. FAN FILTER UNITS INSIDE THE BOX TO BE PROVIDED BY CLEAN ROOM
MANUFACTURER.
2. ALL DUCTWORK SHOWN IN THE PLENUM SPACE TO BE PROVIDED AND
INSTALLED BY THE CLEAN ROOM MANUFACTURER.
RCP PLAN LEGEND
DUCTWORK AND FITTINGS PROVIDED BY
CLEANROOM MANUFACTURER
FFU
FAN FILTER UNIT, PROVIDED BY CLEANROOM
MANUFACTURER
PROJECT
NORTH
SCALE: 3/16" = 1'-0"
THERMOSTAT, AIR BALANCE AND PRESSURE RELATIONSHIP
SCALE: 3/16" = 1'-0"
PHARMACY
STAGING
AREA
PHARS
NON-HAZARDOUS
COMPOUNDING AREA
PHSC1
ANTE ROOM
PHAR1
HAZARDOUS
COMPOUNDING
ROOM
PHHD1
HAZARDOUS
STORAGE
PHHD2
PHARMACY
STAGING
AREA
PHARS
NON-HAZARDOUS
COMPOUNDING AREA
PHSC1
ANTE ROOM
PHAR1
HAZARDOUS
COMPOUNDING
ROOM
PHHD1
HAZARDOUS
STORAGE
PHHD2
100 CFM
75 CFM
100 CFM
75 CFM
75 CFM
T T
T
T
T
LSV-49-1
LSV-49-2
LSV-49-3 LSV-49-4
TU-46-10
CAH
CAH
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED CONNECTION
ON FAN SIDE
WASHER
1-1/2" [40mm] MIN. TO 3" [75mm] MAX.
INSTALLED. 6" [150mm] NOMINAL WITH
MATERIAL TAUT
FLEXIBLE
MATERIAL AS
SPECIFIED
1"x1/8" [25x3mm] DRAW BAND
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
5/16" [8mm] FLANGE
DUCT
SHEET METAL SCREWS ON
12" [300mm] CENTERS
RIVET ON 4"
[100mm] CENTERS
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
1" [25mm] FLANGE & HEMALTERNATE
POSITION
OF BOLT
1 1/2" [40mm]
POCKET SLIP
DUCT
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1/2"
[15mm]
1/2"
[15mm]
1 1/2"
[40mm]
1 1/2" [40mm] MIN. TO 3" [75mm] MAX.
INSTALLED. 6" [150mm] NOMINAL WITH
MATERIAL TAUT
FLANGED
CONNECTION ON
FAN SIDE
WASHER
FLEXIBLE MATERIAL
AS SPECIFIED
NOTE:
1.
2.
3.
4.
5.
RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A
MINIMUM OF 3 TIMES THE DIAMETER OF INLET
A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS
BOX, BUT ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM LENGTH
3'-0" [900mm].
A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE
BOX INLET, PROVIDED THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS
SHOWN, DOES NOT EXCEED 10 FEET (3 METERS). FOR LONGER LENGTHS,
INCREASE THE DUCT SIZE AND PROVIDE A DUCT TRANSITION TO MAINTAIN THE
DUCT STATIC PRESSURE DROP AT OR BELOW 0.2"/100' [1.64Pa/m].
FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY
AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0" [1500mm]. USE RIGID ELBOWS
FOR CHANGE OF DIRECTION GREATER THAN 45°.
COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE
INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.
USE OF THE FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR THE
DEDICATED AHU SERVING THE SURGICAL SUITE.
AIR TERMINAL UNIT
(CV OR VAV)
REHEAT COIL
SOUND ATTENUATOR
SEE EQUIPMENT
SCHEDULE
FLEXIBLE AIR DUCT
CONNECTOR. SEE DETAIL
DIFFUSER (TYP.)
SEE SPECIFICATIONS FOR
CLAMPS AND SEALANT (TYP.)
SEE NOTE 5
SE
E N
OT
E 4
SEE NOTE 3
SEE NOTE 2
SEE NOTE 1
C
O
N
D
E
N
S
A
T
E
TO DRAIN
MV
MANUAL
AIR
VENT
TO BUILDING
LOAD
INVERTED BUCKET
TRAP ASSEMBLY
WELDED
TEE
S
T
E
A
M
P
I
P
E
300mm[12"]
150mm[6"]
SCHEDULE 80 STEEL PIPE
25mm [1"] GATE VALVE
WELDED TEE
MAIN EXHAUST OR RETURN
PLAN VIEW
AIR
FLOW
AIR
FLOW
W
PROVIDE VOLUME DAMPER
AT EACH BRANCH DUCT
1/4W OR 4" [100mm]
MIN.
BRANCH DUCT
VD
ROOF
EXHAUST
FAN
TRANSITION (AS
REQUIRED)
DRIP LIP
GUY WIRE (4 REQUIRED)
1" [25mm] GALVANIZED
STEEL STRAP SECURED TO
EXHAUST STACK
WELDED STAINLESS STEEL
EXHAUST STACK
WELDED
JOINT
SECURE GUY
WIRE TO ROOF
(TYP.)
DRAIN,
1/2" [15mm]
WELDED
COUPLING
'-0
" M
IN.
m m
AS
RE
QU
IRE
D
F.C.
SECURE
STACK TO
ROOF
(TYP.)
SIZE TO MAINTAIN 3500 FPM [17.8
M/S] OUTLET VELOCITY
BLANK PLATE
M
I N
NOTES:
1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON
VIBRATION ISOLATOR UNITS, THE RUNOUT PIPING FOR
CONNECTIONS TO COIL SHALL BE INSTALLED WITH
SWING JOINTS TO ALLOW FOR THE VIBRATION.
2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT
WILL NOT BLOCK THE SWING OR USE OF ACCESS DOORS
OR PANELS; NEITHER SHALL IT BLOCK THE SERVICING
OF FILTERS, VALVES, OR EQUIPMENT.
3. TRAP EACH COIL SEPARATELY WHEN INSTALLED IN A
BANK OF TWO OR MORE HIGH. ALSO PROVIDE SEPARATE
VACUUM BREAKER FOR EACH COIL.
4. TWO TRAP ASSEMBLIES IN PARALLEL ARE SHOWN. TWO
TRAPS REQUIRED WHEN CONDENSATE LOAD IS 2400
KG/HR [5,000 LBS/HR] OR GREATER.
5. SUPPLY & RETURN PIPES ARE SHOWN FROM SAME END.
REHEAT COIL MAY HAVE SUPPLY & RETURN PIPES FROM
OPPOSITE ENDS.
PIPE HANGER
SHALL SUPPORT
PIPING
INDEPENDENT
OF COIL (TYP.)
PITCH COIL DOWN
8mm [1/4"] PER FOOT
TO CONDENSATE
OUTLET
FULL SIZE
TAPPING
PRESSURE
GAGE
SCALE POCKET
SEE
NOTE
NO. 4
STEAM CONDENSATE
RETURN
m
C
H
E
C
K
V
A
L
V
E
C
U
U
M
B
R
E
A
K
E
R
INCREASER,
IF
REQUIRED
REDUCER,
IF
REQUIRED
m m
M
I N m m
M
I N
STEAM SUPPLY
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
M-501
MECHANICAL DETAILS
SCALE: NTS
FLEXIBLE DUCT CONNECTIONS
SCALE: NTS
DUCT CONNECTIONS - AIR TERMINAL UNITS
SCALE: NTS
END OF STEAM LINE DRIP TRAP
EXHAUST OR RETURN BRANCH DUCTWORK
SCALE: NTS
EXHAUST STACK DETAIL
SCALE: NTS
STEAM COIL - PIPING CONNECTIONS
CAH
CAH
EXHAUST AIR
OUTSIDE
AIR
D-1
C O
L
E
H E
A T
C O
C
O O
L I N
G
MPS
V-2
V-1
CHR
CHS
EXHAUST FAN
SUPPLY FAN
AFMD
SUPPLY AIR
TO OTHER
TERMINAL
UNITS
TT TT TT
MT
FT
P R
E
F
I L
T E
R
TT MT
HS
IT
VSMC
HSVSMC
5 3 6
SD
STEAM
CURRENT
TRANSMITTER
FOR FAN
STATUS ,TYP.
PRESSURE SWITCH HIGH
(POSITIVE) TO DISABLE FAN
WHEN HIGH PRESSURE
LIMIT SETPOINT IS REACHED
PSH
SMOKE
DETECTOR
VARIABLE SPEED
MOTOR CONTROLLER,
TYP.
ZC
ZC
PDS
TT
SST
IT
SST
SPS
EXHAUST
AIR
ECC
TYP.
ROOMS
EXAMPLES
TYP. 2 POSITION
TERMINAL UNIT
W/ REHEAT COIL
SERVING CLEAN
ROOMS
ECC
NO
AFMD
FT
NON
HAZ
COMPD
ANTE
ROOM
STORAGE
LEV
PLENUM
HOUSED OR
LEV LEV
LSV LSV LSV
ALARM
PROCESSING
D
U
T
Y
C
L
E
F
U
N
C
T
I
O
N
S
C
H
E
D
U
S
A
R
T
S
T
O
P
SUPPLY FAN VSMC ALARM
STATIC PRESSURE HIGH LIMIT
S
T
A
T
U
S
SYSTEM
A
L
A
R
M
P
R
I
O
R
I
T
Y
A
D
D
A
L
T
E
R
N
A
N
E
L
E
C
T
R
D
V
I
C
E
S
P
E
M
M
A
N
D
P
O
I
Discharge Static Pressure
Discharge Air Humidity
Discharge Air Temperature
Pre-Heat Temperature
Cooiling Coil Temperature
SYSTEM COMPONENT:
O
P
E
N
C
L
O
S
E
S
T
A
R
T
S
T
O
P
V
A
L
S
I
T
I
O
N
D
A
M
P
S
I
T
I
O
N
JOB: 1033.003
AHU-49
VAMC BLD 5 SALISBURY, NC
SYSTEM:
BUILDING:
LEGEND
POINT
BINARY
T
E
M
P
E
R
A
T
U
I
L o c a l a r n e l
M a s t e a n e l
A r e a n e l
H
I
G
S
A
T
E
S
S
U
R
E
H
I
U
M
I
D
I
T
Y
P
R
E
S
S
U
R
E
L
M
P
E
R
A
T
U
R
E
P
E
R
C
E
N
T
P
R
E
S
S
U
R
E
P
O
S
I
T
I
O
N
F
L
O
W
H
I
M
I
T
L
M
I
T
SYSTEM INPUTS
ANA-
BINARY ANALOG
S
P
A
M
N
T
R
O
L
S
T
A
T
E
S
S
U
S
E
T
D
E
M
A
M
I
T
I
N
G
T
E
M
P
E
R
A
T
U
S
E
T
T
E
M
P
E
R
A
T
U
E
R
R
I
D
E
E
N
T
H
A
L
O
N
O
M
I
Z
E
R
T
E
M
P
E
R
A
T
U
O
N
O
M
I
Z
E
R
F
A
I
L
U
D
E
P
R
E
S
S
U
R
E
V
O
L
U
N
T
R
O
L
REMARKS
F
U
M
M
U
N
I
C
A
T
I
O
N
SYSTEM SOFTWARE/CONTROL
APPLICATION/FUNCTION
PAGE:
SUPPLY FAN STATUS
COILING VALVE V-1
PRE-HEAT VALVE V-2
EXHAUST AIR DAMPER
SUPPLY FAN VSMC
OUTSIDE AIR DAMPER
S
T
A
T
E
S
S
U
R
E
C
A
R
B
N
O
X
I
D
E
H
U
M
I
D
I
T
Y
V
A
C
U
U
M
SUPPLY FAN START/STOP
AI-6
AI-7
AI-8
AI-9
T
R
E
N
D
I
N
G
OUTSIDE AIR TEMPERATURE
AI-11
BI-3
BI-5
BI-7
AO-2
AO-3
AO-5
AO-8
AO-9
BO-2
FULL COMMUNICATION
A
B
B
R
E
V
I
A
T
I
O
N
CCT
DAT
DASP
DAH
OAT
SF-STS
SPS-2
SF-ALA
SF-SPD
OAD
EAD
PHT-V1
CLG-V1
SF-SST
OUTPUTS
LOG
SEQUENCE OF OPERATION FOR AIR VOLUME AIR HANDLING UNIT
1. GENERAL
1.1 UNIT IS NORMALLY STARTED AND STOPPED REMOTELY AT THE ECC. H-O-A SWITCH SHALL BE KEPT
IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR MAINTENANCE.
WHEN THE UNIT IS "OFF" D-1 SHALL BE FULLY CLOSED. WHEN THE UNIT IS "ON" D-1 SHALL BE FULLY
OPEN.
2. TEMPERATURE CONTROL
2.1
2.2
2.3
3. AIR FLOW CONTROL
3.1
3.2
4. FREEZE PROTECTION
4.1
5. AUTOMATIC SHUTDOWN/RESTART
5.1
6. EMERGENCY CONSTANT SPEED OPERATION
6.1
SUPPLY AIR TEMPERATURE, SENSED BY TT-1, SHALL BE MAINTAINED AT SETPOINT VIA DIGITAL
CONTROL PANEL BY MODULATING V-1 AND V-2 IN SEQUENCE.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT-5, IS ABOVE 55°F (ADJ) [12.8°C], THE
DIGITAL CONTROL PANEL SHALL MODULATE V-1 TO MAINTAIN THE SUPPLY AIR TEMPERATURE,
SENSED BY TT-1.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR, SENSED BY TT, IS BELOW THE SUPPLY AIR
TEMPERATURE, SENSED BY TT-1, V-2 SHALL MODULATE OPEN TO MAINTAIN THE SUPPLY AIR
TEMPERATURE, SENSED BY TT-1.
THE SUPPLY AIR FLOW SHALL BE CONTROLLED BY THE DIGITAL CONTROL PANEL MODULATING THE
SUPPLY FAN VARIABLE SPEED MOTOR CONTROLLER TO MAINTAIN 1.0" [25mm] OF DUCT STATIC
PRESSURE (FIELD ADJUSTABLE), SENSED BY SPS-1. RESET STATIC PRESSURE BASED ON ACTUAL
BUILDING LOAD BY POLLING ALL LSV.
USING HIGH PRESSURE SENSOR PSH-1 LOCATED AT THE SUPPLY FAN DISCHARGE, SHALL PREVENT
THE SUPPLY FAN FROM DEVELOPING OVER 3" [75mm] OF STATIC PRESSURE (FIELD ADJUSTABLE). IF
STATIC PRESSURE AT PSH-1 DOES EXCEED 3" [75mm] THE SUPPLY AIR FAN SHALL STOP. PSH-1
SHALL BE HARDWIRED TO THE SUPPLY FAN VSMC AND UNIT SHALL BE SHUTDOWN IN HAND,AUTO OR
BYPASS MODE. PSH-1 WILL REQUIRE MANUAL RESET AT THE DEVICE.
UPON FAILURE OF THE VSMC, THE SUPPLY AND EXHAUST FANS SHALL BE STARTED/STOPPED
MANUALLY AT THE DIGITAL CONTROL PANEL OR THE ECC THROUGH THE BY-PASS STARTER. FANS
SHALL THEN BE OPERATED AT CONSTANT SPEED.
IF THE AIR TEMPERATURE AS SENSED BY TT-3 FALLS BELOW 45°F [7°C], AN ALARM SIGNAL SHALL
INDICATE AT THE DCP AND ECC. IF THIS TEMPERATURE FALLS BELOW 40°F [4.4°C], AS SENSED BY
THE TSL THE SUPPLY AND EXHAUST FANS SHALL SHUT DOWN AND A CRITICAL ALARM SHALL
INDICATE AT THE DIGITAL CONTROL PANEL AND ECC. TSL SHALL BE HARDWIRED TO THE SUPPLY
FAN UFD AND UNIT SHALL BE SHUTDOWN IN HAND,AUTO OR BYPASS MODE. TSL WILL REQUIRE
MANUAL RESET AT THE DEVICE.
WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR, SD, THE SUPPLY AND EXHAUST FANS
SHALL SHUT "OFF" AND AN ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM. ALL
SMOKE DAMPERS IN THE SUPPLY AND RETURN DUCTS SHALL CLOSE.
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
M-502
MECHANICAL CONTROLS AND DETAILS
SCALE: NTS
AIR HANDLING UNIT CONTROL DIAGRAM
SCALE: NTS
AIR HANDLING UNIT POINTS LIST
CAH
CAH
VENT TO ATMOSPHERE
NOTES:
1. SEE FLOOR PLANS FOR PIPE SIZES.
2. SEE EQUIPMENT SCHEDULES FOR VALVE DATA AND PIPE SIZES D1 AND D2. INSTALL VALVES AS RECOMMENDED
BY MANUFACTURER.
3. MAKE BYPASS VALVE DISCHARGE PIPE THE SAME SIZE AS D2 FOR THE LARGEST PRV.
4. PROVIDE NECESSARY UNIONS FOR THE REMOVAL OF VALVE WITH SCREWED CONNECTIONS.
5. SLOPE PILOT CONTROL LINE FROM PRESSURE REDUCING VALVE TO DOWN STREAM STEAM PIPING. MIMIMUM
SLOPE SHALL BE 25'/100', 25mm/300mm [1"/12"]
SIPHON
(TYP.)
PILOT CONTROL LINE
REDUCER
(TYP.)
IF REQUIRED
NOTE 1
D1
N.C.
D2
D2
4XD2 MIN.
20XD2 MIN.10XD1 MIN.
NOTE 1
NOTE 3
INVERTER BUCKET
TRAP ASSEMBLY
TYP.
PSV
RIGID DUCT TO AIR TERMINAL
UNIT.
ROUND SHEET METAL DUCT.
MAIN SUPPLY
"D"
45°MAX.
PLAN VIEW
NOTE:
1. ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 300mm [12"] MINIMUM HIGH DRIP LEG
FROM BOTTOM OF
STEAM MAIN TO TRAP INLET. DRIP LEG SHALL HAVE 150mm [6"] SCALE POCKET BELOW TRAP INLET.
TO RETURN MAIN
PIPE SIZE SHALL BE SAME SIZE AS
TRAP
THERMOSTATIC TRAP. SEE
OTHER STEAM DETAILS,
PLANS, AND SCHEDULES
DIELECTRIC FITTING
WHERE RETURN IS
COPPER PIPE
F
L
O
W
SCHEDULE 80
STEEL PIPE
m m m m
DRIP LEG OR EQUIPMENT
CONNECTION. MAKE THE SAME SIZE
AS THE SUPPLY MAIN OR
EQUIPMENT CONNECTION. SEE
NOTE 1
M
I N
M
I N
SCHEDULE 80 STEEL PIPE
SEE DRAWINGS FOR PIPE SIZES
25mm [1"]
GATE VALVE
USE 4-BOLT RAISED FACE FLANGES
SINGLE COIL
WATER COIL
AIR VENT
WHEN COIL
IS NOT
SELF-VENTING
DRAIN WHEN COIL IS
NOT SELF-DRAINING
TEST PLUG
(TYP.)
PIPE HANGER SHALL
SUPPORT
PIPING INDEPENDENT OF
COIL
REDUCER, IF REQUIRED
DRAIN
WATER COIL
AIR VENT
WHEN COIL IS
NOT
SELF-VENTING
TEST PLUG
(TYP.)
PIPE HANGER SHALL SUPPORT
PIPING INDEPENDENT OF COIL
WATER COIL
REDUCER, IF REQUIRED
FLOW ELEMENT
DRAIN WHEN COIL
IS NOT
SELF-DRAINING
DRAIN
DOUBLE COIL
NOTES:
1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE FIRST 2 HANGERS FOR
EACH PIPE SHALL BE SPRING & NEOPRENE TYPE. TYPE "H" FOR 100mm [4"]Ø PIPE & SMALLER. TYPE "H-P"
FOR 125mm [5"]Ø PIPE & LARGER.
2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR USE OF
ACCESS DOORS OR PANELS; NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS, VALES, OR
EQUIPMENT.
3. THE FLOW ELEMENT MAY BE INSTALLED IN THE SUPPLY PIPING IF THE REQUIRED MINIMUM UPSTREAM
AND DOWNSTREAM DIMENSIONS CANNOT BE OBTAINED IN THE RETURN PIPING.
FE
MV
MV
MV
MV
MV
MV
FE
TI
TI
TEMPERATURE
INDICATION TO
ECC SEE
CONTROL
DIAGRAM
MV
CALIBRATED
BALANCING VALVE
(TYP.)
ROOM THERMOSTAT/SENSOR
WALL MOUNTED
48" [1200mm] AFF.
WITH SUPPLEMENTAL HEATING
A
F
O
W
C
F M
ROOM TEMPERATURE (°F)
CV
CFM
TU
RHC
HWS
HWR
V-1
REHEAT
COIL
AIR
TERMINAL
UNIT
AIR
FLOW
TE
ATU
CONTROLLER
PC
TE
CV BOX CONTROL SEQUENCE
NO DEADBAND
SP
FE
R
E
H
E
F
O
W
A. UPON FALL IN SPACE TEMPERATURE
BELOW SET POINT VALVE V-1 WILL
MODULATE TO MAINTAIN SET POINT +
.5°, THE ADJUSTABLE TOLERANCE OF +
.5° HAS BEEN SELECTED TO PREVENT
VALVE HUNTING
B. THE REVERSE SHALL OCCUR ON RISE
IN SPACE TEMPERATURE.
SEAL FLASHING TO
DUCT W/
WATER-RESISTANT
SEALANT
COUNTER FLASHING
TUCK MEMBRANE UNDER
TOP CAP
MEMBRANE OVER
EXISTING
OVERLAP & GLUE NEW
FLASHING
MEMBRΛNE
EXISTING
CURB TOP CAP
DUCT PENETRATIONS
& SIZES.
SEE PLANS FOR
FLASHING TO DUCT, WATERTIGHT.
CONTINUOUSLY CAULK & SECURE
CURB
(TYPICAL)
CONCRETE ROOF
DECK
PACK SPACE WITH
CERAMIC FIBER MATERIAL
AND SEAL BOTH SIDES.
SEE SPECS. FOR
MATERIALS.
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
M-503
MECHANICAL DETAILS
SCALE: NTS
STEAM PRESSURE REDUCING STATION DOUBLE VALVE
SCALE: NTS
SUPPLY DUCT TAKEOFF - AIR TERMINAL UNIT
SCALE: NTS
THERMOSTATIC STEAM TRAP ASSEMBLY
WATER COILS - PIPING CONNECTIONS
SCALE: NTS
CONSTANT VOLUME AIR TERMINAL UNIT CONTROL DIAGRAM
SCALE: NTS
SCALE: NTS
DUCT PENETRATION THRU ROOF
CAH
CAH
C
D+[1"]
D+25mm
INSULATE AS INDICATED FOR ALL
CHILLED WATER. INSULATE PIPE ONLY
FOR STEAM, CONDENSATE
& HEATING WATER.
D+[2
D+[4
D+121mm
D+64mm
D+[1
D+38mm
D+[3
D+95mm
8mm
ANCHOR BOLTS
N=NUMBER
S=SIZE
DRILL Ø = S+2mm
DRILL Ø = S+[
STL PIPE OR
COPPER TUBE
D=PIPE O.D.
NOTE A
PIPE ANCHOR SCHEDULE
D P C N S BOLT PATTERN
mm in mm in mm in mm in mm in
102 4
3/4" DIA. BOLT
MC 6 X 15.1
PIPE
15" MIN.
35" MAX.
INSULATION SADDLE
ROLLER TYPE SUPPORT
DISTRIBUTION PIPE
RETURN
DISTRIBUTION
PIPE
TOP ROLLER
SUPPORTS AT
RISERS
CHANNEL
NUT & JAM NUT
SIDE VIEW
FRONT VIEW
3/4" DIA. BOLTS
1/4
1/2" PLATES
6" DIA. PIPE COLUMN
CONCRETE FILLED
10"
MAX
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
M-504
MECHANICAL DETAILS
SCALE: NTS
STEAM PIPE ANCHOR DETAIL
SCALE: NTS
PIPE GUIDE DETAIL
CAH
CAH
DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.
Phone: (804) 726-9540 https//raymond.global
1601 Summit Avenue
Richmond, VA 23230
DATE DESCRIPTION
PROJECT NO.: RVA1033.003
OWNER:
WG HEFNER VAMC
BUILDING 5
PHARMACY CLEAN ROOM
1601 BRENNER AVE
SALISBURY, NC, 28144
SENSITIVE UNCLASSIFIED
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUES / REVISIONS
09/15/20 15% SD SUBMISSION
10/29/20 35% SD SUBMISSION
DATE VA COR SIGN OFF
09/15/20 ANDRE L. NOBS
SUB
15% SD
11/18/20 ANDRE L. NOBS35% SD
12/19/20 65% DD SUBMISSION
02/25/21 95% DD SUBMISSION
2/2/21 ERIC STEWART65% DD
3/12/21 ERIC STEWART95% DD
03/26/21 100% DD SUBMISSION
05/09/21 FINAL BID DOCUMENTS
4/16/21 ANDRE HAYLES100% DD
09/29/21 DILANDRO COMMENTS
M-601
MECHANICAL SCHEDULES
SUPPLY AIR VALVE SCHEDULE
TAG LOCATION SERVICE
INLET DIA.
SIZE (in.)
AIRFLO
W (CFM)
HOT WATER
BASIS OF
DESIGN
NOTE
S
FLOW
(GPM)
EAT LAT
MIN.
HEATING
CAP. (BTUH)
LSV-49-1 LEVEL 1 NON HAZ. COMPOUNDING 12 675 1.6
75 16040.0 PHOENIX
LSV-49-2 LEVEL 1 ANTE ROOM 10 550 1.3
75 13070.0 PHOENIX
LSV-49-3 LEVEL 1 HAZ. COMPOUNDING 12 1025 2.3
75 22575.0 PHOENIX
LSV-49-4 LEVEL 1 STORAGE ROOM 8 150 0.4
75 3565.0 PHOENIX
AIR HANDLING UNIT SCHEDULE
TAG LOCATION SERVICE
SUPPLY FAN HEATING STEAM COOLING COIL
OPERATIN
G WEIGHT
(LBS)
BASIS OF DESIGN NOTES
FAN MOTOR AIRSIDE AIRSIDE WATER SIDE
TYPE
OPER.
DESIGN
AIRFLO
W
(CFM)
OA
AIRFLO
W
(CFM)
STATIC
PRESS.
RPM HP
HEATIN
G
CAPAC
ITY
(MBH)
EAT DB
(°F)
LAT DB
(°F)
STAGE
S
VOLT/P
H/HZ
MAX.
FAC
E
VEL.
(FPM
EAT LAT
MAX.
S.P.
LOS
S
(in.w g)
SENSIBL
E
CAPACIT
Y
(MBTUH)
TOTAL
CAP.
(MBTU
H)
ENTERI
NG
TEMP
(F)
LEAVIN
G TEMP
(F)
GPM
ESP (in.wg)
DB
(°F)
WB
(°F)
DB
(°F)
WB
(°F)
AHU-
49 ROOF LEVEL 1
CENTRIF
UGAL
2,400 2,400
1.00
1,800
3 163 40.0 102.0 1.0 208/3/60 314 92.0 73.0 49.0 48.0 0.5 116.0 188 42 57 24
1,333
TRANE
UCCAJ08A1F0EGN
1,2,3,4
NOTES:
1. REFER TO SPECIFICATIONS FOR FILTER TYPES.
2. TOTAL UNIT STATIC PRESSURE INCLUDES ESP, DIRTY COILS & DIRTY FILTERS.
3. UNIT TO BE INSTALLED ON ROOF CURB.
4. PROVIDE CONDENSATE DRAIN TRAP
FAN SCHEDULE
TAG LOCATION SERVICE
FAN
V/C/P BASIS OF DESIGN
WEIGHT (LBS)
NOTES
TYPE
OPER.
DESIGN
AIRFLOW
(CFM)
TOTAL
S.P. (in wg)
RPM FAN TYPE
OPER.
BHP
HP
BMEF-1 ROOF LEVEL 1 CENTRIFUGAL
2,775
2,162
HIGH PLUME CONICAL
NOZZLE
2.30 3 208/60/3 GREENHECK FJC-315 265 1
NOTES:
1. PROVIDE VFD WITH PRESSURE SWITCH IN THE FAN.
EXHAUST AIR VALVE SCHEDULE
TAG LOCATION SERVICE
INLET DIA.
SIZE (in.)
AIRFLOW
(CFM)
BASIS OF
DESIGN
NOTES
LEV-49-1 LEVEL 1 NON HAZ. COMPOUNDING 10 600 PHOENIX
LEV-49-2 LEVEL 1 ANTE ROOM 10 450 PHOENIX
LEV-49-3 LEVEL 1 HAZ. COMP. HOOD 12 1050 PHOENIX
LEV-49-4 LEVEL 1 STORAGE ROOM 8 200 PHOENIX
LEV-49-5 LEVEL 1 PASS THROUGH 8 25 PHOENIX
LEV-49-6 LEVEL 1 STAGING 8 350 PHOENIX
LEV-49-7 LEVEL 1 HAZ. COMP. LOW EXHAUST 8 100 PHOENIX
EXISTING TERMINAL UNIT SCHEDULE
TAG LOCATION SERVICE
INLET DIA.
SIZE
AIRFLOW RANGE HOT WATER HEATING COIL
BASIS OF
DESIGN
NOTES
MAX.
COOLING
MAX.
HEATING
EAT LAT
FLOW
(GPM)
MAX.
PRESS.
DROP
TU-46-10 LEVEL1 STAGING 8 250 250 55 90.00 0.80 1.5 EXISTING
NOTES:
1. PROVIDE DUCT TRANSITION AS NEEDED TO RELOCATED TERMINAL UNIT.
GRILLE AND DIFFUSER SCHEDULE
TAG SERVICE MOUNTING
MODULE SIZE (in. x in.)
MATERIAL DESCRIPTION BASIS OF DESIGN NOTES
CD-1 SUPPLY CEILING 24X24 AL
RADIAL HORIZONTAL SQUARE PLAQUE DIFFUSER
TITUS OMNI
1,2,3,4
CD-2 SUPPLY CEILING REFER PLANS AL SIDEWALL GRILLE TITUS 350
1,2,3,4
EG-1 EXHAUST CEILING REFER PLANS AL LOUVERED EXHAUST GRILLE TITUS 510
1,2,3,4
NOTES:
1. REFER TO DRAWINGS FOR NECK SIZES.
2. REFER TO ARCHITECTURAL RCP DRAWINGS FOR COORDINATION WITH CEILING.
3. COORDINATE FINISH WITH ARCHITECT.
4. COORDINATE MOUNTING HEIGHT WITH ARCHITECTURAL ELEVATIONS.
CAH
CAH
| Sheets and Views |
| RVA1033-003 Mech Drawings - M-001 |
| RVA1033-003 Mech Drawings - M-002 |
| RVA1033-003 Mech Drawings - MD101 |
| RVA1033-003 Mech Drawings - MD102 |
| RVA1033-003 Mech Drawings - MD103 |
| RVA1033-003 Mech Drawings - MH101 |
| RVA1033-003 Mech Drawings - MH102 |
| RVA1033-003 Mech Drawings - MH103 |
| RVA1033-003 Mech Drawings - MH111 |
| RVA1033-003 Mech Drawings - M-501 |
| RVA1033-003 Mech Drawings - M-502 |
| RVA1033-003 Mech Drawings - M-503 |
| RVA1033-003 Mech Drawings - M-504 |
| RVA1033-003 Mech Drawings - M-601 |